Orientation:
Location
(coordinates):
Elevation:
*NOTE: Verify Delivery Ticket before unloading and attach to this form
Description YES NO N/A
1. Verify formworks after placing concrete
2. Verify weather protection
3. Verify curing duration and finish
4. Verify design mix
5. Verify test cube taken. Amount:
6. Patching/Pointing
7. Application of hardeners or dust proofing
8. Pour date
9. Formwork remove date:
10. Pour accepted