TCE.11103B-CV-3003-SI-30018 RC DETAILS OF COLUMN FOOTING (SHEET 1 OF 3 )




 
 S T
CK
A

D G
O R
F

1 ,2
3
S T

D
CK
A

G
O R
F

4 ,5
6

O A
L

R A
T

D
D IN G P U M P

N S
.P U M P

L
S
IE
N K
A
T
1 5
0 0
k V
A D G S E
T -1

D
L
S
IE
N K
A
T
1 5
0 0
k V
A D G S E
T -2

LPG BULLET
HSD 1 5
0 0
k V
A D G S E
T -3

1 5
0 0
k V
A D G S E
T -4

1 5
0 0
k V
A D G S E
T -5

S P A
CE P R O V
I S
IO N


1 5
0 0
k V
A D G S E
T -6

S P A
CE P R O V
I S
IO N


 A B C D E F G H I J K L M N O P Q 



UP

Ramp
( 1: 1
2)


Ramp
+ ( 1: 1
2)
1. 2
M


UP
+
1. 2
M

Ramp
( 1: 1
2)


Ramp
( 1: 1
2)

 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000

 

525 350
1750 1750 350 356


709
GREEN Slope
ZONE

                
20 X 20 Wa ter St ora ge

2250

2250

2250
2150 2150
2100 2100
Pon d.

  
             

709

709

709
1 GREEN ZONE

2250

2250

2250
Slope

1950 1950 1950 1950 1850 1850 1950 1950

7500
NORTHING=13246.1134
525 EASTING=15437.6720
NORTHING=13217.5766
EASTING=15312.8936 336
1  1

1750 1750
1700 1700
 
2

300


 1850 1850 
1900 1900
7952

H1 
 
 
3
2050 2050 2450 2450 2450 2450 2600 2600
2600 2600
LEGEND
2250 2250 1800 1800
5800

TYP. ---- TYPICAL EL ---- ELEVATION


           
LVL. ---- LEVEL TOC---- TOP OF CONCRETE
275  336

2600

2600
2550

2550
 525     275        

2200 2200
2150 2150

 THK. ---- THICKNESS/THICK SFR---- SIDE FACE REINFORCEMENT

1900 1900

     PCC ---- PLAIN CEMENT CONCRETE C-------- COLUMN

375

380

375

380
4  REINF.---- REINFORCMENT DIA----- DIAMETER

2550

2550

2600

2600
2950

BOF------ BOTTOM OF FOOTING RC------ REINFORCED CONCRETE


375


FFL ------ FINISHED FLOOR LEVEL FGL----- FINISHED GROUND LEVEL
4a 
7250


 1600 1600
  330   
2000



1550 1550
    
   

277
5 

2500
NOTES
7250

1. FFL EL ±0.000 CORRESPONDS TO RL +22.60M


525 330
   2. FOR OTHER NOTES REF DRAWING TCE.11103B-CV-3051-RC-30007.

1750 1750

 
1550 1550

 
    
275

6 
3. SBC CONSIDRED FOR FOUNDATION DESIGN AT A DEPTH OF 1M FROM NGL IS 110KN/SQM BASED ON
SOIL INVESTIGATION REPORT FROM NAGADI.

1850 1850
 
7z
7250


1850 1850

    
1750 1750

    


  
7 
 
 2600 2600
 2450 2450 
7246

2150 2150 2450 2450 1800 1800 2600 2600


525 H1    
     
275   
    336

2600

2600
2550

2550
 238   237
2250

275
2150 2150

   

1900 1900
  
     

380

380

380
8
375

375

2250

2550

2550

2600

2600
2250 2250
7080

1850 1850

 336 ENGINEERING REFERENCE DRAWINGS

1750 1750
     
     


300
9 1. 11709-AR-01-0001----FACTORY LAYOUT SCHEMATIC DESIGN STAGE-MASTER PLAN LAYOUT
2. TCE.11103B-AC-1023-AC-10109----MAIN PLANT BUILDING GROUND FLOOR GA LAYOUT PLAN
1100

1250 1250
540 3. TCE.11103B-AC-1023-AC-10110----MAIN PLANT BUILDING MEZZANINE FLOOR GA LAYOUT PLAN
7080

 1600 1600
360

10z 
2950

      


1100

1550 1550

      



10 
H1 CONSTRUCTION REFERENCE DRAWINGS
2325
2200 2200 5675
2200 2200 1850 1850 1. TCE.11103B-CV-3054-RC-30005 --- STANDARD DETAILS OF COLUMN & FOOTING
7092

5125 1850 1850 1950 1950 1950 1950


 2. TCE.11103B-CV-3054-RC-30006 --- STANDARD DETAILS OF BEAMS & SLABS
  
   350   
525    350    350     356

2550

2550

    3. TCE.11103B-CV-3051-RC-30007 --- TYPICAL NOTES AND LEGENDS

2250

2250
2150 2150

2150 2150
    
    

 4. TCE.11103B-CV-3054-RC-30019 --- MAIN PLANT BUILDING RC DETAILS OF COLUMN FOOTINGS (SHEET 2 OF 3)
11
711

711

711

711
736



2250

2250
2550

2550
2750

5. TCE.11103B-CV-3054-RC-30020 --- MAIN PLANT BUILDING RC DETAILS OF COLUMN FOOTINGS (SHEET 3 OF 3)


3650

5125

   



11a    A NORTHING=13147.8762
FOUNDATION PLAN EASTING=15328.8341 HOLD
Ca Cz 11b E Ea F Fz G 1:250 H1--- LIFT PIT AND COMBINE FOOTINGS ARE UNDER DISCUSSION.
NORTHING=13176.4133 H1 200 THK BLOCK STEEL COLUMN
EASTING=15453.6139 WALL VD FLOOR
BASE PLATE FFL 

 22600  



PLINTH BEAM TOP 

PLINTH BEAM AS PER 22300 


SCHEDULE 






FGL


21400 


NOTE: 1. BASE PLATE CENTRE SHALL BE MATCH WITH FOOTING CENTER. RC PEDESTAL 




 





12-09-2018
P0     AYB MSD
   
      

ADVANCE COPY (dd-mm-yyyy)

 


 








 FDN BOTTOM-R0


RC DETAILS OF COLUMN FOOTING (SHEET 1 OF 3 ) 

18875
75 THK PCC
PCC 


SECTION 1-1 18800 
MUMBAI
1:25
   
TCE.11103B-CV-3054-RC-30018 P0


 11103B-CV-30018-Rev.P0  
 
           