You are on page 1of 1

Materials, equipment, and labor are three aspects of construction projects that affect productivity.

Labor intensiveness is the most important factor that should be getting attention for improving
productivity (Chan, 2014). Labor account for up to forty percent of the direct capital cost of
large construction projects, and there is a need to maximize the productivity of labour
resources (Ng, S.T. et al, 2004)

Materials, gear, and labor are three angles of construction ventures that influence efficiency.
Labor intensiveness is the foremost critical calculate that ought to be getting attention for moving
forward efficiency (Chan, 2014). Labor account for up to forty percent of the coordinate capital
fetched of huge development ventures, and there's a have to be maximize the efficiency of
work assets (Ng, S.T. et al, 2004)

You might also like