You are on page 1of 1

BIGAANG MATANDA STREET

0+000 0+100 0+200 0+300 0+400

LEGEND:

PROPOSED SLOPE PROTECTION

PROPOSED P.C.C.P. (14days) (200mm THK)

3
2
1
0
-1
-2

+0.43

+0.44
+0.42

+0.46
+0.32

+0.35

+0.64
+0.44
-0.012 +0.32
+0.30

+0.43
+0.39

+0.46
+0.37

+0.33

-0.05 +0.36
+0.36

+0.4

-0.07 +0.4

+0.3

+0.4
FINISHED ELEVATION
-0.11

-0.12

-0.12

-0.12
-0.06

-0.02

-0.11
-0.08

-0.14

-0.03
-0.05

-0.02

-0.29
-0.14

-0.08

-0.06

0.0
0.0

EXISTING ELEVATION

PREPARED BY: CHECKED BY: REVIEWED: RECOMMENDED: APPROVED: PROJECT NAME AND LOCATION: SHEET CONTENTS: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
VARIOUS DPWH
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PROPOSED PROJECTS 5
AS STAKED PLAN EML CONSTRUCTION
AND TRADING
ERNESTO C. GALANG
REGIONAL OFFICE NO. 3

BULACAN 1ST DISTRICT ENGINEERING OFFICE


CONSTRUCTION/IMPROVEMENT OF STRAIGHT LINE DIAGRAM & PROFILE
SINDALAN, CITY OF SAN FERNANDO PAMPANGA
PROJECT ENGINEER
Tikay, City of Malolos, Bulacan DALMACIO B. CRUZ, JR.
CHIEF, PLANNING AND DESIGN
GERONIMO F. ASONZA
ASSISTANT DISTRICT ENGINEER
RUEL V. ANGELES
DISTRICT ENGINEER
ROADS WITH DRAINAGE CANAL, 34
DATE: DATE: DATE: BRGY. TAAL, BOCAUE BULACAN