Periodic Maintenance Work of the Project, "4/6 laning of Agra-Bharatpur BOT Project from Km.

17+756 to
62+295 of NH-11 under NHDP Phase IIIA in the State of Uttar Pradesh & Rajasthan."

INVOICE NO. OPAPL/Bharatpur/SC-WO/Maint/2019-20/RA NO.6/UP06 Date :- 04.10.2019

NAME OF THE CONCESSIONER:-M/s. ORIENTAL PATHWAYS (AGRA) PVT LTD. GSTN NO :-09AAACO7826R1ZN

Address of the Company :-1/712, SUHAG NAGAR, FIROZABAD, Firozabad,


UttarPradesh, 283203

NAME OF THE EPC CONTRACTOR :- M/S. PRAKASH ASHAPLATINGS AND


GSTN NO :-09AABCP0398N1ZW.
TOLL HIGHWAYS (I) LTD.

Address of the Company :- 176, Khachahari chouraha kanpur road, Jhansi, UP,
284001

Invoice Period UP to 01.09.2019 TO 31.09.2019

Upto Date Work Done


Previous Paid Amount This IPC Amount
S.No Description Amount
(Rs)* (Rs)
(Rs)

A Total Amount Based on Works Executed

a) Work done INR 187,317,928.73 INR 177,578,586.73 INR 9,739,342.00

A INR 187,317,928.73 INR 177,578,586.73 INR 9,739,342.00

c) SGST 6 %. INR 11,239,076.00 INR 10,654,716.00 INR 584,361.00

d) CGST 6 %. INR 11,239,076.00 INR 10,654,716.00 INR 584,361.00

B Sub Total A {1A+1B+2} INR 209,796,080.73 INR 198,888,018.73 INR 10,908,064.00

INR 209,796,080.73 INR 198,888,018.73 INR 10,908,064.00

D Recoveries

a) Retention Money.

b) Mobilization Advance.

Sub Total D

Net Payable(C+D) INR 209,796,080.73 INR 242,187,153.80 INR 10,908,064.00

This Bill Amount In Words: (Rupees Two Crore Ninety One Lakhs Fifty Two Thousand Eight Hundred Eighty Nine only)

M/s. Oriental Pathways (Agra) Pvt Ltd. For Prakash Asphaltings & Toll Highways (I) Limited.
NAME OF THE CONCESSIONER :- ORIENTAL PATHWAYS
NAME OF THE CONTRACTOR :- PRAKASH ASPHALTINGS AND T
AGRA - BHARATPUR BOT PROJECT
SUB CONTRACT WORK ORDER- "For works to be executed in the state
1 Original Work Order No. & Date OPAPL/Bharatpur/SC-WO/Maint/2018-19/01 dated 01-Dec-2018.

2 Type of Sub Contract


Periodic Maintenance Work of the Project, "4/6 laning of
NH-11 under NHDP Phase IIIA in the State of Uttar Prades
3 SC Work Period - From and To 1-Dec-18 To 30-Jun-19 7 Months

4 Name of the Sub Contractor M/s Prakash Asphalting & Toll Highways (India) L
5 Address of the Sub Contractor 76, Mall Road, Mhow, Indore-453341.
6 PAN # of Sub Contractor. AABCP0398N.
7 GST # of Sub Contractor. 08AABCP0398N1ZY.
8 Period of Work. 01.09.2019 To 30.09.2019
9 BILL No 6
SUMMARY BILL OF QUANTITIES UPTO LAST BILL

Sl Item Description Unit Quantity Rate Amount (RS) Quantity

Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.25 kg per sqm on the existing
1 bituminous/granular surface cleaned with mechanical broom as directed SQM 4 46 257 16 71 40 112 278,002.50
by authorized representative of OPAPL.

Carrying out repair to POT Holes and necessary patch repair work to
2 existing Bituminous carriageway as per MORTH (Revision 5th) specification SQM 20 000 800 1 60 00 000 37,380.34
Clause 3004.
NAME OF THE CONCESSIONER :- ORIENTAL PATHWAYS
NAME OF THE CONTRACTOR :- PRAKASH ASPHALTINGS AND T
AGRA - BHARATPUR BOT PROJECT
SUB CONTRACT WORK ORDER- "For works to be executed in the state
1 Original Work Order No. & Date OPAPL/Bharatpur/SC-WO/Maint/2018-19/01 dated 01-Dec-2018.

2 Type of Sub Contract


Periodic Maintenance Work of the Project, "4/6 laning of
NH-11 under NHDP Phase IIIA in the State of Uttar Prades
3 SC Work Period - From and To 1-Dec-18 To 30-Jun-19 7 Months

4 Name of the Sub Contractor M/s Prakash Asphalting & Toll Highways (India) L
5 Address of the Sub Contractor 76, Mall Road, Mhow, Indore-453341.
6 PAN # of Sub Contractor. AABCP0398N.
7 GST # of Sub Contractor. 08AABCP0398N1ZY.
8 Period of Work. 01.09.2019 To 30.09.2019
9 BILL No 6
SUMMARY BILL OF QUANTITIES UPTO LAST BILL

Sl Item Description Unit Quantity Rate Amount (RS) Quantity

Milling of existing flexible pavement up to 50 mm depth and finished to


3 uniform level by Milling machine (Wirtgen Sensor Milling Machine) as SQM 20 000 48 9 60 000 214.60
directed by authorized representative of OPAPL.
NAME OF THE CONCESSIONER :- ORIENTAL PATHWAYS
NAME OF THE CONTRACTOR :- PRAKASH ASPHALTINGS AND T
AGRA - BHARATPUR BOT PROJECT
SUB CONTRACT WORK ORDER- "For works to be executed in the state
1 Original Work Order No. & Date OPAPL/Bharatpur/SC-WO/Maint/2018-19/01 dated 01-Dec-2018.

2 Type of Sub Contract


Periodic Maintenance Work of the Project, "4/6 laning of
NH-11 under NHDP Phase IIIA in the State of Uttar Prades
3 SC Work Period - From and To 1-Dec-18 To 30-Jun-19 7 Months

4 Name of the Sub Contractor M/s Prakash Asphalting & Toll Highways (India) L
5 Address of the Sub Contractor 76, Mall Road, Mhow, Indore-453341.
6 PAN # of Sub Contractor. AABCP0398N.
7 GST # of Sub Contractor. 08AABCP0398N1ZY.
8 Period of Work. 01.09.2019 To 30.09.2019
9 BILL No 6
SUMMARY BILL OF QUANTITIES UPTO LAST BILL

Sl Item Description Unit Quantity Rate Amount (RS) Quantity

Providing & laying Bituminous Concrete wearing course using refinery


produced crumb rubber modified bitumen (CRMB-60) complete as per
approved overlay plan / drawing and MORT&H (Fifth Revision)
4 Specifications Clause 507. The BC shall be laid by Full Carriageway Cum 19 167 11 900 22 80 87 300 11,620.35
width Sensor Paver with Big ski Multiplex levelling system consisting of 6
ultrasonic sensors / 2 Control box / connecting cables etc.
NAME OF THE CONCESSIONER :- ORIENTAL PATHWAYS
NAME OF THE CONTRACTOR :- PRAKASH ASPHALTINGS AND T
AGRA - BHARATPUR BOT PROJECT
SUB CONTRACT WORK ORDER- "For works to be executed in the state
1 Original Work Order No. & Date OPAPL/Bharatpur/SC-WO/Maint/2018-19/01 dated 01-Dec-2018.

2 Type of Sub Contract


Periodic Maintenance Work of the Project, "4/6 laning of
NH-11 under NHDP Phase IIIA in the State of Uttar Prades
3 SC Work Period - From and To 1-Dec-18 To 30-Jun-19 7 Months

4 Name of the Sub Contractor M/s Prakash Asphalting & Toll Highways (India) L
5 Address of the Sub Contractor 76, Mall Road, Mhow, Indore-453341.
6 PAN # of Sub Contractor. AABCP0398N.
7 GST # of Sub Contractor. 08AABCP0398N1ZY.
8 Period of Work. 01.09.2019 To 30.09.2019
9 BILL No 6
SUMMARY BILL OF QUANTITIES UPTO LAST BILL

Sl Item Description Unit Quantity Rate Amount (RS) Quantity

Providing and laying of Microsurfacing (Type-III, 6 to 8mm) composed of


modified bitumen emulsion, mineral aggregate, water and necessary
additives (if needed) proportioned, mixed and uniformly spread over a
5 SQM 63 333 140 88 66 620 5400.00
properly prepared surface for surface treatment of pavement as per
MORTH (Revision 5th) specification clause 514 and IRC SP 81-2008.

Providing & laying pavement marking with hot applied thermoplastic


6 paints conforming to ASTM D36/BS 3262 (Part - 1) as per drawing & SQM 19 444 550 1 06 94 200 2072.10
MORT&H (Revision 5th) Specifications Clause 803.
NAME OF THE CONCESSIONER :- ORIENTAL PATHWAYS
NAME OF THE CONTRACTOR :- PRAKASH ASPHALTINGS AND T
AGRA - BHARATPUR BOT PROJECT
SUB CONTRACT WORK ORDER- "For works to be executed in the state
1 Original Work Order No. & Date OPAPL/Bharatpur/SC-WO/Maint/2018-19/01 dated 01-Dec-2018.

2 Type of Sub Contract


Periodic Maintenance Work of the Project, "4/6 laning of
NH-11 under NHDP Phase IIIA in the State of Uttar Prades
3 SC Work Period - From and To 1-Dec-18 To 30-Jun-19 7 Months

4 Name of the Sub Contractor M/s Prakash Asphalting & Toll Highways (India) L
5 Address of the Sub Contractor 76, Mall Road, Mhow, Indore-453341.
6 PAN # of Sub Contractor. AABCP0398N.
7 GST # of Sub Contractor. 08AABCP0398N1ZY.
8 Period of Work. 01.09.2019 To 30.09.2019
9 BILL No 6
SUMMARY BILL OF QUANTITIES UPTO LAST BILL

Sl Item Description Unit Quantity Rate Amount (RS) Quantity

Repair/ Filling of Earthen shoulder in main carriageway, service road,


major/ minor junctions & rest area, satisfying the requirements of
7 minimum soaked CBR value (10%) as indicated in the of modified proctor SQM 98 202 40 39 28 080 30350.00
density with all leads & lIfts all complete as per drawings and MORT&H
specifications clause 3003.

Painting of Kerb / Crash barrier with two or more coats of Synthetic


8 enamel paint including a base coat of cement primer. Km 49.10 60 000 29 46 000 4.31

Toll Plaza Rigid pavement repair & rehabilitation approved by engineer


9 SQM 15,150.00 200 30 30 000 -
NAME OF THE CONCESSIONER :- ORIENTAL PATHWAYS
NAME OF THE CONTRACTOR :- PRAKASH ASPHALTINGS AND T
AGRA - BHARATPUR BOT PROJECT
SUB CONTRACT WORK ORDER- "For works to be executed in the state
1 Original Work Order No. & Date OPAPL/Bharatpur/SC-WO/Maint/2018-19/01 dated 01-Dec-2018.

2 Type of Sub Contract


Periodic Maintenance Work of the Project, "4/6 laning of
NH-11 under NHDP Phase IIIA in the State of Uttar Prades
3 SC Work Period - From and To 1-Dec-18 To 30-Jun-19 7 Months

4 Name of the Sub Contractor M/s Prakash Asphalting & Toll Highways (India) L
5 Address of the Sub Contractor 76, Mall Road, Mhow, Indore-453341.
6 PAN # of Sub Contractor. AABCP0398N.
7 GST # of Sub Contractor. 08AABCP0398N1ZY.
8 Period of Work. 01.09.2019 To 30.09.2019
9 BILL No 6
SUMMARY BILL OF QUANTITIES UPTO LAST BILL

Sl Item Description Unit Quantity Rate Amount (RS) Quantity

Painting of Structure Parapet/Retaining wall with two or more coats of


10 Synthetic enamel paint. SQM 3,100.00 110 254.80

11 Median kerb Height Raising by concrete M-20 grade. RM -- 330 4,659.00

12 PGR PAINTING RM 3,100.00 250 -

Total Amount of Work Order in Rs. 281,652,312

Submitted by For
NAME OF THE CONCESSIONER :- ORIENTAL PATHWAYS
NAME OF THE CONTRACTOR :- PRAKASH ASPHALTINGS AND T
AGRA - BHARATPUR BOT PROJECT
SUB CONTRACT WORK ORDER- "For works to be executed in the state
1 Original Work Order No. & Date OPAPL/Bharatpur/SC-WO/Maint/2018-19/01 dated 01-Dec-2018.

2 Type of Sub Contract


Periodic Maintenance Work of the Project, "4/6 laning of
NH-11 under NHDP Phase IIIA in the State of Uttar Prades
3 SC Work Period - From and To 1-Dec-18 To 30-Jun-19 7 Months

4 Name of the Sub Contractor M/s Prakash Asphalting & Toll Highways (India) L
5 Address of the Sub Contractor 76, Mall Road, Mhow, Indore-453341.
6 PAN # of Sub Contractor. AABCP0398N.
7 GST # of Sub Contractor. 08AABCP0398N1ZY.
8 Period of Work. 01.09.2019 To 30.09.2019
9 BILL No 6
SUMMARY BILL OF QUANTITIES UPTO LAST BILL

Sl Item Description Unit Quantity Rate Amount (RS) Quantity

M/s Prakash Asphalting & Toll Highways (India) Ltd.

Authorised Signatory
ER :- ORIENTAL PATHWAYS (AGRA) PVT LTD
ASH ASPHALTINGS AND TOLL HIGHWAYS (I)LIMITED
ARATPUR BOT PROJECT
be executed in the state of Rajasthan."(Bharatpur Section)"
t/2018-19/01 dated 01-Dec-2018.

of the Project, "4/6 laning of Agra-Bharatpur BOT Project from Km.17+756 to 62+295 of
IA in the State of Uttar Pradesh & Rajasthan."

& Toll Highways (India) Ltd.


453341.

UPTO LAST BILL FOR THIS BILL UPTO DATE

Amount (RS) Quantity Amount (RS) Quantity Amount (RS)

4,448,040.00 15,762.00 252,192.00 293,764.50 4,700,232.00

29,904,272.00 - - 37,380.34 29,904,272.00


ER :- ORIENTAL PATHWAYS (AGRA) PVT LTD
ASH ASPHALTINGS AND TOLL HIGHWAYS (I)LIMITED
ARATPUR BOT PROJECT
be executed in the state of Rajasthan."(Bharatpur Section)"
t/2018-19/01 dated 01-Dec-2018.

of the Project, "4/6 laning of Agra-Bharatpur BOT Project from Km.17+756 to 62+295 of
IA in the State of Uttar Pradesh & Rajasthan."

& Toll Highways (India) Ltd.


453341.

UPTO LAST BILL FOR THIS BILL UPTO DATE

Amount (RS) Quantity Amount (RS) Quantity Amount (RS)

10,300.80 - - 214.60 10,300.80


ER :- ORIENTAL PATHWAYS (AGRA) PVT LTD
ASH ASPHALTINGS AND TOLL HIGHWAYS (I)LIMITED
ARATPUR BOT PROJECT
be executed in the state of Rajasthan."(Bharatpur Section)"
t/2018-19/01 dated 01-Dec-2018.

of the Project, "4/6 laning of Agra-Bharatpur BOT Project from Km.17+756 to 62+295 of
IA in the State of Uttar Pradesh & Rajasthan."

& Toll Highways (India) Ltd.


453341.

UPTO LAST BILL FOR THIS BILL UPTO DATE

Amount (RS) Quantity Amount (RS) Quantity Amount (RS)

138,282,220.93 631.50 7,514,850.00 12,251.85 145,797,070.93


ER :- ORIENTAL PATHWAYS (AGRA) PVT LTD
ASH ASPHALTINGS AND TOLL HIGHWAYS (I)LIMITED
ARATPUR BOT PROJECT
be executed in the state of Rajasthan."(Bharatpur Section)"
t/2018-19/01 dated 01-Dec-2018.

of the Project, "4/6 laning of Agra-Bharatpur BOT Project from Km.17+756 to 62+295 of
IA in the State of Uttar Pradesh & Rajasthan."

& Toll Highways (India) Ltd.


453341.

UPTO LAST BILL FOR THIS BILL UPTO DATE

Amount (RS) Quantity Amount (RS) Quantity Amount (RS)

756,000.00 9,050.00 1,267,000.00 14 450 20 23 000

1,139,655.00 - - 2,072.10 1,139,655.00


ER :- ORIENTAL PATHWAYS (AGRA) PVT LTD
ASH ASPHALTINGS AND TOLL HIGHWAYS (I)LIMITED
ARATPUR BOT PROJECT
be executed in the state of Rajasthan."(Bharatpur Section)"
t/2018-19/01 dated 01-Dec-2018.

of the Project, "4/6 laning of Agra-Bharatpur BOT Project from Km.17+756 to 62+295 of
IA in the State of Uttar Pradesh & Rajasthan."

& Toll Highways (India) Ltd.


453341.

UPTO LAST BILL FOR THIS BILL UPTO DATE

Amount (RS) Quantity Amount (RS) Quantity Amount (RS)

1,214,000.00 8470.00 338,800 38,820.00 1,552,800.00

258,600.00 5.60 336,000 9.91 594,600.00

- - 0 - 0
ER :- ORIENTAL PATHWAYS (AGRA) PVT LTD
ASH ASPHALTINGS AND TOLL HIGHWAYS (I)LIMITED
ARATPUR BOT PROJECT
be executed in the state of Rajasthan."(Bharatpur Section)"
t/2018-19/01 dated 01-Dec-2018.

of the Project, "4/6 laning of Agra-Bharatpur BOT Project from Km.17+756 to 62+295 of
IA in the State of Uttar Pradesh & Rajasthan."

& Toll Highways (India) Ltd.


453341.

UPTO LAST BILL FOR THIS BILL UPTO DATE

Amount (RS) Quantity Amount (RS) Quantity Amount (RS)

28,028.00 - 0 - 28,028.00

1,537,470.00 - 0 4,659.00 1,537,470.00

- 122.00 30,500 122.00 30 500

177,578,586.73 9,739,342.00 187,317,928.73

Verified and Approved By


ER :- ORIENTAL PATHWAYS (AGRA) PVT LTD
ASH ASPHALTINGS AND TOLL HIGHWAYS (I)LIMITED
ARATPUR BOT PROJECT
be executed in the state of Rajasthan."(Bharatpur Section)"
t/2018-19/01 dated 01-Dec-2018.

of the Project, "4/6 laning of Agra-Bharatpur BOT Project from Km.17+756 to 62+295 of
IA in the State of Uttar Pradesh & Rajasthan."

& Toll Highways (India) Ltd.


453341.

UPTO LAST BILL FOR THIS BILL UPTO DATE

Amount (RS) Quantity Amount (RS) Quantity Amount (RS)

M/s. Oriental Pathways (Agra) Pvt Ltd (OPAPL)

Authorised Signatory
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR SHOULDER

PERIOD FROM 01-09-2019 To 30-09-2019

Chainage Length Width


SR. No. Date Side Area SQM
From To (Mt.) (Mt.)
1 7/Sep/19 18850 19250 RHS 400 2 800
2 9/Sep/19 21000 21140 RHS 140 2 280
3 9/Sep/19 21140 21350 RHS 210 2 420
4 9/Sep/19 21680 21790 RHS 110 2 220
5 10/Sep/19 19460 19610 RHS 150 2 300
6 10/Sep/19 19620 19750 RHS 130 2 260
7 10/Sep/19 20200 20290 RHS 90 2 180
8 10/Sep/19 20290 20450 RHS 160 2 320
9 10/Sep/19 20540 20650 RHS 110 2 220
10 10/Sep/19 20820 21000 RHS 180 2 360
11 11/Sep/19 19350 19475 RHS 125 2 250
12 11/Sep/19 19830 19850 RHS 20 2 40
13 11/Sep/19 20050 20140 RHS 90 2 180
14 11/Sep/19 20140 20200 RHS 60 2 120
15 20/Sep/19 19000 19600 LHS 600 2 1200
16 20/Sep/19 40100 40600 LHS 500 2 1000
17 21/Sep/19 38500 38600 LHS 100 2 200
18 21/Sep/19 23900 24270 RHS 370 2 740
19 22/Sep/19 24150 24270 LHS 120 2 240
20 22/Sep/19 23500 23900 RHS 400 2 800
21 23/Sep/19 24500 24600 LHS 100 2 200
22 23/Sep/19 24600 24670 LHS 70 2 140

Grand Total Area. (SQM) 8470


vt. Ltd.

ghways (I) Ltd.

Remarks
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR KERB PAINTING

PERIOD FROM 01-09-2019 To 30-09-2019


Chainage Measurment
SR.
Date Side Depth+ LENGTH Remark.
No. From To Length
Top (KM)
1 6/Sep/19 40510 40560 RHS 50 0.34 0.05
2 6/Sep/19 40590 40800 RHS 210 0.34 0.21
3 6/Sep/19 40820 41200 RHS 380 0.42 0.38
4 8/Sep/19 41200 41650 LHS 450 0.42 0.45
5 8/Sep/19 41730 41850 LHS 120 0.42 0.12
6 8/Sep/19 41600 41650 RHS 50 0.35 0.05
7 9/Sep/19 41680 41730 LHS 50 0.4 0.05
8 9/Sep/19 41850 42000 LHS 150 0.42 0.15
9 9/Sep/19 41680 41730 RHS 50 0.35 0.05
10 9/Sep/19 41730 41770 RHS 40 0.28 0.04
11 9/Sep/19 41770 41800 RHS 30 0.34 0.03
12 9/Sep/19 41800 41900 RHS 100 0.35 0.1
13 9/Sep/19 41900 42000 RHS 100 0.34 0.1
14 9/Sep/19 42000 42050 RHS 50 0.34 0.05
15 9/Sep/19 42050 42100 RHS 50 0.3 0.05
16 9/Sep/19 42100 42200 RHS 100 0.34 0.1
17 9/Sep/19 42200 42290 RHS 90 0.34 0.09
18 10/Sep/19 36800 36850 RHS 50 0.35 0.05
19 10/Sep/19 36850 36900 RHS 50 0.35 0.05
20 10/Sep/19 36900 36950 RHS 50 0.36 0.05
21 10/Sep/19 36950 37000 RHS 50 0.35 0.05
22 10/Sep/19 37000 37050 RHS 50 0.37 0.05
23 10/Sep/19 37050 37100 RHS 50 0.38 0.05
24 10/Sep/19 37100 37150 RHS 50 0.325 0.05
25 10/Sep/19 37150 37200 RHS 50 0.34 0.05
26 10/Sep/19 37200 37250 RHS 50 0.35 0.05
27 10/Sep/19 37250 37300 RHS 50 0.375 0.05
28 10/Sep/19 37300 37350 RHS 50 0.375 0.05
29 10/Sep/19 37350 37400 RHS 50 0.37 0.05
30 10/Sep/19 37400 37450 RHS 50 0.35 0.05
31 10/Sep/19 37450 37500 RHS 50 0.365 0.05
32 11/Sep/19 34400 34450 RHS 50 0.33 0.05
33 11/Sep/19 34450 34500 RHS 50 0.34 0.05
34 11/Sep/19 34500 34550 RHS 50 0.34 0.05
35 11/Sep/19 34550 34600 RHS 50 0.35 0.05
36 11/Sep/19 36500 36550 RHS 50 0.31 0.05
37 11/Sep/19 36550 36600 RHS 50 0.3 0.05
38 11/Sep/19 36600 36650 RHS 50 0.3 0.05
39 11/Sep/19 36650 36750 RHS 100 0.29 0.1
40 11/Sep/19 36750 36800 RHS 50 0.33 0.05
41 14/Sep/19 33220 33250 RHS 30 0.32 0.03
42 14/Sep/19 33250 33350 RHS 100 0.33 0.1
43 14/Sep/19 33350 33400 RHS 50 0.33 0.05
44 14/Sep/19 33400 33450 RHS 50 0.37 0.05
45 14/Sep/19 33450 33500 RHS 50 0.35 0.05
46 14/Sep/19 33500 33550 RHS 50 0.34 0.05
47 14/Sep/19 33550 33600 RHS 50 0.37 0.05
48 14/Sep/19 33600 33700 RHS 100 0.36 0.1
49 14/Sep/19 33700 33750 RHS 50 0.32 0.05
50 14/Sep/19 33750 33800 RHS 50 0.34 0.05
51 14/Sep/19 33800 33910 RHS 110 0.35 0.11
52 23/Sep/19 17900 18100 LHS 200 0.34 0.2
53 23/Sep/19 17900 18100 RHS 200 0.34 0.2
54 25/Sep/19 17725 17900 LHS 175 0.33 0.175
55 25/Sep/19 18100 18300 LHS 200 0.33 0.2
56 25/Sep/19 18430 18700 LHS 270 0.34 0.27
57 25/Sep/19 17725 17900 RHS 175 0.33 0.175
58 25/Sep/19 18100 18300 RHS 200 0.34 0.2
59 25/Sep/19 18430 18650 RHS 220 0.34 0.22
Grand Total Area. (KM) 5.60
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR PGR PAINTING

PERIOD FROM 01-09-2019 To 30-09-2019


Chainage Measurment
SR. No. Date Side Depth+T Length(
From To Length
op RM)

1 28/Sep/19 34090 34212 RHS 122 1.2 122

Grand Total Area. (RM) 122.0


vt. Ltd.

ghways (I) Ltd.

Remark.
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR MICROSURFACING

PERIOD FROM 01-09-2019 To 30-09-2019


Chainage Measurment
SR. No. Date Side Lane
From To Length Width Sqm.

1 23/Sep/19 34350 34850 RHS I 500 3 1500

2 23/Sep/19 35050 35600 RHS I 550 3 1650

3 24/Sep/19 34150 34700 LHS I 550 3 1650

4 25/Sep/19 34700 34950 LHS I 250 3 750

5 25/Sep/19 35050 35300 LHS I 250 3 750

6 30/Sep/19 34150 34700 LHS II 550 2.5 1375

7 30/Sep/19 35050 35600 RHS II 550 2.5 1375

Grand Total Area.(SQM) 9050


. Ltd.

ways (I) Ltd.

Remarks

S.ROAD

S.ROAD

S.ROAD

S.ROAD

S.ROAD

S.ROAD

S.ROAD

9050
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR Overlay BC

PERIOD FROM 01-09-2019 To 30-09-2019


Chainage Measurment
SR.
Date Side
No. From To Length Width Sqm. Depth

1 6/Sep/19 22+160 22+190 BS 30.00 1.7 51.0 0.05

2 6/Sep/19 23+020 23+050 BS 30.00 1.7 51.0 0.05

3 09-Sep-19 23+260 23+695 LHS 435 9.0 3915.0 0.04

4 11-Sep-19 23+695 24+135 LHS 440 9.0 3960.0 0.04

5 12-Sep-19 24+135 24+550 LHS 415 9.0 3735.0 0.04

6 17-Sep-19 24+550 24+830 LHS 280 9.0 2520.0 0.04

7 21-Sep-19 24+830 25+000 LHS 170 9.0 1530.0 0.04

Grand Total QTY. (CUM)


ys (Agra) Pvt. Ltd.

oll Highways (I) Ltd.

BC

09-2019
t
Qty. Remark.
Cum
2.55 median opening

2.55 median opening

156.6 BC Overlay

158.4 BC Overlay

149.4 BC Overlay

100.8 BC Overlay

61.2 BC Overlay

631.5
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR Overlay BC Tack Coat

PERIOD FROM 01-09-2019 To 30-09-2019


SR. Chainage Measurment
Date Side
No. From To Length Width Sqm.
1 6/Sep/19 22+160 22+190 BS 30.00 1.70 51.0

2 6/Sep/19 23+020 23+050 BS 30.00 1.70 51.0

3 09-Sep-19 23+260 23+695 LHS 435 9.00 3915.0

4 11-Sep-19 23+695 24+135 LHS 440 9.00 3960.0

5 12-Sep-19 24+135 24+550 LHS 415 9.00 3735.0

6 17-Sep-19 24+550 24+830 LHS 280 9.00 2520.0

7 21-Sep-19 24+830 25+000 LHS 170 9.00 1530.0

Grand Total QTY. (SQM) 15762.00


s (Agra) Pvt. Ltd.

Highways (I) Ltd.

k Coat

09-2019
Remark.

median opening

median opening

BC Overlay

BC Overlay

BC Overlay

BC Overlay

BC Overlay

You might also like