You are on page 1of 1

Burraq Engineering Solutions

Address: 157/3, Akram Plaza, Muslim town more Ferozpur Road, Lahore
Contact: 03349376619, 03473376119
Sr# Day Plan
Day-1 Day-2 Practical Session on
1 Drawing Insulation Test for Motor Winding
Breaker Testing or Breake Tripping and
1.1 Types of Electrical Drawings or used in electrical overload relay tripping
2 Documents Star Delta and ATS
2.1 Load schedule. VFD (Variable frequency Drive)
2.2 Cable schedule.
2.3 Bill of quantity ( BOQ ).
2.4 Material take off list ( MTO ).
3 Protection Class or IP Rating
4 Time Management
For best time management following must be taken
5 in to considration.
6 Material Management
7 Standard operating procedure ( SOP ).
8 ISO 9001.
9 Quality.
9.1 a. Quality assurance.
9.2 b. Quality control.
10 Job description of Supervisors.
11 Work Permit
12 Who can be Electrical Supervisor
13 Cables and its sizing and specofication
14 Earthing and Grounding System
15 Power Factor Improvement
16 Star Delta Connections and other starting methods
17 Protection

You might also like