REPORT

Residentian Electrical Instalation

Lecture :
Syaiful islami S.Pd., M.Pd. T.

Arrenge By :

Rahmad Kurnia
18063060

Electrical Engineering Educations

Electrical Engineering

Engineering faculty

Padang State University

2020
Rahmad Kurnia Residentian Electrical Installation Wednesday, February 12, 2020
18063060 Practicum
Electrical engineering educations REPORT 2
(Install 2 source boxes, 2
incandescent lamps, 1 Tl lamp, 1
serial switch and 1 single switch and
use MCB)

A. PURPOSE
Students can install lighting installations one grub in accordance with the series of drawings given in 3 x 100
minutes

B. TOOLS AND MATERIALS


a. Tools b. Materials
- Combinations pilers - Single switch
- Wire peel pilers - Searial switch
- Cutting piler - Source voltage box
- Taper pilers - T- dos
- Rounding pilers - Pipe
- (-) Screwdriver - Klem
- (+) Screwdriver - Insulation
- Jara - Light socket
- Multymeter - Rosette wood
- Installation knife - TL lamp
- Wood screw 1”, ¾”, ½ “
- Bulb
- NYA cable 1,5 mm² (phase)
- NYA cable 1,5 mm² (Netral)
- NYA cable 1,5 mm² (Ground)

C. SAFETY WORK
1. Check all of the component you will using before, is that ok ?!
2. Installing the component that’s needed for safety work with carefull, do to the last work steps
3. Connect the phase wire to the middle terminal of light socket to reduce work accident
4. Use the multimeter or megger to check your installation circuit before connect to the source
5. Beware for using the multimeter or megger, look for the limit loud

D. WORK STEPS
1. Before do the practice, draw the wearing diagram and consulling with your lecture
2. Work is in 3 persons maximal, and its will be rate by individual skill
3. Prepare the tools and materials
4. Mark of the layout according the wearing diagram picture you make before,
5. Cut the PVC pipe as per the picture
6. Put the PVC pipe to the work board and nail it using clamps
7. Put the T-dos with wood screw to the board
8. Cut the cable and give 10% tolerance according tehe picture
9. Put in the cable to the pipe
10. Peel for 3cm to the tag end of the cable
11. Install the rosette wit 1” screw for the light socket
12. Instal the single switch, light socket, serial switch, source voltage box, and then connect the wire to
terminal
13. Check the circuit with multymeter
14. If its true you can deffence the connections with insulations or lasdop
15. Install the lamps
16. Tell to your lecture if the circuit is true, and connect to the source to start it
17. If it accepted, done the practice and pul out the circuit and return to the chest

E. PRACTICUM PICTURE
(the picture is drawing to the millimeter block paper)

F. PRACTICUM RESULT PICTURE


(include in the attachment 1 )

G. ANALYSIS
in checking the electrical lighting installation circuit that has been installed can use a multimeter whether the
circuit does not experience a short circuit or incorrect installation
1. to check the short circuit
before use make sure the multimeter is in the position of the switch select on OHM. when the multimeter is
connected to the circuit with parallel mounting (phase to + and neutral to -) so the multimeter needle will
not move if the circuit is load-free. but when loaded (incandescent light) the needle will move and this is a
normal occurrence, because when installed multimeter will automatically load load resistance installed.
2. Matters on Pawn 1 will not apply to TL lamps. because the construction of TL lamps differs greatly from
incandescent lamps and their effect is on the starting fuse of TL lamps.
3. From the two explanations above, in doing trouble shooting of problematic house installations, the
situation should be free.

H. REFERENCE
Syamsuarnis, dkk. 2019. Jobsheet Praktikum INSTALASI PERUMAHAN. Unp press. Unp. Padang
Attachment 1 “ practicum result picture”