Periodic Maintenance Work of the Project, "4/6 laning of Agra-Bharatpur BOT Project from Km.

17+756 to
62+295 of NH-11 under NHDP Phase IIIA in the State of Uttar Pradesh & Rajasthan."

INVOICE NO. OPAPL/Bharatpur/SC-WO/Maint/2019-20/RA NO.09/RAJ09 Date :- 08.11..2019

NAME OF THE CONCESSIONER:-M/s. ORIENTAL PATHWAYS (AGRA) PVT LTD. GSTN NO :-08AAACO7826R1ZP

Address of the Company :- PLOT NO 871, NAGLA BHAMRA, POST - CHICHANA,


POST- CHICHANA, Bharatpur, Rajasthan, 321203.

NAME OF THE EPC CONTRACTOR :- M/S. PRAKASH ASHAPLATINGS AND


GSTN NO :-08AABCP0398N1ZY.
TOLL HIGHWAYS (I) LTD.

Address of the Company :- 242, Subbash Nagar, Udaipur,Rajasthan,313001

Invoice Period UP to 01.10.2019 TO 31.10.2019

Upto Date Work Done


Previous Paid Amount This IPC Amount
S.No Description Amount
(Rs)* (Rs)
(Rs)

A Total Amount Based on Works Executed

a) Work done INR 259,264,795.95 INR 250,068,846.35 INR 9,195,949.60

A INR 259,264,795.95 INR 250,068,846.35 INR 9,195,949.60

c) SGST 6 %. INR 15,555,888.00 INR 15,004,131.00 INR 551,757.00

d) CGST 6 %. INR 15,555,888.00 INR 15,004,131.00 INR 551,757.00

B Sub Total A {1A+1B+2} INR 290,376,571.95 INR 280,077,108.35 INR 10,299,463.60

INR 290,376,571.95 INR 280,077,108.35 INR 10,299,463.60

D Recoveries

a) Retention Money.

b) Mobilization Advance.

Sub Total D

Net Payable(C+D) INR 290,376,571.95 INR 280,077,108.35 INR 10,299,463.60

This Bill Amount In Words: (Rupees One Crore Forty Nine Lakhs Forty Nine Thousand Eight Hundred Fifty Nine only)

M/s. Oriental Pathways (Agra) Pvt Ltd. For Prakash Asphaltings & Toll Highways (I) Limited.
NAME OF THE CONCESSIONER :- ORIENTAL PATHWAYS (AGRA) PVT LTD
NAME OF THE CONTRACTOR :- PRAKASH ASPHALTINGS AND TOLL HIGHWAYS (I)LIMITED
AGRA - BHARATPUR BOT PROJECT
SUB CONTRACT WORK ORDER- "For works to be executed in the state of Rajasthan."(Bharatpur Section)"
1 Original Work Order No. & Date OPAPL/Bharatpur/SC-WO/Maint/2018-19/01 dated 01-Dec-2018.

2 Type of Sub Contract


Periodic Maintenance Work of the Project, "4/6 laning of Agra-Bharatpur BOT Project from Km.17+756 to 62+295 of NH-11
under NHDP Phase IIIA in the State of Uttar Pradesh & Rajasthan."
3 SC Work Period - From and To 1-Dec-18 To 30-Jun-19 7 Months

4 Name of the Sub Contractor M/s Prakash Asphalting & Toll Highways (India) Ltd.
5 Address of the Sub Contractor 76, Mall Road, Mhow, Indore-453341.
6 PAN # of Sub Contractor. AABCP0398N.
7 GST # of Sub Contractor. 08AABCP0398N1ZY.
8 Period of Work. 01.11.2019 To 31.1.2020
9 BILL No 10
SUMMARY BILL OF QUANTITIES UPTO LAST BILL FOR THIS BILL UPTO DATE

Sl Item Description Unit Quantity Rate Amount (RS) Quantity Amount (RS) Quantity Amount (RS) Quantity Amount (RS)

Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.25 kg per sqm on the existing
1 bituminous/granular surface cleaned with mechanical broom as directed SQM 3 57 006 16 57 12 092 400,700.83 6,411,213.28 2,707.91 43,326.50 403,408.74 6,454,539.78
by authorized representative of OPAPL.

Carrying out repair to POT Holes and necessary patch repair work to
2 existing Bituminous carriageway as per MORTH (Revision 5th) specification SQM 30 000 800 2 40 00 000 32,075.08 25,660,064.00 - - 32,075.08 25,660,064.00
Clause 3004.

Milling of existing flexible pavement up to 50 mm depth and finished to


3 uniform level by Milling machine (Wirtgen Sensor Milling Machine) as SQM 30 000 48 14 40 000 54,250.90 2,604,043.20 1,921.99 92,255.52 56,172.89 2,696,298.72
directed by authorized representative of OPAPL.

Providing & laying Bituminous Concrete wearing course using refinery


produced crumb rubber modified bitumen (CRMB-60) complete as per
approved overlay plan / drawing and MORT&H (Fifth Revision)
Specifications Clause 507. The BC shall be laid by Full Carriageway
4 width Sensor Paver with Big ski Multiplex levelling system consisting of 6 Cum 15 333 11 900 18 24 66 667 15,171.71 180,543,407.07 66.35 - 15,238.06 181,332,943.99
ultrasonic sensors / 2 Control box / connecting cables etc.

Providing and laying of Microsurfacing (Type-III, 6 to 8mm) composed of


modified bitumen emulsion, mineral aggregate, water and necessary
additives (if needed) proportioned, mixed and uniformly spread over a
5 SQM 50 667 140 70 93 333 49180.57 6,885,279.80 - - 49,180.57 6,885,279.80
properly prepared surface for surface treatment of pavement as per
MORTH (Revision 5th) specification clause 514 and IRC SP 81-2008.

Providing & laying pavement marking with hot applied thermoplastic


6 paints conforming to ASTM D36/BS 3262 (Part - 1) as per drawing & SQM 15 556 550 85 55 556 4716.84 2,594,262.00 10,014.76 5,508,119.65 14,731.60 8,102,381.65
MORT&H (Revision 5th) Specifications Clause 803.
Repair/ Filling of Earthen shoulder in main carriageway, service road,
major/ minor junctions & rest area, satisfying the requirements of
7 minimum soaked CBR value (10%) as indicated in the of modified proctor SQM 78 562 40 31 42 471 64700.00 2,588,000.00 7,850.00 314,000 72,550.00 2,902,000.00
density with all leads & lIfts all complete as per drawings and MORT&H
specifications clause 3003.

Painting of Kerb / Crash barrier with two or more coats of Synthetic


8 enamel paint including a base coat of cement primer. Km 39.28 60 000 23 56 800 35.35 2,120,700.00 8.58 5 14 500 43.92 2,635,200.00

Painting of Structure Parapet/Retaining wall with two or more coats of


9 Synthetic enamel paint. SQM 3,100.00 110 799.83 87,981.30 1,836.72 2 02 039 2,636.55 290,019.95

10 Median kerb Height Raising by concrete M-20 grade. RM - 330 11,430.00 3,771,900.00 - - 11,430.00 3,771,900.00

11 WMM Work Median Opening Cum - 1 261 30.00 37,830.00 - - 30.00 37,830.00

12 CRMB Work For Median Opening Cum - 957 24.00 22,968.00 - - 24.00 22,968.00

13 PGR PAINTING RM - 250 652.00 163,000.00 352.80 88,200.00 1,004.80 251,200.00

14 DBM LAYING CUM - 10 200 1,625.31 16,578,197.70 124.64 12 71 372 1,749.96 17,849,570.07

15 CAT EYE NOS. 4,000.00 180 - - 2,070.00 372,600 2,070.00 372,600.00

Total Amount of Work Order in Rs. 234,766,919 250,068,846 8,406,412.69 259,264,795.95

Submitted by For Verified and Approved By


M/s Prakash Asphalting & Toll Highways (India) Ltd. M/s. Oriental Pathways (Agra) Pvt Ltd (OPAPL)

Authorised Signatory Authorised Signatory


Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR KERB PAINTING

PERIOD FROM 01-11-2019 To 31-01-2020


Chainage Measurment
SR.
Date Side Length
No. From To Length Depth+Top
(KM)

1 9/Nov/19 46300 46400 LHS 100 0.35 0.1

2 9/Nov/19 46300 46400 RHS 100 0.34 0.1

3 8/Nov/19 49550 49600 RHS 50 0.35 0.05

4 8/Nov/19 49600 49700 RHS 100 0.35 0.1

5 8/Nov/19 49700 49750 RHS 50 0.35 0.05

6 8/Nov/19 49750 49800 RHS 50 0.36 0.05

7 8/Nov/19 49800 49850 RHS 50 0.36 0.05

8 8/Nov/19 49850 49900 RHS 50 0.35 0.05

9 8/Nov/19 49900 50000 RHS 100 0.35 0.1

10 7/Nov/19 50000 50100 RHS 100 0.35 0.1

11 7/Nov/19 50100 50200 RHS 100 0.34 0.1

12 7/Nov/19 50200 50250 RHS 50 0.35 0.05

13 7/Nov/19 50250 50300 RHS 50 0.33 0.05

14 7/Nov/19 50300 50400 RHS 100 0.35 0.1


15 7/Nov/19 50400 50450 RHS 50 0.34 0.05

16 7/Nov/19 50450 50500 RHS 50 0.37 0.05

17 2/Nov/19 50500 50550 RHS 45 0.37 0.045

18 2/Nov/19 50505 50555 LHS 50 0.36 0.05

19 2/Nov/19 50550 50555 RHS 5 0.34 0.005

20 2/Nov/19 50585 50600 LHS 15 0.3 0.015

21 2/Nov/19 50585 50600 RHS 15 0.33 0.015

22 2/Nov/19 50600 50615 LHS 15 0.35 0.015

23 2/Nov/19 50600 50615 RHS 15 0.38 0.015

24 2/Nov/19 50615 50640 LHS 25 0.35 0.025

25 2/Nov/19 50615 50640 RHS 25 0.39 0.025

26 1/Nov/19 50635 50700 RHS 65 0.38 0.065

27 1/Nov/19 50700 50750 RHS 50 0.36 0.05

28 1/Nov/19 50750 50800 RHS 50 0.35 0.05

29 2/Nov/19 50800 50850 RHS 50 0.35 0.05

30 2/Nov/19 50850 50900 RHS 50 0.32 0.05

31 2/Nov/19 50900 50950 RHS 50 0.33 0.05

32 2/Nov/19 50950 51000 RHS 50 0.32 0.05

33 7/Nov/19 51000 51100 RHS 100 0.33 0.1


34 7/Nov/19 51100 51130 RHS 30 0.34 0.03

35 7/Nov/19 51300 51400 RHS 100 0.34 0.1

36 7/Nov/19 51400 51500 RHS 100 0.35 0.1

37 7/Nov/19 51500 51550 RHS 50 0.34 0.05

38 6/Nov/19 51550 51600 RHS 50 0.35 0.05

39 6/Nov/19 51600 51700 RHS 100 0.34 0.1

40 6/Nov/19 51700 51750 RHS 50 0.34 0.05

41 6/Nov/19 51740 51800 LHS 60 0.34 0.06

42 6/Nov/19 51750 51800 RHS 50 0.42 0.05

43 6/Nov/19 51825 51850 RHS 25 0.41 0.025

44 6/Nov/19 51825 51850 LHS 25 0.35 0.025

45 6/Nov/19 51850 51870 RHS 20 1.2 0.02

46 6/Nov/19 51850 51870 LHS 20 1.2 0.02

47 6/Nov/19 51870 51900 RHS 30 0.34 0.03

48 6/Nov/19 51900 51950 RHS 50 0.36 0.05

49 6/Nov/19 51950 52000 RHS 50 0.35 0.05

50 6/Nov/19 52000 52050 RHS 50 0.35 0.05

51 6/Nov/19 52050 52150 RHS 100 0.35 0.1

52 6/Nov/19 52150 52250 RHS 100 0.35 0.1


53 6/Nov/19 52270 52300 RHS 30 0.34 0.03

54 6/Nov/19 52300 52350 RHS 50 0.36 0.05

55 5/Nov/19 52350 52400 RHS 50 0.34 0.05

56 5/Nov/19 52400 52450 RHS 50 0.42 0.05

57 5/Nov/19 52450 52500 RHS 50 0.34 0.05

58 5/Nov/19 52500 52550 RHS 50 0.35 0.05

59 5/Nov/19 52550 52600 RHS 50 0.34 0.05

60 5/Nov/19 52600 52700 RHS 100 0.36 0.1

61 5/Nov/19 52700 52800 RHS 100 0.35 0.1

62 4/Nov/19 52800 52850 RHS 50 0.34 0.05

63 4/Nov/19 52850 52900 RHS 50 0.35 0.05

64 4/Nov/19 52850 52900 LHS 50 0.34 0.05

65 4/Nov/19 52925 52950 RHS 25 0.34 0.025

66 4/Nov/19 52925 52950 LHS 25 0.34 0.025

67 4/Nov/19 52950 53000 RHS 50 0.35 0.05

68 4/Nov/19 52950 53000 LHS 50 0.34 0.05

69 4/Nov/19 53000 53050 RHS 50 0.36 0.05

70 4/Nov/19 53250 53300 RHS 50 0.34 0.05

71 4/Nov/19 53300 53400 RHS 100 0.33 0.1


72 4/Nov/19 53400 53450 RHS 50 0.34 0.05

73 4/Nov/19 53450 53500 RHS 50 0.35 0.05

74 4/Nov/19 53500 53600 RHS 100 0.35 0.1

75 3/Nov/19 53600 53650 RHS 50 0.33 0.05

76 3/Nov/19 53650 53700 RHS 50 0.31 0.05

77 3/Nov/19 53700 53750 RHS 50 0.3 0.05

78 3/Nov/19 53750 53800 RHS 50 0.32 0.05

79 3/Nov/19 53800 53850 RHS 50 0.34 0.05

80 3/Nov/19 53850 53900 RHS 50 0.34 0.05

81 10/Nov/19 60080 60100 LHS 20 0.35 0.02

82 10/Nov/19 60080 60100 RHS 20 0.34 0.02

83 10/Nov/19 60120 60150 RHS 30 0.35 0.03

84 10/Nov/19 60120 60150 LHS 30 0.34 0.03


85 12/Dec/19 54150 54250 RHS 100 0.42 0.1
86 14/Dec/19 46100 46150 LHS 50 0.35 0.05
87 14/Dec/19 46200 LHS 5 0.35 0.005
88 14/Dec/19 46900 46950 LHS 50 0.34 0.05
89 14/Dec/19 55280 55300 RHS 20 0.42 0.02
90 1/1/2020 45310 45510 LHS 200 0.34 0.2
91
1/1/2020 52250 52270 LHS 20 0.34 0.02
92
1/1/2020 55550 55700 LHS 150 0.34 0.15
93 1/1/2020 56115 56475 LHS 360 0.34 0.36
94 1/2/2020 61750 61800 LHS 50 0.34 0.05
95
1/2/2020 61990 62150 LHS 160 0.34 0.16
96 1/2/2020 45250 45390 RHS 140 0.34 0.14
97
1/3/2020 46400 47745 RHS 1345 0.34 1.345
98
1/4/2020 47940 48050 RHS 110 0.34 0.11
99
1/4/2020 48300 48400 RHS 100 0.34 0.1
100 1/4/2020 48800 49050 RHS 250 0.34 0.25
101 1/4/2020 55300 55600 RHS 300 0.34 0.3
102 1/4/2020 56850 57500 RHS 650 0.34 0.65
Grand Total Area. (KM) 8.58
Pvt. Ltd.

Highways (I) Ltd.

Remark.
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FO BC Laying
PERIOD FROM 01-11-2019 To 31-01-2020
Chainage Measurment
SR.
Date Side Qty.
No. From To Length Width Sqm. Depth
Cum

1 29/Dec/19 62040 LHS 5 5.50 27.5 0.20 5.50

2 29/Dec/19 55265 RHS 12 4.70 56.4 0.20 11.28

3 29/Dec/19 54950 RHS 11 4.50 49.5 0.20 9.90

4 29/Dec/19 54360 RHS 13 4.90 63.7 0.20 12.74

5 21/Nov/19 47904 47934 30 4.50 135 0.07 8.78

6 18/Dec/19 45400 LHS 36.9 8.40 309.96 0.04 12.40

7 18/Dec/19 45380 LHS 24.3 5.92 143.856 0.04 5.75


Grand Total QTY. (CUM) 66.3
vt. Ltd.

hways (I) Ltd.

Remark.

SPEED BREAKER

SPEED BREAKER

SPEED BREAKER

SPEED BREAKER

MEDIAN OP.

LINK ROAD

LINK ROAD
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR DBM Laying


PERIOD FROM 01-11-2019 To 31-01-2020
Chainage Measurment
SR.
Date Side Qty.
No. From To Length Width Sqm. Depth
Cum

1 12/Nov/19 48927 48990 LHS 63 3.45 217.35 0.07 14.13

2 12/Nov/19 49456.5 49620 LHS 163.5 3.20 523.2 0.07 36.62

3 18/Nov/19 35049 35106 RHS 57 3.20 182.4 0.07 11.86

4 24/Nov/19 43875 43926.8 RHS 51.8 2.90 150.22 0.07 9.76

5 24/Nov/19 43964.2 43981.5 RHS 17.3 2.90 50.17 0.07 3.26

6 24/Nov/19 43669.5 43787 RHS 117.5 2.90 340.75 0.07 22.15

7 24/Nov/19 44008 44050 RHS 42 3.65 153.3 0.07 9.96

8 24/Nov/19 44139 44150 RHS 11 3.00 33 0.07 2.15

9 24/Nov/19 44050 44073 RHS 23 3.40 78.2 0.07 5.08


5/Dec/19 54161 54179 LHS 18.00 2.95 53.10 0.05 2.66
10

5/Dec/19 54182 54200 LHS 18.00 4.10 73.80 0.05 3.69


11

5/Dec/19 54275.5 54293 RHS 17.50 3.80 66.50 0.05 3.33


12
Grand Total QTY. (CUM) 124.6
vt. Ltd.

hways (I) Ltd.

Remark.

DBM

DBM

DBM

DBM

DBM

DBM

DBM

DBM

DBM

DBM

DBM

DBM
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR DBM Laying Tack Coat


PERIOD FROM 01-11-2019 To 31-01-2020

SR. Chainage Measurment


Date Side
No. From To Length Width Sqm.

1 12/Nov/19 48927 48990 LHS 63 3.45 217.35


2 12/Nov/19 49456.5 49620 LHS 163.5 3.20 523.2
3 18/Nov/19 35049 35106 RHS 57 3.20 182.4
4 24/Nov/19 43875 43926.8 RHS 51.8 2.90 150.22
5 24/Nov/19 43964.2 43981.5 RHS 17.3 2.90 50.17
6 24/Nov/19 43669.5 43787 RHS 117.5 2.90 340.75
7 24/Nov/19 44008 44050 RHS 42 3.65 153.3
8 24/Nov/19 44139 44150 RHS 11 3.00 33
9 24/Nov/19 44050 44073 RHS 23 3.40 78.2
5/Dec/19 54161 54179 LHS 18.00 2.95 53.10
10
5/Dec/19 54182 54200 LHS 18.00 4.10 73.80
11
5/Dec/19 54275.5 54293 RHS 17.50 3.80 66.50
12
1 29/Dec/19 62040 LHS 5 5.50 27.5
2 29/Dec/19 55265 RHS 12 4.70 56.4
3 29/Dec/19 54950 RHS 11 4.50 49.5
4 29/Dec/19 54360 RHS 13 4.90 63.7
5 21/Nov/19 47904 47934 30 4.50 135
6 18/Dec/19 45400 LHS 36.9 8.40 309.96
7 18/Dec/19 45380 LHS 24.3 5.92 143.856
Grand Total QTY. (CUM) 2707.9
(Agra) Pvt. Ltd.

Toll Highways (I) Ltd.

Tack Coat
2020

Remark.

DBM

DBM

DBM

DBM

DBM

DBM

DBM

DBM

DBM

DBM

DBM

DBM

SPEED BREAKER
SPEED BREAKER
SPEED BREAKER
SPEED BREAKER
MEDIAN OP.
LINK ROAD
LINK ROAD
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR DBM MILLING


PERIOD FROM 01-11-2019 To 31-01-2020

SR. Chainage Measurment


Date Side
No. From To Length Width Sqm.
1 12/Nov/19 48927 48990 LHS 63 3.45 217.35
2 12/Nov/19 49456.5 49620 LHS 163.5 3.20 523.2
3 18/Nov/19 35049 35106 RHS 57 3.20 182.4
4 24/Nov/19 43875 43926.8 RHS 51.8 2.90 150.22
5 24/Nov/19 43964.2 43981.5 RHS 17.3 2.90 50.17
6 24/Nov/19 43669.5 43787 RHS 117.5 2.90 340.75
7 24/Nov/19 44008 44050 RHS 42 3.65 153.3
8 24/Nov/19 44139 44150 RHS 11 3.00 33
9 24/Nov/19 44050 44073 RHS 23 3.40 78.2
10 5/Dec/19 54161 54179 LHS 18.00 2.95 53.10
11 5/Dec/19 54182 54200 LHS 18.00 4.10 73.80
12 5/Dec/19 54275.5 54293 RHS 17.50 3.80 66.50

Grand Total QTY. (CUM) 1922.0


(Agra) Pvt. Ltd.

Toll Highways (I) Ltd.

LLING
2020

Remark.

DBM
DBM
DBM
DBM
DBM
DBM
DBM
DBM
DBM
DBM
DBM
DBM
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR SHOULDER

PERIOD FROM 01-11-2019 To 31-01-2020

Chainage
Length Width
SR. No. Date Side Area SQM
From To (Mt.) (Mt.)

1 10/Nov/19 45400 45450 LHS 50 2 100


2 1/1/2020 50150 50540 LHS 390 2 780
3 1/1/2020 51550 52350 LHS 800 2 1600
4 1/1/2020 42735 42950 RHS 215 2 430
5 1/1/2020 43090 43270 RHS 180 2 360
6 1/2/2020 43480 43530 RHS 50 2 100
7 1/2/2020 43550 43600 RHS 50 2 100
8 1/2/2020 45190 45635 RHS 445 2 890
9 1/2/2020 45860 45920 RHS 60 2 120
10 1/2/2020 46855 46875 RHS 20 2 40
11 1/3/2020 46985 47000 RHS 15 2 30
12 1/3/2020 48370 48400 RHS 30 2 60
13 1/3/2020 49750 49990 RHS 240 2 480
14 1/3/2020 50305 50350 RHS 45 2 90
15 1/3/2020 51820 51940 RHS 120 2 240
16 1/4/2020 52220 52300 RHS 80 2 160
17 1/4/2020 52370 52400 RHS 30 2 60
18 1/4/2020 52660 52700 RHS 40 2 80
19 1/4/2020 53000 53020 RHS 20 2 40
20 1/4/2020 53110 53140 RHS 30 2 60
21 1/4/2020 53170 53205 RHS 35 2 70
22 1/5/2020 55350 55400 RHS 50 2 100
23 1/5/2020 55500 55750 RHS 250 2 500
24 1/5/2020 59150 59400 RHS 250 2 500
25 1/5/2020 60400 60650 RHS 250 2 500
26 1/5/2020 60820 61000 RHS 180 2 360

Grand Total QTY. (CUM) 7850.0


t. Ltd.

hways (I) Ltd.

Remarks
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR STRUCTURE PARAPET/RETAINING WALL PAINTING

PERIOD FROM 01-11-2019 To 31-01-2020


Measurment
SR. No. Date Chainage Side
Length Depth+Top Sqm.
1 6-Nov-19 42640 LHS 2.1 1.45 3.045

2 6-Nov-19 42640 RHS 2.1 1.45 3.045

3 6-Nov-19 43040 LHS 4.6 1.45 6.67

4 6-Nov-19 43040 RHS 4.6 1.45 6.67

5 6-Nov-19 43245 LHS 5.6 1.45 8.12

6 7-Nov-19 43245 RHS 5.6 1.45 8.12

7 7-Nov-19 43640 LHS 4.6 1.45 6.67

8 7-Nov-19 43640 RHS 4.6 1.45 6.67

9 7-Nov-19 44080 LHS 5.6 1.45 8.12

10 7-Nov-19 44080 RHS 4.6 1.45 6.67

11 8-Nov-19 44440 LHS 5.6 1.45 8.12

12 8-Nov-19 44440 RHS 4.6 1.45 6.67

13 8-Nov-19 44840 LHS 4.6 1.45 6.67

14 9-Nov-19 44840 RHS 4.6 1.45 6.67

15 9-Nov-19 45250 LHS 4.1 1.45 5.945

16 9-Nov-19 45250 RHS 4.1 1.45 5.945

17 9-Nov-19 45750 LHS 3.1 1.45 4.495

18 9-Nov-19 45750 RHS 3.6 1.45 5.22

19 10-Nov-19 45900 LHS 8.6 1.45 12.47

20 10-Nov-19 45900 RHS 8.6 1.45 12.47

21 10-Nov-19 46460 LHS 3.1 1.45 4.495

22 11/Nov/19 46460 RHS 3.1 1.45 4.495

23 11/Nov/19 46760 LHS 3.1 1.45 4.495

24 11/Nov/19 46760 RHS 3.1 1.45 4.495


25 11/Nov/19 46850 LHS 5.1 1.45 7.395

26 11/Nov/19 46850 RHS 5.1 1.45 7.395

27 11/Nov/19 46950 LHS 4.6 1.45 6.67

28 11/Nov/19 46950 RHS 4.6 1.45 6.67

29 11/Nov/19 47575 LHS 8.6 1.45 12.47

30 11/Nov/19 47575 RHS 8.6 1.45 12.47

31 11/Nov/19 47870 LHS 4.1 1.45 5.945

32 11/Nov/19 47870 RHS 4.6 1.45 6.67

33 11/Nov/19 47970 LHS 4.1 1.45 5.945

34 11/Nov/19 47970 RHS 4.4 1.45 6.38

35 12/Nov/19 48270 LHS 4.1 1.45 5.945

36 12/Nov/19 48270 RHS 4.1 1.45 5.945

37 12/Nov/19 48950 LHS 4.1 1.45 5.945

38 12/Nov/19 48950 RHS 4.1 1.45 5.945

39 12/Nov/19 49668 LHS 4.1 1.45 5.945

40 12/Nov/19 49668 RHS 4.1 1.45 5.945

41 12/Nov/19 50275 LHS 8.1 1.45 11.745

42 12/Nov/19 50275 RHS 8.1 1.45 11.745

43 12/Nov/19 50430 LHS 4.1 1.45 5.945

44 12/Nov/19 50430 RHS 4.1 1.45 5.945

45 12/Nov/19 50600 LHS 4.1 1.45 5.945

46 13/Nov/19 50600 RHS 4.1 1.45 5.945

47 13/Nov/19 50760 LHS 4.1 1.45 5.945

48 13/Nov/19 50760 RHS 4.1 1.45 5.945

49 13/Nov/19 51035 LHS 3.1 1.45 4.495

50 13/Nov/19 51035 RHS 3.1 1.45 4.495

51 13/Nov/19 51242 RHS 17.6 1.25 22

52 13/Nov/19 51242 RHS 17.6 1.25 22

53 13/Nov/19 51483 LHS 5.6 1.45 8.12

54 13/Nov/19 51483 RHS 12.6 1.45 18.27

55 13/Nov/19 51861 RHS 18.2 1.2 21.84


56 13/Nov/19 52258 RHS 19.7 1.2 23.64

57 13/Nov/19 52258 LHS 16.6 1.45 24.07

58 13/Nov/19 52825 LHS 4.1 1.45 5.945

59 13/Nov/19 52825 RHS 4.1 1.45 5.945

60 14/Nov/19 53170 LHS 3.1 1.45 4.495

61 14/Nov/19 53170 RHS 3.1 1.45 4.495

62 14/Nov/19 56067 LHS 4.6 1.45 6.67

63 14/Nov/19 56067 RHS 4.6 1.45 6.67

64 14/Nov/19 56225 LHS 317 1.2 380.4

65 14/Nov/19 56225 RHS 317 1.2 380.4

66 14/Nov/19 56225 LHS 15.6 1.2 18.72

67 14/Nov/19 56225 RHS 15.6 1.2 18.72

68 14/Nov/19 56225 LHS 4 1.3 5.2

69 14/Nov/19 56225 RHS 4 1.3 5.2

70 15/Nov/19 56900 LHS 6.6 1.45 9.57

71 15/Nov/19 56900 RHS 7.6 1.45 11.02

72 15/Nov/19 58150 LHS 4.1 1.45 5.945

73 15/Nov/19 58150 RHS 4.6 1.45 6.67

74 15/Nov/19 59940 LHS 6.1 1.45 8.845

75 15/Nov/19 59940 RHS 7.6 1.45 11.02

76 15/Nov/19 60104 LHS 11.7 1.2 14.04

77 15/Nov/19 60104 RHS 19 1.2 22.8

78 15/Nov/19 60104 LHS 11.7 1.2 14.04

79 15/Nov/19 60104 RHS 19 1.2 22.8

80 16/Nov/19 61130 LHS 5.7 1.45 8.265

81 16/Nov/19 61130 RHS 6.1 1.45 8.845

82 16/Nov/19 61200 LHS 4.7 1.45 6.815

83 16/Nov/19 61200 RHS 6.1 1.45 8.845

84 16/Nov/19 61650 LHS 9.2 1.45 13.34

85 16/Nov/19 61650 RHS 12.6 1.45 18.27

86 12/Dec/19 54300 LHS 25 1.5 37.5


87 12/Dec/19 54300 RHS 25 1.5 37.5

88 14/Dec/19 51850 LHS 20 1.2 24

89 14/Dec/19 51810 median 20 1.2 24


90 15/Jan/20 46075 RHS 50 1.5 75
91 15/Jan/20 46075 LHS 50 1.5 75
92 21/Jan/20 60100 RHS 24 0.1 2.4
93 21/Jan/20 52250 RHS 28 0.1 2.8
94 21/Jan/20 51850 RHS 24 0.1 2.4
95 21/Jan/20 51250 RHS 24 0.1 2.4
96 21/Jan/20 51250 LHS 12 0.1 1.2
97 22/Jan/20 46350 RHS 28 0.1 2.8
98 22/Jan/20 46100 LHS 28 0.1 2.8
99 22/Jan/20 39770 RHS 24 0.1 2.4
100 22/Jan/20 39770 LHS 30 0.1 3
101 22/Jan/20 35950 RHS 26 0.1 2.6
102 23/Jan/20 35950 RHS 44 0.1 4.4
103 23/Jan/20 35950 LHS 70 0.1 7
104 23/Jan/20 32750 RHS 32 0.1 3.2
105 23/Jan/20 32750 LHS 32 0.1 3.2
106 23/Jan/20 27250 LHS 65 0.1 6.5
107 24/Jan/20 27650 LHS 24 0.1 2.4
Grand Total Area. (SQM) 1837
gra) Pvt. Ltd.

oll Highways (I) Ltd.

G WALL PAINTING

20

Remark.
Median
Median
Median
Medain Wall Agra
Medain Wall Bharatpur

Median
Median
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR CAT EYE PAINTING

PERIOD FROM 01-11-2019 To 31-01-2020


Chainage Cat eyes Qty.in
SR. No. Date Items Side
From To nos.
1 25/Dec/19 Cat Eyes Fixing 54365 RHS 17
2 25/Dec/19 Cat Eyes Fixing 54400 54385 RHS 2
3 25/Dec/19 Cat Eyes Fixing 55275 RHS 17
4 25/Dec/19 Cat Eyes Fixing 56440 56080 RHS 11
5 25/Dec/19 Cat Eyes Fixing 56800 54300 RHS 36
6 14/Dec/19 Cat Eyes Fixing 60750 60800 LHS 64
7 15/Dec/19 Cat Eyes Fixing 60800 LHS 20
8 23/Dec/19 Cat Eyes Fixing 60900 60750 median 6
9 23/Dec/19 Cat Eyes Fixing 61150 median 2
10 23/Dec/19 Cat Eyes Fixing 61200 median 2
11 23/Dec/19 Cat Eyes Fixing 61600 median 4
12 15/Dec/19 Cat Eyes Fixing 61800 LHS 44
13 16/Dec/19 Cat Eyes Fixing 61800 LHS 44
14 16/Dec/19 Cat Eyes Fixing 61800 RHS 22
15 19/Dec/19 Cat Eyes Fixing 61800 RHS 36
16 19/Dec/19 Cat Eyes Fixing 61800 RHS 16
17 23/Dec/19 Cat Eyes Fixing 61850 median 10
18 19/Dec/19 Cat Eyes Fixing 62000 LHS 52
19 21/Dec/19 Cat Eyes Fixing 62000 RHS 40
20 21/Dec/19 Cat Eyes Fixing 62000 Notch 5
21 19/Dec/19 Cat Eyes Fixing 62050 LHS 36
22 19/Dec/19 Cat Eyes Fixing 62050 RHS 24
23 21/Dec/19 Cat Eyes Fixing 62050 RHS 28
24 21/Dec/19 Cat Eyes Fixing 62050 Notch 5
25 21/Dec/19 Cat Eyes Fixing 62050 62150 RHS 3
26 23/Dec/19 Cat Eyes Fixing 62295 61850 median 7
27 23/Dec/19 Cat Eyes Fixing 62300 60800 median 15
28 23/Dec/19 Cat Eyes Fixing speed breaker sevar 5
29 10/Jan/20 Cat Eyes Fixing 43200 LHS 1
30 10/Jan/20 Cat Eyes Fixing 43700 48600 LHS 50
31 10/Jan/20 Cat Eyes Fixing 55215 LHS 44
32 10/Jan/20 Cat Eyes Fixing 55250 LHS 44
33 10/Jan/20 Cat Eyes Fixing 55250 RHS 17
34 11/Jan/20 Cat Eyes Fixing 48700 54200 LHS 38
35 11/Jan/20 Cat Eyes Fixing 56300 58200 LHS 38
36 11/Jan/20 Cat Eyes Fixing 55250 RHS 19
37 11/Jan/20 Cat Eyes Fixing 55250 median 5
38 11/Jan/20 Cat Eyes Fixing 55215 RHS 40
39 11/Jan/20 Cat Eyes Fixing 54940 RHS 32
40 11/Jan/20 Cat Eyes Fixing 54930 median 5
41 11/Jan/20 Cat Eyes Fixing 55220 median 5
42 11/Jan/20 Cat Eyes Fixing 54890 RHS 6
43 12/Jan/20 Cat Eyes Fixing 58300 62295 LHS 29
44 12/Jan/20 Cat Eyes Fixing 54200 52600 RHS 29
45 12/Jan/20 Cat Eyes Fixing 54890 RHS 26
46 12/Jan/20 Cat Eyes Fixing 54890 LHS 32
47 12/Jan/20 Cat Eyes Fixing 54940 LHS 32
48 12/Jan/20 Cat Eyes Fixing 54900 median 5
49 12/Jan/20 Cat Eyes Fixing 57400 median 3
50 12/Jan/20 Cat Eyes Fixing 57430 median 3
51 12/Jan/20 Cat Eyes Fixing 56080 56440 LHS 11
52 12/Jan/20 Cat Eyes Fixing 57320 57400 LHS 3
53 13/Jan/20 Cat Eyes Fixing 52500 44400 RHS 82
54 13/Jan/20 Cat Eyes Fixing 45340 LHS 36
55 13/Jan/20 Cat Eyes Fixing 45400 LHS 40
56 13/Jan/20 Cat Eyes Fixing 45400 RHS 40
57 13/Jan/20 Cat Eyes Fixing 45340 RHS 32
58 13/Jan/20 Cat Eyes Fixing 45390 median 3
59 13/Jan/20 Cat Eyes Fixing 45360 median 3
60 14/Jan/20 Cat Eyes Fixing 44300 39000 RHS 54
61 19/Jan/20 Cat Eyes Fixing 54350 62250 LHS 80
62 19/Jan/20 Cat Eyes Fixing 44040 44110 median 10
63 19/Jan/20 Cat Eyes Fixing 43665 LHS 2
64 19/Jan/20 Cat Eyes Fixing 44070 LHS 2
65 19/Jan/20 Cat Eyes Fixing 44460 LHS 4
66 19/Jan/20 Cat Eyes Fixing 44860 LHS 4
67 19/Jan/20 Cat Eyes Fixing 45260 LHS 4
68 19/Jan/20 Cat Eyes Fixing 45720 LHS 4
69 19/Jan/20 Cat Eyes Fixing 45900 LHS 4
70 19/Jan/20 Cat Eyes Fixing 46090 46110 LHS 6
71 19/Jan/20 Cat Eyes Fixing 46340 46360 LHS 6
72 19/Jan/20 Cat Eyes Fixing 46480 LHS 4
73 19/Jan/20 Cat Eyes Fixing 46760 LHS 4
74 19/Jan/20 Cat Eyes Fixing 46850 LHS 4
75 19/Jan/20 Cat Eyes Fixing 46950 LHS 4
76 19/Jan/20 Cat Eyes Fixing 47250 LHS 4
77 19/Jan/20 Cat Eyes Fixing 47560 LHS 4
78 19/Jan/20 Cat Eyes Fixing 47870 LHS 4
79 20/Jan/20 Cat Eyes Fixing 54350 62250 RHS 80
80 20/Jan/20 Cat Eyes Fixing 47970 LHS 4
81 20/Jan/20 Cat Eyes Fixing 48270 LHS 4
82 20/Jan/20 Cat Eyes Fixing 48950 LHS 4
83 20/Jan/20 Cat Eyes Fixing 49670 LHS 4
84 20/Jan/20 Cat Eyes Fixing 50275 LHS 4
85 20/Jan/20 Cat Eyes Fixing 50440 LHS 4
86 20/Jan/20 Cat Eyes Fixing 50600 LHS 2
87 20/Jan/20 Cat Eyes Fixing 50760 LHS 4
88 20/Jan/20 Cat Eyes Fixing 51030 LHS 4
89 20/Jan/20 Cat Eyes Fixing 51250 LHS 4
90 20/Jan/20 Cat Eyes Fixing 51480 LHS 4
91 20/Jan/20 Cat Eyes Fixing 51860 LHS 6
92 21/Jan/20 Cat Eyes Fixing 52250 LHS 6
93 21/Jan/20 Cat Eyes Fixing 52840 LHS 4
94 21/Jan/20 Cat Eyes Fixing 53170 LHS 4
95 21/Jan/20 Cat Eyes Fixing 54200 54440 LHS 13
96 21/Jan/20 Cat Eyes Fixing 56270 56440 LHS 6
97 21/Jan/20 Cat Eyes Fixing 56900 LHS 4
98 21/Jan/20 Cat Eyes Fixing 58160 LHS 4
99 21/Jan/20 Cat Eyes Fixing 59950 LHS 4
100 21/Jan/20 Cat Eyes Fixing 60110 LHS 6
101 21/Jan/20 Cat Eyes Fixing 60580 60940 LHS 11
102 21/Jan/20 Cat Eyes Fixing 61150 LHS 4
103 22/Jan/20 Cat Eyes Fixing 60580 60940 LHS 11
104 22/Jan/20 Cat Eyes Fixing 61900 62295 LHS 23
105 22/Jan/20 Cat Eyes Fixing 62295 61900 RHS 12
106 22/Jan/20 Cat Eyes Fixing 60935 60780 RHS 6
107 22/Jan/20 Cat Eyes Fixing 61210 RHS 2
108 22/Jan/20 Cat Eyes Fixing 61150 RHS 2
109 22/Jan/20 Cat Eyes Fixing 61650 LHS 6
110 22/Jan/20 Cat Eyes Fixing 61210 LHS 4
111 23/Jan/20 Cat Eyes Fixing 60800 RHS 8
112 23/Jan/20 Cat Eyes Fixing 60800 LHS 4
113 23/Jan/20 Cat Eyes Fixing 60750 LHS 4
114 23/Jan/20 Cat Eyes Fixing 55215 LHS 3
115 23/Jan/20 Cat Eyes Fixing 60750 60570 RHS 6
116 23/Jan/20 Cat Eyes Fixing 58260 57910 RHS 10
117 23/Jan/20 Cat Eyes Fixing 57550 57330 RHS 7
118 23/Jan/20 Cat Eyes Fixing 57330 57480 LHS 8
119 23/Jan/20 Cat Eyes Fixing 54450 54200 RHS 12
120 23/Jan/20 Cat Eyes Fixing 59950 RHS 2
121 23/Jan/20 Cat Eyes Fixing 60100 RHS 3
122 23/Jan/20 Cat Eyes Fixing 58160 RHS 2
123 23/Jan/20 Cat Eyes Fixing 56900 RHS 2
124 23/Jan/20 Cat Eyes Fixing 56440 56080 RHS 11
125 24/Jan/20 Cat Eyes Fixing 53180 RHS 4
126 24/Jan/20 Cat Eyes Fixing 52890 52940 median 14
127 24/Jan/20 Cat Eyes Fixing 52835 RHS 4
128 24/Jan/20 Cat Eyes Fixing 52250 52270 RHS 6
129 24/Jan/20 Cat Eyes Fixing 51850 51870 RHS 6
130 24/Jan/20 Cat Eyes Fixing 51800 median 14
131 24/Jan/20 Cat Eyes Fixing 51480 RHS 6
132 24/Jan/20 Cat Eyes Fixing 51240 RHS 6
133 24/Jan/20 Cat Eyes Fixing 51040 RHS 4
134 24/Jan/20 Cat Eyes Fixing 50760 RHS 4
135 24/Jan/20 Cat Eyes Fixing 50600 RHS 4
136 24/Jan/20 Cat Eyes Fixing 50600 LHS 2
137 24/Jan/20 Cat Eyes Fixing 50570 median 10
138 24/Jan/20 Cat Eyes Fixing 50430 RHS 4
139 24/Jan/20 Cat Eyes Fixing 50280 RHS 4
140 25/Jan/20 Cat Eyes Fixing 49680 RHS 4
141 25/Jan/20 Cat Eyes Fixing 48950 RHS 4
142 25/Jan/20 Cat Eyes Fixing 48270 RHS 4
143 25/Jan/20 Cat Eyes Fixing 47970 RHS 4
144 25/Jan/20 Cat Eyes Fixing 47865 RHS 4
145 25/Jan/20 Cat Eyes Fixing 47570 RHS 4
146 25/Jan/20 Cat Eyes Fixing 47250 RHS 4
147 25/Jan/20 Cat Eyes Fixing 46950 RHS 4
148 25/Jan/20 Cat Eyes Fixing 46850 RHS 4
149 25/Jan/20 Cat Eyes Fixing 46760 RHS 4
150 25/Jan/20 Cat Eyes Fixing 46475 RHS 4
151 25/Jan/20 Cat Eyes Fixing 46350 RHS 6
152 25/Jan/20 Cat Eyes Fixing 46100 RHS 6
153 25/Jan/20 Cat Eyes Fixing 45900 RHS 4
154 25/Jan/20 Cat Eyes Fixing 45725 RHS 4
155 27/Jan/20 Cat Eyes Fixing 45300 45440 median 8
156 27/Jan/20 Cat Eyes Fixing 45260 RHS 4
157 27/Jan/20 Cat Eyes Fixing 44890 RHS 4
158 27/Jan/20 Cat Eyes Fixing 44460 RHS 4
159 27/Jan/20 Cat Eyes Fixing 44080 RHS 2
160 27/Jan/20 Cat Eyes Fixing 43660 RHS 4
161 27/Jan/20 Cat Eyes Fixing 43260 RHS 4
162 27/Jan/20 Cat Eyes Fixing 43065 RHS 4
163 27/Jan/20 Cat Eyes Fixing 42660 RHS 4
Grand Total NOS. 2070
hways (Agra) Pvt. Ltd.

ngs & Toll Highways (I) Ltd.

PAINTING

1-01-2020

Remark.

Speed breaker
Shoulder & median kerb
Speed breaker
Center lane
Center lane
Zebra Crossing
Zebra Crossing
Shoulder & median kerb
Strucure cat Eye Fixing
Strucure cat Eye Fixing
Strucure cat Eye Fixing
Zebra Crossing
Zebra Crossing
Zebra Crossing
Zebra Crossing
Zebra Crossing
median cut
Zebra Crossing
Zebra Crossing
Zebra Crossing
Zebra Crossing
Zebra Crossing
Zebra Crossing
Zebra Crossing
Zebra Crossing
Shoulder & median kerb
Center lane
Speed breaker sevar police station
Center lane
Center lane
Zebra Crossing
Zebra Crossing
Zebra Crossing
Center lane
Center lane
Zebra Crossing
Zebra Crossing
Zebra Crossing
Zebra Crossing
Zebra Crossing
Zebra Crossing
Zebra Crossing
Center lane
Center lane
Zebra Crossing
Zebra Crossing
Zebra Crossing
Median openning
Median openning
Median openning
under pass
under pass
Center lane
Zebra Crossing
Zebra Crossing
Zebra Crossing
Zebra Crossing
Median opening
Median opening
Center lane
Center lane
Median opening
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Center lane
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
super elevation
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
super elevation
Structure cat Eye Fixing
super elevation
super elevation
super elevation
super elevation
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Zebra Crossing
Zebra Crossing
Zebra Crossing
Zebra Crossing
super elevation
super elevation
super elevation
super elevation
super elevation
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
median opening
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
median opening
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
median opening
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
median opening
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Structure cat Eye Fixing
Name of Concessioner :- M/s.Oriental Pathways (Agra) P
Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways

MEASUREMENT FOR ROAD MARKING


PERIOD FROM 01-11-2019 To 31-01-2020
Center Median
Chainage
Sr.N Type of Length Length
Date Side No.of
o. Mark
Patte
From To 0.100 0.150
1 4-Dec-19 62030 62295 RHS Median 265
2 4-Dec-19 60900 62000 RHS Median 1070
3 5-Dec-19 57950 60900 RHS Median 2935
4 8-Dec-19 56390 57950 RHS Median 1605
5 8-Dec-19 56390 57835 RHS Shoulder
6 9-Dec-19 57835 60900 RHS Shoulder
7 10-Dec-19 60900 62306 RHS Shoulder
8 10-Dec-19 60800 JN BS Zebra
9 10-Dec-19 60750 JN BS Zebra
10 10-Dec-19 61790 JN BS Zebra
11 10-Dec-19 61835 JN BS Zebra
12 10-Dec-19 61960 JN BS Zebra
13 10-Dec-19 62040 JN BS Zebra
14 11-Dec-19 54365 56390 RHS Median 2007
15 11-Dec-19 54365 54650 RHS Shoulder
16 12-Dec-19 54600 56392 RHS Shoulder
17 12-Dec-19 55184 55318 RHS Center 23 69
18 12-Dec-19 57366 57473 RHS Center 18 54
19 12-Dec-19 56048 56521 RHS Center 79 237
20 12-Dec-19 55318 56048 RHS Center 79 237
21 12-Dec-19 56521 57366 RHS Center 94 282
22 12-Dec-19 54855 55005 RHS Center 20 60
23 12-Dec-19 55005 55184 RHS Center 22 66
24 12-Dec-19 43050 45600 LHS Shoulder
25 15-Dec-19 45600 47185 LHS Shoulder
26 16-Dec-19 47200 48750 LHS Shoulder
27 17-Dec-19 55350 58050 LHS Shoulder
28 18-Dec-19 58050 60675 LHS Shoulder
29 18-Dec-19 49700 51750 LHS Shoulder
30 19-Dec-19 60675 62090 LHS Shoulder
31 19-Dec-19 61715 62300 RHS Center 140 420
32 19-Dec-19 59000 59900 LHS Median 900
33 19-Dec-19 51765 51775 LHS Median 10
34 19-Dec-19 51775 51820 LHS Median 15
35 19-Dec-19 51820 51875 LHS Median 55
36 19-Dec-19 52250 52270 LHS Median 20
37 19-Dec-19 51755 53395 LHS Shoulder
38 19-Dec-19 53395 53475 LHS Shoulder
39 19-Dec-19 53475 53980 LHS Shoulder
40 20-Dec-19 53500 53970 RHS Median 470
41 20-Dec-19 53482 54143 RHS Shoulder
42 20-Dec-19 53445 53482 RHS Shoulder
43 20-Dec-19 51725 53445 RHS Shoulder
44 20-Dec-19 59900 60505 LHS Median 605
45 20-Dec-19 61100 61715 LHS Median 615
46 20-Dec-19 61740 62000 LHS Median 260
47 21-Dec-19 54335 55255 LHS Median 901
48 21-Dec-19 53970 55350 LHS Shoulder
49 21-Dec-19 51825 51865 RHS Median 40
50 21-Dec-19 52890 52940 LHS Median 17
51 21-Dec-19 51775 51825 RHS Median 17
52 21-Dec-19 50550 50585 RHS Median 11
53 21-Dec-19 52927 52940 RHS Median 13
54 21-Dec-19 52890 52903 LHS Median 13
55 21-Dec-19 51813 51825 LHS Median 12
56 21-Dec-19 51775 51787 LHS Median 12
57 21-Dec-19 50585 50615 LHS Median 30
58 21-Dec-19 50525 50555 LHS Median 30
59 22-Dec-19 54145 54850 RHS Center 118 354
60 22-Dec-19 54125 54450 LHS Center 55 165
61 22-Dec-19 55030 55365 LHS Center 70 210
62 22-Dec-19 56389 56530 LHS Center 15 45
63 22-Dec-19 57350 57560 LHS Center 24 72
64 22-Dec-19 54150 54365 RHS Median 191
65 22-Dec-19 54150 54235 LHS Median 85
66 22-Dec-19 54235 54380 LHS Median 100
67 22-Dec-19 57350 57390 LHS Median 40
68 22-Dec-19 58100 58200 LHS Median 100
69 22-Dec-19 54140 54370 RHS Shoulder
70 22-Dec-19 47900 51725 RHS Shoulder
71 23-Dec-19 60900 61715 RHS Center 90 270
72 23-Dec-19 58250 60800 RHS Center 283 849
73 23-Dec-19 57850 58150 RHS Center 50 150
74 23-Dec-19 57475 57850 RHS Center 53 159
75 23-Dec-19 59000 60500 LHS Center 167 501
76 23-Dec-19 61150 61700 LHS Center 62 186
77 23-Dec-19 45140 47900 RHS Shoulder
78 24-Dec-19 42470 45140 RHS Shoulder
79 24-Dec-19 57450 JN BS Zebra
80 24-Dec-19 55250 JN BS Zebra
81 24-Dec-19 54900 JN BS Zebra
82 24-Dec-19 54200 JN BS Zebra
83 24-Dec-19 52900 JN BS Zebra
84 25-Dec-19 48050 48100 RHS Median 50
85 25-Dec-19 46250 46300 RHS Median 50
86 25-Dec-19 45513 45575 RHS Median 62
87 25-Dec-19 45310 45513 RHS Median 68
88 29-Dec-19 58100 58250 RHS 25 75
89 29-Dec-19 51800 JN BS Zebra
90 29-Dec-19 50575 JN BS Zebra
91 29-Dec-19 48000 JN BS Zebra
92 29-Dec-19 45400 JN BS Zebra
93 29-Dec-19 44115 44040 RHS 0.3 75
94 29-Dec-19 44050 44080 LHS 0.3 30
95 29-Dec-19 44040 43600 RHS 440
96 29-Dec-19 44050 44030 RHS 20
97 29-Dec-19 43050 42775 RHS 275
98 29-Dec-19 42775 42750 RHS 25
99 30-Dec-19 55265 Speed breaker marking
100 30-Dec-19 54955 Speed breaker marking
101 30-Dec-19 54360 Speed breaker marking
102 30-Dec-19 55260 JN BS Zebra
103 30-Dec-19 54350 JN BS Zebra
104 30-Dec-19 41500 39400 RHS 0.3
105 31-Dec-19 61980 JN BS Zebra
106 31-Dec-19 61750 JN BS Zebra
107 31-Dec-19 61750 link road RHS
108 31-Dec-19 61750 link road RHS
109 31-Dec-19 61750 link road RHS
110 31-Dec-19 61750 link road RHS
111 31-Dec-19 61750 Speed breaker mark RHS
112 31-Dec-19 62050 JN BS Zebra
113 31-Dec-19 55200 link road RHS
114 31-Dec-19 55200 link road RHS
115 31-Dec-19 55200 link road RHS
116 31-Dec-19 54300 saras chowki LHS
117 31-Dec-19 54300 saras chowki LHS
118 31-Dec-19 54300 saras chowki LHS
119 31-Dec-19 54300 saras chowki LHS
120 31-Dec-19 54300 saras chowki LHS
121 31-Dec-19 54300 saras chowki LHS
122 9-Jan-20 44010 LHS
123 9-Jan-20 42795 LHS
124 9-Jan-20 42740 RHS
125 9-Jan-20 41705 LHS
126 9-Jan-20 41635 RHS
127 9-Jan-20 40610 LHS
128 10-Jan-20 45400 BS Chevron
129 11-Jan-20 45960 bus lay LHS Zebra
130 11-Jan-20 47025 bus lay LHS Zebra
131 11-Jan-20 49830 bus lay LHS Zebra
132 11-Jan-20 49830 MCW LHS Zebra
133 11-Jan-20 50340 MCW LHS Zebra
134 11-Jan-20 53525 MCW LHS Zebra
135 11-Jan-20 53525 bus lay LHS Zebra
136 12-Jan-20 55370 bus lay LHS Zebra
137 12-Jan-20 55400 bus lay LHS Zebra
138 12-Jan-20 55400 MCW LHS Zebra
139 12-Jan-20 50340 bus lay RHS Zebra
140 12-Jan-20 50340 MCW RHS Zebra
141 12-Jan-20 49030 bus lay RHS Zebra
142 12-Jan-20 47025 bus lay RHS Zebra
143 12-Jan-20 47025 MCW RHS Zebra
144 12-Jan-20 45960 bus lay RHS Zebra
145 12-Jan-20 45960 MCW RHS Zebra
146 12-Jan-20 45600 bus lay RHS Zebra
147 12-Jan-20 53525 bus lay RHS Zebra
148 12-Jan-20 53525 MCW RHS Zebra
149 13-Jan-20 42300 42550 RHS MEDIAN 250
150 13-Jan-20 57390 58100 LHS MEDIAN 710
151 13-Jan-20 58200 58350 LHS MEDIAN 150
152 13-Jan-20 51180 51350 LHS MEDIAN 170
153 13-Jan-20 48750 49700 LHS SHOULDER
154 13-Jan-20 52900 53486 RHS CENTER 66 198
155 13-Jan-20 56530 57350 LHS CENTER 92 276
156 13-Jan-20 57560 58367 LHS CENTER 90 270
157 13-Jan-20 52900 53486 RHS CENTER 66 198
Grand Total QTY. (SQM)
Pathways (Agra) Pvt. Ltd.
tings & Toll Highways (I) Ltd.

D MARKING
31-01-2020
Shoulde
Zebra Crossing
r
Size of
Length Total Qty
Nos.Mar Mark in Sqm.
Remark
k
0.150 3 X 0.5
39.75
160.5
440.25
240.75
1421 213.15
3006 450.96
1367 205.05
20 2 30
21 2 31.5
20 2 30
20 2 30
23 2 34.5
22 2 33
301.095
278 41.625
1761 264.21
6.9
5.4
23.7
23.7
28.2
6
6.6
2466 369.9
1585 237.75
1544 231.6
2694 404.1
2580 387
2050 307.5
1403 210.45
42
135
1.5
2.25
8.25
3
1640 246
26 3.96
505 75.75
70.5
661 99.15
12 1.845
1720 258
90.75
92.25
39
135.15
1392 208.8
6
2.475
2.55
1.71
1.95
1.95
1.8
1.8
4.5
4.5
35.4
16.5
21
4.5
7.2
28.65
12.75
15
6
15
197 29.55
3615 542.25
27
84.9
15
15.9
50.1
18.6
2640 396
2632 394.77
32 1.5 48
41 1.5 61.5
32 1.5 48
52 1.5 78
32 1.5 48
7.5
7.5
9.3
10.125
7.5
32 2 48
32 2 48
32 2 48
37 2 55.5
11.25
4.5
66
3
41.25
3.75
20
17
24
9 2 18
3 2 6
2096 94.338
3 3 9
4 3 12
18 3 54
7 3 21
7 3 21
7 3 21
6
4 3 12
8 3 24
6 3 18
6 3 18
6 3 18
7 3 21
7 3 21
7 3 21
6 3 18
5 3 15
8 2 12
16 2 24
16 2 24
16 2 24
16 2 24
16 2 24
23 3.45
8 2 12
8 2 12
8 2 12
3 2 5
8 2 12
10 2 15
8 2 12
8 2 12
10 2 15
3 2 5
8 2 12
5 2 8
8 2 12
8 2 12
4 2 6
8 2 12
4 2 6
8 2 12
10 2 15
5 2 8
38
107
23
26
950 143
20
28
27
20
10014.8
Name of Concessioner :- M/s.Oriental Pathways (Agra) Pvt. Ltd.

Name of EPC Contractor :- M/S. Prakash Asphaltings & Toll Highways (I) Ltd.

MEASUREMENT FOR PGR Painting

PERIOD FROM 01-09-2019 To 30-09-2019


Chainage Measurment
SR. No. Date Side Depth+ Length(
From To Length
Top RM)
6 21/Sep/19 54130 54170 LHS 40 1.2 48
8 22/Sep/19 54170 54232 LHS 56 1.2 67.2
9 22/Sep/19 54232 54282 LHS 50 1.2 60
6 22/Sep/19 54240 54282 LHS 42 1.2 50.4
10 22/Sep/19 54282 54364 LHS 70 1.2 84
20 24/Sep/19 57434 57446 median 12 1.2 14.4
17 23/Sep/19 57486 57510 median 24 1.2 28.8
Grand Total Area. (RM) 353