You are on page 1of 6

Quality Management System Based on the ISO

9001:2015: Study Case of a Coachwork Company


Franklin Tigre-O., Edith Elena Tubón-Núñez, Sandra Carrillo, Jorge Buele, Franklin Salazar-L.
Facultad de Ingeniería en Sistemas, Electrónica e Industrial
Universidad Técnica de Ambato
Ambato, Ecuador
{fg.tigre, ee.tubon, sandralcarrillor, jl.buele, fw.salazar}@uta.edu.ec

Abstract — The management of the quality system in a stage starts when the company´s direction gives importance to
coachwork company based on the ISO 9001 standard, version the implementation of the QMS ISO 9001, for meeting client’s
2015 and it aims directing and controlling the productive exigencies and considering products quality as an advantage
processes to ensure compliance with the operation parameters facing the market competition [3].
and to achieve the expected effects. The development of this
research comprises: (i) description of the manufacturing The implementation of a QMS ISO 9001, improves
processes, (ii) diagnosis of the ISO 9001:2015 requirements, (iii) industry´s performance because it promotes a process approach
documentation structure of the QMS and (iv) development of the and it meets the rules and client´s requirements, contributing in
Quality Route method as an improvement for critical processes the products manufacturing which meet parameters as comfort,
which generate non-compliant results. The proposed continuous security and quality [4]. In the coachwork industry, the
improvement model aims to adapt the company to current adoption of QMS from the family of ISO 9001, provides a
market needs and meet the customers’ necessities, allowing the standardization of its processes, promoting the continuous
enterprise to increase its productivity and profitability thanks to improvement based on the Deming cycle, helping to face the
the systematic optimization and development of its processes. threats of the competition in the national and international
This encourages a specific management and generates positive market [5].
changes in the organization, maintaining a vision of improvement
and continuous innovation, in search of assurance of the quality ISO 9001:2015 standard is the quality management model
of the products/services. In the application allows to compare most known and certified around the world. The current
with the initial situation made to the manufactured product, and version is focused on adapting to complex environments and
it is found that the percentage of defects decreased from 72.0% to on including new business practices. The requirements of this
36.0%. The method of the Quality Route based on the Deming model are generic and applicable to any kind of enterprise
cycle with its stages; plan, do, check and act, implemented as a regardless of its size or its activity. The application in new
continuous improvement action in body manufacturing industrial sectors is framed in the evolution of the standard,
processes, allows solving problems from identified improvement improving the internal and external competitiveness of the
opportunities, establishing a quality control system in the business, strengthening the capacity of supplying consistent
manufacturing phases of the product, through the execution of
and high-quality products [4]. The requirements for
visual inspections and use of records.
implementing a QMS according to the methodology of the
Keywords - ISO Standards, Manufacturing industries, Project ISO, are non-rigid elements. For this reason, the QMS requires
Management, Quality metrics, Standards organizations. a constant upgrade for satisfying the organization and the
client’s needs. The current internationally approved standard
I. INTRODUCTION has a high-level structure improving the relations between: the
Worldwide, the vehicle coachwork companies think in the management systems, the concerned parties, an efficient
production as a transformation process of raw materials into process management, and the adoption of the risk-based
aggregated value products. Over the years, the manufacturing approach [6].
of metallic structures for buses has evolved in correspondence The risk-based approach of the current version of ISO,
with people´s demands and with technology progresses, that is the Failure Mode Effects Analysis (FMEA) and the Quality
why, industries have had to implement a QMS under the ISO Route are processes of a high reach when managing the
9001:2015 standard, promoting a permanent control of the improvement actions inside any QMS. FMEA and Quality
operative’s processes and obtaining quality products with a Route represent tools allowing to identify the main failures in
high technical standard at international level [1]. the productive methods, avoiding reprocessing activities and
The Quality Management System (QMS) ISO 9001, is the bringing benefits and costs reductions to the organization [7].
most adopted quality management model worldwide, having The Quality Route method is intended to identify and solve
nowadays more than 1.1 million of certificates given to problems in product manufacturing with the aim of reducing
manufacturing and service organizations [2]. Where quality internal failures and perform a continuous improvement of the
management has seen an evolution in the following stages: processes, it identifies the improvement opportunities and
quality control, quality assurance, total quality and finally, the reduces the non-conformities of higher occurrence that affect
emerging of business excellence models. Quality assurance the quality of the product.
Nowadays, coachwork companies search client´s 2015. The results show that there is a reduction in critical
satisfaction and economic efficiency, known as business processes and with this, it is sought to improve the integrity of
excellence, for this the following actions need to be taken: a the processes, for a correct administration with medium-term
continuous improvement of the processes; reduction of failure benefits.
percentage in products; programing rigorous controls in
manufacturing and respecting the established quality This project is divided into V sections, including the
specifications. In Latin America there are many coachwork introduction in section I, section II presents the study case. In
enterprises distributed in each country. The industries, for section III the Deming Cycle methodology is detailed. Section
meeting the demand of high-quality products, started the IV describes the discussion of results and its conclusions are
implementation of a QMS based on the ISO 9001:2015 presented in section V.
regulation which is a model focused on a continuous II. STUDY CASE
improvement and on achieving business objectives, increasing
effectiveness and efficiency, improving the processes and A. Description of manufacturing process for buses coachwork
optimizing the industry resources [8]. In the last report made Coachwork manufacturing has a high complexity level due
by the National Coachwork Manufacturers (CANFAC) for 41 to some aspects such as design, time and available workforce.
nationally approved companies in year 2014, it was found that Next, a description of the identified manufacturing processes is
coachwork companies having a QMS ISO 9001:2008 presented below.
represented 24%, while 7% was still in process of its adoption,
68% had not implemented any QMS and 1% was not registered 1) Structure Assembly
in the coachwork guild [9]. The body structure is formed by tubes, sections, angles and
metal sheets. All elements are made of steel and attached one
There are several researches with topics related to the to each other by means of weldings, rivets, screws and bolts
implementation of ISO standards for the continuous that determine the shape of the coachwork.
improvement of processes. In the research work of Mihajlović,
2018 [10], she presents a series of methods and techniques of 2) Structure Lining
quality process improvement in the milk industry in the The structure is completely covered by coils, steel sheets
republic of Serbia. With the initial hypothesis that the and prefabricated glass fibers, installed by means of solders,
improvement of quality processes directly influences the screws, rivets and waterproof paste.
competitive position of the company, it is determined that there
is a dominant use of the method based on the PDCA cycle to 3) Paint
improve the quality of internal processes. Similarly, in the Design and full paint of the vehicle body according to the
work of Velasco et al., 2018 [11] the low level of safety within bus company.
the critical processes of the manufacturing industry is evaluated 4) Finish
in order to reduce productivity risks. This study proposes the Installation of many accessories inside and outside the
implementation of an Information Security Management coachwork ensuring the expected features of the body.
System (ISMS) in accordance with the ISO 27001 standard,
applying the Deming methodology (PDCA). In addition, as B. Stages of the manufacturing process
presented in the investigation of Sanz-Calcedo, 2015 [12] the The coachwork manufacturing process has a sequence of
use of several standards (ISO 9001: 2015, ISO 14001: 2015, activities which include from the initial order of manufacture
OHSAS 18001: 2007) can be merged to perform the analysis until the final delivery to the client as depicted in Fig. 1.
on integrated quality management, medium environment and
safety in industrial projects. From a qualitative point of view, C. Current state of requirements according to the ISO
the possibility of managing integrated projects of quality, 9001:2015 standard
environment and safety in the industry is determined, through The diagnosis of the current situation of the company
the integration of traditional systems associated with concerning the required documentation by the ISO 9001:2015
international standards. standard, was done through a checklist consisting on a question
bank in correspondence with the requirements described on
With a sustainable theoretical foundation from the
chapters 4 and 10 of this international standard. The data
aforementioned research has been able to acquire the basis for
analysis was quantitative and very useful for having a clear
the development of this proposal applied to the manufacturing
idea of the conformity percentage according to the established
industry. In this paper, the current situation of an industry is
requisites and was the starting point for doing the
analyzed to identify possible risks and the bodybuilding sector
documentation structure of the QMS. The results of the
is presented as a case study. The objective is to promote the
evaluation are shown in Table VI.
focus of the processes when developing and implementing a
quality management system (QMS), in order to guarantee the D. Documentation structure of QMS ISO 9001:2015
correct manufacture of metal structures for buses. In addition, a ISO has always required a documented QMS, so the
systematic planning of the processes and their interactions is information related to the documentation must be up to date
developed, by providing the necessary resources and that these and well preserved by the organization. The documentation
are managed in an appropriate manner, focused on the cycle of structure developed in this paper aims to guarantee an efficient
continuous improvement Plan, Do, Check and Act (PDCA). management of the QMS.
All this based on the requirements established in ISO 9001:

This work was financed by Universidad Técnica de Ambato (UTA)


1) Quality Manual 2) Determine opportunities for improvement (defects)
The company´s quality manual has the documentation of The improvement opportunities are shown in Table I,
the QMS, based on the requirements of ISO 9001:2015. In this which lists the defects observed during product inspection.
manual the quality policy and goals are described, defining the These defects obviously have the highest probability of failure
scope of the organizational management of its processes. and generate problems in the manufacturing processes
developed in the company.
2) Procedures Manual
The procedures manual includes the description of the 3) Define possible causes
activities needed for executing the operations, which must be For defining the possible causes of the problems generated
carried out in the organization according to the quality in the manufacturing processes, an Ishikawa´s or cause-effect
management. In addition, the responsible for the corresponding diagram was used. As an example, a cause-effect diagram for
activities are identified and established. the non-conformity in the Paint process is shown in Fig. 2,
showing the different defects found.
3) Records
The records intend to provide evidence of the controlled TABLE I. DEVELOPMENT OF THE CONTINUOUS IMPROVEMENT PROJECT
activities implementation. This control can be carried out
through verifications, inspections and preventive or corrective Project of route of quality
actions, in order to show the achieved results of the quality Description Detail
management. Identification
Prioritization of car body fabrication
of
Process processes: Armed with structure, Lined,
E. Quality Route Development improvement
Painted, Finished
opportunities
Increases in coachwork demands for buses of the different Reduce the number of defects in the body at
modalities, lead the company to focus all its efforts on Pretensions to
Objective the end of each process involved in the
implementing projects of continuous improvement for the be achieved
manufacture
manufacturing processes. This brought the development of Determination Applies indices of defects in the
many improvement actions through the Quality Route method, of manufactured body, causing reprocesses and
Scope
which follows the PDCA cycle. This standard procedure is improvement customer dissatisfaction due to poor product
processes quality
based on facts and data, aiming the improvement of work Current
areas. Definition
situation of the Name
of the Formula Unit Goal
improvement indicator
Problem
processes
Armed Structure
(Total
Defects defective
of welds
Reduce
structure found / # of %
to 10%
reinforce welds to be
ment evaluated)
* 100
Lining
(# of lined
defects /
Defects
Total
of lining Reduce
inspection %
of the to 10%
points
Level of structure
established)
improvement
* 10
Indicators looking at
Paint
manufacturing
processes (# of paint
defects /
Paint Total set Reduce
%
Defects inspection to 10%
points) *
100
Finished
Figure 1. Flow Diagram of the manufacturing process. (# of
finished
III. DEMING CYCLE METHODOLOGY defects /
Defects
Total of Reduce
A. Plan of %
inspection to 10%
finished
1) Prioritize the redesign of manufacturing processes to points
established)
be improved * 100
In Table 1 are listed the body manufacturing processes to
be improved and also the objective, scope and established
indicators.
Pareto Diagram of Causes - Lined Structure
50
100
40

Percentage
80

Frequency
30
60
20 40
10 20
0 0
Causes ns il x il s ks t er d
ai co fle co ot ar an fib le
st ka sp al al
ed Si lle
d
nt
m se ss st
lf e
x
n kl f ta la n g f la in
ka ri n
o
in
s a hi n
o g dl
y
Si W io y Se lis io en ba
at dl Po at ok s
lic Ba p l ic Br las
p
ap ap rg
d d be
Ba Ba Fi
Frequency 7 7 6 6 5 4 3 3 3
Percentage 15,9 15,9 13,6 13,6 11,4 9,1 6,8 6,8 6,8
% Accumulated 15,9 31,8 45,5 59,1 70,5 79,5 86,4 93,2 100,0

Figure 4. Pareto Diagram- Structure Lining process.


Figure 2. Ishikawa´s Diagram – Paint Process.
TABLE III. IMPROVEMENT ACTIONS
4) Determine improvement actions Relative Cumulative Relative
Causes Frequency
After defining and analyzing the defects, its causes and the Frequency Frequency
undesired effects on the manufacturing processes of buses Porosities 22 69% 69%
bodies, improvement actions are suggested for each kind of
Cracks 8 25% 94%
defect found in the visual inspection of the final product, as
shown in Table II. These actions will be implemented on the Lack of penetration 2 6% 100%
manufacturing processes needing to be improved.
Undermining 0 0% 100%
TABLE II. DEFECTS OF THE STRUCTURE ASSEMBLY PROCESS Excess penetration 0 0% 100%
Processe Total 32
Improvement actions Detail
s
-Determine the defects of greater occurrence in the
-Armed
processes of construction of bodies.
In Fig. 3, the results for the Structure Assembly process are
structure -Product shown, proving that 69% of defects are caused by porosities in
-Apply inspection points of product quality, during
-Lined -Quality the welding bead while 31% corresponds to defects related
and after each identified process to improve.
structure -Control
-Pint
-Develop formats for the registration and analysis of
-Records with cracks and lack of penetration. These non-conformities
data obtained from quality inspection for making require corrections for meeting the quality standards of the
-Finished
decisions based on facts.
product.
B. Do
TABLE IV. DEFECTS OF THE STRUCTURE LINING PROCESS.
For executing the improvement actions, the potential
defects were determined and systematic controls were carried Relative Cumulative Relative
Causes Frequency
out by doing visual inspections of bodies of the “E17” model, Frequency Frequency
which is the most frequently manufactured in the COPSA Wrinkled coil 7 16% 16%
Company, object of study. Sikaflex stains 7 16% 32%
Using the records of the QMS, information on the potential Badly installed coil 6 14% 45%
defects was collected for its further quality control analysis, Bad application of
obtaining the results listed below. 6 14% 59%
Sikaflex
In Tables III and IV and in Fig, 3 and 4, the prioritization of Sealant spots 5 11% 70%
the defects with greater occurrence, according to the Pareto Polishing marks 4 9% 80%
principle, arePareto
shown.Diagram of Causes - Armed Structure
35
Broken glass fiber 3 7% 86%
100 Fiberglass badly
30 3 7% 93%
installed
25 80 Bad application of
3 7% 100%
Percentage

sealant
Frequency

20 60
Total 44
15
40
10
Figure 4 shows the Lining process data, where it was found
20
5 that 80% of defects correspond with: wrinkled coil, Sikaflex
0 0
stains, badly installed coil, bad application of Sikaflex and
Causes Porosities Cracks Lack of penetration Otro
Frequency 22 8 2 0
sealant stains. The remaining 20% corresponds to defects of:
Percentage 68,8 25,0 6,3 0,0 polishing marks, broken and badly installed Fiberglass, bad
% Accumulated 68,8 93,8 100,0 100,0
application of the sealant. All this failures demand to be
Figure 3. Pareto Diagram - Structure Assembly process. corrected immediately.
C. Check IV. DISCUSSION OF RESULTS
1) Analysis of results after applying the improvement A. Result’s tabulation, analysis and interpretation of current
actions. status of requirements according to ISO 9001:2015
The global results obtained concerning the performance Table VI shows the general results of the diagnosis made to
indicators established on the Quality Route project, are tools
the company regarding the required documentation described
that allowed to describe the characteristics or conditions
in chapters 4 through 10 of ISO 9001:2015. From a total of 103
derived from the developed activities and to check as well, the
criteria assessed on mandatory requirements of ISO 9001:2015,
evolution of the defects found in the coachwork manufacturing
it was determined that a total of 43 criteria, which corresponds
processes, based on the premise that “Quality of that we do
to only 42% of the sample, meets the international standard,
cannot be improved if we don´t measure our work”. In table V
while 58% corresponding to other 60 criteria, does not meet the
it can be observed that the Paint process has the greater
established standards.
percentage of defects in comparison with the rest of processes,
having a value of 72.0%. The Paint process is a vital stage in TABLE VI. RESULTS OF THE ISO 9001:2015 EVALUATION
coachwork manufacturing along with the Finish process Qualification
because the results of both are observed in detail by the client ISO C: NC: NA: Criteria
9001:2015 Comply Fails Does not apply evaluated
when receiving the final product.
Context of the
6 7 0 13
organization
TABLE V. RESULTS OF APPLYING THE IMPROVEMENT ACTIONS
Leadership 0 6 0 6
Indicator name Formula Application Unity Goal
Planning 0 6 0 6
Armed of the structure
(Total defective Support for 5 1 0 6
Defects of welds found / #
(32/62)*100= Reduce
structure of welds to be % Operation 32 13 0 45
51,6 to 10%
reinforcement evaluated) * Evaluating
100 0 20 0 20
performance
Lined structure
(# defects of Improvement 0 7 0 7
lining / total
Total Value 43 60 0 103
inspection (44/70)*100= Reduce
Lining defects %
points 62,9 to 10% Total % 42% 58% 0% 100%
established) *
100 ISO 9001:2015 specifies 4 documents and 18 records for
Painted implementing and certifying the QMS. The requirements of the
(# of paint standard in the chapters 4, 7 and 8 refer to the context of the
defects / total organization, support and operation. The organization takes
(36/50)*100= Reduce
Paint defects inspection
points set) *
72,0 to 10% into consideration internal and external aspects that may affect
100 its capacity of achieving its planned goals. In addition,
Finished necessary resources are provided for monitoring and tracking
(# of finished products and services in correspondence with their
defects / total requirements. With respect to the operation, the organization
Defects of (40/70)*100= Reduce
inspection % effectively defines the criteria and processes for products and
finished 57,1 to 10%
points set) *
100
customer services.

D. Act The coachwork company has not completely defined


aspects about the commitment of the senior management
1) Preventing recurrence of non-conformities. personnel, showing a lack of responsibility. The inappropriate
The next step in the Quality Route is the elimination or performance evaluation of productive processes affects the
reduction of potential defects detected on the Paint process. For continuous improvement plan because of the non-conformities
this, the coachwork painting procedure was developed and found without having any associated corrective actions. These
implemented, with the aim of standardizing the way activities requirements appear in chapters 5, 6, 9 and 10, demonstrating
are carried out and providing quality control parameters for the the greatest occurrence of non-conformities evaluated on then
buses final paint coat. checklist.
2) Conclusion for the improvement plan B. Analysis of results of the painting process after applying
The application of the Quality Route method provides a the Quality Route method
guide for solving problems in the manufacturing processes of
Table VII shows the obtained results after implementing the
coachwork, for achieving the goals established by the
quality improvement actions of the product in the Paint
Company's senior management; creating a prestigious brand in
process, validating the effectiveness of the established action
the sector and satisfy the client needs. Additionally, a
plan of continuous improvement. In Fig. 5 the improvement
methodology is established for improving the rest of the
achieved in the Paint process is shown, if we compare with the
processes involved in the manufacturing of vehicle bodies.
first inspection carried out to the manufactured product, the
defects percentage decreased from 72.0% to 36.0%. The preset
goal by the company´s senior management was reducing the The documentation structure of the quality management
defects index to 10% or eliminating the non-conformities system, based on the requirements of ISO 9001:2015, was done
permanently by applying systematically the Quality Route considering the flexibility of its current version. The minimum
method as a continuous improvement action in further set of documents were defined for supporting the management
productions, resulting in profits for the company and satisfying of the organization concerning processes, product and services
the clients with quality products. The organization did not it provides to the interested parties. Documentation include
count with an improvement work plan. With this proposal, a set quality manual, mandatory documents, procedures manual and
of control, analysis and verification procedures were identified and demanded records for achieving international
implemented. Work stations are expected to reduce flaws in certification. The steps of the Quality Route Method -based on
products and services and the credibility of the business is the Deming cycle- were applied. Plan, Do, Check and Act,
expected to rise. were used as continuous improvement actions in coachwork
manufacturing. This way, problems were solved by using the
TABLE VII. DEFECTS ON THE PAINT PROCESS (AFTER IMPROVEMENT). identified improvement opportunities and a QMS in the
Defects Count Indicator Formula Application
manufacturing phase of the product was established.
Bad surface sanding 6 ACKNOWLEDGMENT
Putty bad application 5
Unhooked (dripped) 4
This work was financed in part by Universidad Técnica de
Number of
paint
Ambato (UTA) and Dirección de Investigación y Desarrollo
Badly polished 3
Defects of defects / (DIDE) under project PFISEI 26.
Bubble formation 3
the Total (18/50)*100
Sanding and polishing painting inspection = 36,0 REFERENCES
2
marks process points
Non-uniform brightness 2 established [1] D. Alwerfalli, A. Karatas and M. Alshammari, “Application of quality
* 100 management systems (QMS) in construction industry,” Proceedings of
Craters 2
the International Conference on Industrial Engineering and Operations
Dirt-dust 1 Management, pp. 46, 2017.
Bad first application 0 [2] C. Chen, K. Anchecta and Y. Lee, “A Stepwise ISO-Based TQM
TOTAL Implementation Approach Using ISO 9001:2015,” Management and
Production Engineering Review, vol. 7, no. 4, pp. 65-75, 2016.
[3] S. Esgarrancho and C. J. F. Cândido, “Firm preparation for ISO 9001
certification – the case of the hotel industry in Portugal,” Total Quality
Management and Business Excellence, pp. 1-20, 2017.
[4] K. Ruamchat, N. Thawesaengskulthai and C. Pongpanich,
“Development of quality management system under ISO 9001:2015 and
Joint Inspection Group (JIG) for aviation fuelling service,” Management
and Production Engineering Review, vol. 8, no. 3, pp. 50-59, 2017.
[5] A. N. Schmeleva, “Evaluation and improvement of the operating
efficiency of enterprise quality management system (QMS): Conceptual
bases,” Quality - Access to Success, vol. 18, no. 160, pp. 100-107, 2017.
[6] C. Valmohammadi and M. Kalantari, “Using structural equation
modelling to test ISO 9000 motivation, depth of ISO implementation
and performance of Iranian manufacturing organisations,” International
Journal of Productivity and Quality Management, vol. 20, no. 3, pp. 405-
427, 2017.
[7] N. P. Solomon, A. Bester and M. Moll, “Diffusion of a quality
Figure 5. Defects on the Paint process (Before and after). management system: A case study,” South African Journal of Industrial
Engineering, vol. 28, no. 2, pp. 149-164, 2017.
[8] J. B. P. Juanzon and M. M. Muhi, “Significant Factors to Motivate
V. CONCLUSIONS Small and Medium Enterprise (SME) Construction Firms in the
Manufacturing processes of buses’ metal structures in a Philippines to Implement ISO9001:2008,” Procedia Engineering, vol.
coachwork company were carried out by describing and 171, pp. 354-361, 2017.
surveying processes, detailing and determining the responsible [9] A. Chiarini, “Risk-based thinking according to ISO 9001:2015 standard
and the risk sources European manufacturing SMEs intend to manage”,
actors, the target, indicator, inputs, resources and outputs on TQM Journal, vol. 29, no. 2, pp. 310-323, 2017
manufacturing the product. Besides, a deficient control of
[10] M. Mihajlović, “Methods and Techniques of Quality Process
information by the administration was found. The diagnosis of Improvement in the Milk Industry in the Republic of Serbia,” Economic
mandatory requirements of ISO 9001:2015 showed the current Themes, vol. 56, no. 2, pp. 221-237, 2018.
status of the requirements of the international standard, [11] J. Velasco, R. Ullauri, L. Pilicita, B. Jácome, P. Saa and O. Moscoso-
referencing those chapters related to minimal requirements Zea, "Benefits of Implementing an ISMS According to the ISO 27001
about the documentation managed and kept by the organization Standard in the Ecuadorian Manufacturing Industry," 2018 International
as evidence of planning, process control and implementation of Conference on Information Systems and Computer Science
(INCISCOS), pp. 294-300, 2018.
continuous improvement actions. The result showed that only
[12] J. G. Sanz-Calcedo, A. G. González, O. López, D. R. Salgado, I.
42% met the requirements which makes clear the need for Cambero and J. M. Herrera. “Analysis on integrated management of the
establishing the documentation structure of the QMS. quality, environment and safety on the industrial projects,” Procedia
Engineering, vol. 132, 140-145, 2015.

You might also like