IMPLEMENT HYDRAULIC SYSTEM

The implement hydraulic systems for the D6T contain the following major components:

• a load sensing, pressure compensated, variable displacement piston type hydraulic pump
• pilot operated implement control valves and differential steering control
• a fixed displacement steering motor
• electro-hydraulic implement control for all blade functions on AccuGrade ready machines
(ripper/winch controls remain pilot operated in all cases)
• a new A4 Machine ECM used for implement hydraulic functions and system monitoring
• hydraulic oil filters for both case drain oil and for implement return oil
• an oil-to-air hydraulic oil cooler mounted behind the radiator cores
• an electronic implement lockout control
SERV1865-01 - 111 - Text Reference
04/09

The standard implement hydraulic system for the D6T machine has changed from the D6R
Series III machine. Pilot operated controls are used for all blade functions for ripper (or winch)
operation. An EH blade angle control (thumb rocker switch) and an EH manifold with two
proportional solenoids for blade angle control are added if the machine is equipped with a
VPAT blade.

The differential steering system is similar to the D6R Series III machine except it doesn’t use a
counterbalance valve.

An Electro-Hydraulic (EH) dozer control lever (joystick) and an EH pilot manifold with four
proportional solenoids for blade lift and blade tilt functions, as well as an ON/OFF (AccuGrade
Boost), solenoid are added on machines that are equipped with AccuGrade. The EH dozer
control lever also contains a thumb rocker blade angle control and the associated (second) EH
pilot manifold with the blade angle solenoids if the AccuGrade machine is equipped with a
VPAT blade.

There are four versions of the implement hydraulic system. These four distinct versions of the
hydraulic system are:
• implement hydraulic system with an "S" or "SU" blade (pilot operated controls and pilot
operated implement control valves)
• implement hydraulic system with a VPAT blade (pilot operated controls and pilot
operated implement control valves with EH blade angle control)
• AccuGrade® ready implement hydraulic system with "S" or "SU" blade (pilot operated
controls and pilot operated implement control valves for the ripper/winch and EH blade
control for all blade functions)
• AccuGrade® ready implement hydraulic system with a VPAT blade (pilot operated
controls and pilot operated implement control valves for the ripper/winch and EH blade
control for all blade functions)
SERV1865-01 - 112 - Text Reference
04/09

3
2 4

1 5

91

The hydraulic oil tank (1) is located on top of the right fender. The hydraulic oil tank serves as
the reservoir that provides oil for the operation of the implements and the steering.
Components of the hydraulic oil tank and associated service points are identified in the
illustration above:
• implement case drain oil filter (2)
• vacuum breaker (3)
• hydraulic oil fill tube (4)
• fluid level sight glass (5)
An ecology drain valve is located on the bottom of the tank (not visible above) and may be
easily accessed through an opening on the underside of the right fender.

NOTE: The vacuum breaker on the hydraulic oil tank should always be used to
equalize the pressure inside the hydraulic oil tank with the atmospheric pressure before
removing the cap from the filler tube. Doing so will prevent scalding injuries due to hot
hydraulic oil being expelled through the filler tube when the cap is removed.
SERV1865-01 - 113 - Text Reference
04/09

92

The implement hydraulic pump on the D6T is a load sensing, pressure compensated, variable
displacement piston type pump. The pump (1) is mounted to the rear of the flywheel housing
at the upper left corner.

The implement hydraulic pump draws oil from the hydraulic oil tank and provides high
pressure oil flow to the implement valve stack. The pump also provides oil flow to the pressure
reducing manifold, which in turn, provides pilot pressure oil to the pilot operated implement
controls.

High pressure supply oil to the implement valve stack is directed through a hose that connects
to the pump discharge port. High pressure supply oil to the pressure reducing manifold is
directed through a hose that connects to an "L" fitting that is installed in the side of the pump
discharge port.

Other components identified are the:


• pump pressure and flow compensator valve (2)
• fitting for the load sensing signal line (from the signal resolver network) (3)
• fitting for the case drain line (4)
SERV1865-01 - 114 - Text Reference
04/09

A "tee" fitting replaces the "L" fitting at the pump discharge port on AccuGrade® Ready
machines. A pump discharge pressure sensor is installed on one side of the "tee" fitting. The
fitting on the opposite side of the "tee" connects to the supply line to the pressure reducing
manifold.

The pump discharge pressure sensor is only present on machines that are equipped with
AccuGrade®. This pressure sensor is a necessary component to perform the calibrations of the
four proportional solenoid controlled pilot valves on the EH pilot manifold. The solenoid
controlled pilot valves are used for blade lift and blade tilt control functions and they will be
discussed later in this presentation.

The status of the pump discharge pressure sensor may be viewed using Cat ET, or through the
LCD display on the Main Display Module in the dash, using the 4C-8195 service tool.
SERV1865-01 - 125 - Text Reference
04/09

99

Pressure Reducing Manifold

The pressure reducing manifold supplies pilot pressure oil to the steering pilot valve and to the
pilot operated implement controls (or to the solenoid controlled pilot valves on ARO machines
equipped with EH control of the blade functions).

Supply oil from the implement hydraulic pump flows through a screen as it enters the manifold.
The oil then flows to the pressure reducing valve. The pressure reducing valve is infinitely
variable and meters the oil to provide pilot pressure oil of approximately 3275 kPa (475 psi).
This oil is now pilot oil.

The pilot oil then flows through the accumulator check valve, which is installed upstream of
the hydraulic accumulator. The check valve prevents backflow in the pilot system in case of
low pilot pressure conditions. The check valve also prevents the hydraulic accumulator from
discharging when the machine is shut down.

The oil then flows to the hydraulic accumulator and the pilot relief valve. The pilot relief valve
limits the pressure in the pilot oil system past the pressure reducing valve to protect the
accumulator. The pilot relief valve opens to dissipate excess pressure in the event of pressure
spikes in the pilot oil system.
SERV1865-01 - 126 - Text Reference
04/09

The hydraulic accumulator stores energy (pilot pressure) for approximately 1-2 minutes after
the engine is stopped, allowing the implements to be lowered using the implement controls in a
dead engine situation.

The pilot oil then flows to the solenoid operated implement lockout valve. The implement
lockout valve is controlled by the implement lockout switch, which is located on the right
console in the operator compartment.

The implement lockout valve is operated using an ON/OFF solenoid. When the implement
lockout switch is set to the UNLOCKED position, the implement lockout solenoid is
ENERGIZED and the implements may be operated using the implement control levers.

When the implement lockout switch is set to the LOCKED position, the implement lockout
solenoid is DE-ENERGIZED and the pilot supply oil is blocked. The implements cannot be
operated using the implement controls when the implement lockout switch is in the LOCKED
position.

When the implement lockout valve is in the UNLOCKED condition, the pilot supply oil exits
the pilot manifold at the outlet. The pilot supply oil is then directed to the pilot operated
implement controls (or to the solenoid controlled pilot valves on ARO machines equipped with
EH control of the blade functions).

The status of the implement lockout switch and the implement lockout solenoid may be viewed
using Cat ET, or through the LCD display on the Main Display Module in the dash, using the
4C-8195 service tool.
SERV1865-01 - 127 - Text Reference
04/09

3 1

2
1
6

100

Pressure Reducing Manifold


The pressure reducing manifold (1) is located inside the forward compartment on the right
fender and is situated outboard from the power train oil filter. Service points are:
• pilot relief valve (2)
• pressure reducing valve (3)
• implement pump discharge pressure test port (HA) (4)
• accumulator (5)
• pilot supply pressure test port (CP) (6)

Note: Not visible in this picture are the:


• hydraulic oil sampling port (S•O•S)
• accumulator pressure test port (CPG)
• accumulator check valve (near or left side of the implement lockout solenoid)
• implement lockout solenoid (ENERGIZED in the UNLOCKED condition)
SERV1865-01 - 128 - Text Reference
04/09

101

Implement Hydraulic System Operation (Pilot Control)

This color schematic shows the components and conditions in the implement hydraulic system
with the engine running, all of the implements in HOLD, and the implement pump at LOW
PRESSURE STANDBY. Oil is drawn from the hydraulic oil tank by the load sensing, variable
displacement, piston-type implement pump. High pressure supply oil is sent to the closed-
center implement control valves by the pump. Return oil from the implement control valves
and the case drain oil from the pumps and motors is returned to the hydraulic oil tank.

High pressure supply oil from the implement pump is also sent to the pressure reducing
manifold which produces and supplies pilot pressure oil to the pilot valves.

When the operator moves a pilot operated implement control, oil is sent to the implement
control valve to move the valve spool, allowing oil to flow to the implement cylinder(s). The
implement movement is proportional to the amount of implement control movement. (The
farther the implement control is moved, the faster the implement will move.)
SERV1865-01 - 129 - Text Reference
04/09

As the implement control valve spool moves due to pilot oil pressure, the pilot oil at the
opposite end of the control valve spool is returned back to the tank. Pilot return oil from the
implement control valves also enters the pilot valve body through the control ports. The pilot
return oil flows past the pilot valve spool and is directed through internal passages in the pilot
valve body to a common pilot return oil passage; the pilot oil is then returned to the tank.

The control lever assembly and the control plate determines the amount of movement of the
pilot valve spools. When the control lever is moved, the lever assembly rotates and the control
plate pushes down on the upper plunger. The upper plunger and the centering spring move the
pilot valve spools down to close off the tank passages and open the pilot supply passages to the
control ports.

When the control lever is in the HOLD position, the centering springs, the pressure control
return springs, and bias springs keep the pilot spools and the lever assembly in the HOLD
position. When in the HOLD position, pilot supply oil is blocked by each of the four pilot
valve spools and each implement control valve end is open to the tank (through the pilot lines
and the control ports).

Each pilot valve spool has a cross-drilled hole in the spool that intersects with an axial passage
through the center of the spool that is open at the bottom. An orifice is installed in the axial
passage at the the bottom of the pilot valve spool. Tank pressure oil is allowed to move
through the cross-drilled hole, the axial passage, and the orifice so that a hydraulic lock cannot
prevent the free movement of the pilot valve spool. The orifice at the bottom of the pilot valve
spool also helps stabilize and dampen the movement of the spool.

The dozer control lever is equipped with a magnetic coil assembly that is positioned around the
upper portion of the BLADE LOWER pilot valve. A cupped washer is attached to the bottom
of the control plate, and it is positioned above the coil. When the dozer control lever is moved
forward to approximately 90 percent of lever travel, the washer contacts the magnetic coil.
This is the FLOAT position for the dozer blade. The magnetic coil is always ENERGIZED and
the coil will hold the washer to maintain the FLOAT position until the dozer control lever is
moved back toward the RAISE position.

The dozer control lever also has a float detent attached to the underside of the control plate
above the BLADE RAISE pilot valve spool. A detent plate is attached to the top of the valve
body. The detent is spring biased outward so that the point of the detent moves freely within
the cutout in the detent plate. When the dozer control lever is moved to approximately 85
percent of forward lever movement (BLADE LOWER), the chisel point of the detent contacts
the lip at the top of the detent plate. The lip provides the operator with a bit of "feel" to
indicate that the QUICK-DROP position is close. When the dozer control lever is moved
further so that the detent point moves past the lip, the QUICK-DROP function is activated. The
detent also indicates the relative location of the FLOAT position, which is only a few degrees
of lever movement past the lip.
SERV1865-01 - 130 - Text Reference
04/09

102
1

3
7

103

6
5

The dozer control pilot valve (1) is located at the front of the right console and is mounted to
the top of the console. The dozer control lever (2) operates the pilot valve.

The ripper control pilot valve (3) is located at the rear of the right console and is mounted to a
bracket beneath the console. The following lines are visible in the illustration above:
• ripper raise pilot line (to RAISE end of ripper control valve) (4)
• pilot valve drain line (to tank) (5)
• ripper lower pilot line (to LOWER end of ripper control valve) (6)
• pilot supply line (from pressure reducing manifold) (7)
SERV1865-01 - 131 - Text Reference
04/09

104

Implement Pilot Valve Operation

The standard implement hydraulic system for the D6T Track-type Tractor uses pilot operated
implement control valves. The illustration above shows a cross-sectional view of the pilot
valve that is used for dozer blade functions. Only the blade raise and the blade lower pilot
valve spools are shown, for clarity. The dozer control pilot valve also contains pilot valve
spools for the blade tilt left and the blade tilt right functions. Pilot valves are also used for
operation of the ripper or the winch, if the machine is equipped with either of these
attachments. The pilot valves for the ripper and the winch operate similarly to the dozer
control pilot valve. Pilot valves for blade control are used only on non-ARO machines.

Pilot supply oil from the pressure reducing manifold enters the pilot valve at the pilot supply
inlet. Pilot supply oil is made available to all four pilot valve spools through internal passages
in the pilot valve body. The four pilot valve spools direct pilot oil to their respective control
ports when they are actuated. Four pilot lines connect the four control ports to the respective
ends of the implement control valves. The flow of pilot (pressure) oil to any implement control
valve spool is proportionate to the amount of movement of the implement control lever. The
pilot pressure sent to the end of any implement control valve spool determines the amount of its
movement. The amount of movement of the implement control valve spool determines the
flow rate of high pressure pump supply oil that is sent to the implement cylinders.
SERV1865-01 - 132 - Text Reference
04/09

1
2

105

Implement Control Valve Operation

The implement control valve stack is located below the right console in the operator
compartment. The valve stack is mounted to a bracket on the inside of the right fender. The
control valve stack may be accessed by removing the operator seat and pedestal and then
removing the sound panel and metal access cover beneath the right armrest.

The implement control valve stack consists of the inlet manifold (1), the blade lift control valve
(2), the blade tilt control valve (3), the blade angle control valve (4), and the end cover (5).

The implement control valves are all parallel to each other.

The blade angle control valve is only present on machines equipped with the VPAT blade. The
ripper/winch control valve will only be present if the machine is equipped with those
attachments.

The EH pilot manifold for blade lift and tilt functions is mounted to the outboard side of the
valve stack bracket, if the machine is equipped with AccuGrade®.
SERV1865-01 - 133 - Text Reference
04/09

The implement hydraulic system main relief valve (not shown) is installed in the inlet manifold
(1) of the valve stack.

The main relief valve is set off of the machine using the 1U9358 Test Block manifold.

The main relief valve setting is approximately 3000 kPa (435 psi) higher than the high pressure
cutoff setting of the pressure compensator valve on the implement pump.

NOTE: Machines equipped with AccuGrade® Ready Option (ARO) will have a separate pilot
electro-hydraulic manifold and implement control joystick.
SERV1865-01 - 134 - Text Reference
04/09

106

The blade lift control valve is a closed-center, pilot operated valve that is controlled with pilot
oil from the dozer control pilot valve. The blade lift control valve has four positions: RAISE,
HOLD, LOWER, and FLOAT. Centering springs keep the spool in the HOLD position when
the control valve is not in use. The illustration above shows the blade lift control valve in the
HOLD condition.

When the operator starts the machine, the implement pump sends high pressure supply oil
through the inlet manifold to the load check valve to the main valve spool. With the main valve
spool in the HOLD position, oil cannot flow to the cylinders, and oil pressure will begin to
increase in the hydraulic system.

Components of the implement control valves are:

Load Check Valve: The Load Check Valve prevents reverse implement flow when the
operator moves a valve from HOLD and system pressure is lower than the cylinder, or work
port pressure. Without the load check valve, the implement would drift down slightly (droop)
before moving as commanded. The load check valve will open to allow supply oil to flow
through the control valve when the system pressure is higher than the work port pressure.
SERV1865-01 - 135 - Text Reference
04/09

Resolver: Also called a double check valve, the resolver compares the signal between the
control valves and sends the highest resolved work port pressure to the implement pump
compensator. Although this illustration shows the resolver and signal lines as external
components, the resolver is internal to the control valve and the signal lines are internally
drilled passages.

Main Valve Spool: The Main Valve Spool controls oil flow to the implement cylinders and
return oil from the implement cylinders back to the tank. The spool contains three cross-drilled
holes that connect to an axial drilled passage through the center of the spool. The two cross-
drilled holes on the left hand side of the spool sense work port pressure in the head and rod
ends of the cylinders. The work port pressures are transmitted to the pilot chamber through the
cross-drilled hole on the right hand side of the spool.

Makeup Valve: The Makeup Valve opens to allow tank pressure oil to fill voids in the head
ends of the cylinders during times when cylinder supply pressure decreases below the tank
pressure.

Orifice: The Orifice provides smoother implement operation by delaying the rate at which the
signal pressure in the flow control spool spring cavity decreases when the operator changes
implement directions.

NOTE: A dozer valve without a flow compensator valve is only fitted on the following
machine arrangements: S-Blade & Ripper; S-Blade & ARO & Ripper; VPAT Blade &
Ripper; VPAT Blade & ARO & Ripper.
A dozer control valve with a flow compensator will be fitted to the following machine
arrangements: S-Blade & winch; S-Blade & ARO & winch; VPAT Blade & winch;
VPAT Blade & ARO & winch.
SERV1865-01 - 136 - Text Reference
04/09

107

Implement Hydraulic System Operation (Electro-Hydraulic Control, ARO)

Machines that are equipped with AccuGrade use an electro-hydraulic control group to operate
the bulldozer. This color schematic shows the components and conditions in the implement
hydraulic system solenoid valves for a standard blade or seven solenoid valves for a VPAT
blade.

With the engine running, all of the implements in HOLD, and the implement pump at LOW
PRESSURE STANDBY, oil is drawn from the hydraulic oil tank by the load sensing, variable
displacement, piston-type implement pump. High pressure supply oil is sent to the closed-
center implement control valves by the pump. Return oil from the implement control valves
and the case drain oil from the pumps and motors is returned to the hydraulic oil tank.

High pressure supply oil from the implement pump is also sent to the pressure reducing
manifold.

The electro-hydraulic control allows the Machine ECM to move the blade when AccuGrade is
active.
SERV1865-01 - 137 - Text Reference
04/09

When the implement controls are in HOLD position, the solenoids are de-energized and pilot
oil is blocked. Oil in the passages to the main control valve are connected to the tank through
the pilot manifold.

When an implement control is activated, the solenoid for that circuit is energized forcing a
spool in the pilot manifold to shift. This shift allows pilot oil to travel from the pilot manifold
to the end of the main control spool. The main spool shifts and the implement moves in the
direction selected by the operator. The solenoids are proportional. The movement of the valve
spool will be in proportion to the amount of movement of the implement control lever.
SERV1865-01 - 138 - Text Reference
04/09

108

The above illustration shows the components of the dozer lift valve when the machine is
configured with VPAT Blade, ARO, and winch. A flow control spool and load sense relief
valve are installed in this situation.
SERV1865-01 - 139 - Text Reference
04/09

109

When the dozer pilot control lever is moved to the RAISE position, pilot oil is directed to the
right end of the blade lift control valve spool. The main spool shifts to the left and the
implement hydraulic pump oil flows past the load check valve, main control spool, and out to
the rod end of the blade lift cylinders, causing the blade to raise. Oil from the head end of the
blade lift cylinders passes through the quick drop valve and then enters the main control valve.
The oil flows past the main control spool and returns to the hydraulic oil tank.

Work port pressure in the cylinder rod end also flows into the cross-drilled passage in the
middle of the main spool. This signal oil is directed to the signal resolver passage. If this is the
highest pressure in the signal resolver network, the signal resolver ball shifts to the right and the
signal pressure is sent to the pump compensator valve. The pump then UPSTROKES to meet
the flow demand in proportion to the signal pressure.
SERV1865-01 - 140 - Text Reference
04/09

110

The illustration above shows the blade tilt control valve in the HOLD position. In this position,
the flow from the hydraulic pump enters the control valve at the supply port. Initially, the flow
control valve is held to the left by the spring. When the system flow comes into the valve, it
passes the flow control valve and is stopped by the main spool. The pressure builds and moves
the flow control valve to the right, metering the flow to the main spool. The load check valve
is also in the closed position while the control is in HOLD.

NOTE: All tilt control valves are fitted with flow compensator valves.
Line relief and make-up valves will be fitted to both work ports when the machine is
configured with VPAT blade.
SERV1865-01 - 141 - Text Reference
04/09

111

When the operator moves the dozer control lever from HOLD to TILT LEFT, the dozer control
pilot valve directs pilot oil to right end of the blade tilt control valve, which shifts the main
valve spool to the left into the TILT LEFT position.

Oil from the implement hydraulic pump flows past the load check valve and then past the main
control spool to the rod end of the tilt cylinder which causes the blade to tilt left. As the blade
tilts left, oil from the head end of the tilt cylinder returns through the head end passage, flows
past the main spool, and the returns to the hydraulic oil tank.

Work port pressure in the cylinder rod end also flows into the cross-drilled passage in the
middle of the main spool. This signal oil is directed to the signal resolver passage. If this is the
highest pressure in the signal resolver network, the signal resolver ball shifts to the right and the
signal pressure is sent to the pump compensator valve. The pump then UPSTROKES to meet
the flow demand in proportion to the signal pressure.
SERV1865-01 - 142 - Text Reference
04/09

112

The illustration above shows the BLADE ANGLE control valve in the HOLD position. In this
position, the flow from the implement hydraulic pump enters the control valve at the supply
port. Initially, the flow control valve is held to the left by the spring. When the system flow
enters the valve, it passes the flow control valve and is stopped by the main spool. The
pressure in the passage increases and moves the flow control valve to the right, metering the
flow to the main spool. The load check valve is also in the closed position while the control is
in HOLD.

Oil from both rod end and head end of the cylinders is blocked by the main control valve spool.
Both the rod and head ends of the blade angle cylinder are protected by a combination makeup
valve and line relief.

NOTE: All angle control valves are fitted with flow compensator valves and are
supplied pilot oil from a pilot EH manifold.
SERV1865-01 - 143 - Text Reference
04/09

113

When the operator moves the BLADE ANGLE pilot control valve for ANGLE RIGHT, pilot oil
is directed to the right end of the main control valve spool. The oil from the implement pump
flows from the supply port, past the load check valve, the main spool, and then to the head end
of the left angle cylinder and the rod end of the right angle cylinder. Oil from the opposite ends
of the cylinders returns to the control valve past the main control spool, then returns to the
hydraulic oil tank.

Work port pressure in the cylinder rod end also flows into the cross-drilled passage in the
middle of the main spool. This signal oil is directed to the signal resolver passage. If this is the
highest pressure in the signal resolver network, the signal resolver ball shifts to the right and the
signal pressure is sent to the pump compensator valve. The pump then UPSTROKES to meet
the flow demand in proportion to the signal pressure.
SERV1865-01 - 144 - Text Reference
04/09

114

When the machine is equipped with a ripper, the control valve will be the fourth valve in the
valve stack. The control valve is spring centered and has three positions, HOLD, RAISE, and
LOWER.

When the control is in the HOLD position, implement pump supply oil flows into the inlet of
the valve, past the load check valve and is stopped by the closed center control valve spool.
This supply passage is a common passage to all the control valves in the stack. In HOLD, the
pump will maintain a pressure of 3000 kPa (435 psi) in the common passage.

NOTE: A dozer valve without a flow compensator valve is only fitted on the following
machine arrangements: S-Blade & Ripper; S-Blade & ARO & Ripper; VPAT Blade &
Ripper; VPAT Blade & ARO & Ripper.
A dozer control valve with a flow compensator will be fitted to the following machine
arrangements: S-Blade & winch; S-Blade & ARO & winch; VPAT Blade & winch;
VPAT Blade & ARO & winch.
SERV1865-01 - 145 - Text Reference
04/09

117

When the operator moves the pilot control valve to RIPPER RAISE, position pilot oil is
directed to the left end of the main control valve for the ripper. The main spool moves to the
right and the implement pump oil flows from the supply port past the main control spool out
the port to the head end of the ripper cylinder. Oil from the rod end of the cylinder returns
through the rod end port of the control valve, past the main control spool, and then returns to
the hydraulic oil tank.

Work port pressure in the cylinder head end also flows into the cross-drilled passage in the
middle of the main spool. This signal oil is directed to the signal resolver passage. If this is the
highest pressure in the signal resolver network, the signal resolver ball shifts to the right and the
signal pressure is sent to the pump compensator valve. The pump then UPSTROKES to meet
the flow demand in proportion to the signal pressure.
SERV1865-01 - 146 - Text Reference
04/09

116

The resolver network consists of a resolver (ball check valve) in each implement control valve.
Each resolver compares the signal pressure from the previous control valve to the pressure from
the current control valve. The resolver valve shifts to allow the highest work port pressure to
flow to the implement hydraulic pump compensator valve.

In the illustration above, the ripper control valve has been activated. The resolver for the ripper
compares it’s signal pressure to that coming from the float boost. The ripper signal is higher
because the ripper control has been activated. The signal from the ripper then travels to the
resolver for the bulldozer angle, bulldozer tilt, and bulldozer lift circuits. In this case, the ripper
circuit has the highest signal pressure because none of the other implements have been
activated. This signal goes to the pump compensator to control implement pump output.

When all the implements are in HOLD, the pressure in the resolver network is equal to tank
pressure. The pump compensator will keep the pump in the LOW PRESSURE STANDBY
position until an implement is activated.
SERV1865-01 - 147 - Text Reference
04/09

117

Quick Drop Valve

The single quick-drop valve (1) is mounted on top of the radiator guard in the center and is
covered with a metal enclosure. This valve provides the quick drop function for both lift
cylinders.
SERV1865-01 - 148 - Text Reference
04/09

118

Shown in the illustration above is a schematic for the single quick-drop valve. The valve is
mounted on top of the engine hood at the front of the machine.

In the schematic, components in the quick-drop valve are shown with the blade on the ground.
The variable orifice sleeve is the essential component in the valve and functions to create the
pressure necessary to move the valve spool and direct rod end oil to the head end in the
QUICK-DROP mode.

The piston bypass valves that are contained in the blade lift cylinder pistons allow high
pressure oil to pass from either the rod end or the head end of the cylinders. The bypass valves
serve to soften the end-of-stroke for the cylinders. The bypass valves also allow high pressure
oil to pass from either the rod end or the head end when one cylinder reaches end-of-stroke
before the other cylinder reaches end-of-stroke. This situation could be caused by the blade
being tilted during a BLADE RAISE or a BLADE LOWER function.
SERV1865-01 - 149 - Text Reference
04/09

119

Shown in this illustration are the components of the single quick-drop valve: the orifice sleeve,
the plunger, the valve spool, the right and left covers, and the spring.

As shown in the previous illustration, the valve components are shown with the dozer blade on
the ground. Both the orifice sleeve and the plunger can float in the valve and their positions in
HOLD depend on the previous action of the lift control valve: RAISE, LOWER, or FLOAT.
SERV1865-01 - 150 - Text Reference
04/09

120

When the main control valve spool in the blade lift control valve is moved to the RAISE
position, high pressure supply oil enters the quick-drop valve through the passage at the lower
left and moves the orifice sleeve to the right. The oil then flows out to the rod ends of the lift
cylinders. Return oil from the head ends of the lift cylinders enters the quick-drop valve
through the upper passages and flows past the valve spool to the blade lift control valve.

At the same time, return oil pressure also enters the passage to the plunger end inside the valve
spool; this pressure is felt on the right end of the plunger. However, the blade RAISE pressure
felt on the left end of the plunger is higher than the return oil pressure and keeps the plunger
shifted to the right. Blade RAISE pressure also enters the passage to the right end of the spool.
Since the same pressure is felt on the left end of the spool, the spring keeps the spool shifted to
the right.

NOTE: The orifice sleeve floats on the valve spool and is kept on the spool by a
retaining ring.
SERV1865-01 - 151 - Text Reference
04/09

121

As the operator moves the dozer control lever forward to LOWER the blade (but not to within
3° - 4° of the FLOAT detent), return oil from the rod ends of the lift cylinders enters the
quick-drop valve through the middle passages. The return oil flows past the orifice sleeve to
the control valve and moves the orifice sleeve to the left against the retaining ring. This oil
flow creates a pressure differential across the orifice sleeve.

High pressure supply oil (red) from the blade lift control valve enters the quick-drop valve
through the lower middle passage and flows past the valve spool to the head ends of the lift
cylinders. Supply oil pressure also enters the passage to the right plunger end and is felt on the
right end of the plunger. The return oil pressure (red/white hatch) on the right end of the
plunger is higher and keeps the plunger shifted to the left.

Rod end return oil pressure (red and white stripe) enters the passage to the right end of the
spool. This pressure is also felt on the major diameter at the left end of the spool just to the
right of the orifice sleeve. In addition, return oil pressure, after the pressure drop across the
orifice sleeve, is felt on the minor diameter at the left end of the spool. The net result is that the
spool is kept to the right because of the spring and return oil pressure. The major diameters of
the spool (the effective area at the right end and the effective area just to the right of the orifice
sleeve) cancel each other. The pressure on the right end of the spool is not high enough to
overcome the spring and return oil pressure on the minor diameter at the left end of the spool.
SERV1865-01 - 152 - Text Reference
04/09

122

When the dozer blade is rapidly lowered to the ground (the blade control lever has been moved
to a forward position that is within 3° - 4° of the FLOAT detent), the quick-drop valve operates
in the QUICK-DROP mode.

The increased lever travel results in higher cylinder rod end flow and a higher pressure drop
across the orifice sleeve. The only difference from the dozer LOWER position is that the
pressure drop across the orifice sleeve that is felt on the minor diameter of the right end of the
spool overcomes the resistance of the spring, and the spool starts to move. The minimum flow
that causes the necessary pressure drop across the orifice sleeve to begin spool movement is
referred to as the "trigger point" and occurs at a point just before the float detent of maximum
lever travel. When the spool starts to move, the effective area of the orifice sleeve decreases
and the pressure drop increases to shift the spool even further.

The result is that the spool shifts completely to the left. This movement connects the rod
end of the lift cylinders to the head end of the lift cylinders across the slots in the spool. This
connection provides even less resistance, and the downward blade velocity and flow from the
rod ends increases. This connection also provides a "filling" function of the head ends of the
cylinders to minimize the pause time. Some of the oil from the rod ends still flows across the
orifice sleeve causing a pressure drop to keep the spool shifted.
SERV1865-01 - 153 - Text Reference
04/09

123

When the blade contacts the ground and stops, flow from the rod ends of the lift cylinders also
stops. With no pressure drop across the orifice, the spring shifts the spool back to the right.
After the pump fills the head ends of the cylinders (pause time) and the head end cylinder
pressure starts to increase, the blade begins to move down. Supply oil pressure (red) enters the
passage to the right end of the plunger. Return oil pressure (red and white stripes) from the rod
end of the lift cylinders is felt on the left end of the plunger. This pressure is lower than the oil
pressure (red and white stripes) on the right end of the plunger, and the plunger moves to the
left. The pressure drop across the orifice sleeve that is felt on the minor diameter of the right
end of the spool works to move the spool to the left. However, this movement is resisted by the
spring and the supply oil pressure (red and white stripes) acting on the plunger. Therefore, the
spool stays shifted to the right.

You might also like