SCOPE OF WORK
PT MOBAR SARANA ENERGI is going to deliver the work with scope of
1. Basic Design
2. Detail Design
3. Calculation data sheet
4. Isometric Drawing
5. MTO
6. And other related works
Which stated as the responsibility of Sub contractor
The list of the works can be seen in the Table 1.
Table 1. Scope of work
NO DESCRIPTION REMARKS
PROCESS
1 SPECIFICATION
Process Design basis V
BEDD V
Process Description & Control Philosphy V
2 DRAWING
Overall Block Flow Diagram
Process Flow Diagram (PFD) For Fire Fighting System
Process Flow Diagram (PFD) For Water Treatment
System and Water Balance
P&ID Fuel Oil System
P&ID Fuel Gas System
P&ID Lubricating Oil System
P&ID Water Treatment System
P&ID Drawing WWTP (oily water system)
P&ID For Fire Fighting System
P&ID Instrument air and Plant air system
P&ID Interconnecting Cooling Water System
Layout Fire Fighting Equipment
3 CALCULATION
Line sizing calculation
HSD and Fuel Gas Consumption Calculation
Water Consumption Calculation
Process Calculation Fuel Oil Storage Tank
34
Process Calculation Lubricating Oil Storage Tank
Process Calculation Water Tank
Deep Well (Raw Water) Pump Calculation
Service Water Pump Calculation
Sludge Transfer Pump Calculation
Lubrication Oil Unloading Pump Calculation
Firewater consumption calculation
Calculation for Fire Water Pump
Calculation for Jockey Pump
Hydraulic Calculation
4 PROCESS DATASHEET
Process Datasheet for BOP
5 SPECIFICATION
Process Individual Specification for Water Treatment
System
Process Individual Specification for Waste Water
Treatment System
Process Specification for Fire Protection System
6 LIST
Equipment List
Line List
MECHANICAL
1 Engineering Document
Engineering Specification
Construction/ Installation Procedure
Calculation
Data Sheet
List & Report
Loading Data for Tank
2 Engineering Drawing
Standard Drawing
General Arrangement for Tank
Layout Drawing (for HVAC, Plumbing, Fire Fighting)
Isometric Drawing
3 MTO
MTO HVAC
MTO Plumbing
MTO Fire Fighting
4 Others
Consingering
35
PIPING
1 Engineering Document
Engineering Spesification
Inspection and Test Plan (ITP)
List & Report
2 Engineering Drawing
Standard Drawing and Support
Plot Plan/ Equipment Layout
Key Plan/ drawing Index
Piping Layout (Outside Cube/Interconnection)
Isometric Drawing (Outside Cube/Interconnection)
Information Drawing (Loading Data, Nozzle
Orientation, Insert Plate, etc.)
3 MTO
MTO Piping Material (Outside Cube/Interconnection)
MTO Pipe Support
4 Other
Consingering
CIVIL
1 Specification
Engineering Specification For Civil and Structure
2 Civil (Calculation and Engineering Drawing)
Foundation
- As per deliverable List
Structure
- As per deliverable List
Sub Structure
- As per deliverable List
Drainage
Pavement
3 Data
Piping Layout & Information Loading Data
4 MTO
5 OTHER
Consingering
ELECTRICAL
1 Basic Engineering
36
Single Line Diagram
Electrical System Description & System Analysis
Electrical Equipment & Motor List
Standard Drawing
Design Criteria
Engineering Specification
Data Sheet
2 DETAIL ENGINEERING
Cable Schedule
Shematic Diagram
Connection Diagram
Hazardous Area Classification
Cable Tray, Trench, Pit & Power Wiring Layout
Grounding & Lightning Wiring Layout
Lighting & Receptacle Wiring Layout
Telephone & Public Address Wiring Layout
Material Take Off
3 OTHER
Consingering
INSTRUMENT
1 BASIC ENGINEERING
Data Sheet and Calculation
Standard Drawing
Design Criteria
Engineering Specification
2 DETAIL ENGINEERING
Instrument Layout
Instrument Cable Schedule
Typical Drawing For Instalation
Material Take Off
Instrument Work Volume
Symbol & Index
3 OTHERS
Consingering
*ALL INCLUDE NATIVE FILES (CAD drawing, word, excel and other documents)
HUMAN RESOURCES
PT MOBAR SARANA ENERGI will provide engineering team which consists of the
following fields
37
MECHANICAL
• Energy Conversion and Power Generation
• Mechanical Design and Heavy Equipment
• Piping and Fluid Transfer
• Material
ELECTRICAL, INSTRUMENTATION AND CONTROL
• Distribution System
• Power and Electrical Protection System
• Drive and Motor
• High Voltage and Earthing System
• Industrial Control and Instrumentation
CIVIL
• Geotechnical (Geologist)
• Geodetic
• Structural (Static Analysis)
• Structural (Dynamic Analysis)
• Civil QA&QC
• Civil Infrastructures
• Architect
• Auto CAD Drafter
ORGANIZATION
The engineering team will be led by Project manager and supported by 3 co
Leader in civil, mechanical and electrical & Instrument engineering. The team
will be divided into 2 teams, consists of 30 MW Team and 20 MW Team. These
division is needed to produce more efficient workflow, where 4 locations of
project can be worked in parallel.
Each team, i.e 30 MW Team and 20 MW Team, will be led by a senior engineer
and has team member of civil engineers, mechanical engineers, electrical and
instrument engineers. The supporting staff of drafters and cost estimators are
available for each team
The non-technical supporting staff are available to provide the best service, to
ensure that all the work flow can be achieved smoothly without any
disturbance.
38
Project Manager
Arief Hariyanto
39
Technical competence and Experiences
The engineering team of PT MOBAR SARANA ENERGI has high competence,
with long and very wide experiences either in power or in oil and gas
industries.
40
Figure 2. Heat and Mass Balance of PLTGU Bekasi Power
Other project related to this project also has been completed by member of PT
MSE Engineering team. The project of PJB Muara tawar can be as the example
of our products of engineering projects. The project was to develop the Detail
design of electrical system including the calculation sheets and other
documents. The result of this project can be seen in the Appendix
Mr. M Arief Gunawan Sungkar has very long experience in power generation
industry particularly with Wartsila products and EPC Projects such as
• EPC MFO system project PLTD Sei Raya, PLN Wil. Kalbar
• Rehab project PLTD Sei Raya, PLN Wil. Kalbar
• EPC MFO system project Leung Bata, PLN wil. SBU
With all very competence and very closed related to this project, PT MSE is very
confident to be able to handle project.
Approval Process
Related to the technical documents, there will be a document approval process
including technical drawings. Path and duration of the approval process will
created and expected the document and personnel involved in the discussion
became more orderly and effective.
41
documents can be instantly transformed into AFF if there were only minor
comments.
Document with IFR and IFA status that submitted to PT PP can be returned to the
Consultant to be revised without waiting for a signature of project leader PT PP.
AFF status document declared valid after signed by the Project Leader PP.
Work Methodology
42
Deliverables items
The detail items must be delivered in this project can be found in the appendix.
However, in general it can be categorized in the following items:
1. Technical specification
The detail specifications are needed to ensure that the construction work can be
conducted in high quality. It must consist of
• General description of the work including the fulfillment of the
regulation related to the work
• Specific description of work including the pattern of the work flow,
material flow, installation sequence of each equipment
• Scope of work of each sub system work
• References and standard related to the work
2. Drawing for procurement/bidding
The drawing must be approved by project owner before delivered to the
candidates
3. Engineering estimates
After the design process, the engineering estimates must be determined to be
reference for project owner. It must be completed with unit price of the
components
4. Construction drawing
The final stage of engineering is to produce the construction drawing for
procurement/bidding process. It will be also used for reference during the
construction process.
43
VI. Master Schedule
All works will be delivered in 60 days after the kick of meeting with PT PP. The detail of master schedule can be found in Table 2
Week
Description
1 2 3 4 5 6 7 8
Kick-Off Meeting
Survey Lapangan Labuhan Bajo
Nabire
Ternate
Bontang
Desain Proses Sipil (Labuhan Bajo & Nabire) System Studies
Calculation Details
Drawing Details
Data Equipment Sheet
Desain Proses Mekanikal (Labuhan Bajo & System Studies
Nabire) Calculation Details
Drawing Details
Data Sheet Equipment
Desain Proses Elektrikal (Labuhan Bajo & System Studies
Nabire) Calculation Details
Drawing Details
Data Sheet Equipment
Desain Proses Sipil (Ternate & Bontang) System Studies
Calculation Details
Drawing Details
44
Data Equipment Sheet
Desain Proses Mekanikal (Ternate & Bontang) System Studies
Calculation Details
Drawing Details
Data Sheet Equipment
Desain Proses Elektrikal (Ternate & Bontang) System Studies
Calculation Details
Drawing Details
Data Sheet Equipment
45
VII. Experience List
The experience list of PT MSE can be seen in the Table 3.
Table 3. Experience List of PT MSE
46
2013 PUSH BUTTON STAND - FTI PT. FUJITECHNICA INDONESIA
2013 FINAL TEST STAND - AHM PT. ASTRA HONDA MOTOR
2014 SCM CONTROL SYSTEM TRI MANUNGGAL PERKASA
INTERNATIONAL
2014 PT NIPSEA CHEMICAL (PENGADAAN DAN PEMASANGAN PT. NIPSEA PAINT AND CHEMICALS
CONTROL SYSTEM DAN JASA ENGINERING DESIGN SERVICE
UNTUK CED PROJECT)
2014 FINAL TESTER STEP 2 PT. ASTRA HONDA MOTOR
2014 POLRI - TRANSPORTASI PT. SSSA
2015 CLEAN MAKER & LEAK TESTER PT. ASTRA HONDA MOTOR
2015 PT. LOTTE CHEMICAL-BOLT & NU CLAMP FOR BAG FILTER PT. LOTTE CHEMICALS
2015 PT. LOTTE CHEMICAL-BOLT & NU CLAMP FOR BAG FILTER PT. LOTTE CHEMICALS
2015 OLI SKIMMER PT. ASPROS BINAREKA
2015 MODIFIKASI CEROBONG PAINTING STEEL SUNTER PT. ASTRA HONDA MOTOR
2015 PANEL STAR DELTA 33,5KW PT. KSB INDONESIA
2015 PENG. & INSTALASI PIPA HYDRANT PT. FUJITECHNICA INDONESIA
2015 POMPA SHOWPEN INDO EXTRUSIONS
2015 AHM - MC RADIATOR COLLANT FILLING PT. ASTRA HONDA MOTOR
2015 KSB - PANEL PRIMING DND 24VDC PT. KSB INDONESIA
2015 FAIRING BOOTH PT. ASTRA HONDA MOTOR
2015 PRESSURE SAFETY VALVE PT. PEMBANGUNAN PERUMAHAN
2015 RISET PARKIR OTOMATIS PT. MOBAR SARANA ENERGI
2015 INSTALASI PLC PT. KSB INDONESIA
2015 MESJID GENTA PAK DINDIN
2015 AHM - REPLACEMENT EXHAUST AREA UC & TC LINE K PLANT PT. ASTRA HONDA MOTOR
3
2015 PENGADAAN HYDRAULIC-INDO PT. INDEX
2015 KSB - ZELIO & EMERGENCY PT. KSB INDONESIA
2015 PT. INDEX - TEPLON PT. INDEX
2016 POLRI - ALMATSUS - BORGOL PT. SSSA
47
2016 AHM - ABS TESTER PT. ASTRA HONDA MOTOR
2016 JBR - PENGERJAAN SERTA PENYEDIA BAHAN MATERIAL DI PT. JABAR BUMI KONSTRUKSI
PROYEK INSFRASTRUKTUR PROYEK GEOTHERMAL DI
CISOLOK-SUKABUMI
2016 BEKISTING PT. JABAR BUMI KONSTRUKSI
2016 AHM - COLLAR PRESS MACHINE METRO GARMIN
2016 FLANGE & VALVE PT. HIRATEK
2016 INDO-MARKETING RECTIEFER UNIT - CHEMICAL PUMP PT. INDEX
2016 EXXEL TECHNOLOGI PTE LTD-AMPLIFIER PT. EXXEL TECHNOLOGI PTE LTD
2016 AHM - OTOMASI SIDESTAND DURABILITY PT. ASTRA HONDA MOTOR
2016 AHM - REPLACEMENT EXHAUST BLADE PT. ASTRA HONDA MOTOR
2016 PENGGANTIAN PINTU EVAPORATOR 1 PLANT 4 PT. ASTRA HONDA MOTOR
2016 PIPE SHOES KARAHA BODAS
2016 TRANSPORTASI TANKI PT. SSSA
2016 RANSPORTASI CABINET PT. SSSA
2016 BANGKA 50MW LOKASI AIR ANYIR, BANGKA PT. PP PLTG
2016 AHM - SEAT HARDNESS PT. ASTRA HONDA MOTOR
2016 ASPROS - ANCHOR PIPA DUDUKAN OIL SEPARATOR PT. ASPROS BINAREKA
2016 AHM - REKONDISI AIR SUPPLY UNIT - PAINTING CW P3 PT. ASTRA HONDA MOTOR
2016 FTMD - BALL PUNCH DEFORMATION TESTER FTMD
2016 AHM - PEMBUATAN CERB STEP 2 EXH WELDING FUEL TANK - PT. ASTRA HONDA MOTOR
P1
2016 ASPROS - PEMBUATAN BOX & PLAT MEDIA FILTER SS304 PT. ASPROS BINAREKA
(6UNIT)
2016 ITB - WINCH SYSTEM MACHINE ITB
2016 INDEX - ANODIZING RECTIFIER PT. INDEX
2016 PA AGUS - TANKI STAINLESS PAK AGUS
2016 PT. INDEX - HALF PULSE RETRIFIER PT. INDEX
2016 AHM - MOD. CEROBONG WELDING 2B P2(BUFFING) PT. ASTRA HONDA MOTOR
2016 AHM - JASA MAINTENANCE DROP TEST PT. ASTRA HONDA MOTOR
48
2016 AHM - REPLACEMENT TANKI ACID UPL - P3 PT. ASTRA HONDA MOTOR
2016 AHM - MODIFIKASI CEROBONG STEP 2- CERB. EXH WELDING PT. ASTRA HONDA MOTOR
LINE 3&4 P1
2016 SINKONA - PERBAIKAN JAKET REAKTOR PT. SINKONA LESTARI INDONESIA
2016 AHM - UPGRADING HEADLIGHT TESTER PT. ASTRA HONDA MOTOR
2016 PT. PUPESA - CONF. LETTER MACHINE COMPACT PT. PUPESA
2016 FTMD - JASA PEMBUATAN SPESIMEN PENELITIAN PN-7-20- FTMD
2016
2016 AIR POLLUTION DISPERSION SIMULATION PT PEMBANGUNAN PERUMAHAN Div.
EPC
2016 ITB - BRIQUETTE MACHINE ITB ITB
ELECTRIC
2012 PRIMING ELECTRICAL 12VDC KSB
2012 JASA ELECTRICAL & INSTRUMENT CONTROL ROOM IDLP
PLN&DALLE
2012 JASA INSTALASI BESERTA PENGADAAN MATERIAL IDLP
ELECTRICAL, INSTRUMENTASI&PLC
2016 JASA STUDI SISTEM KELISTRIKAN PEMBANGKIT LISTRIK PT. ENERGY SAKTI
TENAGA AIR 3 X 6 MW (PLTA PAKKAT) SENTOSA
2016 STUDY PENYAMBUNGAN PLTS 6M DI TARAKAN PT TRITAMA MITRA
KALIMANTAN UTARA LESTARI (TML ENERGY)
2016 INVENTARISASI RUMAH BELUM BERLISTRIK DI PT. EDUMATIC
KABUPATEN SUBANG INTERNASIONAL
2016 EVALUASI KEGIATAN LISTRIK PERDESAAN TAHUN 2014 - PT. EDUMATIC
2015 WILAYAH KABUPATEN BEKASI DAN KOTA BEKASI INTERNASIONAL
2016 INTERCONNECTION STUDY OF PLTA AEK NABARA PT. SUMBER BAHTERA ABADI
2016 STUDI PENYAMBUNGAN PLTS 3 MW DI KALIMANTAN PT TRITAMA MITRA
SELATAN LESTARI (TML ENERGY)
2016 STUDI SISTEM KELISTRIKAN PT ENERGY KARYA
PEMBANGKIT LISTRIK TENAGA MIKROHIDRO 2 X 5 MW PERSADA
49
DI SULAWESI SELATAN
2015 POWER SYSTEM ANALYSIS IN PANJANG ISLAND POWER PLANT HIRE ENGINEERING
POWER SYSTEM ANALYSIS JAWA-13 STEAM POWER HIRE ENGINEERING
PLANT (2X1000 MW)
2014 ELECTRICITY SYSTEM STUDY OF PLTA SALU URO & KALAENA PT. TIRTA ENERGY CEMERLANG
2016 ELECTRICITY SYSTEM STUDY MICRO HYDRO POWER PLANT PT. BANGUN ENERGI
2 X 2,5 MW (PLTM SALU PAKU) LESTARI
2015 DEVELOPMENT PLANNING OF SUB STATION AND POWER PT. ANGKASA PURA II
CABLES AT SOEKARNO HATTA INTERNATIONAL AIRPORT
2014- FEASIBILITY STUDY OF AIRPORT POWER PLANT AT PT. ANGKASA PURA II
2015
KUALANAMU INTERNASIONAL AIRPORT
2014 ELECTRICITY ROADMAP STUDY PT. ANGKASA PURA II
2014 STUDI KELAYAKAN PEMBANGUNAN INDEPENDENT PT.PERTAMINA PUSAT
POWER PRODUCER DI SUMATERA UTARA
2013- ELECTRICITY SYSTEM ASSESSMENT IN 13 FIELDS PT. PERTAMINA EP
2016
2016 FRONT END ENGINEERING DESIGN (FEED) POWER PLANT PT. PERTAMINA EP
DISTRICT I UBEP LIRIK
2012 KARAMA HEPP 450 MW WEST SULAWESI PT. PLN (PERSERO) PUSAT
2011 DYNAMIC STABILITY STUDIES FOR SUMATERA ELECTRIC PLN PUSLITBANG, P3B
2016 PEMUTAKHIRAN ROAD MAP LISTRIK PERDESAAN PT. PLN (Persero)
2016 EVALUASI KEGIATAN LISTRIK PERDESAAN TAHUN 2014 - UPT ESDM JAWA BARAT
2015 WILAYAH KABUPATEN DAN KOTA BEKASI WILAYAH II PURWAKARTA
2016 ANALISIS DAMPAK SISTEM TENAGA DI SUMATERA PT. PERTAMINA PERSERO
2016 UTARA ATAS PROYEK IPP KEK SEI MANGKEI 250 MW
KEGIATAN PENYUSUNAN ROADMAP PENGEMBANGAN DINAS ENERGI DAN
JARINGAN LISTRIK MENUJU RE JAWA BARAT 100% SUMBER DAYA MINERAL
PROVINSI JAWA BARAT
2016 STUDI PELAKSANAAN OPERATION AND MAINTENANCE PT. ANGKASA PURA II
50
PERALATAN ELEKTRONIKA, ELEKTRIKAL DAN MEKANIKAL
DI TERMINAL 3 ULTIMATE BANDAR UDARA
2016 POWER WHEELING IMPLEMENTATION STUDY PT. PLN (PERSERO)
51
PURA II-PERUSAHAAN GAS
NEGARA-WIKA
2017 DEVELOPMENT STUDY OF JAWA-BALI GRID 2019-2022 PT. PLN (PUSAT)
2016 FRONT END ENGINEERING DESIGN (FEED) OF AIRPORT CONSORTIUM OF ANGKASA
CIVIL
52
2015 ENGINEERING DESIGN DETAIL OF POWER SYSTEM SUPPLY PT. PLN PJB
SWITCHGEAR 6,3 KV CNG PLANT
2014 PENINGKATAN KAPASITAS DAN JARINGAN LISTRIK BANDARA PT. ANGKASA PURA II
SOEKARNO HATTA TANGERANG
2013 ENGINEERING DESIGN DETAIL FOR REPLACEMENT PT. ANGKASA PURA II
PERALATAN JARINGAN LISTRIK PRIORITY DAN NON PRIORITY
KAWASAN TENGAH DI BANDARA SOEKARNO-HATTA
2013 ENGINEERING DESIGN DETAIL OF SUB STATION AND POWER PT. ANGKASA PURA II
CABLES AT SOEKARNO HATTA INTERNATIONAL AIRPORT
INSTRUMENTATION
2011 SILO 10 CONTROL SYSTEM UPGRADE SIEMENS S5 TO S7 CV.SAHABAT PRATAMA
2011 SHIP UNLOADER A & B SECONDARY HMI PT. MITRA PANDAWA SENTOSA
2011 LOCK HOPPER CONTROL SYSTEM (LHCS) RETROFIT CV.SAHABAT PRATAMA
2011 PERAWANG OFFTAKE STATION METERING SYSTEM - HMI PT. PRATIWI PUTRI SULUNG
PROGRAMMING
2011 "INFOMEDIA" SOFTWARE DEVELOPMENT - KANTOR IMIGRASI DENY KUSWANDI
BOGOR
2011 "PENGAWASAN ORANG ASING" WEB APPLICATION DENY KUSWANDI
DEVELOPMENT - KANTOR IMIGRASI BANDUNG
2011 SPEED AWARENESS MONITORING, PROGRAMMING SERVICES PT.SYMMETRY CONTRACTING
2012 "VESSEL TRAFFIC MANAGEMENT" SOFTWARE DEVELOPMENT PT. KAESA INDAH SEJAHTERA
2012 PLC PROGRAMMING PANARAN OFFTAKE STATION PT. MOBAR SARANA ENERGI
2012 > TROBLESHOOTING FC TEKKO & LCM JAYA PT. MITRA PANDAWA SENTOSA
> TROBLESHOOTING & PLC PROGRAMMING
FC LOTUS 668
2012 > MAINTENANCE SERVICES, TOKA TINDUNG PT. MITRA PANDAWA SENTOSA
POWERHOUSE.
> PROVISION OF SCADA SYSTEM AT PLTD
TRISAKTI
> GENERATOR CONTROL PANEL
53
MODIFICATION FOR BLACKSTART
OPERATION, PT. VALE INDONESIA
2012 > TANK OVERFILL PROTECTION SYSTEM CV. SAHABAT PRATAMA
> LUBE OIL COMPLEX (LOC) III HMI UPGRADE
> REDUNDANT HMI FOR LOCK HOPPER
CONTROL SYSTEM (LHCS)
2012 PACKER 667 CONTROL SYSTEM CV. SAHABAT PRATAMA
2012 HMI PROGRAMMING, PROJECT TIE IN PAD 29 & PAD 30 PT. MITRA PANDAWA SENTOSA
(GEODIPA PLTP DIENG UNIT 1)
2012 PLC PROGRAMMING WATER TREATMENT PACKAGE CV. BANGUN GUNA SEJAHTERA
2012 WEB-APP DEVELOPMENT : DENY KUSWANDI
> APLIKASI POA KANIM BOGOR
> DEMO APLIKASI KEPUASAN PELANGGAN
2013 > IMPROVISASI TRISAKTI PT. MITRA PANDAWA SENTOSA
> MFO TRISAKTI
> SCADA PLTD SORONG
> SCADA PLTD BALI 1
> SCADA PLTD LOMBOK
> SCADA PLTD BALI 2
2013 CPI SCADA PIPELINE PT. CONTROL SYSTEMS
2013 METER KALIBRATOR SYSTEM MEDAN PT. PRATIWI PUTRI SULUNG
2013 PLC PROGRAMMING WATER TREATMENT PACKAGE CV. BANGUN GUNA SEJAHTERA
2013 MODIFIKASI PROGRAM HMI AHM PT. MOBAR SARANA ENERGI
2013 SURVEY TELEMETERING PERTAMINA EP PT. LAPI ITB
2013 PERBAIKAN HMI METERING SAKO PERTAMINA EP
2013 TECHNICAL ASSESSMENT & LOOP CHECK DEHC, PLTP DIENG PT LAPI GANESHATAMA CONSL.
UNIT 1
2013 JASA PENDAMPINGAN LELANG RETROFIT DEHC PT LAPI GANESHATAMA CONSL.
2013 PMC PROYEK RETROFIT DEHC PLTP DIENG PT. GEO DIPA ENERGI
2013 PEMELIHARAAN METER KALIBRATOR DIMET BANDUNG PT. PRATIWI PUTRI SULUNG
54
2013 PLC PROGRAM MODIFICATION (PLC ON MAINTENANCE) CV. PARAMA
COMPRESSOR STATION SEKERNAN & BELILAS
2013 PLC CABLE RECTIFICATION COMPRESSOR STATION SEKERNAN CV. PARAMA
2013 PLC PROGRAMMING WATER TREATMENT PACKAGE CV. BANGUN GUNA SEJAHTERA
2013 INSTRUMENT ENGINEERING & INSTALLATION PLTU MALUKU PT. MAHARANI PRIMA
UTARA
2014 SOLAR POWER SYSTEM 3 X 300WP PT. ANUGRAH ARTHA MANDIRI JASA
2014 MAINTENANCE SERVICES, SPEED AWARENESS MONITORING SATNETCOM
(SAM)
2014 DATA COMMUNICATION SYSTEM TCP-DCS BELILAS TRANSPORTASI GAS INDONESIA
COMPRESSOR STATION
2014 METER KALIBRATOR SYSTEM PGN BATAM PT. PRATIWI PUTRI SULUNG
2014 DCS ASSESSMENT PLTP DIENG (BAILEY INFI90 & DELTA-V) PT. GEO DIPA ENERGI
55
CONTROL) FOR 2 (TWO) YEARS AT RO2 BELILAS COMPRESSOR
STATION
2015 SERVICES FOR CONTROL SYSTEM SCADA - INTAKE & WTP BESTINDO PUTRA MANDIRI
TANGERANG DENGAN MENGGUNAKAN PLC SIEMENS S7 - 1500
& S7 - 1200
2015 JASA UPGRADING MODBUS COMMUNICATION DANIEL FLOCOM MEDCO E&P INDONESIA
S600 METER SALES INDRALAYA & BORANG STATION
2015 SERVIS BAS ICONIC SANBE FARMA
2016 PERBAIKAN SISTEM SCADA PLC INTAKE (PLC TWDO) MOYA BEKASI JAYA
2016 SERVICE SYSTEM SCADA MOYA BEKASI JAYA
2016 SERVICE ENGINEERING: UPGRADE FIELD SERVER, SANBE FARMA
KONFIGURASI ULANG FIELD SERVER, CONTINUTY CABLE
2016 SERVICE ENGINEERING FOR DISPLAY PANEL STABILITY ROOM: SANBE FARMA
TROUBLESHOOTING, CONTINUTY CABLE, PROGRAMMING &
CONFIGURATION, TESTING
2016 PENGADAAN SPAREPART F & G SYSTEM GTM & RO1 TRANSPORTASI GAS INDONESIA
2016 PENGADAAN MATERIAL & JASA PENGGANTIAN SAMMS MVX GEO DIPA ENERGI UNIT DIENG
PLC HWP
2016 CONTROL & MONITORING HVAC SYSTEM SANBE FARMA
2016 SERVICE TOUCH SCREEN TERMINAL PL 360T SANBE FARMA
56