CL OF CARRIAGEWAY

SEE DETAIL ''A'' SEE DETAIL ''A''


FILLED W/ ASPHALT SEALANT (30-40)
SLOPE 1.5 % SLOPE 1.5 % PENETRATION BLOWN ASPHALT

16 mm Ø TIE BARS @ 600 O.C

ITEM 311(1)c1 - PORTLAND


CEMENT CONCRETE PAVEMENT ITEM 311(1)c1 - PORTLAND CEMENT CONCRETE
(UNREINFORCED) - 0.23 M. THK PAVEMENT (UNREINFORCED) - 0.23M. THK

ITEM 200(1) - AGGREGATE SUB BASE


COURSE t = 0.20 M. ITEM 200(1) - AGGREGATE
ITEM 104(2)a - EMBANKMENT FROM SUB BASE COURSE
BORROW (COMMON SOIL) t = 0.20M. THK.

TYPICAL ROADWAY SECTION


(SECTION A) EXISTING PCCP

SEE DETAIL ''A''


SLOPE 1.5 % SLOPE 1.5 %
DETAIL "A"
SCALE: 1:10 MTS

ITEM 311(1)c1 - PORTLAND


CEMENT CONCRETE PAVEMENT
(UNREINFORCED) - 0.23 M. THK
DETAIL OF
ITEM 200(1) - AGGREGATE SUB BASE NGL
CONCRETE CANAL
COURSE t = 0.20 M.
ITEM 104(2)a - EMBANKMENT FROM
BORROW (COMMON SOIL)

PROP. CONCRETE CANAL


DETAIL OF PARAPET WALL
TYPICAL ROADWAY SECTION
(SECTION B)

NGL NGL

NGL

BASE OF PROTECTION

LONGITUDINAL TRANSVERSE
SECTION SECTION

SET NO. SHEET NO.

CONSTRUCTION/IMPROVEMENT OF
ACCESS ROADS LEADING TO DECLARED
TOURISM DESTINATIONS, ACCESS ROAD
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
8
ROBERT C. DURAN JESS ANTHONY A. AGUIGAM SUSAN P. SIMEON EFREN S. MARQUEZ SHERELL S. PE BENITO MATHIAS L. MALENAB
PROJECT MANAGER
LEADING TO MADONGAN DAM, BRGY.
DAQUIOAG, MARCOS, ILOCOS NORTE ILOCOS NORTE SECOND DISTRICT
ENGINEERING OFFICE PROJECT ENGINEER CHIEF, PLANNING AND DESIGN SECTION OIC, CONSTRUCTION SECTION OIC, ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 16
DATE: _______________ SAN PABLO, SAN NICOLAS, ILOCOS NORTE DATE: _______________ DATE: _______________ DATE: _______________ DATE: _______________ DATE: _______________