You are on page 1of 2

PERHITUNGAN SAMBUNGAN

SAMBUNGAN RAFTER DAN KOLOM


M = -797646 kg cm
D = -1893.05 kg
N = -893.05 kg
V = D*cosa + N*sina = -2059.723 kg
H = D*sina + N*cosa = -1352.746 kg
Dipakai diameter baut f 18 mm .... A = 2.5434 cm^2
Jumlah baut yang digunakan (n) = 12 buah
Jarak antar baut : 2.5 d <= s <=7 d
2.5 * 18 <= s <= 7 * 18
45 mm <= s <= 126 mm
Jarak antar baut = 100 mm
h1^2 = 100 cm^2
h2^2 = 400 cm^2
h3^2 = 900 cm^2
h4^2 = 1600 cm^2
h5^2 = 2500 cm^2 +
Sh^2 = 5500 cm^2
Tmax = M*h5/(2*Sh^2) = -3625.66 kg
smax = Tmax/A = -1425.52 kg/cm^2
t = D/(n*A) = -62.02 kg/cm^2
si = (smax^2+3*t^2)^0.5 = 1429.56 kg/cm^2 .... <= 1600 kg/cm^2... OK

SAMBUNGAN PUNCAK RAFTER


M = -797646 kg cm
D = -1893.05 kg
N = -893.05 kg
V = D*cosa + N*sina = -2059.723 kg
H = D*sina + N*cosa = -1352.746 kg
Dipakai diameter baut f 18 mm .... A = 2.5434 cm^2
Jumlah baut yang digunakan (n) = 12 buah
Jarak antar baut : 2.5 d <= s <=7 d
2.5 * 18 <= s <= 7 * 18
45 mm <= s <= 126 mm
Jarak antar baut = 100 mm
h1^2 = 100 cm^2
h2^2 = 400 cm^2
h3^2 = 900 cm^2
h4^2 = 1600 cm^2
h5^2 = 2500 cm^2 +
Sh^2 = 5500 cm^2
Tmax = M*h5/(2*Sh^2) = -3625.66 kg
smax = Tmax/A = -1425.52 kg/cm^2
t = D/(n*A) = -62.02 kg/cm^2
si = (smax^2+3*t^2)^0.5 = 1429.56 kg/cm^2 .... <= 1600 kg/cm^2... OK
SAMBUNGAN KOLOM DAN CRANE
M = -797646 kg cm
D = -1893.05 kg
N = -893.05 kg
V = D*cosa + N*sina = -2059.723 kg
H = D*sina + N*cosa = -1352.746 kg
Dipakai diameter baut f 18 mm .... A = 2.5434 cm^2
Jumlah baut yang digunakan (n) = 12 buah
Jarak antar baut : 2.5 d <= s <=7 d
2.5 * 18 <= s <= 7 * 18
45 mm <= s <= 126 mm
Jarak antar baut = 100 mm
h1^2 = 100 cm^2
h2^2 = 400 cm^2
h3^2 = 900 cm^2
h4^2 = 1600 cm^2
h5^2 = 2500 cm^2 +
Sh^2 = 5500 cm^2
Tmax = M*h5/(2*Sh^2) = -3625.66 kg
smax = Tmax/A = -1425.52 kg/cm^2
t = D/(n*A) = -62.02 kg/cm^2
si = (smax^2+3*t^2)^0.5 = 1429.56 kg/cm^2 .... <= 1600 kg/cm^2... OK

SAMBUNGAN ANTAR RAFTER


M = -797646 kg cm
D = -1893.05 kg
N = -893.05 kg
V = D*cosa + N*sina = -2059.723 kg
H = D*sina + N*cosa = -1352.746 kg
Dipakai diameter baut f 18 mm .... A = 2.5434 cm^2
Jumlah baut yang digunakan (n) = 12 buah
Jarak antar baut : 2.5 d <= s <=7 d
2.5 * 18 <= s <= 7 * 18
45 mm <= s <= 126 mm
Jarak antar baut = 100 mm
h1^2 = 100 cm^2
h2^2 = 400 cm^2
h3^2 = 900 cm^2
h4^2 = 1600 cm^2
h5^2 = 2500 cm^2 +
Sh^2 = 5500 cm^2
Tmax = M*h5/(2*Sh^2) = -3625.66 kg
smax = Tmax/A = -1425.52 kg/cm^2
t = D/(n*A) = -62.02 kg/cm^2
si = (smax^2+3*t^2)^0.5 = 1429.56 kg/cm^2 .... <= 1600 kg/cm^2... OK