/ have reviewed the (drawings/specifications) for items .checked on the following list. The items checked were found (generally acceptable/generally
worked).
deficient/acceptable with exceptions) for the level of detail and completeness required of this submitta/. I recommend this submittal be (acceptable/re
SUBMITTALS STATUS: (90%) (100% Final)
OK? NOTES REQUIRED
NOT
BUILDINGS DRAWINGS
CH'D y N 90% 100%
Final

Use also ALL DRAWINGS Checklist


Design Criteria/SOPR
Check elements of design for conformance with criteria mentioned in
SOPR
Check compliance with Design Directives
.,匾 �
ARCHITECTURE PLANS
1. Verify that previous NHC & SAPL comments a「e incorporated
2. Verify that 「equirements are incorporated on plans and previous
review comments are included
3. Verify adherence to the required codes such as SBC &
SASO
4. Ve 「ify cross references to elevations, sections, details
5. Verify schedules for windows, doors and partitions
6. Check critical dimensions
7. Check coordination with Structu 「al, MEP, Civil plans
8. Verify completeness of specifications including previous review
comments
9. Ensure the revisions and changes are listed
10. verify the completeness of submitted package, including but
not limited to drawings, calculations, and all architectural
points
INTERIORS PLANS

Page 1 of 7