Project Costing

Sr. No Specification S.S Cost (Rs.) M.S Cost (Rs.)


1 Equipments
03 Nos. 20 KL Conical Roof Flat Bottom Storage Tank 6,300,000 1,400,000
05 Nos. Gear Pump For Emulsifier Transer, Capacity-6 M3/hr, Head-5 Kg/cm2. Rotodel Make.05 Nos.
375,000
Motor:-3 HP, 1400 RPM, FLP, Foot Mount, CG make
01 Centrifugal Pump with motor For Hot Water Circulation Cap.-5 M3/hr & head-10 m 50,000 50,000
03 Nos. Level Indicator for 03 Storage Tank 20 Kl 50,000
2 Structure
Gantry, Foundation & Color. Apprx. 4 T. Load Cell M.S Frame Apprx. 2 T of 3 Nos. 20 Kl Storage Tank 480,000 480,000
3 Piping
Piping Material,Fabrication,Fitting & Erection Apprx. 500 m 1,260,000 600,000
4 Civil
Pump foundations, storage tank foundation, Dyke, Collection tank & Steps both sides.Excavation &
925,000 925,000
preparation of Earthing Pit.
5 Utility
4 Kl M.S Hot Water Bath & Piping. Insulation & Cladding of 20 KL Storage Tank & Process Piping apprx. 300
300,000 300,000
Sq. M, On- Off Valve Instrument Air Piping
6 Instrumentation
Hot Water Bath Auto Control System, Load Cell, Installation, Calibration, Weighing system,On-Off
Valve,Cabling, Automation & Commisioning 3,650,000 3,600,000
7 Electrical
Earthing Assembly, Lighting Arrangment, Cable Tray, Cabling & Terminations, Load Cell Connection 610,000 610,000
8 Miscellaneous
Erection of 03 Nos. 20 KL Storage Tank with Crain & Khalasi 50,000 50,000
Lifting Existing Vessles & Batch Tanks for placing Load Cell 250,000 250,000
Dismentaling & Refabrication of Existing Pipes 50,000 50,000
Total Budgatory Cost 14,350,000 8,315,000
Considering 8% contingency 1,148,000 665,200
Grand Total 15,498,000 8,980,200

Page 1
Capex

Existing Facalities:-
Bulk emulsifier storage facality is not available presently.
Emulsifier handling via HDPE Drum which requires to put in Hot Water Bath during winter season due to freezing problem.
Solvents addition into Formulation Vessels from Solvent Yard directly.
Stabilizer & LC addition into Formulation Vessels through Batch Tank as well as directly via drum.
Addition of Solvents, Stablizier , Emulsifier & LC into Formulation Vessels via Mass Flow meter.
Emulsifier addition via Mass Flow Meter isn't well effective.
Presently no weighing systems e.g Load cell provided in Emulsifier/Stabilizer Batch Tanks & Formulation Vessels.

Proposed Facalities:-
Individual 03 Nos. 20 Kl Emulsifier Storage Tank for bulk storage & handling system.
Load Cell Installation in all 03 Nos. 20 Kl Emulsifier Storage Tank
Load Cell Installation in all seperate 1 Kl Batch Tank for Emulsifier, Stabilizer & LC.
Load Cell Installation in all 03 Nos. Formulation Vessels.
Automation & PLC Updation for Emulsifier, Stablizer & LC Handling system.

Benifits:-
EHS level will be improved after installing Emulsifier Storage Tanks & handling system.
Stock keeping facality will be available after Load Cell Installation in all Emulsifier Storage Tank.
Accurate measurement of emulsifier, stabilizer & LC quantity in all Batch Tank after Load Cell Installation.
Accurate quantity of Solvent & LC addition into Formulation vessels after Load Cell Installation.

Major Cost of the Project:-


03 Nos. 20 Kl Emulsifier Storage Tank
Load Cell Installation in all Emulsifier Storage Tank, Batch Tank & Formulation Vessels.
Automation & PLC Updation for Emulsifier, Stablizer & LC Handling system.

Page 2