Abutment
4 4 2 1 1 2 Deck Erection Parallel Stage
Chuen a E4-04M
tR
Pier
2 3 Construction Unbalanced Cantilever E4-03
Stage 2 C1-05M* C2-01, C2-02* C2-05M C2-05M, C3-01* C4-01, C4-02* s Pier
Ea
Phasing Segment Erected by E4-02
5 7 6 7 Falsework and Crane Pier
Headroom
Stage 3 C4-03, C4-04M*
# Across MTRC Track
E4-01
Pier consideration
8 ^ Across Fanling Highway E3-05M
ge during lifting
id
Bridge D1 Bridge D2 Bridge E1 Bridge E2 Bridge E3 Bridge E4 Br E3 Portal of segments
E3-04
above Ho Ka
Pier
Stage 1 E2-02, E2-03M E3-01 E3-02 E3-03 E3-04 E3-05M E4-01 E4-02 E4-03 E4-04M E3-03 Yuen Foot
3 2 1 1 Bridge
y
Proposed
wa
Stage 2 D2-01# D2-02, D2-03^ D2-04M
Pier
BBI
3 9 9 E3-02
igh
Stage 3 D1-01 D1-02, D1-03 D1-04M E1-01, E1-02, E1-03, E1-04 E1-05M E2-01# Pier
E3-01 Erection Method:
H
11 11 10 10 4
E2 ge
ng
Pier
In-situ Cast (including Pier
id
Ma Wat Wai Construction Phasing Tong Hang
E2-03M
Br
nli
Head Segment)
Bridge
Fa
Bridg
B1 e Shung Him Bridge Bridge Pier Abutment Balanced Cantilever by
B2 E2-02 D2-04
Tong C4 E1 Pier Stitching between E1-05M and E2-01 Lifting Frame
Brid D2-03
ge Pier before completion of T-span E2-01
C1 ge Pier E1-05M
Pi
Balanced Cantilever by
Brid 3
Pier
er
M
B2-02 E1-04
Pier E2-01
Bridge
-0
Pier
C Crane
Pier B1-02 Pier Pier
a
6
at
Portal Pier
Pier B1-05 Portal Portal Pier Pier D2-01
C1-01M Portal Pier Pier Pier
C1-02 C4-02 C4-03 D1-04M
Balanced Cantilever by
Ri ge
C4-01 C4-04M D1-01 D1-02 D1-03
Bridge B1 Bridge B2 Bridge C1 Bridge C2 Bridge C3 Bridge C4 Bridge D1 Bridge D2 Bridge E1 Bridge E2 Bridge E3 Bridge E4 Bus-bus Noise Barriers &
Time
Segment
Erection
Pile and II) Pile after Pier Deliver
Segment
Erection
Access to Cap Pile access to Special Lifting
Portion VII Frame to E2
Pile Portion IB Cap after Erection
T&C of
Segment
Segment
Erection
Erection
Segment
over ERL
Erection
Deck C3-01
Pier E1-04
Segment
Erection
Pier Complete Complete
Segment
Erection
Segment
Erection
Bridge Finishing
before cut before cut
Segment Cap
Segment
Erection
Erection
C-tendon at and Extension of
Beam C-tendon at
and TCSS
Bridge Finishing
E2-03M E3-05M
& Complete HKY Footbridge
and TCSS
Complete
Deck end span
Bridge Finishing
Bridge Finishing
Bridge Finishing
and TCSS
and TCSS
Bridge Finishing
Bridge Finishing
Bridge Finishing
Bridge Finishing
and TCSS
before cut C-tendon at C4-04M Complete Complete
C-tendon at
and TCSS
and TCSS
and TCSS
and TCSS
and TCSS
Bridge Finishing
C-tendon at C-tendon at
and TCSS
and TCSS
D1-04M E1-03M
1. Removal of existing buildings 1. Different access dates for 1. Use of special movable 1. Access to C4-02 after partly 1. TTA arrangement for 1. Commencement of Pier 1. Completion of T-span of 1. Early liaison with MTRC for 1. Use of crane to cater for the
2. End span erection above different piers lifting frame for C3-02 and removal of the existing erection over public road D2-03 and Abutment D2-04M E1-05M for early stitches and commencement of works at Ho Ka Yuen Foot Bridge
Planning
Ma Wat River 2. Temporary site formation C3-05M to provide more building 2. Stitching requirement for after different TTA stages in erection at E2-01 E2-01 2. Use of special 2. Early completion of the
works required for forming of flexibility in segment erection 2. Falsework above Ma Wat completion of T-span D1-03 Fanling Highway 2. Deferred completion of movable lifting frame and spans to allow early
haul road 2. Falsework above Ma Wat River for portal construction and D1-04M 2. Erection of falsework for bridge spans to allow space lifting frame to overcome commencement of bridge
River for portal construction end-span erection at D2-04M for on-site precast yard and requirements of ERL and furniture works
segment storage Dongjiang Watermain