Overall Construction Sequence of the Works

Bridge C1 Bridge C2 Bridge C3 Bridge C4 Legends: ge


id
i ne Br E4
r Works
Stage 1 Completed * Erection of Twin Box at Tong Hang Tung lL oise Barrie
i Proposed N
C1-01 C1-02, C1-03, C1-04 C2-03, C2-04* C3-02* C3-03, C3-04* C3-05M*

N
Abutment
4 4 2 1 1 2 Deck Erection Parallel Stage
Chuen a E4-04M

tR
Pier
2 3 Construction Unbalanced Cantilever E4-03
Stage 2 C1-05M* C2-01, C2-02* C2-05M C2-05M, C3-01* C4-01, C4-02* s Pier

Ea
Phasing Segment Erected by E4-02
5 7 6 7 Falsework and Crane Pier
Headroom
Stage 3 C4-03, C4-04M*
# Across MTRC Track
E4-01
Pier consideration
8 ^ Across Fanling Highway E3-05M

ge during lifting
id
Bridge D1 Bridge D2 Bridge E1 Bridge E2 Bridge E3 Bridge E4 Br E3 Portal of segments
E3-04
above Ho Ka
Pier
Stage 1 E2-02, E2-03M E3-01 E3-02 E3-03 E3-04 E3-05M E4-01 E4-02 E4-03 E4-04M E3-03 Yuen Foot
3 2 1 1 Bridge

y
Proposed

wa
Stage 2 D2-01# D2-02, D2-03^ D2-04M
Pier
BBI
3 9 9 E3-02

igh
Stage 3 D1-01 D1-02, D1-03 D1-04M E1-01, E1-02, E1-03, E1-04 E1-05M E2-01# Pier
E3-01 Erection Method:

H
11 11 10 10 4

E2 ge

ng
Pier
In-situ Cast (including Pier

id
Ma Wat Wai Construction Phasing Tong Hang
E2-03M

Br

nli
Head Segment)
Bridge

Fa
Bridg
B1 e Shung Him Bridge Bridge Pier Abutment Balanced Cantilever by
B2 E2-02 D2-04
Tong C4 E1 Pier Stitching between E1-05M and E2-01 Lifting Frame
Brid D2-03
ge Pier before completion of T-span E2-01
C1 ge Pier E1-05M
Pi

Balanced Cantilever by
Brid 3
Pier
er

Pier B1-01 Pier


Wo Hop Shek
B1

M
B2-02 E1-04
Pier E2-01
Bridge
-0

Pier
C Crane
Pier B1-02 Pier Pier
a
6

Pier Portal E1-03 D2-02


Village
Pier B1-03 Pier C1-03 E1-01 E1-02
W
B2-03
Pier B1-04 B2-01M
C2 Pier

at
Portal Pier
Pier B1-05 Portal Portal Pier Pier D2-01
C1-01M Portal Pier Pier Pier
C1-02 C4-02 C4-03 D1-04M
Balanced Cantilever by
Ri ge
C4-01 C4-04M D1-01 D1-02 D1-03

On Lok Tsuen Brid Stitching between D1-02 and D1-03


ve
Portal
Pier C3-05M Special Lifting Frame
r Bridge D2 before completion of T-span D1-03
C1-04 Portal
Pier C3-04
C1-05M
Portal D1 Stitching between D1-03 and D1-04M
Pier Pier C3-03 Unbalanced Cantilever
C2-01 Pier Pier C3-02
before completion of T-span D1-04M
C2-02 Pier
C2-03
Pier
C2-04
Pier
C2-05M
C3-01
Envisaged Construction Methods by Falsework and Crane

Bridge B1 Bridge B2 Bridge C1 Bridge C2 Bridge C3 Bridge C4 Bridge D1 Bridge D2 Bridge E1 Bridge E2 Bridge E3 Bridge E4 Bus-bus Noise Barriers &
Time

Interchange HKY Footbridge


Implement TTA at TWSRW upon Access to Implement
TTA at FLH
Pile Portion XIII and XVIII and TTA at TWSRE
Considerations Season Season Season Season Season Season Season Season Season Season

Pile Access Watermain Demolish Existing


5th Wet 5th Dry 4th Wet 4th Dry 3rd Wet 3rd Dry 2nd Wet 2nd Dry 1st Wet 1st Dry

upon Access to Portion XIV, XV, and XVII Pile


to Pile Access to
Portion I C2-01 Pile Portion XIII
Diversion NBs & Recycle
Pile Access to Panels
Portion XIII
Cap Footing Pile Footing Roadworks Demolish
Pile
Access Cap Pile and Toilet Substructures of
Pier Cap Pier/ Pile Pile
Access Access to
Access to
Establishment of
Pier Cap works at NB71 to 73
to Pile to Portion V
Portal Cap On-site Precast Yard Commence-
Portion II Portion III
Portion VIII ment of off-site BBI
Pile Cap Pile Pile Pier Pier segment NB works
Pile Pier E4-04 casting
Pier/ Pile Pile
Implement
Pile Pre-fabri- at
Footing TTA at Pier cation on
Portal Cap FLH&TWSRE E1-05 Site TWSRW
Beam Pier/ Pile
Pier/ Pile Pile Cap Modify TTA
Pile & Portal Portal Cap Pile at TWSRW
Cap Deck Pile
D2-04 Pier Remaining
(within Cap
Portion I C4-02 Cap NB Works
Portal Pile Pier Pier

Segment
Erection
Pile and II) Pile after Pier Deliver

Segment
Erection
Access to Cap Pile access to Special Lifting
Portion VII Frame to E2
Pile Portion IB Cap after Erection
T&C of
Segment

Segment
Erection

Erection

Cap New BBI

Segment
over ERL

Erection
Deck C3-01
Pier E1-04

Segment
Erection
Pier Complete Complete
Segment
Erection
Segment
Erection

Pile end spans end spans


Modification

Bridge Finishing
before cut before cut
Segment Cap

Segment
Erection

Erection
C-tendon at and Extension of
Beam C-tendon at

and TCSS

Bridge Finishing
E2-03M E3-05M
& Complete HKY Footbridge

and TCSS
Complete
Deck end span
Bridge Finishing

Bridge Finishing

Complete end spans


Complete Complete end span before cut before cut

Bridge Finishing
and TCSS

and TCSS

end span C-tendon at Pre-fabrication


end span before cut C-tendon at
Bridge Finishing

Bridge Finishing
Bridge Finishing

Bridge Finishing

Bridge Finishing

before cut C3-05M Off-site

and TCSS
before cut C-tendon at C4-04M Complete Complete
C-tendon at
and TCSS

and TCSS
and TCSS

and TCSS

and TCSS

C-tendon at C2-05M end spans end spans


C1-01M C1-05M
before cut before cut
Bridge Finishing

Bridge Finishing
C-tendon at C-tendon at
and TCSS

and TCSS
D1-04M E1-03M

1. Removal of existing buildings 1. Different access dates for 1. Use of special movable 1. Access to C4-02 after partly 1. TTA arrangement for 1. Commencement of Pier 1. Completion of T-span of 1. Early liaison with MTRC for 1. Use of crane to cater for the
2. End span erection above different piers lifting frame for C3-02 and removal of the existing erection over public road D2-03 and Abutment D2-04M E1-05M for early stitches and commencement of works at Ho Ka Yuen Foot Bridge
Planning

Ma Wat River 2. Temporary site formation C3-05M to provide more building 2. Stitching requirement for after different TTA stages in erection at E2-01 E2-01 2. Use of special 2. Early completion of the
works required for forming of flexibility in segment erection 2. Falsework above Ma Wat completion of T-span D1-03 Fanling Highway 2. Deferred completion of movable lifting frame and spans to allow early
haul road 2. Falsework above Ma Wat River for portal construction and D1-04M 2. Erection of falsework for bridge spans to allow space lifting frame to overcome commencement of bridge
River for portal construction end-span erection at D2-04M for on-site precast yard and requirements of ERL and furniture works
segment storage Dongjiang Watermain

Client : Contract No. & Title: Drawing Title : Drawing No. : Designer : Tenderer :

Contract No. ND/2019/05


Fanling North New Development Area,
Overall Construction Approach -
Overall Construction Sequence of
CD4(a)(i)-03
Phase 1: Fanling Bypass Eastern Section the Works
(Shung Him Tong to Kau Lung Hang) DCK JV