V.

Technical Requirements

SCOPE OF WORK

PT MOBAR SARANA ENERGI is going to deliver the work with scope of

1. Basic Design
2. Detail Design
3. Calculation data sheet
4. Isometric Drawing
5. MTO
6. And other related works

Which stated as the responsibility of Sub contractor

The list of the works can be seen in the Table 1.

Table 1. Scope of work

NO DESCRIPTION REMARKS
PROCESS
1 SPECIFICATION
Process Design basis V
BEDD V
Process Description & Control Philosphy V

2 DRAWING
Overall Block Flow Diagram
Process Flow Diagram (PFD) For Fire Fighting System
Process Flow Diagram (PFD) For Water Treatment
System and Water Balance
P&ID Fuel Oil System
P&ID Fuel Gas System
P&ID Lubricating Oil System
P&ID Water Treatment System
P&ID Drawing WWTP (oily water system)
P&ID For Fire Fighting System
P&ID Instrument air and Plant air system
P&ID Interconnecting Cooling Water System
Layout Fire Fighting Equipment

3 CALCULATION
Line sizing calculation
HSD and Fuel Gas Consumption Calculation
Water Consumption Calculation
Process Calculation Fuel Oil Storage Tank

34
Process Calculation Lubricating Oil Storage Tank
Process Calculation Water Tank
Deep Well (Raw Water) Pump Calculation
Service Water Pump Calculation
Sludge Transfer Pump Calculation
Lubrication Oil Unloading Pump Calculation
Firewater consumption calculation
Calculation for Fire Water Pump
Calculation for Jockey Pump
Hydraulic Calculation

4 PROCESS DATASHEET
Process Datasheet for BOP

5 SPECIFICATION
Process Individual Specification for Water Treatment
System
Process Individual Specification for Waste Water
Treatment System
Process Specification for Fire Protection System

6 LIST
Equipment List
Line List

MECHANICAL
1 Engineering Document
Engineering Specification
Construction/ Installation Procedure
Calculation
Data Sheet
List & Report
Loading Data for Tank

2 Engineering Drawing
Standard Drawing
General Arrangement for Tank
Layout Drawing (for HVAC, Plumbing, Fire Fighting)
Isometric Drawing

3 MTO
MTO HVAC
MTO Plumbing
MTO Fire Fighting

4 Others
Consingering

35

PIPING
1 Engineering Document
Engineering Spesification
Inspection and Test Plan (ITP)
List & Report

2 Engineering Drawing
Standard Drawing and Support
Plot Plan/ Equipment Layout
Key Plan/ drawing Index
Piping Layout (Outside Cube/Interconnection)
Isometric Drawing (Outside Cube/Interconnection)
Information Drawing (Loading Data, Nozzle
Orientation, Insert Plate, etc.)

3 MTO
MTO Piping Material (Outside Cube/Interconnection)
MTO Pipe Support

4 Other
Consingering

CIVIL
1 Specification
Engineering Specification For Civil and Structure

2 Civil (Calculation and Engineering Drawing)
Foundation
- As per deliverable List
Structure
- As per deliverable List
Sub Structure
- As per deliverable List
Drainage
Pavement

3 Data
Piping Layout & Information Loading Data

4 MTO

5 OTHER
Consingering

ELECTRICAL
1 Basic Engineering

36
Single Line Diagram
Electrical System Description & System Analysis
Electrical Equipment & Motor List
Standard Drawing
Design Criteria
Engineering Specification
Data Sheet

2 DETAIL ENGINEERING
Cable Schedule
Shematic Diagram
Connection Diagram
Hazardous Area Classification
Cable Tray, Trench, Pit & Power Wiring Layout
Grounding & Lightning Wiring Layout
Lighting & Receptacle Wiring Layout
Telephone & Public Address Wiring Layout
Material Take Off

3 OTHER
Consingering

INSTRUMENT
1 BASIC ENGINEERING
Data Sheet and Calculation
Standard Drawing
Design Criteria
Engineering Specification

2 DETAIL ENGINEERING
Instrument Layout
Instrument Cable Schedule
Typical Drawing For Instalation
Material Take Off
Instrument Work Volume
Symbol & Index

3 OTHERS
Consingering

*ALL INCLUDE NATIVE FILES (CAD drawing, word, excel and other documents)


HUMAN RESOURCES

PT MOBAR SARANA ENERGI will provide engineering team which consists of the
following fields

37

MECHANICAL
• Energy Conversion and Power Generation
• Mechanical Design and Heavy Equipment
• Piping and Fluid Transfer
• Material

ELECTRICAL, INSTRUMENTATION AND CONTROL
• Distribution System
• Power and Electrical Protection System
• Drive and Motor
• High Voltage and Earthing System
• Industrial Control and Instrumentation

CIVIL
• Geotechnical (Geologist)
• Geodetic
• Structural (Static Analysis)
• Structural (Dynamic Analysis)
• Civil QA&QC
• Civil Infrastructures
• Architect
• Auto CAD Drafter

ORGANIZATION

The engineering team will be led by Project manager and supported by 3 co
Leader in civil, mechanical and electrical & Instrument engineering. The team
will be divided into 2 teams, consists of 30 MW Team and 20 MW Team. These
division is needed to produce more efficient workflow, where 4 locations of
project can be worked in parallel.

Each team, i.e 30 MW Team and 20 MW Team, will be led by a senior engineer
and has team member of civil engineers, mechanical engineers, electrical and
instrument engineers. The supporting staff of drafters and cost estimators are
available for each team

The non-technical supporting staff are available to provide the best service, to
ensure that all the work flow can be achieved smoothly without any
disturbance.

38
Project Manager
Arief Hariyanto

Civil Lead Engineer Mechanical Lead Engineer Electrical Lead Engineer


Pandit Parma Chakimoelmal Jaskur Nanang Hariyanto

Supporting 30 MW Team 20 MW Team


Team Civil Civil
• Senior Engineer • Senior Engineer
• Assistant Engineer • Assistant Engineer
• Drafter 1 • Drafter 1
Administration • Drafter 2 • Drafter 2
Treasury Mechanical Mechanical
General Affair • Senior Engineer • Senior Engineer
Schedule keeper • Assistant engineer • Assistant engineer
Transportation
• Drafter 1 • Drafter 1
• Drafter 2 • Drafter 2
Electrical and Instrument Electrical and Instrument
• Senior engineers • Senior Engineer
• Assistant Engineer • Assistant engineer
• Drafter 1 • Drafter 1
• Drafter 2 • Drafter 2

39
Technical competence and Experiences
The engineering team of PT MOBAR SARANA ENERGI has high competence,
with long and very wide experiences either in power or in oil and gas
industries.

Various projects have been completed by engineering team of PT MSE, such as


PLTGU 130 MW Bekasi Power. The scope of work was the Engineering
Procurement and Construction of PLTGU. The calculation of Heat and Mass
Balance of main component, i.e Gas Turbine, HRSG and Steam Turbine as well
as Balance of Plant. The example of the work can be found in the Figure 1 and
the Figure 2. Mr Chakimoelmal Jaskur was the mechanical engineering team
leader of the project.

Figure 1. Layout of PLTGU

40
Figure 2. Heat and Mass Balance of PLTGU Bekasi Power

Other project related to this project also has been completed by member of PT
MSE Engineering team. The project of PJB Muara tawar can be as the example
of our products of engineering projects. The project was to develop the Detail
design of electrical system including the calculation sheets and other
documents. The result of this project can be seen in the Appendix

Mr. M Arief Gunawan Sungkar has very long experience in power generation
industry particularly with Wartsila products and EPC Projects such as
• EPC MFO system project PLTD Sei Raya, PLN Wil. Kalbar
• Rehab project PLTD Sei Raya, PLN Wil. Kalbar
• EPC MFO system project Leung Bata, PLN wil. SBU

With all very competence and very closed related to this project, PT MSE is very
confident to be able to handle project.

Approval Process
Related to the technical documents, there will be a document approval process
including technical drawings. Path and duration of the approval process will
created and expected the document and personnel involved in the discussion
became more orderly and effective.

a. Flow of submitted documents have the status as follows:


IFI : Issued for
Information
IFR : Issued for Review
IFA : Issued for Approval
AFF : Approved for Final
IFR, IFA and AFF used in the approval process documents and engineering
drawings. While the IFI is just information. The status of first time submitted
engineering documents and drawings is IFR, and the next is IFA and AFF. IFR

41
documents can be instantly transformed into AFF if there were only minor
comments.

b. The duration of the document approval process is set as follows:


i. Submitted documents by Planning Consultant should be
reviewed by PT PP, a maximum of three (3) days for
number submitted documents between 1 - 5 files (submit
at the same time).
ii. Submitted documents by Planning Consultant should be
reviewed by PT PP, a maximum of seven (7) days for
number submitted documents between 1 - 10 files
(submit at the same time).
iii. Planning Consultant need to revise the document that
has been returned by PT PP, a maximum of six (6) days
for number submitted documents between 1 - 5 files
(back at the same time)
iv. Planning Consultant need to revise the document that
has been returned by PT PP, a maximum of twelve (12)
days for number submitted documents between 1 - 10
files (back at the same time)

Document with IFR and IFA status that submitted to PT PP can be returned to the
Consultant to be revised without waiting for a signature of project leader PT PP.
AFF status document declared valid after signed by the Project Leader PP.

Work Methodology

The methodology of this project can be described as follow:


1. The study of technical data of the main equipment and its requirements to
determine the necessity of the systems to develop the planning and to
look for any possible problems can arise.
2. Field survey in parallel for all locations in aspects of Civil, Mechanical,
Electrical and Instrumentation
3. Mechanical calculation per the technical data of main equipment and
other related systems
4. Loading analysis of the system according to the standard related to the
power plant and simulate it using ETAP software
5. Calculation of capacity of each apparatus and machine according to
produce the drawing, work plan documents and other technical aspects,
TOC, BoQ, engineering estimate as well as the reports
6. Presentation and weekly meeting with PT PP EPC Division
7. Technical assistance to the contractors during procurement and
construction works

42
Deliverables items
The detail items must be delivered in this project can be found in the appendix.
However, in general it can be categorized in the following items:

1. Technical specification
The detail specifications are needed to ensure that the construction work can be
conducted in high quality. It must consist of
• General description of the work including the fulfillment of the
regulation related to the work
• Specific description of work including the pattern of the work flow,
material flow, installation sequence of each equipment
• Scope of work of each sub system work
• References and standard related to the work
2. Drawing for procurement/bidding
The drawing must be approved by project owner before delivered to the
candidates

3. Engineering estimates
After the design process, the engineering estimates must be determined to be
reference for project owner. It must be completed with unit price of the
components

4. Construction drawing
The final stage of engineering is to produce the construction drawing for
procurement/bidding process. It will be also used for reference during the
construction process.

All document must be delivered according to deliverables list of the RFQ


documents.

43
VI. Master Schedule
All works will be delivered in 60 days after the kick of meeting with PT PP. The detail of master schedule can be found in Table 2

Table 2. Master schedule

Week
Description
1 2 3 4 5 6 7 8
Kick-Off Meeting
Survey Lapangan Labuhan Bajo
Nabire
Ternate
Bontang
Desain Proses Sipil (Labuhan Bajo & Nabire) System Studies
Calculation Details
Drawing Details
Data Equipment Sheet
Desain Proses Mekanikal (Labuhan Bajo & System Studies
Nabire) Calculation Details
Drawing Details
Data Sheet Equipment
Desain Proses Elektrikal (Labuhan Bajo & System Studies
Nabire) Calculation Details
Drawing Details
Data Sheet Equipment
Desain Proses Sipil (Ternate & Bontang) System Studies
Calculation Details
Drawing Details

44
Data Equipment Sheet
Desain Proses Mekanikal (Ternate & Bontang) System Studies
Calculation Details
Drawing Details
Data Sheet Equipment
Desain Proses Elektrikal (Ternate & Bontang) System Studies
Calculation Details
Drawing Details
Data Sheet Equipment

45
VII. Experience List
The experience list of PT MSE can be seen in the Table 3.
Table 3. Experience List of PT MSE

YEAR PROJECT NAME CLIENT


MECHANICAL
2011 DISPLAY MONITORING EQUIPMENT EXPENSE FOR CAPACITY PT ASTRA HONDA MOTOR
UP AT
2011 MODIFIKASI MAINT MC DIAGNOSTIC TESTER PT ASTRA HONDA MOTOR
2011 JASA SERVICE DIAGNOSTIC P3 PT ASTRA HONDA MOTOR
2011 FINAL INSPECTION TEST & DUCTING EXHAUST PT ASTRA HONDA MOTOR
2012 JASA PEMBUATAN HMI DAN IMPLEMENTASI WORKSTATION IDLP
2012 PALLET MAKING FTI
2012 COLLAPSIBLE BASKET PT PHE
2012 PENGADAAN ALAT LAB ITB ITB
2012 JASA SERVICE MESIN DIAGNOSTIC P3 PT. ASTRA HONDA MOTOR
2012 MOUNTING ANTENNA SISTEM MECATECH
2012 SERVICE COMPRESSION SCREW HEXAGON PT TITAN
2012 SP[ROKET FOR BP-709 PT. AMOCO MITSUI PTA INDONESIA
2012 JASA MODIF FINAL INSPECTION FOR CBS TYPE PT. ASTRA HONDA MOTOR
2013 OPEN TOP BASKET - PHE PT. PERTAMINA HULU ENERGI
2013 REPAIR ROTARY VALVE - PT. TITAN PT. TITAN
2013 TRASH BASKET & B3 STEEL BOX PT. PERTAMINA HULU ENERGI
2013 ALAU UJI LITBANG PU LITBANG
2013 PIPA - FTI PT. FUJITECHNICA INDONESIA
2013 SCREW JET COOKER - STARCH SOLUTION (PAK SONSON)
2013 MODIFIKASI EXHAUST FAN DUCTING - AHM PT. ASTRA HONDA MOTOR
2013 CHASSY DIAGNOSTIC TESTER - AHM PT. ASTRA HONDA MOTOR

46
2013 PUSH BUTTON STAND - FTI PT. FUJITECHNICA INDONESIA
2013 FINAL TEST STAND - AHM PT. ASTRA HONDA MOTOR
2014 SCM CONTROL SYSTEM TRI MANUNGGAL PERKASA
INTERNATIONAL
2014 PT NIPSEA CHEMICAL (PENGADAAN DAN PEMASANGAN PT. NIPSEA PAINT AND CHEMICALS
CONTROL SYSTEM DAN JASA ENGINERING DESIGN SERVICE
UNTUK CED PROJECT)
2014 FINAL TESTER STEP 2 PT. ASTRA HONDA MOTOR
2014 POLRI - TRANSPORTASI PT. SSSA
2015 CLEAN MAKER & LEAK TESTER PT. ASTRA HONDA MOTOR
2015 PT. LOTTE CHEMICAL-BOLT & NU CLAMP FOR BAG FILTER PT. LOTTE CHEMICALS
2015 PT. LOTTE CHEMICAL-BOLT & NU CLAMP FOR BAG FILTER PT. LOTTE CHEMICALS
2015 OLI SKIMMER PT. ASPROS BINAREKA
2015 MODIFIKASI CEROBONG PAINTING STEEL SUNTER PT. ASTRA HONDA MOTOR
2015 PANEL STAR DELTA 33,5KW PT. KSB INDONESIA
2015 PENG. & INSTALASI PIPA HYDRANT PT. FUJITECHNICA INDONESIA
2015 POMPA SHOWPEN INDO EXTRUSIONS
2015 AHM - MC RADIATOR COLLANT FILLING PT. ASTRA HONDA MOTOR
2015 KSB - PANEL PRIMING DND 24VDC PT. KSB INDONESIA
2015 FAIRING BOOTH PT. ASTRA HONDA MOTOR
2015 PRESSURE SAFETY VALVE PT. PEMBANGUNAN PERUMAHAN
2015 RISET PARKIR OTOMATIS PT. MOBAR SARANA ENERGI
2015 INSTALASI PLC PT. KSB INDONESIA
2015 MESJID GENTA PAK DINDIN
2015 AHM - REPLACEMENT EXHAUST AREA UC & TC LINE K PLANT PT. ASTRA HONDA MOTOR
3
2015 PENGADAAN HYDRAULIC-INDO PT. INDEX
2015 KSB - ZELIO & EMERGENCY PT. KSB INDONESIA
2015 PT. INDEX - TEPLON PT. INDEX
2016 POLRI - ALMATSUS - BORGOL PT. SSSA

47
2016 AHM - ABS TESTER PT. ASTRA HONDA MOTOR
2016 JBR - PENGERJAAN SERTA PENYEDIA BAHAN MATERIAL DI PT. JABAR BUMI KONSTRUKSI
PROYEK INSFRASTRUKTUR PROYEK GEOTHERMAL DI
CISOLOK-SUKABUMI
2016 BEKISTING PT. JABAR BUMI KONSTRUKSI
2016 AHM - COLLAR PRESS MACHINE METRO GARMIN
2016 FLANGE & VALVE PT. HIRATEK
2016 INDO-MARKETING RECTIEFER UNIT - CHEMICAL PUMP PT. INDEX
2016 EXXEL TECHNOLOGI PTE LTD-AMPLIFIER PT. EXXEL TECHNOLOGI PTE LTD
2016 AHM - OTOMASI SIDESTAND DURABILITY PT. ASTRA HONDA MOTOR
2016 AHM - REPLACEMENT EXHAUST BLADE PT. ASTRA HONDA MOTOR
2016 PENGGANTIAN PINTU EVAPORATOR 1 PLANT 4 PT. ASTRA HONDA MOTOR
2016 PIPE SHOES KARAHA BODAS
2016 TRANSPORTASI TANKI PT. SSSA
2016 RANSPORTASI CABINET PT. SSSA
2016 BANGKA 50MW LOKASI AIR ANYIR, BANGKA PT. PP PLTG
2016 AHM - SEAT HARDNESS PT. ASTRA HONDA MOTOR
2016 ASPROS - ANCHOR PIPA DUDUKAN OIL SEPARATOR PT. ASPROS BINAREKA
2016 AHM - REKONDISI AIR SUPPLY UNIT - PAINTING CW P3 PT. ASTRA HONDA MOTOR
2016 FTMD - BALL PUNCH DEFORMATION TESTER FTMD
2016 AHM - PEMBUATAN CERB STEP 2 EXH WELDING FUEL TANK - PT. ASTRA HONDA MOTOR
P1
2016 ASPROS - PEMBUATAN BOX & PLAT MEDIA FILTER SS304 PT. ASPROS BINAREKA
(6UNIT)
2016 ITB - WINCH SYSTEM MACHINE ITB
2016 INDEX - ANODIZING RECTIFIER PT. INDEX
2016 PA AGUS - TANKI STAINLESS PAK AGUS
2016 PT. INDEX - HALF PULSE RETRIFIER PT. INDEX
2016 AHM - MOD. CEROBONG WELDING 2B P2(BUFFING) PT. ASTRA HONDA MOTOR
2016 AHM - JASA MAINTENANCE DROP TEST PT. ASTRA HONDA MOTOR

48
2016 AHM - REPLACEMENT TANKI ACID UPL - P3 PT. ASTRA HONDA MOTOR
2016 AHM - MODIFIKASI CEROBONG STEP 2- CERB. EXH WELDING PT. ASTRA HONDA MOTOR
LINE 3&4 P1
2016 SINKONA - PERBAIKAN JAKET REAKTOR PT. SINKONA LESTARI INDONESIA
2016 AHM - UPGRADING HEADLIGHT TESTER PT. ASTRA HONDA MOTOR
2016 PT. PUPESA - CONF. LETTER MACHINE COMPACT PT. PUPESA
2016 FTMD - JASA PEMBUATAN SPESIMEN PENELITIAN PN-7-20- FTMD
2016
2016 AIR POLLUTION DISPERSION SIMULATION PT PEMBANGUNAN PERUMAHAN Div.
EPC
2016 ITB - BRIQUETTE MACHINE ITB ITB
ELECTRIC
2012 PRIMING ELECTRICAL 12VDC KSB
2012 JASA ELECTRICAL & INSTRUMENT CONTROL ROOM IDLP
PLN&DALLE
2012 JASA INSTALASI BESERTA PENGADAAN MATERIAL IDLP
ELECTRICAL, INSTRUMENTASI&PLC
2016 JASA STUDI SISTEM KELISTRIKAN PEMBANGKIT LISTRIK PT. ENERGY SAKTI
TENAGA AIR 3 X 6 MW (PLTA PAKKAT) SENTOSA
2016 STUDY PENYAMBUNGAN PLTS 6M DI TARAKAN PT TRITAMA MITRA
KALIMANTAN UTARA LESTARI (TML ENERGY)
2016 INVENTARISASI RUMAH BELUM BERLISTRIK DI PT. EDUMATIC
KABUPATEN SUBANG INTERNASIONAL
2016 EVALUASI KEGIATAN LISTRIK PERDESAAN TAHUN 2014 - PT. EDUMATIC
2015 WILAYAH KABUPATEN BEKASI DAN KOTA BEKASI INTERNASIONAL
2016 INTERCONNECTION STUDY OF PLTA AEK NABARA PT. SUMBER BAHTERA ABADI
2016 STUDI PENYAMBUNGAN PLTS 3 MW DI KALIMANTAN PT TRITAMA MITRA
SELATAN LESTARI (TML ENERGY)
2016 STUDI SISTEM KELISTRIKAN PT ENERGY KARYA
PEMBANGKIT LISTRIK TENAGA MIKROHIDRO 2 X 5 MW PERSADA

49
DI SULAWESI SELATAN
2015 POWER SYSTEM ANALYSIS IN PANJANG ISLAND POWER PLANT HIRE ENGINEERING
POWER SYSTEM ANALYSIS JAWA-13 STEAM POWER HIRE ENGINEERING
PLANT (2X1000 MW)
2014 ELECTRICITY SYSTEM STUDY OF PLTA SALU URO & KALAENA PT. TIRTA ENERGY CEMERLANG
2016 ELECTRICITY SYSTEM STUDY MICRO HYDRO POWER PLANT PT. BANGUN ENERGI
2 X 2,5 MW (PLTM SALU PAKU) LESTARI
2015 DEVELOPMENT PLANNING OF SUB STATION AND POWER PT. ANGKASA PURA II
CABLES AT SOEKARNO HATTA INTERNATIONAL AIRPORT
2014- FEASIBILITY STUDY OF AIRPORT POWER PLANT AT PT. ANGKASA PURA II
2015
KUALANAMU INTERNASIONAL AIRPORT
2014 ELECTRICITY ROADMAP STUDY PT. ANGKASA PURA II
2014 STUDI KELAYAKAN PEMBANGUNAN INDEPENDENT PT.PERTAMINA PUSAT
POWER PRODUCER DI SUMATERA UTARA
2013- ELECTRICITY SYSTEM ASSESSMENT IN 13 FIELDS PT. PERTAMINA EP
2016
2016 FRONT END ENGINEERING DESIGN (FEED) POWER PLANT PT. PERTAMINA EP
DISTRICT I UBEP LIRIK
2012 KARAMA HEPP 450 MW WEST SULAWESI PT. PLN (PERSERO) PUSAT
2011 DYNAMIC STABILITY STUDIES FOR SUMATERA ELECTRIC PLN PUSLITBANG, P3B
2016 PEMUTAKHIRAN ROAD MAP LISTRIK PERDESAAN PT. PLN (Persero)
2016 EVALUASI KEGIATAN LISTRIK PERDESAAN TAHUN 2014 - UPT ESDM JAWA BARAT
2015 WILAYAH KABUPATEN DAN KOTA BEKASI WILAYAH II PURWAKARTA
2016 ANALISIS DAMPAK SISTEM TENAGA DI SUMATERA PT. PERTAMINA PERSERO
2016 UTARA ATAS PROYEK IPP KEK SEI MANGKEI 250 MW
KEGIATAN PENYUSUNAN ROADMAP PENGEMBANGAN DINAS ENERGI DAN
JARINGAN LISTRIK MENUJU RE JAWA BARAT 100% SUMBER DAYA MINERAL
PROVINSI JAWA BARAT
2016 STUDI PELAKSANAAN OPERATION AND MAINTENANCE PT. ANGKASA PURA II

50
PERALATAN ELEKTRONIKA, ELEKTRIKAL DAN MEKANIKAL
DI TERMINAL 3 ULTIMATE BANDAR UDARA
2016 POWER WHEELING IMPLEMENTATION STUDY PT. PLN (PERSERO)

2016 JASA MANAJEMEN KONSTRUKSI PEMBANGUNAN SUB PT. ANGKASA PURA II


GARDU INDUK BANDARA SOEKARNO-HATTA DAN
PENARIKAN KABEL POWER MENUJU GARDU HUBUNG
BANDARA SOEKARNO-HATTA
2014 PENINGKATAN KAPASITAS DAN JARINGAN LISTRIK PT. ANGKASA PURA II
2017 BANDARA SOEKARNO HATTA TANGERANG
2016 REPLACEMENT PERALATAN JARINGAN LISTRIK PRIORITY PT. ANGKASA PURA II
DAN NON PRIORITY KAWASAN TENGAH DI BANDARA
2016 SOEKARNO-HATTA PT. PLN TARAKAN
ELECTRICITY BUSINESS DEVELOPMENT OF PT. PLN
TARAKAN
2017 MEASUREMENT OF DYNAMIC PARAMETERS OF PT. PLN (PERSERO) PUSAT
GENERATORS IN JAWA-BALI POWER SYSTEM, 2017 PENGATUR BEBAN
2017 ASSESMEN SISTEM JARINGAN LISTRIK BANDARA PT. ANGKASA PURA II
SOEKARNO-HATTA
2017 JASA KONSULTAN PENGAWAS PAKET PEKERJAAN PT. ANGKASA PURA II
REPLACEMENT PERALATAN JARINGAN LISTRIK PRIORITY
DAN NON PRIORITY KAWASAN TENGAH DI BANDARA
SOEKARNO HATTA
2017 STUDI SENSITIVITAS PENGEMBANGAN SISTEM PT. PLN (PERSERO) PUSAT
KELISTRIKAN JAWA-BALI TAHUN 2019-2022 PENGATUR BEBAN
ENGINEERING DESIGN OF 500 KV SUMATERA SYSTEM PT PLN (PERSERO)
2017 REASSESSMENT STUDIES OF ON GOING SUMATERA-JAVA PT. PLN PUSAT (PERSERO)
500KV HVDC INTERCONNECTION PROJECT FOR
RELIABILITY & SECURITY OF POWER SUPPLY IN JAVA &
2017 FEASIBILITY STUDY OF AIRPORT POWER PLANT CONSORTIUM OF ANGKASA

51
PURA II-PERUSAHAAN GAS
NEGARA-WIKA
2017 DEVELOPMENT STUDY OF JAWA-BALI GRID 2019-2022 PT. PLN (PUSAT)
2016 FRONT END ENGINEERING DESIGN (FEED) OF AIRPORT CONSORTIUM OF ANGKASA

2016 POWER PLANT PURA II-PERUSAHAAN GAS


NEGARA-WIKA
2016 PLANNING AND POWER SYSTEM SUPPLY SWITCHGEAR 6,3 PT. PLN PJB
KV CNG PLANT
INTERNATIONAL COMPANY
2017 GRID INTEGRATION STUDY FOR SOLAR FARM IN BELITUNG INTERNATIONALE ZUSAMMENARBEIT
(GIZ) GMBH
2016 GRID CODE ANALYSIS FOR SUMATRA AND KALIMANTAN TRACTEBEL ENGINEERING
2016 GRID IMPACT STUDY OF SOLAR FARM IN LAMPUNG TRACTEBEL ENGINEERING
2016 LASOLO HYDRO POWER PLANT POWER SYSTEM STUDY PT LASOLO HIDRO ENERGI- POWER
CHINA

2016 PRELIMINARY GRID IMPACT STUDY GE ENERGY


FOR SOLAR FARM IN NORTH SULAWESI
2016 GRID IMPACT STUDY TRACTEBEL ENGINEERING
FOR SOLAR FARM
2016 TIMOR REGIONAL INTERCONNECTION STUDY WORLD BANK-TRACTEBEL
ENGINEERING
2016 INTERCONNECTION STUDY OF BIOGAS POWER PLANT EVANS GROUP COMPANY
GUNUNG PELAWAN LESTARI
FEASIBILITY STUDY OF WASTE CRUSHER PT. MYEOUNGJIN
INDONESIA
2016 ELECTRICITY STUDY OF PLTBG AANE JANGKANG BELITUNG AUSTINDO AUFWIND NEW

CIVIL

52
2015 ENGINEERING DESIGN DETAIL OF POWER SYSTEM SUPPLY PT. PLN PJB
SWITCHGEAR 6,3 KV CNG PLANT
2014 PENINGKATAN KAPASITAS DAN JARINGAN LISTRIK BANDARA PT. ANGKASA PURA II
SOEKARNO HATTA TANGERANG
2013 ENGINEERING DESIGN DETAIL FOR REPLACEMENT PT. ANGKASA PURA II
PERALATAN JARINGAN LISTRIK PRIORITY DAN NON PRIORITY
KAWASAN TENGAH DI BANDARA SOEKARNO-HATTA
2013 ENGINEERING DESIGN DETAIL OF SUB STATION AND POWER PT. ANGKASA PURA II
CABLES AT SOEKARNO HATTA INTERNATIONAL AIRPORT
INSTRUMENTATION
2011 SILO 10 CONTROL SYSTEM UPGRADE SIEMENS S5 TO S7 CV.SAHABAT PRATAMA
2011 SHIP UNLOADER A & B SECONDARY HMI PT. MITRA PANDAWA SENTOSA
2011 LOCK HOPPER CONTROL SYSTEM (LHCS) RETROFIT CV.SAHABAT PRATAMA
2011 PERAWANG OFFTAKE STATION METERING SYSTEM - HMI PT. PRATIWI PUTRI SULUNG
PROGRAMMING
2011 "INFOMEDIA" SOFTWARE DEVELOPMENT - KANTOR IMIGRASI DENY KUSWANDI
BOGOR
2011 "PENGAWASAN ORANG ASING" WEB APPLICATION DENY KUSWANDI
DEVELOPMENT - KANTOR IMIGRASI BANDUNG
2011 SPEED AWARENESS MONITORING, PROGRAMMING SERVICES PT.SYMMETRY CONTRACTING
2012 "VESSEL TRAFFIC MANAGEMENT" SOFTWARE DEVELOPMENT PT. KAESA INDAH SEJAHTERA
2012 PLC PROGRAMMING PANARAN OFFTAKE STATION PT. MOBAR SARANA ENERGI
2012 > TROBLESHOOTING FC TEKKO & LCM JAYA PT. MITRA PANDAWA SENTOSA
> TROBLESHOOTING & PLC PROGRAMMING
FC LOTUS 668
2012 > MAINTENANCE SERVICES, TOKA TINDUNG PT. MITRA PANDAWA SENTOSA
POWERHOUSE.
> PROVISION OF SCADA SYSTEM AT PLTD
TRISAKTI
> GENERATOR CONTROL PANEL

53
MODIFICATION FOR BLACKSTART
OPERATION, PT. VALE INDONESIA
2012 > TANK OVERFILL PROTECTION SYSTEM CV. SAHABAT PRATAMA
> LUBE OIL COMPLEX (LOC) III HMI UPGRADE
> REDUNDANT HMI FOR LOCK HOPPER
CONTROL SYSTEM (LHCS)
2012 PACKER 667 CONTROL SYSTEM CV. SAHABAT PRATAMA
2012 HMI PROGRAMMING, PROJECT TIE IN PAD 29 & PAD 30 PT. MITRA PANDAWA SENTOSA
(GEODIPA PLTP DIENG UNIT 1)
2012 PLC PROGRAMMING WATER TREATMENT PACKAGE CV. BANGUN GUNA SEJAHTERA
2012 WEB-APP DEVELOPMENT : DENY KUSWANDI
> APLIKASI POA KANIM BOGOR
> DEMO APLIKASI KEPUASAN PELANGGAN
2013 > IMPROVISASI TRISAKTI PT. MITRA PANDAWA SENTOSA
> MFO TRISAKTI
> SCADA PLTD SORONG
> SCADA PLTD BALI 1
> SCADA PLTD LOMBOK
> SCADA PLTD BALI 2
2013 CPI SCADA PIPELINE PT. CONTROL SYSTEMS
2013 METER KALIBRATOR SYSTEM MEDAN PT. PRATIWI PUTRI SULUNG
2013 PLC PROGRAMMING WATER TREATMENT PACKAGE CV. BANGUN GUNA SEJAHTERA
2013 MODIFIKASI PROGRAM HMI AHM PT. MOBAR SARANA ENERGI
2013 SURVEY TELEMETERING PERTAMINA EP PT. LAPI ITB
2013 PERBAIKAN HMI METERING SAKO PERTAMINA EP
2013 TECHNICAL ASSESSMENT & LOOP CHECK DEHC, PLTP DIENG PT LAPI GANESHATAMA CONSL.
UNIT 1
2013 JASA PENDAMPINGAN LELANG RETROFIT DEHC PT LAPI GANESHATAMA CONSL.
2013 PMC PROYEK RETROFIT DEHC PLTP DIENG PT. GEO DIPA ENERGI
2013 PEMELIHARAAN METER KALIBRATOR DIMET BANDUNG PT. PRATIWI PUTRI SULUNG

54
2013 PLC PROGRAM MODIFICATION (PLC ON MAINTENANCE) CV. PARAMA
COMPRESSOR STATION SEKERNAN & BELILAS
2013 PLC CABLE RECTIFICATION COMPRESSOR STATION SEKERNAN CV. PARAMA
2013 PLC PROGRAMMING WATER TREATMENT PACKAGE CV. BANGUN GUNA SEJAHTERA
2013 INSTRUMENT ENGINEERING & INSTALLATION PLTU MALUKU PT. MAHARANI PRIMA
UTARA
2014 SOLAR POWER SYSTEM 3 X 300WP PT. ANUGRAH ARTHA MANDIRI JASA
2014 MAINTENANCE SERVICES, SPEED AWARENESS MONITORING SATNETCOM
(SAM)
2014 DATA COMMUNICATION SYSTEM TCP-DCS BELILAS TRANSPORTASI GAS INDONESIA
COMPRESSOR STATION
2014 METER KALIBRATOR SYSTEM PGN BATAM PT. PRATIWI PUTRI SULUNG
2014 DCS ASSESSMENT PLTP DIENG (BAILEY INFI90 & DELTA-V) PT. GEO DIPA ENERGI

2014 HMI UPGRADE, TANK FARM MONITORING PT. CONTROL SYSTEMS


2014 AIR DRYER UNIT CONTROLLER PT. SAHABAT PRATAMA
2014 HVAC CONTROL SYSTEM, RFCC PROJECT PT. MITRA PANDAWA SENTOSA
2014 ENGINEERING SERVICES PACKAGE PT. CINOVASI REKAPRIMA
2014 ENGINEERING SERVICES FOR HMI PT. YOKOGAWA INDONESIA
2014 MODIFICATION PLC PROGRAM & HMI PT. PRATIWI PUTRI SULUNG
2014 INSPECTION & REPAIR ESD PLC AT SEKERNAN TRANSPORTASI GAS INDONESIA
2014 PLC PROGRAMMING BANGUN GUNA SEJAHTERA
2014 SCM CONTROL SYSTEM TRI MANUNGGAL PERKASA
INTERNATIONAL
2014 SCM CONTROL SYSTEM ARCA ENERGI
2015 SAFETY SYSTEM [ESD] SPBG EMPAT SATRIA LESTARI
KAMPUNG MELAYU - PULO GEBANG - CIPUTAT
2015 BLANKET CONTRACT FOR SERVICE OF WINCC SIEMENS AND TRANSPORTASI GAS INDONESIA
PLC SIEMENS SIMATIC 7 (INSTRUMENTATION SYSTEM AND

55
CONTROL) FOR 2 (TWO) YEARS AT RO2 BELILAS COMPRESSOR
STATION

2015 SERVICES FOR CONTROL SYSTEM SCADA - INTAKE & WTP BESTINDO PUTRA MANDIRI
TANGERANG DENGAN MENGGUNAKAN PLC SIEMENS S7 - 1500
& S7 - 1200
2015 JASA UPGRADING MODBUS COMMUNICATION DANIEL FLOCOM MEDCO E&P INDONESIA
S600 METER SALES INDRALAYA & BORANG STATION
2015 SERVIS BAS ICONIC SANBE FARMA
2016 PERBAIKAN SISTEM SCADA PLC INTAKE (PLC TWDO) MOYA BEKASI JAYA
2016 SERVICE SYSTEM SCADA MOYA BEKASI JAYA
2016 SERVICE ENGINEERING: UPGRADE FIELD SERVER, SANBE FARMA
KONFIGURASI ULANG FIELD SERVER, CONTINUTY CABLE
2016 SERVICE ENGINEERING FOR DISPLAY PANEL STABILITY ROOM: SANBE FARMA
TROUBLESHOOTING, CONTINUTY CABLE, PROGRAMMING &
CONFIGURATION, TESTING
2016 PENGADAAN SPAREPART F & G SYSTEM GTM & RO1 TRANSPORTASI GAS INDONESIA
2016 PENGADAAN MATERIAL & JASA PENGGANTIAN SAMMS MVX GEO DIPA ENERGI UNIT DIENG
PLC HWP
2016 CONTROL & MONITORING HVAC SYSTEM SANBE FARMA
2016 SERVICE TOUCH SCREEN TERMINAL PL 360T SANBE FARMA