You are on page 1of 9
sueeen taut Design Calculations ere ae ae ae Ee Project coe Al T Wastewater Treatment Plant Design Course & ear Civil Engineering Year § Department of Civil, i i |Parorstucture —<“—~*=“‘~*S*””C~C*~*@CaT Tat Sheet. ~— | Construction & Mineral art of Structure sTeuTation Shoet No. Engineering Horizontal Flow Tank (Primary Settlement) 7 aa | Drawing Ret; Calculations By: | Checked By: Date: Scheme Design Maurice Healy | Jason Shields | 220082014 Relerence Calculations Output Minimum side wall depth = 2m Q=59.4m"day 60% reduction of TSS Peak flow factor = 2.5 ‘Surface Overflow Rate = SOR = 185 - (2.5xTSS removal) 185 - (2.5x60) = 35 m/m/day Step 1 - Calculate surface area (A) of tank required: 504 #_ SE = Lem Surface SOR 3 Area=1.697m* Step 2 — Calculate tank dimensions: Assume width/length ratio of 8:1 Hence: 1.697% m? Length x3 = 2.256m. Length=2.256m Wedth = Step 3 - Calculate tank volume: Assume minimum tank depth of 2m. Volume = V = 2mx2.256mx0.752m = 3.393m" Width=0.752m, Volume=8.393m* Project coe Al T Wastewater Treatment Plant Design Course & ear Civil Engineering Year § Department of Civil, i i |Parorstucture —<“—*~*—“—*”:”SCSC~*~*@CaT TO SHEN. ~— | Construction & Mineral art of Structure sTeuTation Shoet No. Engineering Horizontal Flow Tank (Primary Settlement) 2 of [2 | Drawing Ref; Calculations By: | Checked By: Date: Scheme Design Maurice Healy | Jason Shields | 220082014 Relerence Calculations Output Step 4 — Hydraulic Retention Time (HRT) 3.393m2x24 Q 584m /day HRT. L37hours Step 5 - Peak flow SOR peak flaw factor x Q Peak flaw SOR = = _25x59.4m3/day “9am? Peak flow SOR = 87.5m3 /m?/day Step 6 - Primary Sludge Production Weight of Dry solids = Wee = Q x TSS x F Assume F =0.6 Q=59.4m*day Assume TSS = 300mg/l Wee = 59.4m°/d x 300mgM x 0.6 x (10°10°) Wes = 10.6922 kg/day Was = 320 kg/day Note: External Dimensions of tank are as follows: Length = 2.856m Width = 1.352, Depth = 2.1m HRT=1.37hours Peak flow SOR=87.5m'/m’/day We.=320kg/day Length=2.856m Width=1.352m Depth=2.1m Project coe Al T Wastewater Treatment Plant Design Course & ear Civil Engineering Year § Department of Civil, i i |Parorstucture —<“—*~*—“—*””SCSC~*~*~*~*C*@CT TON SHEN. §~— | Construction & Mineral art of Structure sTeuTation Shoet No. Engineering Horizontal Flow Tank (Secondary Settlement) 1 of [2 | Drawing Ref; Calculations By: | Checked By: Date: Scheme Design Maurice Healy | Jason Shields | 220082014 Relerence Calculations Output Minimum side wall depth = 2m Q=59.4m"iday 60% reduction of TSS Peak flow factor = 2.5 ‘Surface Overflow Rate = SOR = 185 - (2.5xTSS removal) 185 - (2.5x60) = 35 m/m/day Step 1 - Calculate surface area (A) of tank required: Q@ s4 ee 2 son as ~ LePine Step 2 Calculate tank dimensions: Assume wicth/length ratio of 3:1 Hence: 1.697% m? Length x3 = 2.256m. Wedth = Step 3 - Calculate tank volume: Assume minimum tank depth of 2m. Volume = V = 2mx2.256mx0.752m = 3.393m" SOR=35m/m/day Surface Area=1.697m* Length=2.256m Width=0.752m, Volume=3.393m? A iT Department of Civil, Construction & Mineral Project Wastewater Treatment Plant Design [Part ot Structure Course & ear Civil Engineering Year § | Catcutatien Sheet Wo. | Engineering Horizontal Flow Tank (Socondary Settiement) z of 2 | Drawing Rat] Caleutaions By: Checked By Dates Scheme Design Maurice Healy | Jason Shields | 2200872018 Reterence Calculations output HRT. Weight Assume F =0.6 Q=59.4m*day Length = 2.856m Width = 1.352, Depth = 2.1m Step 4 — Hydraulic Retention Time (HRT) Step 5 - Peak flow SOR Peak flaw SOR = Peak flow SOR = 87.5m3 /m?/day Step 6 - Primary Sludge Production Assume TSS = 300mg/ Wee = 59.4m°/d x 300mg/l x 0.6 x (10°/10°) Note: External Dimensions of tank are as follows: 3393mr x29 07 Ban fday = Thurs peak flaw factor x Q a _25x59.4m3/day “9am? of Dry solids = We, = Q x TSS x F Wes = 10.6922 kg/day Was = 320 kg/day HRT=1.37 hours Peak flow SOR=87.5m*/m"/day We.=320kg/day Length=2.856m Width=1.352m Depth=2.1m Project coe Al T Wastewater Treatment Plant Design Course & ear Civil Engineering Year § Department of Civil, i i |Parorstucture —“—*~*~<~*~=S*~*~S*S«*@ «TTT SHUT. §~— | Construction & Mineral art of Structure sTeuTation Shoet No. Engineering Extended Aeration (Secondary Treatment) 1 of [3 | Drawing Ref; Calculations By: | Checked By: Date: Scheme Design Maurice Healy | Jason Shields | 220082014 Relerence Calculations Output Population Equivalent = 220x1.5=330 Water use = 180l/day Influent Flow (Q.) = 380 p.e x 180Viday = 59.4m*/day Influent BOD (S.) = 300mg/1 Effluent BOD (S) = 20mag/i Assume Yield coefficient (Y) = 0.6 Assume decay rate (ky) = 0.06day” Assume MLSS (X) = 3500mg/I Assume WAS MLSS (X.) = 14000mg/l Assume MCRT (¢.) = 10day’" Step 1 — Calculate the aeration tank volume (V): aS ) ry +kabe: O.0.¥( So-S ) M+ kate: - _ 10x59.4x0 a5 0.3 — 0.02 1+ sexi) y 2 3584 e Ge NE V=17.82m* Assume 2m depth. Hence: Area = 17.82m"/2m? = 891m? Width = 2.985m Length = 2.985m Volume=17.82m* Area=8.91m? Width=2.985m Length=2.985m Project coe Al T Wastewater Treatment Plant Design Course & ear Civil Engineering Year § Department of Civil, i i |Parorstucture —“—~*”*”*”~”C~C*Y Calculation Set NO. ~— | Construction & Mineral art of Structure sTeuTation Shoet No. Engineering Extended Aeration (Secondary Treatment) 2 of [3 | Drawing Ref; Calculations By: | Checked By: Date: Scheme Design Maurice Healy | Jason Shields | 2200872018 Reterence Calculations output Step 2 - Calculate the Hydraulic Retention Time (HRT) =HRT = 4 & _ 1 7B2m 2 o= Soams, /day = 72hours b=72 hours Step 3 — Volume of wasted sludge per day (Q,): Q,=0.4455m'/day Step 4 — Mass of sludge wasted each day (QyX,): Qi%, = 0.4455 x 14 = 6.237kg/day Step 5 - Fraction of sludge recycled (QQ) (Qo FQ) = Qo - Qu IR. + (p+ Qu dXw 594x3,5)—6.237 201,663 14-35 ~ 105 = 19.206m? day Q, _ 19.206 De = oa = 9923 2.3%) n ; Xu=6.237kg/day Q/0,=32.3% Project Course & ear coe Al T Wastewater Treatment Plant Design Civil Enginooring Year § Department of Civil, “2 “ | Calculation Sheet No. | Construction & Mineral sTeutation Sheet Engineering (Secondary Treatment z a3 | Drawing Ref: Calculations By: | Checked By: Date: Scheme Design Maurice Healy | Jason Shields | 220082014 Relerence Calculations Output Step 6 Calculate fim ratio fim=0.29 F QoQ S94x03 1782 m= VX 1782x355 62.37 028 Note: External Dimensions of tank are as follows: Length = 3.585m Width = 3.585m Depth = 2.1m Length=3,585m Width=3.585m, Depth=2.1m

You might also like