Professional Documents
Culture Documents
DIMENSION FOUNDATION
2. MATERIAL PROPERTIES
3. DESIGN LOAD
Based on Doc. No. 220802DLRSC1005 Calmarine – Geotechnical Investigations Test Final Report on ORF Area
According to soil investigation report, the nearest boring log for telecom tower foundation are on CBH-04.
Bore Hole Number = CBH-04
Safety Factor (SF) = 3
Pile Dimension = 0.4 m (spun)
Area = 0.1257 m2
Perimeter (As) = 1.2566 m
Length of pile foundation = 17.00 m
Thus,
Allowable Compression Bearing Capacity = Eg * Pall = 894.72 kN
Allowable Compression Capacity by pile material = 121 ton = 1210.00 kN
Pile Arrangement
Pile x y x2 y2
No (m) (m) (m2) (m2)
1 -0.850 0.850 0.723 0.723
2 0.850 0.850 0.723 0.723
3 0.000 0.000 0.000 0.000
4 -0.850 -0.850 0.723 0.723
5 0.850 -0.850 0.723 0.723
5 S= 2.89 2.89
n= 5 (number of pile)
P1 My*dx Mx*dy
Pvmax = + +
n ∑x2 ∑y2
P2 My*dx Mx*dy
Pvmin = - -
Pvmin = - -
n ∑x2 ∑y2
Weight of pedestal Wp = L P * B P * HP * γc
= 1 * 1 * 1.2 * 24
= 28.80 kN
P1 = Fz_max + Wf P2 = Fz_min + Wf
= 1750.65 + 218.85 = -1307.72 + 218.85
= 1969.50 kN = -1088.87 kN
Pall = 894.72 kN
Ptension = 411.93 kN 0.53
Remarks [OK]
Horizontal reaction :
Ʃ Hy_max
Hmax =
n
-136.790
=
5
= -27.36 kN Ø= 0.7
-27.36
= kN
0.70
= -39.08 kN
dP
PMAX
dP + d
α d
(b)
( )√
V C = 0 . 083 Vsc =+2###f c kN
b0
' b0 d Vc = 7998.41 kN (ACI-05,11-34)
Vu < ØVc
393.90 kN < 2487.56 kN [OK]
5. FOUNDATION DESIGN
5.1 Pedestal Reinforcement
Check requirement :
Pedestal Height 1.2
Ratio = = = 1.20 < 2.50 Pedestal
Width of pedestal 1.0
Rebar requirement :
ro= 0.005 As = r o Ag = 0.005 x 100 x 100 = 50.00
(ACI 318 Section 15.8.2.1)
Used : D - 16 = 2.01 cm2 n = 28 56.2973
Foundation slab is simplified as a continuous one way slab with 1 m strip and supported
on pinned supports.
S = pile distance/spacing s= 1.7 m
Ultimate load,
Qu = 1.4Qf + Qp;
Qu = 1.4*16.8+434.018 Qu = 457.54 kN/m
Reinforcement design:
fc' = 30 MPa
fy = 400 MPa
b= 1000 mm
t = 700 mm
Concrete cover = 50 mm
Embedment = 100 mm
Effective depth = 590 mm
Mu = 165.29 kN.m
Mu 165.29
Rn = = = 0.53 MPa
f bd' 2 0.9 x 590 x 1000^2 (ACI-318)
0 . 85 × fc 0.00133 (ACI-318)
rreq = ׿ =
fy
¿
0 . 85 × fc
׿
fy
¿
(ACI-318)
0 . 85×fc 600
rmax = 0 . 75×
fy
×0. 85×
600+fy ( ) = 0.02438
rneed = 0.00180
Asreq = r*b*d
= 0.0018 * 1000 * 590
= 1062.0 mm2
Reinforcement to be used,
Rebar diameter, dr = 16 mm
Rebar section area, Ar = 201 mm2
Spacing s= 150 mm
Total area, As.installed = 1340 mm2
Check Reinforcement : As.installed > Asreq 1340.0 mm² > 1062 mm² [OK]
Fxt = 4340.5231 kg
Fyt = 4342.7665 kg √Fxt+Fyt
(angka diambil dari reaksi dari tiang pancang )
F/n pile 20823. 2/1
= = 1.9
2
( πD /4 ) ( 0 . 4fy ) ( π/4×1,9 2 ) ( 0,4×4000 ) √( 〖 4340.5 〗 ^2 )+
〖 4342.8 〗 ^2
Dipakai 10 D 16 untuk tiang pancang diameter 400
Used 12 D 16 for pile dia. 400
Panjang penjangkaran berdasarkan diameter tulangan
2
0 . 25×π ×19 ×4000×9, 806/100
0, 019× = 276.27 mm
√( 332×9,806 /100 )
® Dipakai 400 mm didalam pile cap untuk tiang pancang diameter 400 mm
vc =
√ f c = √ 33 .2 =0 . 960 MPa=9 . 417 kg/cm2 0.91 9.3093
6 6
® Dipakai 400 mm didalam pile cap untuk tiang pancang diameter 400 mm
Embedment
Fcv = 1/6*f'c^0.5 = 0.9 MPa = 9.1 kg/cm2
Pr = 5.03 cm2
Ft = 21.8 kN = 2219.92 kg
Le = Ft/(Fcv*Pr) = 48 cm
5.2 SETTLEMENT CHECKING
Vertical Settlement
Settlement in pile group consist of :
- Elastic shortening of pile materials
Hence, the total settlement of pile group is :
ρt = ρpile + ρi + ρcp
2/3L
Consolidated Layer
TOTAL SETTLEMENT
(ACI-05,11-34)
(ACI-05,11-35)
Pedestal
cm2
(ACI-318)
(ACI-318)
(ACI-318)
(ACI-318)
(ACI-318)
F/(((πD^2)/4)(0.4
Fy))
Total = 1969.50 kN / 9.8 = 200.9691 ton , one group footing = 5 pile , single load plan pile 200.9691 /5 = 40.194 ton
Efficiency group = 0.990 so single load plan pile = 40.19382 /0.99 = 40.600 ton
If static load test max. load 200 % , we need load more than 40.59981 ton x 2 = 81.200 ton
F/(((πD^2)/4) 6140.01/(((π 〖 x
(0.4 Fy))
1.6 〗 ^2)/4)(0.4 x 4000))
Vc= √fc/6
Ft = π x d x L x Vc
Ft = π x d x L x Vc
Vc= √fc/6