You are on page 1of 2
West Bengal Highway Development Corporation Limited |A Wholly Owned Company af Govt. of West Benga) HBC Bhawan, th & Sh Floor Munshi Pomehand Saran, Kolkata - 700021 oe Tol (033) 2625267, Tle Fax (039) 2262 5266, Ema: ined@utnc gov'e "Gororate dentty Number” UsE203W820125GC 180687 weawhfidetgov.in EEE Memo No: 0249/WeHDCL ate: February 17,2020 To: ‘The Chaiman North Durum Municipality Brau, Duran | Subjects = Construction of proposed 6 lane Elevated Connector between Belghora Expressway and Kalyan! Expressway’ including widening of Kalyon Expresonay to & lane fom Nina to Muragacha (Total Length 4.565 lm) (Phase ~ 1) & Upgradation of Kalyan Expressway to 4/6 lane configuration trom Muragacha (Ch. 4#565 Kin) to Kampa (Ch 35-340 Kin) eluding tlerated corridor with proposed Mogra- Kampa- Batjaguk Road Conger inthe csi of North 24 Paraganas in West Sengal (Phaso- Il) on €°C Mode ~ Dumping of Garbage and. waste material within the ROW of Dumdum- Barrackpore- Kalyani Expressway regards Reference: 1. RA Ifracon Pt td Reference No. DRAWEHDCL/KE/2019-20/019 dated 10.02 2020, Sr, ‘As you know, WSHOCL hasbeen entrusted for implementation ofthe works mentioned inthe subject and the works have been avarded fo the Gammon Engineers & Contactos Pvt, Ld(Phasel) & Dineschandra Agron Inracon Pvt, Lid, (Phase) to be executed on EPC Mode, During visit of the site on various ‘ceasions, it has been observed that there is huge dumping of municipal waste within the ROW. ‘of the Dumdum- Barrackpore- Kalyani Expressway which needs to be stopped immediately. The EPC Contractors are mobizng at ste nd the werk Is going tO Start very Soon, Ths dumping of waste ‘reatng hinrances in execution of he rok Rs requested from this end to extend all necessary support n ths regacd. copy ofthe request leter othe PC Cenvactor Is enclosed herent, Tonkin you «eanjan Kurs) "9 Pa9 Pro Dec), WEMD Memo or 0249/3(4)/WaHoCL Date: February 372020 oy foarte 7 hie err! Hanoer, WOH. fr nd oration General Manager (), WBHDCL fer kn information, ‘Asstt Project Manager (I), WBHOCL for inermaton & Necessary ation, ‘thoried Signatory, DineshchandraR. Agrawal Iran Pt id for formation and necessary action, 5 (anon Rar) Project biector (V), WBNDCL Page 2 of West Bengal Highway Development Corporation Limited UAWholy Owned Company f Govt of West Bega RSC Bhanan sh th ls Mn Promctan Sern sata 70001 To fay aiee Sno Se (05) 20025068 ena och goin rotten umber” UAS20O1B20 236 HT winweawiietgor.in Memo No: 0249/WBHDCL Date: February 17,2020 co The Chatman North Dumdum Municipality Brat, Duda Subject: Construction of proposed 6 lane Elevated Connector between Belghais Expressway and Kalani Expressway Including widening of Katyen Expressway to € lane fem Nina to ‘Murogacha (Total Length 4.565 km) (Phase — 1) & Upgraaation of Kalai Sxpressway to 4/6 lone configuration from Muragacha (Ch. 44565 Km) to Kampa (Ch 354340 Kin) Peleg leveled coor with proposed Mogra- Kampa- Barajagul Road Corror in the dtc of "rth 24 Paraganas in West Bengal (Phas Il) on EPC Mode ~ Dumping of Garbage and ‘waste material within the ROW of Dumidum- Barrackpore- Kalyani Expressway regards Reference: 1. DRA Infracon Pt. Lid Reference No, DRA/WEHDCL/KE/2019-2/019 dated 10.02.2020, sr, ‘As you know, WHOL has been entrusted for inplementation ofthe works mentonsd athe subject ad the works have been avorded tothe Gammon Engineers & Contractors Pt. Lts(Phase:) &Dieshenandta R oranalInracon Pt. Ld, (Phase) to be executed on EPC Moe. During Visit ofthe ste on various ‘ccasions, it has been observed that there is huge dumping of municipal waste within the ROW ‘of the Dumdum- Barrackpore- Kalyani Expressway which needs to be stopped immediately. The PC Contractors ae mobilzng at ste and the wrk i going to tart very soon, THs umping Of ates ‘reating hindrances im exeiton ofthe projets. 12s requests rom this end to extend all necessary support in hs regard. A copy ofthe request eter ofthe EPC Contacte is enclosed herevith, Tenkg 0, anon xu fe Pret tenth WSCC. Memo No: 0249/3(3)/WoHDCL Date: February 37.2020 ony oar 1 Chief General Manager, WEHOCL for kind information 2. Genera Manager (1), WHOCL fo kind nvrmatin, 3 Assstant Project Manager (1), WBHDCL fr information & Necessary action. 5 putnorzed Signatory, Dineshchandra R Agra Infracan Pt. i. for formation end necessary acon. tanjan Kumar) 19] 2]2029 fe mond earn age tof

You might also like