Professional Documents
Culture Documents
A box-shaped vessel 80m long, 16m breadth is floating at a mean draft of of 4.8m.
1 A midship compartment length 12m and breadth 10m is bilged. Calculate her new
mean draft after bilging.
L x B x di = (L x B x db) - (l x b x db)
80 x 16 x 4.8 = (80 x 16 x db) - (12 x 10 x db)
6144 = 1160db
db = 6144 / 1160
= 5.2966 m
A box-shaped vessel 80m long, 16m breadth is floating at a mean draft of of 4.8m.
A midship compartment length 12m and breadth 10m is bilged. The bilged
2
compartment contained cargo of SF 2.1 m³/ton and relative density 0.65, calculate
the mean draft after bilging.
L x B x di = (L x B x db) - (l x b x db)ρ
80 x 16 x 4.8 = (80 x 16 x db) - (12 x 10 x db)0.5615
6144 = 1280db - 67.38db
6144 = 1212.62db
db = 6144 / 1212.62
= 5.0667 m
A box-shaped vessel 120m long, 20 breadth is floating at a mean draft of of 5.0m. A
3 midship compartment length 20m and breadth 12m is bilged.
3.1 Calculate her new mean draft after bilging.
3.2 Calculate the effect on the GM after bilging
L x B x di = (L x B x db) - (l x b x db)
120 x 20 x 5.0 = (120 x 20 x db) - (20 x 12 x db)
12000 = 2160db
db = 12000 / 2160
= 5.5556 m
Before Bilging
KB = 5/2
2.5 m
BM = B² / 12d
= (20 x 20) / (12 x 5)
= 6.6667 m
KM = 9.1667 m
After Bilging
KB = 5.5556 / 2
2.7778 m
BM = B² / 12d
= (20 x 20) / (12 x 5.5556)
= 6.0000 m
KM = 8.7777 m
L x B x di = (L x B x db) - (l x b x h)ρ
120 x 20 x 5.0 = (120 x 20 x db) - (20 x 12 x 4.5)0.3
12000 = 2400db - 324
2400db = 12324
db = 12324 / 2400
= 5.1350 m
Before Bilging
KB = 5/2
2.5 m
BM = B² / 12d
= (20 x 20) / (12 x 5)
= 6.6667 m
KM = 9.1667 m
After Bilging
Volume KB Moment
120x20x5.1350 5.1350/2 31641.87
20x12x4.5x0.3 4.5/2 729.00
12000 30912.87
KB = 3.912.87 / 12000
2.5761 m
BM = B² / 12d
= (20 x 20) / (12 x 5.0)
= 6.6667 m
KM = 9.2427 m
L x B x di = (L x B x db) - (l x b x db)
100 x 15 x 5 = (100 x 15 x db) - (6 x 15 x db)
7500 = 1500db - 90db
db = 7500 / 1410
= 5.31915 m
BB’ = l / 2
= 6/2
= 3 m
BML = B(L-l)³
12V
= 12 x 94 x 94 x 94
12 x 7500
= 9967008
90000
= 110.7445 m
MCTC = W x BML
100L
= (L x B x Draft x Density) x BML
100L
= (100 x 15 x 5 x 1.025) x 110.7456
100 x 100
= 851352.2
10000
= 85.13522 t-m