West Bengal Highway Development Corporation Limited
{AWhally Owned Company a Got of West Bena
we 100 onan: sr 8 oa Monee Srna 20021
Tok 033) 2989 S267, Tela Fax (085) 2262 5268, Erma newt gown
{Corporat entity Number Uts203H8201256C 180687
vw Bidet gorse
Memo No: 0250/weHDCL Date: February 17,2020
To: ‘The Chairman
Pana Munpalty
‘Subject: Upgradation of Kalani Expresay to 4/6 lane cnfiguration from Muragacha (Ch. 4565
‘Kn) to Kampa (Ch. 35+340 Kn) Inuaing elevated coridor with proposed Moora Kamba
Barajagul Road Corridor inthe cstet of North 24 Poragans In West Bengal (Phase I.) on
PC Mode ~ Dumping of Garbage and waste material within the ROW of Dumdum
Barrackpore- Kalyan Expressway regards
1, DRA Infiacon Put Ltd Reference No, DRAWEHOCL/KE/2019-20/019 dated 10,02,2020
Sr,
‘As you know, WBHDCL has been enrusted for implementation ofthe work mentioned inthe subject and the
‘work hasbeen awarded to the Dineshchandra 8 Agrawal Inffacan Pe id (Phase) toe exceed on EPC
ode. During visit of the site on various occasions, It has been observed that there is huge
‘dumping of municipal waste within the ROW of the Dumdum- Barrackpore: Kalyani Expresswey
which needs to be stopped immediately. The EPC Contractor Is mabising at site art the Work Is Sond
to start very soon This dumping af waste sedi hncrances in execution ofthe projec
18s requests from tis end to extend all necessary support in ths regard. A copy ofthe request eter of the
PC Convactor is enclosed herent,
‘Thanking you,
(@arjan Kumar! P2920
Projet Diector (V), WEHDCL
Memo No: 0250/1(4)/waHDCL Date: February 17,2020
Copy fora to:-
1. Chief General Manager, WBHOCL fo kind information.
2. General Manager 1), WHC. or Kd information,
5 Assistant Project Manager (I), WHDCL for iformation & Necessary scion,
4 ‘thorized Signatory, BineshchandraR Apranal nfacon PM. Ld or information ant necessary acon,
rr
Projet Dieetor (V}, WBHOCL
Page 1064pl ef the Councttors of Receipt No. ration Limited
‘anihati Municipality ga
Pani North 24 Paton paw, 20258 [ehte-z000
Roseived one ete slong Ti os'59 | Ree
S.L. Plan supported by Aig nei t¥e copy of Deed / Building Plan /
SARs supported by AMldeit/ Land Bond / Rent Reese
from Sti/Sm.KLead.. . sary 47,2020
Aton ortepa.sca dies rt pepn
Ward No... HOMMINg NOvnpeonsinine acha (Ch, 44565
Pig ano
MoemeNo 0200 flowy Der fl once on
12/2 Po : W of Dumdum-
—— Tm
— ee. Receiving Secon ——_—stot 0.022020
Sr,
‘4s you kno, WHOCL hasbeen entrusted for Implementation of the work mentioned inte subect an the
work has been enarded to te Dineshchandra 8 AarawalInfracon Pt. 2a (Phase) to be exceed on EPC
"ode. During visit of the site on various occasions, It has been observed that there is huge
‘dumping of municipal waste within the ROW of the Dumdum- Barrackpore- Kalyani Expressway
‘Which needs to be stopped immediately. The EPC Conrotr is moblsing st steed the work go
to sar very soon. This dumping of waste creating Nndrances in execution of the pret
14s requested from this end to extend al necessary suppor inthis reper A copy ofthe request ete ofthe
EC Contractors enclosed here,
ons
raphe
ee eee
aces eoonens oe) ees
Re
1 Chief General Manager, WBHOCL for kin information,
2. General Manager (1), WEHOCL for kind nfo,
3, Assistant Project Manager (1), WBHOCL for information & Necessary action,
‘Authorized Signatory, Dineshchana R Agrawal Inracon Pt. Lid for information snd necessary ation
bag
realty Afro
von ca
Page 674