You are on page 1of 4

Construction Bid Form

Owner Information Contractor Information


Enter contractor
Enter owner Name in this Company name in this
Name cell Company cell
Enter owner address in Enter contractor Name in
Address this cell Name this cell
Enter owner City, State, Enter contractor Address
City, State ZIP and Zip code in this cell Address Enter
in thiscontractor
cell City,
Enter owner Phone State, and Zip code in
Phone number in this cell City, State ZIP this cell
Enter owner Email Enter contractor phone
Email address in this cell Phone number in this cell
Enter contractor Email
Email address in this cell
Enter Project name in this Enter Completion date in
Project name cell Completion date this cell

Scope of Work
Project scope of work goes here. Type in all of the specifications you would like.

Sample text: This is going to be a mock project of building a large set of stairs. We will
use only 2x4 and 2x8 lumber, as well as joist brackets, to construct the frame. Stairs will
be cut from the 2x4 material. No less than 2" screws will be used. Any nails will be no
less than 10 penny. Design weight shall hold a minimum of 500 pounds per step. Steps
will be level with that of the house. A running board will be fastened to the house.
Contractor will take care of clean up.

Not Included
Project details that are not included goes here. Type in everything that is not included in
this bid.

Sample text: No rails will be installed. Ground to be prepped by owner. Stairs to be


Company
painted by Proposal
owner.
Company proposal goes here. Type an overview of the proposal including who is
proposing the work, the expected completion date and the amount of the proposal.

Sample text: We, Company Name, propose the above scope of work, to be completed by
Completion Date for the amount of Total Amount.

Submitted by (Company Representative Date

Page 1 of 4
Owner Acceptance
Owner acceptance goes here. Type in the Owner's name in a confirmation statement that
includes the completion date and total amount stated in the company proposal.

Sample text: I, Owner Name, do accept the above scope of work, proposed to be
completed by Completion Date for the amount of Total Amount.

Submitted by (home owner or authorize Date

Page 2 of 4
Cost Breakdown

List of Materials and Costs

Qty. Description Cost Total

5 2x8x10 lumber $6.75 $33.75

20 2x4x10 lumber $4.97 $99.40

30 Joist brackets $2.49 $74.70

2 Box of screws, 2 in $6.67 $13.34

2 Box of nails, 10 penny $3.25 $6.50

2 Pair of gloves, leather $7.75 $15.50

2 Laborer charges $100.00 $200.00

Subtotal $443.19

Tax rate 7.50%

Tax $33.24

Grand total $476.43

Page 3 of 4
Bid Cost Summary

Breakdown of Materials and Costs Notes


Enter notes in this cell.

Laborer charges

2x4x10 lumber

Joist brackets
Notes

2x8x10 lumber

Pair of gloves, leather

Page 4 of 4

You might also like