You are on page 1of 68

BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
1 Beam B100 (600 x 1500), (900 x 1500)

Bottom L = 11.082+7.087+(.55+.60)-(2*.025)+.90lap 600 25 6 1 6 20.169 121.014

Bottom L = 5.275+(1.00+.15)+(.55+.60)-(2*2*.025) 150 600 25 3 1 3 7.475 22.425

Bottom Extra L = 8.832+.75 32 6 1 6 9.582

Top L = 11.082+7.087+(.55+.60)-(2*.016)+.575lap 600 16 6 1 6 19.862 119.172

Top Extra L = 1.352+1.575 20 6 1 6 2.927 17.562

Top Extra L = 1.575+3.452+7.087(.55+.60)-(2*.025)+.90lap 600 25 6 1 6 14.114 84.684

SFR L = 11.082+.687+(.375+.10)+.375lap 10 6 2 12 12.619 151.428

SFR L = 5.275+(.45+.12)+(.45+.12) 12 6 2 12 6.415 76.980


1440
Stirrups L = .54+.54+1.44+1.44+.24-(3*2*.012) 125 12 13 2 26 4.128 107.328
540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 13 4 52 3.328 173.056
140
1440
Stirrups L = .54+.54+1.44+1.44+.24-(3*2*.012) 175 12 17 1 17 4.128 70.176
540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 175 12 17 2 34 3.328 113.152
140
1440
Stirrups L = .54+.54+1.44+1.44+.20-(3*2*.01) 125 10 6 2 12 4.100 49.200
540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.01) 125 10 6 4 24 3.300 79.200
140
1440
Stirrups L = .54+.54+1.44+1.44+.20-(3*2*.01) 200 10 6 1 6 4.100 24.600
540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.01) 200 10 6 2 12 3.300 39.600
140
1440
Stirrups L = .54+.54+1.44+1.44+.24-(3*2*.012) 125 12 42 1 42 4.128 173.376
540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 42 2 84 3.328 279.552
140

2 Beam B103 (750 x 1500)

Bottom L = 5.425+(1.00+.495)+(1.175+.32)-(2*2*.032) 495 1095 32 7 1 7 8.287

Bottom II L = 5.425+(1.00+.495)+(1.175+.32)-(2*2*.032) 495 1095 32 7 1 7 8.287

Bottom Extra L = 5.425-.675-.675 20 2 1 2 4.075 8.150

Prepared By Checked By Page 1 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
Top L = 5.425+(1.00+.495)+(.575+.16)-(2*2*.016) 495 335 16 7 1 7 7.591 53.137

Top L = 1.375+(1.00+.495)-(2*.020) 495 20 7 1 7 2.830 19.810

Top L = 1.375+(.725+.20)-(2*.020) 525 20 7 1 7 2.260 15.820

SFR L = 5.425+(.45+.12)+(.45+.12) 12 6 2 12 6.565 78.780


1440
Stirrups L = .69+.69+1.44+1.44+.24-(3*2*.012) 125 12 43 1 43 4.428 190.404
690
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 43 2 86 3.328 286.208
140
3 Beam B104 (900 x 1500)

Bottom L = 3.472+(1.75+.60)+(.70+.60)-(2*2*.025) 600 600 25 9 1 9 7.022 63.198

Bottom Extra L = 3.472-.45+(.70+.60)-(2*.016) 600 16 2 1 2 4.290 8.580

Top L = 3.472+(1.75+.60)+(.70+.60)-(2*2*.025) 600 600 25 9 1 9 7.022 63.198

SFR L = 3.472+(.45+.12)+(.45+.12) 12 6 2 12 4.612 55.344


1440
Stirrups L = .84+.84+1.44+1.44+.20-(3*2*.01) 125 10 8 2 16 4.700 75.200
840
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.01) 125 10 8 6 48 3.300 158.400
140
1440
Stirrups L = .84+.84+1.44+1.44+.20-(3*2*.01) 225 10 7 1 7 4.700 32.900
840
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.01) 225 10 7 3 21 3.300 69.300
140
4 Beam B105 (1200 x 1500), (1800 x 1500)

Bottom L = 18.305+(.90+.25)-(2*.025)+.90lap 750 25 12 1 12 20.305 243.660

Bottom L = 5.50+(.90+.25)+(.90+.25)-(2*2*.025) 200 750 25 6 1 6 7.700 46.200

Bottom Extra L = 8.67+.875 16 2 1 2 9.545 19.090

Bottom Extra L = 6.40+(.90+.25)-(2*.025) 750 25 8 1 8 7.500 60.000

Top L = 18.305+(.575+.16)-(2*.016)+.575lap 335 16 12 1 12 19.583 234.996

Top L = 5.50+(.575+.16)+(.575+.16)-(2*2*.016) 335 16 6 1 6 6.906 41.436

Top Extra L = 1.55+1.50+1.70 25 8 1 8 4.750 38.000

Prepared By Checked By Page 2 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
Top Extra L = 1.70+10.984+(.90+.25)-(2*.025)+.90lap 750 25 8 1 8 14.684 117.472

Top Extra L = 5.50+(.90+.25)+(.90+.25)-(2*.025) 300 750 25 4 1 4 7.750 31.000

SFR L = 18.305+(.575+.16)+(.575+.16)+.575lap 16 6 2 12 20.350 244.200


1440
Stirrups L = 1.14+1.14+1.44+1.44+.20-(3*2*.01) 125 10 14 2 28 5.300 148.400
1140
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.01) 125 10 14 10 140 3.300 462.000
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.20-(3*2*.01) 250 10 9 1 9 5.300 47.700
1140
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.01) 250 10 9 5 45 3.300 148.500
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.16-(3*2*.008) 125 8 8 2 16 5.272 84.352
1140
1440
Stirrups L = .14+.14+1.44+1.44+.16-(3*2*.008) 125 8 8 10 80 3.272 261.760
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.16-(3*2*.008) 250 8 3 1 3 5.272 15.816
1140
1440
Stirrups L = .14+.14+1.44+1.44+.16-(3*2*.008) 250 8 3 5 15 3.272 49.080
140
1440
Stirrups L = 1.74+1.74+1.44+1.44+.24-(3*2*.012) 125 12 12 2 24 6.528 156.672
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 12 16 192 3.328 638.976
140
1440
Stirrups L = 1.74+1.74+1.44+1.44+.24-(3*2*.012) 250 12 10 1 10 6.528 65.280
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 250 12 10 8 80 3.328 266.240
140

5 Beam B112 (1350 x 1500)

Bottom L = 2.785+(.90+.25)+(.90+.25)-(2*.025) 300 25 12 1 12 5.035 60.420

Bottom L = 2.785+(.725+.20)+(.725+.20)-(2*.020) 75 20 4 1 4 4.595 18.380

Top L = 2.785+(.725+.20)+(.725+.20)-(2*.020) 75 20 12 1 12 4.595 55.140

Top Extra L = .675+(.725+.20) 20 12 1 12 1.600 19.200

SFR L = 2.785+(.575+.16)+(.575+.16) 16 6 2 12 4.255 51.060


1440
Stirrups L = 1.29+1.29+1.44+1.44+.24-(3*2*.012) 125 12 6 2 12 5.628 67.536
1140

Prepared By Checked By Page 3 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
1440 ( mm )
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 6 10 60 3.328 199.680
140
1440
Stirrups L = 1.29+1.29+1.44+1.44+.24-(3*2*.012) 225 12 5 1 5 5.628 28.140
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 225 12 5 5 25 3.328 83.200
140

6 Beam B113 (300 x 750)

Bottom L = 4.035+(.575+.16)+(.575+.16)-(2*.016) 185 16 3 1 3 5.473 16.419

Bottom L = 1.025+(.45+.12) 12 2 1 2 1.595 3.190

Top L = 4.035+(.925+.25)+(.925+.25)-(2*.025) 600 25 3 1 3 6.335 19.005

Top Extra L = 1.025+(.925+.25) 25 3 1 3 2.200 6.600


690
Stirrups L = .24+.24+.69+.69+.24-(3*2*.012) 125 12 9 2 18 2.028 36.504
240
690
Stirrups L = .24+.24+.69+.69+.24-(3*2*.012) 250 12 9 1 9 2.028 18.252
240

7 Beam B117 (1200 x 1500)

Bottom L = 18.475+(.90+.25)+(.90+.25)-(2*.025)+.90lap 450 450 25 12 1 12 21.625 259.500

Bottom Extra L = 7.47+1.725+(.725+.20)-(2*.020) 225 20 12 1 12 10.080 120.960

Top L = 18.475+(.90+.25)+(.90+.25)-(2*.025)+.90lap 450 450 25 12 1 12 21.625 259.500

SFR L = 18.475+(.575+.16)+(.575+.16)+.575lap 16 6 2 12 20.520 246.240


1440
Stirrups L = 1.14+1.14+1.44+1.44+.24-(3*2*.012) 125 12 15 2 30 5.328 159.840
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 15 10 150 3.328 499.200
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.24-(3*2*.012) 200 12 16 1 16 5.328 85.248
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 200 12 16 5 80 3.328 266.240
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.20-(3*2*.010) 125 10 15 2 30 5.300 159.000
1140
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 15 10 150 3.300 495.000
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.20-(3*2*.010) 250 10 13 1 13 5.300 68.900
1140

Prepared By Checked By Page 4 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
1440 ( mm )
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 250 10 13 5 65 3.300 214.500
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.20-(3*2*.010) 125 10 8 2 16 5.300 84.800
1140
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 8 10 80 3.300 264.000
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.20-(3*2*.010) 225 10 7 1 7 5.300 37.100
1140
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 225 10 7 5 35 3.300 115.500
140

8 Beam B118 (600 x 1500)

Bottom L = 2.785+(1.175+.32)+(1.175+.32)-(2*.032) 645 32 6 1 6 5.711

Bottom II L = 2.785+(.90+.25)+(.90+.25)-(2*.025) 300 25 6 1 6 5.035 30.210

Top L = 2.785+(.575+.16)+(.575+.16) 16 6 1 6 4.255 25.530

Top Extra L = .70+(.725+.20) 20 6 1 6 1.625 9.750

Top Extra L = .70+(.725+.20) 100 20 6 1 6 1.625 9.750

SFR L = 2.785+(.375+.10)+(.375+.10) 10 6 2 12 3.735 44.820


1440
Stirrups L = .54+.54+1.44+1.44+.24-(3*2*.012) 125 12 6 2 12 4.128 49.536
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 6 4 24 3.328 79.872
140
1440
Stirrups L = .54+.54+1.44+1.44+.24-(3*2*.012) 175 12 7 1 7 4.128 28.896
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 175 12 7 2 14 3.328 46.592
140

9 Beam B123 (1200 x 1500)

Bottom L = 25.175+(.90+.25)+(.90+.25)-(2*2*.025)+(2*.90)lap 450 600 25 12 1 12 29.175 350.100

Bottom Extra L = 15.015-.85+.875+.575lap 16 2 1 2 15.615 31.230

Top L = 25.175+(.575+.16)+(.575+.16)+(2*.575)lap 185 16 12 1 12 27.795 333.540

Top Extra L = 14.17+1.70+(.725+.20)+.725lap 225 20 12 1 12 17.520 210.240

Top Extra L = 4.21+1.70+(.725+.20) 375 20 12 1 12 6.835 82.020

Prepared By Checked By Page 5 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
SFR L = 25.175+(.575+.16)+(.575+.16)+(2*.575)lap 16 6 2 12 27.795 333.540
1440
Stirrups L = 1.14+1.14+1.44+1.44+.16-(3*2*.008) 125 8 13 2 26 5.272 137.072
1140
1440
Stirrups L = .14+.14+1.44+1.44+.16-(3*2*.008) 125 8 13 10 130 3.272 425.360
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.16-(3*2*.008) 250 8 11 1 11 5.272 57.992
1140
1440
Stirrups L = .14+.14+1.44+1.44+.16-(3*2*.008) 250 8 11 5 55 3.272 179.960
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.20-(3*2*.010) 125 10 15 2 30 5.300 159.000
1140
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 15 10 150 3.300 495.000
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.20-(3*2*.010) 225 10 14 1 14 5.300 74.200
1140
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 225 10 14 5 70 3.300 231.000
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.24-(3*2*.012) 125 12 15 2 30 5.328 159.840
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 15 10 150 3.328 499.200
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.24-(3*2*.012) 250 12 14 1 14 5.328 74.592
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 250 12 14 5 70 3.328 232.960
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.24-(3*2*.012) 125 12 8 2 16 5.328 85.248
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 8 10 80 3.328 266.240
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.24-(3*2*.012) 250 12 6 1 6 5.328 31.968
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 250 12 6 5 30 3.328 99.840
140

10 Beam B124 (600 x 1500), (450 x 1500)

Bottom L = 32.05+(.90+.25)+(.90+.25)-(2*2*.025)+(2*.90)lap 600 600 25 6 1 6 36.050 216.300

Bottom Extra L = 8.335-1.025-1.025 16 6 1 6 6.285 37.710

Top L = 32.05+(.90+.25)+(.90+.25)-(2*2*.025)+(2*.90)lap 600 600 25 6 1 6 36.050 216.300

SFR L = 32.05+(.375+.10)+(.375+.10)+(2*.375)lap 10 6 2 12 33.750 405.000

Prepared By Checked By Page 6 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
1440 ( mm )
Stirrups L = .54+.54+1.44+1.44+.24-(3*2*.012) 125 12 8 2 16 4.128 66.048
540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 8 4 32 3.328 106.496
140
1440
Stirrups L = .54+.54+1.44+1.44+.24-(3*2*.012) 250 12 5 1 5 4.128 20.640
540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 250 12 5 2 10 3.328 33.280
140
1440
Stirrups L = .54+.54+1.44+1.44+.20-(3*2*.010) 125 10 15 2 30 4.100 123.000
540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 15 4 60 3.300 198.000
140
1440
Stirrups L = .54+.54+1.44+1.44+.20-(3*2*.010) 250 10 12 1 12 4.100 49.200
540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 250 10 12 2 24 3.300 79.200
140
1440
Stirrups L = .54+.54+1.44+1.44+.24-(3*2*.012) 125 12 8 2 16 4.128 66.048
540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 8 4 32 3.328 106.496
140
1440
Stirrups L = .54+.54+1.44+1.44+.24-(3*2*.012) 250 12 6 1 6 4.128 24.768
540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 250 12 6 2 12 3.328 39.936
140
1440
Stirrups L = .54+.54+1.44+1.44+.20-(3*2*.010) 125 10 18 2 36 4.100 147.600
540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 18 4 72 3.300 237.600
140
1440
Stirrups L = .54+.54+1.44+1.44+.20-(3*2*.010) 250 10 15 1 15 4.100 61.500
540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 250 10 15 2 30 3.300 99.000
140
1440
Stirrups L = .54+.54+1.44+1.44+.16-(3*2*.008) 125 8 16 2 32 4.072 130.304
540
1440
Stirrups L = .14+.14+1.44+1.44+.16-(3*2*.008) 125 8 16 4 64 3.272 209.408
140
1440
Stirrups L = .54+.54+1.44+1.44+.16-(3*2*.008) 250 8 14 1 14 4.072 57.008
540
1440
Stirrups L = .14+.14+1.44+1.44+.16-(3*2*.008) 250 8 14 2 28 3.272 91.616
140

11 Beam B143 (1500 x 1500)

Bottom L = 25.055+(.90+.25)+(.90+.25)-(2*2*.025)+(2*.90)lap 600 600 25 15 1 15 29.055 435.825

Prepared By Checked By Page 7 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
Botto Extra L = .60+1.20+2.025 20 8 1 8 3.825 30.600

Top L = 25.055+(.90+.25)+(.90+.25)-(2*2*.025)+(2*.90)lap 600 600 25 15 1 15 29.055 435.825

SFR L = 25.055+(.575+.16)+(.575+.16)+(2*.575)lap 16 6 2 12 27.675 332.100


1440
Stirrups L = 1.44+1.44+1.44+1.44+.24-(3*2*.012) 125 12 10 1 10 5.928 59.280
1440
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 10 6 60 3.328 199.680
140
1440
Stirrups L = 1.44+1.44+1.44+1.44+.20-(3*2*.010) 125 10 17 2 34 5.900 200.600
1440
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 17 12 204 3.300 673.200
140
1440
Stirrups L = 1.44+1.44+1.44+1.44+.20-(3*2*.010) 250 10 15 1 15 5.900 88.500
1440
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 250 10 15 6 90 3.300 297.000
140
1440
Stirrups L = 1.44+1.44+1.44+1.44+.20-(3*2*.010) 125 10 12 2 24 5.900 141.600
1440
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 12 12 144 3.300 475.200
140
1440
Stirrups L = 1.44+1.44+1.44+1.44+.20-(3*2*.010) 250 10 10 1 10 5.900 59.000
1440
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 250 10 10 6 60 3.300 198.000
140
1440
Stirrups L = 1.44+1.44+1.44+1.44+.16-(3*2*.008) 125 8 14 2 28 5.872 164.416
1440
1440
Stirrups L = .14+.14+1.44+1.44+.16-(3*2*.008) 125 8 14 12 168 3.272 549.696
140
1440
Stirrups L = 1.44+1.44+1.44+1.44+.16-(3*2*.008) 225 8 14 1 14 5.872 82.208
1440
1440
Stirrups L = .14+.14+1.44+1.44+.16-(3*2*.008) 225 8 14 6 84 3.272 274.848
140

12 Beam B144 (600 x 1000)

Bottom L = 6.15+(1.175+.32)+(1.175+.32)-(2*2*.032) 345 345 32 6 1 6 9.012

Bottom II L = 6.15+(1.175+.32)+(1.175+.32)-(2*2*.032) 345 345 32 6 1 6 9.012

Top L = 6.15+(.575+.16)+(.575+.16) 16 6 1 6 7.620 45.720

Top Extra L = 1.55+(.725+.20) 20 3 2 6 2.475 14.850

Prepared By Checked By Page 8 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
SFR L = 6.15+(.375+.10)+(.375+.10) 10 4 2 8 7.100 56.800
940
Stirrups L = .54+.54+.94+.94+.20-(3*2*.010) 100 10 16 2 32 3.100 99.200
540
940
Stirrups L = .14+.14+.94+.94+.20-(3*2*.010) 100 10 16 4 64 2.300 147.200
140
940
Stirrups L = .54+.54+.94+.94+.20-(3*2*.010) 200 10 14 1 14 3.100 43.400
540
940
Stirrups L = .14+.14+.94+.94+.20-(3*2*.010) 200 10 14 2 28 2.300 64.400
140

13 Beam B145 (1800 x 1500)

Bottom L = 5.919+(.90+.25)+(.90+.25)-(2*.025) 600 25 18 1 18 8.169 147.042

Top L = 5.919+(.575+.16)+(.575+.16) 185 16 18 1 18 7.389 133.002

Top Extra L = 1.50+(.90+.25) 25 12 1 12 2.650 31.800

Top Extra L = 1.50+(.90+.25) 600 25 12 1 12 2.650 31.800

SFR L = 5.919+(.575+.16)+(.575+.16) 16 6 2 12 7.389 88.668


1440
Stirrups L = 1.74+1.74+1.44+1.44+.20-(3*2*.010) 125 10 13 2 26 6.500 169.000
1440
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 13 16 208 3.300 686.400
140
1440
Stirrups L = 1.74+1.74+1.44+1.44+.20-(3*2*.010) 250 10 11 1 11 6.500 71.500
1440
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 250 10 11 8 88 3.300 290.400
140

14 Beam B147 (900 x 1500)

Bottom L = 10.853+(1.175+.32)+(1.175+.32)-(2*2*.032)+1.175lap 945 345 32 9 1 9 14.890

Bottom II L = 10.853+(.90+.25)+(.90+.25)-(2*2*.025)+.90lap 600 25 4 1 4 13.953 55.812

Top L = 10.853+(.90+.25)+(.90+.25)-(2*2*.025)+.90lap 600 25 9 1 9 13.953 125.577

SFR L = 10.853+(.45+.12)+(.45+.12) 12 6 2 12 11.993 143.916


1440
Stirrups L = .84+.84+1.44+1.44+.24-(3*2*.012) 125 12 13 1 13 4.728 61.464
840
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 13 3 39 3.328 129.792
140

Prepared By Checked By Page 9 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
1440 ( mm )
Stirrups L = .84+.84+1.44+1.44+.20-(3*2*.010) 125 10 17 2 34 4.700 159.800
840
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 17 6 102 3.300 336.600
140
1440
Stirrups L = .84+.84+1.44+1.44+.20-(3*2*.010) 255 10 17 1 17 4.700 79.900
840
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 225 10 17 3 51 3.300 168.300
140

15 Beam B148 (1800 x 1500)

Bottom L = 24.605+(.90+.25)+(.90+.25)-(2*.025)+(2*.90)lap 500 25 18 1 18 28.655 515.790

Bottom Extra L = 10.46+.40+1.40 32 14 1 14 12.260

Top L = 24.605+(.90+.25)+(.90+.25)-(2*.025)+(2*.90)lap 500 25 18 1 18 28.655 515.790

Top Extra L = 2.025+1.20+1.40 20 6 1 6 4.625 27.750

SFR L = 24.605+(.575+.16)+(.575+.16)+(2*.575)lap 16 6 2 12 27.225 326.700


1440
Stirrups L = 1.74+1.74+1.44+1.44+.24-(3*2*.012) 125 12 15 1 15 6.528 97.920
1740
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 15 8 120 3.328 399.360
140
1440
Stirrups L = 1.74+1.74+1.44+1.44+.20-(3*2*.010) 125 10 17 2 34 6.500 221.000
1740
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 17 16 272 3.300 897.600
140
1440
Stirrups L = 1.74+1.74+1.44+1.44+.20-(3*2*.010) 225 10 17 1 17 6.500 110.500
1740
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 225 10 17 8 136 3.300 448.800
140
1440
Stirrups L = 1.74+1.74+1.44+1.44+.20-(3*2*.010) 100 10 15 2 30 6.500 195.000
1740
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 100 10 15 16 240 3.300 792.000
140
1440
Stirrups L = 1.74+1.74+1.44+1.44+.20-(3*2*.010) 200 10 13 1 13 6.500 84.500
1740
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 200 10 13 8 104 3.300 343.200
140
1440
Stirrups L = 1.74+1.74+1.44+1.44+.24-(3*2*.012) 100 12 16 2 32 6.528 208.896
1740
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 100 12 16 16 256 3.328 851.968
140

Prepared By Checked By Page 10 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
1440 ( mm )
Stirrups L = 1.74+1.74+1.44+1.44+.24-(3*2*.012) 200 12 14 1 14 6.528 91.392
1740
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 200 12 14 8 112 3.328 372.736
140

16 Beam B149 (900 x 1500), (1050 x 1500)

Bottom L = 25.031+(.90+.25)+(.90+.25)-(2*.025)+(2*.90)lap 600 25 9 1 9 29.081 261.729

Bottom L = 6.135+(.90+.25)+(.90+.25)-(2*.025) 600 25 1 1 1 8.385 8.385

Bottom Extra L = 23.955+.40+(.90+.25)-(2*.025)+(2*.90)lap 600 25 4 1 4 27.255 109.020

Bottom Extra L = 11.06+.40 25 5 1 5 11.460 57.300

Top L = 25.031+(.90+.25)+(.90+.25)-(2*.025)+(2*.90)lap 600 25 9 1 9 29.081 261.729

Top L = 6.135+(.90+.25)+(.90+.25)-(2*.025) 600 25 1 1 1 8.385 8.385

Top Extra L = 1.075+1.80+2.025 25 6 1 6 4.900 29.400

Top Extra L = 2.025+1.20+1.40 25 4 1 4 4.625 18.500

Top Extra L = 1.40+1.20+1.55 25 2 1 2 4.150 8.300

Top Extra L = 1.55+(.575+.16)-(2*.016) 185 16 2 1 2 2.253 4.506

SFR L = 25.031+(.45+.12)+(.45+.12)+(2*.45)lap 12 6 2 12 27.071 324.852


1440
Stirrups L = .84+.84+1.44+1.44+.24-(3*2*.012) 125 12 9 1 9 4.728 42.552
840
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 9 3 27 3.328 89.856
140
1440
Stirrups L = .84+.84+1.44+1.44+.24-(3*2*.012) 125 12 17 2 34 4.728 160.752
840
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 17 6 102 3.328 339.456
140
1440
Stirrups L = .84+.84+1.44+1.44+.24-(3*2*.012) 225 12 17 1 17 4.728 80.376
840
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 225 12 17 3 51 3.328 169.728
140
1440
Stirrups L = .84+.84+1.44+1.44+.24-(3*2*.012) 125 12 12 2 24 4.728 113.472
840
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 12 6 72 3.328 239.616
140

Prepared By Checked By Page 11 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
1440 ( mm )
Stirrups L = .84+.84+1.44+1.44+.24-(3*2*.012) 250 12 10 1 10 4.728 47.280
840
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 250 12 10 3 30 3.328 99.840
140
1440
Stirrups L = .99+.99+1.44+1.44+.20-(3*2*.010) 125 10 13 2 26 5.000 130.000
990
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 13 8 104 3.300 343.200
140
1440
Stirrups L = .99+.99+1.44+1.44+.20-(3*2*.010) 200 10 14 1 14 5.000 70.000
990
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 200 10 14 4 56 3.300 184.800
140

17 Beam B150 (200 x 750)

Bottom L = 2.60+(.725+.20)+(.725+.20)-(2*2*.020) 375 375 20 2 1 2 4.370 8.740

Top L = 2.60+(.725+.20)+(.725+.20)-(2*2*.020) 375 375 20 2 1 2 4.370 8.740


690
Stirrups L = .14+.14+.69+.69+.16-(3*2*.008) 125 8 6 2 12 1.772 21.264
140
690
Stirrups L = .14+.14+.69+.69+.16-(3*2*.008) 225 8 5 1 5 1.772 8.860
140

18 Beam B151 (800 x 1500)

Bottom L = 2.885+(.90+.25)+(.90+.25)-(2*.025) 600 25 8 1 8 5.135 41.080

Bottom II L = 2.885+(.575+.16)+(.575+.16)-(2*.016) 185 16 4 1 4 4.323 17.292

Top L = 2.885+(.90+.25)+(.90+.25)-(2*.025) 600 25 8 1 8 5.135 41.080

SFR L = 2.885+(.45+.12)+(.45+.12) 12 6 2 12 4.025 48.300


1440
Stirrups L = .74+.74+1.44+1.44+.24-(3*2*.012) 125 12 7 2 14 4.528 63.392
740
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 7 6 42 3.328 139.776
140
1440
Stirrups L = .74+.74+1.44+1.44+.24-(3*2*.012) 225 12 5 1 5 4.528 22.640
740
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 225 12 5 3 15 3.328 49.920
140

19 Beam B152 (500 x 1500)

Bottom L = 6.00+(.90+.25)+(.90+.25)-(2*.025) 900 25 5 1 5 8.250 41.250

Prepared By Checked By Page 12 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
Top L = 6.00+(.90+.25)+(.90+.25)-(2*.025) 900 25 5 1 5 8.250 41.250

SFR L = 6.00+(.45+.12)+(.45+.12) 12 6 2 12 7.140 85.680


1440
Stirrups L = .44+.44+1.44+1.44+.16-(3*2*.008) 125 8 13 2 26 3.872 100.672
440
1440
Stirrups L = .14+.14+1.44+1.44+.16-(3*2*.008) 125 8 13 2 26 3.272 85.072
140
1440
Stirrups L = .44+.44+1.44+1.44+.16-(3*2*.008) 225 8 12 1 12 3.872 46.464
440
1440
Stirrups L = .14+.14+1.44+1.44+.16-(3*2*.008) 225 8 12 1 12 3.272 39.264
140
20 Beam B155 (300 x 750)

Bottom L = 6.00+(.725+.20)+(.725+.20)-(2*.020) 525 20 3 1 3 7.810 23.430

Top L = 6.00+(.725+.20)+(.725+.20)-(2*.020) 525 20 3 1 3 7.810 23.430


690
Stirrups L = .24+.24+.69+.69+.16-(3*2*.008) 125 8 13 2 26 1.972 51.272
240
690
Stirrups L = .24+.24+.69+.69+.16-(3*2*.008) 250 8 23 1 23 1.972 45.356
240
21 Beam B156 (200 x 600)

Bottom L = 2.16+(.90+.25)+(50*.025)-(2*.025) 750 25 2 1 2 4.510 9.020

Top L = 2.16+(.575+.16)+(50*.016)-(2*.016) 335 16 2 1 2 3.663 7.326

Top Extra L = .55+(.45+.12)-(2*.012) 170 12 2 1 2 1.096 2.192


540
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 100 8 22 1 22 1.472 32.384
140
22 Beam B157 (300 x 600)

Bottom L = 3.508+(.27+.45)+(.27+.45)-(2*2*.016) 450 450 16 3 1 3 4.884 14.652

Top L = 3.508+(.27+.45)+(.27+.45)-(2*2*.016) 450 450 16 3 1 3 4.884 14.652


540
Stirrups L = .24+.24+.54+.54+.16-(3*2*.008) 125 8 8 2 16 1.672 26.752
240
540
Stirrups L = .24+.24+.54+.54+.16-(3*2*.008) 250 8 6 1 6 1.672 10.032
240
23 Beam B158 (200 x 600) - 2Nos

Bottom L = 4.04+(.575+.16)+(50*.016)-(2*.016) 335 16 2 2 4 5.543 22.172

Top L = 4.04+(.575+.16)+(50*.016)-(2*.016) 335 16 2 2 4 5.543 22.172

Prepared By Checked By Page 13 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
Top Extra L = .975+(.45+.12)-(2*.012) 170 12 2 2 4 1.521 6.084
540
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 125 8 9 4 36 1.472 52.992
140
540
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 200 8 9 2 18 1.472 26.496
140
24 Beam B159 (300 x 1200), (900 x 1500)

Bottom L = 3.185+(.90+.25)+(.90+.25)-(2*.025) 750 25 3 1 3 5.435 16.305

Bottom L = 6.00+(.90+.25)+(.90+.25)-(2*.025) 600 25 9 1 9 8.250 74.250

Bottom II L = 6.00+(.90+.25)+(.90+.25)-(2*.025) 600 25 9 1 9 8.250 74.250

Top L = 10.385+(.575+.16)+(.575+.16)-(2*2*.016) 335 335 16 3 1 3 11.791 35.373

Top L = 6.00+(.575+.16)+(.575+.16)-(2*.016) 335 16 6 1 6 7.438 44.628

Top Extra L = .80+(.575+.16)-(2*.016) 335 16 3 1 3 1.503 4.509

Top Extra L = .80+1.20+1.50 25 3 1 3 3.500 10.500

Top Extra L = 1.50+(.90+.25) 25 3 1 3 2.650 7.950

Top Extra L = 1.50+(.90+.25)-(2*.025) 750 25 6 1 6 2.600 15.600

SFR L = 3.185+(.30+.08)+(.30+.08) 8 4 2 8 3.945 31.560

SFR L = 6.00+(.45+.12)+(.45+.12) 12 6 2 12 7.140 85.680


1140
Stirrups L = .24+.24+1.14+1.14+.24-(3*2*.012) 125 12 7 2 14 2.928 40.992
240
1140
Stirrups L = .24+.24+1.14+1.14+.24-(3*2*.012) 175 12 8 1 8 2.928 23.424
240
1440
Stirrups L = .84+.84+1.44+1.44+.24-(3*2*.012) 100 12 60 1 60 4.728 283.680
840
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 100 12 60 3 180 3.328 599.040
140
25 Beam B160 (200 x 450)

Bottom L = 2.60+(.575+.16)+(50*.016)-(2*2*.016) 335 335 16 2 1 2 4.071 8.142

Top L = 4.04+(.575+.16)+(50*.016)-(2*.016) 335 335 16 2 1 2 5.543 11.086


390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 100 8 7 2 14 1.172 16.408
140
390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 200 8 6 1 6 1.172 7.032
140

Prepared By Checked By Page 14 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
26 Beam B161 (200 x 450)

Bottom L = 2.70+(.17+.30)+(.17+.30)-(2*2*.016) 300 300 16 2 1 2 3.576 7.152

Top L = 2.70+(.17+.30)+(.17+.30)-(2*2*.016) 300 300 16 2 1 2 3.576 7.152


390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 100 8 7 2 14 1.172 16.408
140
390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 200 8 6 1 6 1.172 7.032
140
27 Beam B162 (200 x 450)

Bottom L = 2.85+(.575+.16)+(50*.016) 16 2 1 2 4.385 8.770

Top L = 2.85+(.575+.16)+(50*.016) 16 2 1 2 4.385 8.770


390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 100 8 8 2 16 1.172 18.752
140
390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 200 8 6 1 6 1.172 7.032
140
28 Beam B163 (200 x 1300)

Bottom L = 3.45+(.90+.25)+(50*.025) 300 25 2 1 2 5.850 11.700

Bottom II L = 3.45+(1.175+.32)+(50*.032) 645 32 2 1 2 6.545

Top L = 3.45+(.90+.25)+(50*.025) 300 25 2 1 2 5.850 11.700

Top Extra L = .875+(.90+.25) 300 25 2 1 2 2.025 4.050

Top Extra L = .875+(50*.025) 25 2 1 2 2.125 4.250

SFR L = 3.45+(.30+.08)+(.30+.08) 8 4 2 8 4.210 33.680


1240
Stirrups L = .14+.14+1.24+1.24+.24-(3*2*.012) 100 12 35 1 35 2.928 102.480
140
29 Beam B164 (200 x 450)

Bottom L = 4.60+(.17+.30)+(.575+.16)-(2*2*.016) 300 185 16 2 1 2 5.741 11.482

Top L = 4.60+(.17+.30)+(.575+.16)-(2*2*.016) 300 185 16 2 1 2 5.741 11.482


390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 100 8 6 2 12 1.172 14.064
140
390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 200 8 4 1 4 1.172 4.688
140

Prepared By Checked By Page 15 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
390 ( mm )
Stirrups L = .14+.14+.39+.39+.20-(3*2*.010) 100 10 6 2 12 1.200 14.400
140
390
Stirrups L = .14+.14+.39+.39+.20-(3*2*.010) 200 10 5 1 5 1.200 6.000
140
30 Beam B165 (1100 x 1500)

Bottom L = 4.888-.03+(.90+.25)+.75 600 750 25 10 1 10 6.758 67.580

Bottom II L = 4.888-.03+(.90+.25)+.75 600 750 25 4 1 4 6.758 27.032

Top L = 4.888-.03+(.575+.16)+.75 185 750 16 10 1 10 6.343 63.430

Top Extra L = 1.703-.03+.80+.75 750 25 10 1 10 3.223 32.230

SFR L = 1.703-.03+(.575+.16) 16 5 2 10 3.223 32.230


1440
Stirrups L = 1.04+1.04+1.44+1.44+.24-(3*2*.012) 100 12 1 0 5.128 0.000
1040
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 100 12 32 4 128 3.328 425.984
140
1440
Stirrups L = 1.04+1.04+1.44+1.44+.24-(3*2*.012) 100 12 5 1 5 5.128 25.640
1040
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 100 12 5 4 20 3.328 66.560
140
31 Beam B166 (300 x 600)

Bottom L = 3.503+(.27+.45)+(.27+.45)-(2*2*.016) 450 450 16 3 1 3 4.879 14.637

Top L = 3.503+(.27+.45)+(.27+.45)-(2*2*.016) 450 450 16 3 1 3 4.879 14.637

Top Extra L = .975+(.45+.12)-(2*.012) 170 12 2 1 2 1.521 3.042


540
Stirrups L = .24+.24+.54+.54+.16-(3*2*.008) 125 8 8 2 16 1.672 26.752
240
540
Stirrups L = .24+.24+.54+.54+.16-(3*2*.008) 250 8 6 1 6 1.672 10.032
240
32 Beam B167 (300 x 900)

Bottom L = 5.497+(.27+.60)+(.90+.25)-(2*2*.025) 600 650 25 3 1 3 7.417 22.251

Bottom II L = 5.497+(.27+.60)+(.725+.20)-(2*2*.025) 600 375 20 2 1 2 7.192 14.384

Top L = 5.497+(.27+.60)+(.725+.20)-(2*2*.025) 600 375 20 3 1 3 7.192 21.576

Top Extra L = .975+(.45+.12)-(2*.012) 170 12 2 1 2 1.521 3.042

SFR L = 5.497+(.30+.08)+(.30+.08) 8 3 2 6 6.257 37.542

Prepared By Checked By Page 16 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
840 ( mm )
Stirrups L = .24+.24+.84+.84+.20-(3*2*.010) 125 10 12 2 24 2.300 55.200
240
840
Stirrups L = .24+.24+.84+.84+.20-(3*2*.010) 225 10 11 1 11 2.300 25.300
240
33 Beam B168 (200 x 450)

Bottom L = 1.685+(.575+.16)+(50*.016)-(2*.016) 185 16 2 1 2 3.188 6.376

Top L = 1.685+(.575+.16)+(50*.016)-(2*.016) 185 16 2 1 2 3.188 6.376

Top Extra L = .575+(50*.016) 16 2 1 2 1.375 2.750


390
Stirrups L = .14+.14+.39+.39+.24-(3*2*.012) 125 12 13 1 13 1.228 15.964
140
34 Beam B169 (1250 x 1500)

Bottom L = 8.15+(.90+.25)+(.90+.25)-(2*.025) 300 25 12 1 12 10.400 124.800

Bottom II L = 8.15+(1.175+.32)+(1.175+.32)-(2*2*.032) 645 345 32 8 1 8 11.012

Top L = 8.15+(.90+.25)+(.90+.25)-(2*.025) 300 25 8 1 8 10.400 83.200

Top Extra L = 2.05+(.90+.25)-(2*.025) 300 25 8 1 8 3.150 25.200

Top Extra L = 2.05+(.90+.25) 25 8 1 8 3.200 25.600

SFR L = 8.15+(.575+.16)+(.575+.16) 16 6 2 12 9.620 115.440


1440
Stirrups L = 1.19+1.19+1.44+1.44+.24-(3*2*.012) 125 12 17 2 34 5.428 184.552
1040
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 17 10 170 3.328 565.760
140
1440
Stirrups L = 1.19+1.19+1.44+1.44+.24-(3*2*.012) 250 12 15 1 15 5.428 81.420
1040
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 250 12 15 5 75 3.328 249.600
140
35 Beam B170 (1600 x 1500)

Bottom L = 8.15+(.90+.25)+(.90+.25)-(2*.025) 300 25 16 1 16 10.400 166.400

Top L = 8.15+(.90+.25)+(.90+.25)-(2*.025) 300 25 8 1 8 10.400 83.200

SFR L = 8.15+(.575+.16)+(.575+.16) 16 6 2 12 9.620 115.440


1440
Stirrups L = 1.54+1.54+1.44+1.44+.20-(3*2*.010) 125 10 6 2 12 6.100 73.200
1540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 6 14 84 3.300 277.200
140

Prepared By Checked By Page 17 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
1440 ( mm )
Stirrups L = 1.54+1.54+1.44+1.44+.20-(3*2*.010) 225 10 4 1 4 6.100 24.400
1540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 225 10 4 7 28 3.300 92.400
140
1440
Stirrups L = 1.54+1.54+1.44+1.44+.20-(3*2*.010) 125 10 11 2 22 6.100 134.200
1540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 11 14 154 3.300 508.200
140
1440
Stirrups L = 1.54+1.54+1.44+1.44+.20-(3*2*.010) 225 10 11 1 11 6.100 67.100
1540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 225 10 11 7 77 3.300 254.100
140
36 Beam B171 (1600 x 1500)

Bottom L = 7.50+(1.175+.32)+(1.175+.32)-(2*2*.032) 945 945 32 16 1 16 10.362

Bottom II L = 7.50+(.90+.25)+(.90+.25)-(2*2*.025) 600 600 25 16 1 16 9.700 155.200

Top L = 7.50+(.90+.25)+(.90+.25)-(2*2*.025) 600 600 25 16 1 16 9.700 155.200

Top Extra L = 1.875+(.90+.25)-(2*.025) 600 25 16 1 16 2.975 47.600

Top Extra L = 1.875+(.90+.25)-(2*.025) 600 25 10 1 10 2.975 29.750

SFR L = 7.50+(.575+.16)+(.575+.16) 16 6 2 12 8.970 107.640


1440
Stirrups L = 1.54+1.54+1.44+1.44+.24-(3*2*.012) 125 12 16 2 32 6.128 196.096
1540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 16 14 224 3.328 745.472
140
1440
Stirrups L = 1.54+1.54+1.44+1.44+.24-(3*2*.012) 225 12 16 1 16 6.128 98.048
1540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 225 12 16 7 112 3.328 372.736
140
37 Beam B172 (200 x 450)

Bottom L = 3.26+(.725+.20)+(.725+.20)-(2*2*.020) 675 675 20 2 1 2 5.030 10.060

Top L = 3.26+(.575+.16)+(.575+.16)-(2*2*.016) 485 485 16 2 1 2 4.666 9.332


390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 100 8 9 2 18 1.172 21.096
140
390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 100 8 7 1 7 1.172 8.204
140
38 Beam B173 (1600 x 1500)

Bottom L = 3.287+(.90+.25)+(.90+.25)-(2*2*.025) 600 25 16 1 16 5.487 87.792

Top. L = 3.287+(.90+.25)+(.90+.25)-(2*2*.025) 600 25 16 1 16 5.487 87.792


Prepared By Checked By Page 18 of 68 Requested By Approved By
BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
SFR L = 3.287+(.575+.16)+(.575+.16) 16 6 2 12 4.757 57.084
1440
Stirrups L = 1.54+1.54+1.44+1.44+.16-(3*2*.008) 100 8 33 1 33 6.072 200.376
1540
1440
Stirrups L = .14+.14+1.44+1.44+.16-(3*2*.008) 100 8 33 7 231 3.272 755.832
140
39 Beam B175 (450 x 1500)

Bottom L = 1.016+(.90+.25)+(.90+.25)-(2*2*.025) 450 300 25 4 1 4 3.216 12.864

Bottom II L = 1.016+(.575+.16)+(.575+.16)-(2*.016) 450 16 2 1 2 2.454 4.908

Top L = 1.016+(.90+.25)+(.90+.25)-(2*2*.025) 600 25 4 1 4 3.216 12.864

Top II L = 1.016+(.575+.16)+(.575+.16)-(2*.016) 450 16 2 1 2 2.454 4.908

SFR L = 1.016+(.575+.16)+(.575+.16) 16 6 2 12 2.486 29.832


1440
Stirrups L = .39+.39+1.44+1.44+.24-(3*2*.012) 125 12 9 1 9 3.828 34.452
390
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 9 1 9 3.328 29.952
140
40 Beam B176 (600 x 1500)

Bottom L = 6.228+(.90+.25)+(.90+.25)-(2*.025) 1000 25 6 1 6 8.478 50.868

Top L = 6.228+(.90+.25)+(.90+.25)-(2*.025) 600 25 6 1 6 8.478 50.868

SFR L = 6.228+(.375+.10)+(.375+.10) 10 6 2 12 7.178 86.136


1440
Stirrups L = .54+.54+1.44+1.44+.20-(3*2*.010) 100 10 9 2 18 4.100 73.800
540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 100 10 9 4 36 3.300 118.800
140
1440
Stirrups L = .54+.54+1.44+1.44+.20-(3*2*.010) 200 10 6 1 6 4.100 24.600
540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 200 10 6 2 12 3.300 39.600
140
1440
Stirrups L = .54+.54+1.44+1.44+.24-(3*2*.012) 100 12 14 1 14 4.128 57.792
540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 100 12 14 2 28 3.328 93.184
140
41 Beam B177 (200 x 900)

Bottom L = 7.897-.03+(.60)+(50*.02)-(2*.020) 600 20 2 1 2 9.427 18.854

Top L = 7.897-.03+(.60)+(50*.02)-(2*.020) 600 20 2 1 2 9.427 18.854

Prepared By Checked By Page 19 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
Top Extra L = 3.207-.03+(.60)+.45 170 16 2 1 2 4.227 8.454

SFR L = 7.897-.03+(.30+.08) 8 3 2 6 8.247 49.482


840
Stirrups L = .14+.14+.84+.84+.24-(3*2*.012) 100 12 10 1 10 2.128 21.280
140
840
Stirrups L = .14+.14+.84+.84+.20-(3*2*.010) 125 10 4 2 8 2.100 16.800
140
840
Stirrups L = .14+.14+.84+.84+.20-(3*2*.010) 200 10 4 1 4 2.100 8.400
140
840
Stirrups L = .14+.14+.84+.84+.24-(3*2*.012) 125 12 15 1 15 2.128 31.920
140
840
Stirrups L = .14+.14+.84+.84+.20-(3*2*.010) 125 10 7 2 14 2.100 29.400
140
840
Stirrups L = .14+.14+.84+.84+.20-(3*2*.010) 200 10 6 1 6 2.100 12.600
140
42 Beam B178 (200 x 450)

Bottom L = 3.007-.03+(.575+.16)+(.30)-(2*2*.016) 585 300 16 2 1 2 3.948 7.896

Top L = 3.007-.03+(.575+.16)+(.30)-(2*2*.016) 585 300 16 2 1 2 3.948 7.896


390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 100 8 5 2 10 1.172 11.720
140
390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 200 8 4 1 4 1.172 4.688
140
390
Stirrups L = .14+.14+.39+.39+.24-(3*2*.012) 100 12 10 1 10 1.228 12.280
140
43 Beam B179 (200 x 450)

Bottom L = 3.007-.03+(.30)+(.725+.20)-(2*2*.020) 300 775 20 2 1 2 4.122 8.244

Top L = 3.007-.03+(.30)+(.725+.20)-(2*2*.020) 300 775 20 2 1 2 4.122 8.244


390
Stirrups L = .14+.14+.39+.39+.24-(3*2*.012) 125 12 9 1 9 1.228 11.052
140
390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 100 8 5 2 10 1.172 11.720
140
390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 200 8 4 1 4 1.172 4.688
140
44 Beam B180 (600 x 900)

Bottom L = 3.453+(1.175+.32)+(1.175+.32)-(2*.032) 945 32 6 1 6 6.379

Bottom II L = 3.453+(.90+.25)+(.90+.25)-(2*.025) 600 25 6 1 6 5.703 34.218

Top L = 3.453+(.725+.20)+(.725+.20)-(2*.020) 375 20 6 1 6 5.263 31.578

Prepared By Checked By Page 20 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
Top Extra L = .875+(.575+.16) 16 2 1 2 1.610 3.220

SFR L = 3.453+(.375+.10)+(.375+.10) 10 3 2 6 4.403 26.418


840
Stirrups L = .54+.54+.84+.84+.20-(3*2*.010) 125 10 8 2 16 2.900 46.400
540
840
Stirrups L = .14+.14+.84+.84+.20-(3*2*.010) 125 10 8 4 32 2.100 67.200
140
840
Stirrups L = .54+.54+.84+.84+.20-(3*2*.010) 175 10 9 1 9 2.900 26.100
540
840
Stirrups L = .14+.14+.84+.84+.20-(3*2*.010) 175 10 9 2 18 2.100 37.800
140
45 Beam B181 (1600 x 1500)

Bottom L = 3.685+(.90+.25)+(.90+.25)-(2*.025) 600 25 16 1 16 5.935 94.960

Bottom II L = 3.685+(.90+.25)+(.90+.25)-(2*.025) 600 25 4 1 4 5.935 23.740

Top. L = 3.685+(.575+.16)+(.575+.16)-(2*.016) 185 16 16 1 16 5.123 81.968

Top Extra L = .95+(.90+.25) 25 10 1 10 2.100 21.000

SFR L = 3.685+(.575+.16)+(.575+.16) 16 6 2 12 5.155 61.860


1440
Stirrups L = 1.54+1.54+1.44+1.44+.24-(3*2*.012) 125 12 8 2 16 6.128 98.048
1540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 8 14 112 3.328 372.736
140
1440
Stirrups L = 1.54+1.54+1.44+1.44+.24-(3*2*.012) 225 12 7 1 7 6.128 42.896
1540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 225 12 7 7 49 3.328 163.072
140
46 Beam B182 (750 x 1500), (1200 x 1500)

Bottom L = 10.63+(1.175+.32)+(1.175+.32)-(2*2*.032)+1.175lap 345 195 32 7 1 7 14.667

Bottom L = 5.60+(1.175+.32)+(1.175+.32)-(2*.032) 445 32 5 1 5 8.526

Bottom II L = 10.63+(.90+.25)+(.90+.25)+.90lap 25 4 1 4 13.830 55.320

Top L = 10.63+(.90+.25)+(.90+.25)+.90lap 25 7 1 7 13.830 96.810

Top L = 5.60+(.90+.25)+(.90+.25) 25 5 1 5 7.900 39.500

Top Extra L = .70+(.575+.16) 16 2 1 2 1.435 2.870

Top Extra L = .70+1.80+1.40 16 2 1 2 3.900 7.800

Prepared By Checked By Page 21 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
SFR L = 2.725+(.45+.12)+(.45+.12) 12 6 2 12 3.865 46.380

SFR L = 5.60+(.575+.16)+(.575+.16) 16 6 2 12 7.070 84.840


1440
Stirrups L = .69+.69+1.44+1.44+.24-(3*2*.012) 125 12 22 1 22 4.428 97.416
690
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 22 2 44 3.328 146.432
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.24-(3*2*.012) 100 12 15 2 30 5.328 159.840
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 100 12 15 10 150 3.328 499.200
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.24-(3*2*.012) 125 12 21 1 21 5.328 111.888
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 21 5 105 3.328 349.440
140
47 Beam B183 (200 x 450)

Bottom L = 6.547+(50*.02)+(50*.02) 20 2 1 2 8.547 17.094

Top L = 6.547+(50*.016)+(50*.016) 16 2 1 2 8.147 16.294

Top Extra L = .875+1.35+1.683-.425 20 2 1 2 3.483 6.966


390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 100 8 9 2 18 1.172 21.096
140
390
Stirrups L = .14+.14+.39+.39+.16-(3*2*.008) 200 8 8 1 8 1.172 9.376
140
390
Stirrups L = .14+.14+.39+.39+.20-(3*2*.010) 100 10 5 2 10 1.200 12.000
140
390
Stirrups L = .14+.14+.39+.39+.20-(3*2*.010) 100 10 3 1 3 1.200 3.600
140
48 Beam B184 (600 x 1500)

Bottom L = 6.228+(.90+.25)+(.90+.25)-(2*.025) 1000 25 6 1 6 8.478 50.868

Top L = 6.228+(.90+.25)+(.90+.25)-(2*.025) 600 25 6 1 6 8.478 50.868

SFR L = 6.228+(.375+.10)+(.375+.10) 10 6 2 12 7.178 86.136


1440
Stirrups L = .54+.54+1.44+1.44+.16-(3*2*.008) 125 8 8 2 16 4.072 65.152
540
1440
Stirrups L = .14+.14+1.44+1.44+.16-(3*2*.008) 125 8 8 4 32 3.272 104.704
140
1440
Stirrups L = .54+.54+1.44+1.44+.16-(3*2*.008) 175 8 8 1 8 4.072 32.576
540
1440
Stirrups L = .14+.14+1.44+1.44+.16-(3*2*.008) 175 8 8 2 16 3.272 52.352
140

Prepared By Checked By Page 22 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
1440 ( mm )
Stirrups L = .54+.54+1.44+1.44+.24-(3*2*.012) 100 12 14 1 14 4.128 57.792
540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 100 12 14 2 28 3.328 93.184
140
49 Beam B185 (1200 x 1500)

Bottom L = 8.818+(.90+.25)+(.90+.25)-(2*2*.025) 300 1000 25 12 1 12 11.018 132.216

Bottom II L = 8.818+(.90+.25)+(.90+.25)-(2*2*.025) 300 1000 25 6 1 6 11.018 66.108

Top L = 8.818+(.90+.25)+(.90+.25)-(2*2*.025) 300 1000 25 12 1 12 11.018 132.216

SFR L = 8.818+(.575+.16)+(.575+.16) 16 6 2 12 10.288 123.456


1440
Stirrups L = 1.14+1.14+1.44+1.44+.24-(3*2*.012) 125 12 14 2 28 5.328 149.184
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 14 10 140 3.328 465.920
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.24-(3*2*.012) 250 12 12 1 12 5.328 63.936
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 250 12 12 5 60 3.328 199.680
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.24-(3*2*.012) 100 12 14 2 28 5.328 149.184
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 100 12 14 10 140 3.328 465.920
140
50 Beam B186 (1200 x 1500)

Bottom L = 6.103+(.90+.25)+(.90+.25)-(2*.025) 600 25 12 1 12 8.353 100.236

Bottom II L = 6.103+(.90+.25)+(.90+.25)-(2*.025) 600 25 10 1 10 8.353 83.530

Top L = 6.103+(.90+.25)+(.90+.25)-(2*.025) 600 25 12 1 12 8.353 100.236

SFR L = 6.103+(.575+.16)+(.575+.16) 16 6 2 12 7.573 90.876


1440
Stirrups L = 1.14+1.14+1.44+1.44+.24-(3*2*.012) 125 12 49 1 49 5.328 261.072
1140
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 49 5 245 3.328 815.360
140
51 Beam B187 (600 x 900)

Bottom L = 3.745+(1.175+.32)+(1.175+.32)-(2*.032) 945 32 6 1 6 6.671

Bottom II L = 3.745+(1.175+.32)+(1.175+.32)-(2*.032) 945 32 6 1 6 6.671

Top L = 3.745+(.725+.20)+(.725+.20)-(2*.020) 375 20 6 1 6 5.555 33.330

Prepared By Checked By Page 23 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
SFR L = 3.745+(.375+.10)+(.375+.10) 10 3 2 6 4.695 28.170
840
Stirrups L = .54+.54+.84+.84+.16-(3*2*.008) 100 8 37 1 37 2.872 106.264
540
840
Stirrups L = .14+.14+.84+.84+.16-(3*2*.008) 100 8 37 2 74 2.072 153.328
140
52 Beam B188 (1200 x 1500)

Bottom L = 3.892+(.90+.25)+(.90+.25)-(2*.025) 600 25 12 1 12 6.142 73.704

Bottom II L = 3.892+(.90+.25)+(.90+.25)-(2*.025) 600 25 8 1 8 6.142 49.136

Top L = 3.892+(.90+.25)+(.90+.25)-(2*.025) 600 25 12 1 12 6.142 73.704

SFR L = 6.103+(.575+.16)+(.575+.16) 16 6 2 12 7.573 90.876


1440
Stirrups L = 1.14+1.14+1.44+1.44+.20-(3*2*.010) 125 10 9 2 18 5.300 95.400
1140
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 9 10 90 3.300 297.000
140
1440
Stirrups L = 1.14+1.14+1.44+1.44+.20-(3*2*.010) 225 10 7 1 7 5.300 37.100
1140
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 225 10 7 5 35 3.300 115.500
140
53 Beam B189 (600 x 900)

Bottom L = 3.475+(.90+.25)+(50*.025) 25 6 1 6 5.875 35.250

Bottom II L = 3.475+(.725+.20)+(50*.020) 20 2 1 2 5.400 10.800

Top L = 3.475+(.725+.20)+(50*.020) 20 6 1 6 5.400 32.400

SFR L = 3.475+(.30+.08)+(.30+.08) 8 3 2 6 4.235 25.410


840
Stirrups L = .54+.54+.84+.84+.20-(3*2*.010) 125 10 8 2 16 2.900 46.400
540
840
Stirrups L = .14+.14+.84+.84+.20-(3*2*.010) 125 10 8 4 32 2.100 67.200
140
840
Stirrups L = .54+.54+.84+.84+.20-(3*2*.010) 225 10 7 1 7 2.900 20.300
540
840
Stirrups L = .14+.14+.84+.84+.20-(3*2*.010) 225 10 7 2 14 2.100 29.400
140
54 Beam B190 (300 x 600)

Bottom L = 3.212+(.90+.25)+(50*.025)-(2*.025) 600 25 3 1 3 5.562 16.686

Bottom L = 3.212+(.725+.20)+(50*.020)-(2*.020) 375 20 2 1 2 5.097 10.194

Prepared By Checked By Page 24 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
Top L = 3.212+(.725+.20)+(50*.020)-(2*.020) 375 20 3 1 3 5.097 15.291

Top Extra L = .875+(.725+.20)-(2*.020) 375 20 3 1 3 1.760 5.280


540
Stirrups L = .24+.24+.54+.54+.24-(3*2*.012) 125 12 32 1 32 1.728 55.296
240
55 Beam B191 (600 x 1500)

Bottom L = 10.65+(.90+.25)+(.90+.25)-(2*.025)+.90 600 25 6 1 6 13.800 82.800

Top L = 10.65+(.90+.25)+(.90+.25)-(2*.025)+.90lap 600 25 6 1 6 13.800 82.800

SFR L = 10.65+(.375+.10)+(.375+.10) 10 6 2 12 11.600 139.200


1440
Stirrups L = .54+.54+1.44+1.44+.20-(3*2*.010) 125 10 22 1 22 4.100 90.200
540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 22 2 44 3.300 145.200
140
1440
Stirrups L = .54+.54+1.44+1.44+.20-(3*2*.010) 125 10 30 1 30 4.100 123.000
540
1440
Stirrups L = .14+.14+1.44+1.44+.20-(3*2*.010) 125 10 30 2 60 3.300 198.000
140
1440
Stirrups L = .54+.54+1.44+1.44+.24-(3*2*.012) 125 12 14 1 14 4.128 57.792
540
1440
Stirrups L = .14+.14+1.44+1.44+.24-(3*2*.012) 125 12 14 2 28 3.328 93.184
140
56 Beam B192 (200 x 450)

Bottom L = 1.981+(50*.020)+(.15+.30)-(2*.020) 300 20 2 1 2 3.391 6.782

Bottom II L = 1.981+(50*.020)+(.15+.30)-(2*.020) 300 20 2 1 2 3.391 6.782

Top L = 1.981+(50*.016)+(.15+.30)-(2*.016) 300 16 2 1 2 3.199 6.398

Top Extra L = .50+(.15+.30)-(2*.016) 300 16 2 1 2 0.918 1.836


390
Stirrups L = .14+.14+.39+.39+.24-(3*2*.012) 100 12 20 1 20 1.228 24.560
140
57 Beam B194 (200 x 450)- 2 Nos

Bottom L = .807+(.575+.16)+(.17+.30)-(2*2*.016) 585 300 16 2 2 4 1.948 7.792

Top L = .807+(.725+.20)+(.17+.30)-(2*2*.016) 775 300 20 2 2 4 2.138 8.552


390
Stirrups L = .14+.14+.39+.39+.20-(3*2*.010) 125 10 6 2 12 1.200 14.400
140

Prepared By Checked By Page 25 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
58 Beam B196 (200 x 600)

Bottom L = 9.134+(.17+.45)+(.17+.45)-(2*2*.016) 450 450 16 2 1 2 10.310 20.620

Top L = 9.134+(.17+.45)+(.17+.45)-(2*2*.016) 450 450 16 2 1 2 10.310 20.620


390
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 125 8 7 1 7 1.472 10.304
140
390
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 125 8 8 2 16 1.472 23.552
140
390
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 250 8 6 1 6 1.472 8.832
140
390
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 125 8 9 2 18 1.472 26.496
140
390
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 250 8 7 1 7 1.472 10.304
140
59 Beam B197 (200 x 600)

Bottom L = 9.134+(.17+.45)+(.17+.45)-(2*2*.016) 450 450 16 2 1 2 10.310 20.620

Top L = 9.134+(.17+.45)+(.17+.45)-(2*2*.016) 450 450 16 2 1 2 10.310 20.620


390
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 125 8 7 1 7 1.472 10.304
140
390
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 125 8 8 2 16 1.472 23.552
140
390
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 250 8 6 1 6 1.472 8.832
140
390
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 125 8 9 2 18 1.472 26.496
140
390
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 250 8 7 1 7 1.472 10.304
140
60 Beam B198 (200 x 600)

Bottom L = 5.242+(.575+.16)+(.27+.45)-(2*2*.016) 335 450 16 2 1 2 6.633 13.266

Top L = 5.242+(.575+.16)+(.27+.45)-(2*2*.016) 335 450 16 2 1 2 6.633 13.266


390
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 135 8 10 2 20 1.472 29.440
140
390
Stirrups L = .14+.14+.54+.54+.16-(3*2*.008) 250 8 10 1 10 1.472 14.720
140

Prepared By Checked By Page 26 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Beam BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No : A32
Spacing
Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Sl No Description Shape of Bar
Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm
(M)
( mm )
61 Beam B204 (200 x 450) Grid(U5/V14)

Bottom L = 1.016+(.725+.20)+(.725+.20)-(2*2*.020) 225 75 20 2 1 2 2.786 5.572

Bottom II L = 1.016+(.725+.20)+(.725+.20)-(2*2*.020) 225 75 20 2 1 2 2.786 5.572

Top L = 1.016+(.725+.20)+(.725+.20)-(2*2*.020) 225 75 20 2 1 2 2.786 5.572


390
Stirrups L = .14+.14+.39+.39+.24-(3*2*.012) 100 12 10 1 10 1.228 12.280
140
62 Beam B204 (200 x 450) Grid(U5/V17-V19)

Bottom L = .975+(.17+.30)+(.725+.20)-(2*2*.020) 300 775 20 2 1 2 2.290 4.580

Bottom II L = .975+(.17+.30)+(.725+.20)-(2*2*.020) 300 775 20 2 1 2 2.290 4.580

Top L = .975+(.17+.30)+(.725+.20)-(2*2*.020) 300 775 20 2 1 2 2.290 4.580


390
Stirrups L = .14+.14+.39+.39+.24-(3*2*.012) 100 12 10 1 10 1.228 12.280
140

Total length ( in RM ) 5389.958 17349.908 20564.314 4281.752 1040.043 8615.227

Unit Weight ( in kg / RM ) 0.395 0.620 0.890 1.580 2.470 3.858

Total Weight ( in kg ) 2129.033 10756.943 18302.239 6765.168 2568.906 33237.546

Prepared By Checked By Page 27 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

57.492

58.009

58.009

Prepared By Checked By Page 28 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 29 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 30 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 31 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

34.266

Prepared By Checked By Page 32 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 33 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 34 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

54.072

54.072

Prepared By Checked By Page 35 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

134.010

Prepared By Checked By Page 36 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

171.640

Prepared By Checked By Page 37 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 38 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 39 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 40 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 41 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

13.090

Prepared By Checked By Page 42 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 43 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

88.096

Prepared By Checked By Page 44 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

165.792

Prepared By Checked By Page 45 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 46 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

38.274

Prepared By Checked By Page 47 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

102.669

42.630

Prepared By Checked By Page 48 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 49 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

40.026

40.026

Prepared By Checked By Page 50 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 51 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 52 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

Prepared By Checked By Page 53 of 68 Requested By Approved By


NG SCHEDULE

BBS No : A32

Total length in metres

32mm

1152.173

6.320

7281.733

Prepared By Checked By Page 54 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Slab Bottom BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No :
Spacing
Cutting Total length in metres
Dia Length
Bar c/c No.of No.of Total
Description
No Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm 32mm
(M)
( mm )
Slab Bottom

2.25
14 Main Bar 200 8 33 1 33 2.250 74.250

Dist
4.052 200 8 8 1 8 4.052 32.416
3.6
14A Main Bar 200 8 37 1 37 3.600 133.200
4.446
Dist 250 8 12 1 12 4.446 53.352
4.293
14B Dist 8 4 1 4 4.293 17.172
1.8
15 Main Bar 200 8 20 1 20 1.800 36.000
4.701
Dist 250 8 5 1 5 4.701 23.503
3.535
16 Main Bar 200 8 19 1 19 3.535 67.165
4.555
Dist 250 8 12 1 12 4.555 54.660
4.706
16A Dist 8 4 1 4 4.706 18.822
4.415
`17 Main Bar 200 8 21 1 21 4.415 92.715
5.010
Dist 250 8 16 1 16 5.010 80.152
3.285
18 Main Bar 175 8 27 1 27 3.285 88.695
6.207
Dist 250 8 11 1 11 6.207 68.272
4.31
19 Main Bar 200 8 17 1 17 4.310 73.270
4.277
Dist 250 8 16 1 16 4.277 68.424
2.178
20 Main Bar 200 8 18 1 18 2.178 39.204
4.160
Dist 250 8 6 1 6 4.160 24.960
2.430
21 Main Bar 200 8 33 1 33 2.430 80.174
4.215
Dist 250 8 7 1 7 4.215 29.505

Prepared By Checked By Page 55 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Slab Bottom BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No :
Spacing
Cutting Total length in metres
Dia Length
Bar c/c No.of No.of Total
Description
No Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm 32mm
(M)
( mm )
3.585
22 Main Bar 100 8 57 1 57 3.585 204.345
6.503
Dist 250 8 12 1 12 6.503 78.036
3.753
23 Main Bar 100 8 67 1 67 3.753 251.451
9.050
Dist 250 8 13 1 13 9.050 117.650
3.753
23A Main Bar 125 8 12 1 12 3.753 45.036
3.59
24 Main Bar 115 8 71 1 71 3.590 254.890
9.050
Dist 250 8 8 1 8 9.050 72.400
4.100
24A Dist 250 8 6 1 6 4.100 24.600
0.9
25,26 Main Bar 200 8 5 2 10 0.900 9.000
1.200
Dist 200 8 4 2 8 1.200 9.600
4.1
27 Main Bar 200 8 11 1 11 4.100 45.100
3.5
200 8 10 1 10 3.500 35.000
4.700
Dist 250 8 13 1 13 4.700 61.100
2.650
250 8 4 1 4 2.650 10.600
3.000
28 Main Bar 150 8 52 1 52 3.000 156.000
8.097
Dist 250 8 12 1 12 8.097 97.164
5.588
29 Main Bar 100 8 36 1 36 5.588 201.168
6.216
Dist 150 8 33 1 33 6.216 205.128
0.957
30 Main Bar 200 8 14 1 14 0.957 13.398
3.600
Dist 200 8 4 1 4 3.600 14.400
3.590
31 Main Bar 125 8 23 1 23 3.590 82.570

Prepared By Checked By Page 56 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Slab Bottom BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No :
Spacing
Cutting Total length in metres
Dia Length
Bar c/c No.of No.of Total
Description
No Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm 32mm
(M)
( mm )
6.650
Dist 250 8 8 1 8 6.650 53.200
2.333
31A Main Bar 125 8 24 1 24 2.333 55.992
3.500
Dist 250 8 6 1 6 3.500 21.000
3.785
32 Main Bar 100 8 83 1 83 3.785 314.155
9.183
Dist 250 8 13 1 13 9.183 119.379
3.600
33 Main Bar 200 8 18 1 18 3.600 64.800
4.372
Dist 250 8 12 1 12 4.372 52.464
2.515
34 Main Bar 200 8 18 1 18 2.515 45.270
4.372
Dist 250 8 8 1 8 4.372 34.976
1.916
35 Main Bar 175 8 10 1 10 1.916 19.160
2.115
Dist 175 8 7 1 7 2.115 14.805
1.590
Main Bar 175 8 5 1 5 1.590 7.950
1.216
Dist 175 8 8 1 8 1.216 9.728

36 Main Bar 1.166 200 8 7 1 7 1.166 8.162


1.780
Dist 200 8 5 1 5 1.780 8.900

37 Main Bar 1.916 200 8 7 1 7 1.916 13.412


1.972
Dist 200 8 5 1 5 1.972 9.860
2.930 79.110
37 Main Bar 175 8 27 1 27 2.930
3.250
Dist 175 8 24 1 24 3.250 78.000

39 Main Bar 2.095 200 8 32 1 32 2.095 67.040


7.200
Dist 250 8 7 1 7 7.200 50.400

40 Main Bar 2.360 200 8 17 1 17 2.360 40.120

Prepared By Checked By Page 57 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Slab Bottom BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No :
Spacing
Cutting Total length in metres
Dia Length
Bar c/c No.of No.of Total
Description
No Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm 32mm
(M)
( mm )
4.160
Dist 250 8 8 1 8 4.160 33.280

41 Main Bar 2.540 200 8 12 1 12 2.540 30.480


3.107
Dist 250 8 8 1 8 3.107 24.856
5.520 60.720
42 Main Bar 200 8 11 1 11 5.520
2.980
Dist 250 8 20 1 20 2.980 59.600

43 Main Bar 4.764 100 8 188 1 188 4.764 895.632


19.555
Dist 250 8 17 1 17 19.555 332.435

44 Main Bar 3.625 150 8 40 1 40 3.625 145.000


6.900
Dist 250 8 12 1 12 6.900 82.800

45 Main Bar 2.825 200 8 18 1 18 2.825 50.850


4.403
Dist 250 8 9 1 9 4.403 39.627

46 Main Bar 3.571 200 8 9 1 9 3.571 32.139


2.594
Dist 250 8 12 1 12 2.594 31.128
5.993 53.937
47 Main Bar 200 8 9 1 9 5.993
2.414
Dist 250 8 23 1 23 2.414 55.522

48 Main Bar 3.656 200 8 24 1 24 3.656 87.744


5.194
Dist 250 8 14 1 14 5.194 72.716

49 Main Bar 2.040 200 8 19 1 19 2.040 38.760


4.600
Dist 250 8 7 1 7 4.600 32.200

50 Main Bar 2.040 200 8 17 1 17 2.040 34.680


4.100
Dist 250 8 7 1 7 4.100 28.700

51 Main Bar 2.090 200 8 24 1 24 2.090 50.160

Prepared By Checked By Page 58 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Slab Bottom BBS DRAWING NO : S-PE-GN-32 -(R0), S-PE-GN-35-(R0)-sheet 1 to 9 BBS No :
Spacing
Cutting Total length in metres
Dia Length
Bar c/c No.of No.of Total
Description
No Bars Mem Bars
(mm) 8mm 10mm 12mm 16mm 20mm 25mm 32mm
(M)
( mm )
5.479
Dist 250 8 7 1 7 5.479 38.353

52 Main Bar 2.090 200 8 26 1 26 2.090 54.340


5.803
Dist 250 8 7 1 7 5.803 40.621

Cut out Rod


1.700
1 Main Bar -U37 B&T 10 6 2 12 1.700 20.400
1.400
2 Main Bar -U32 B&T 10 4 2 8 1.400 11.200
2.800
10 4 2 8 2.800 22.400
1.000
3 Main Bar -U31 B&T 10 4 2 8 1.000 8.000
1.800
10 4 2 8 1.800 14.400
1.000
4 Main Bar -U30 B&T 10 4 2 8 1.000 8.000
1.800
10 4 2 8 1.800 14.400
1.800
10 2 1 2 1.800 3.600
1.000
4 Main Bar -U21 B&T 10 4 2 8 1.000 8.000
1.800
10 4 2 8 1.800 14.400
1.000
5 Main Bar -U11 B&T 10 4 2 8 1.000 8.000
1.800
10 6 2 12 1.800 21.600

Total length ( in RM ) 6718.709 154.400 0.000 0.000 0.000 0.000 0.000

Unit Weight ( in kg / RM ) 0.395 0.620 0.890 1.580 2.470 3.858 6.320

Total Weight ( in kg ) 2653.890 95.728 0.000 0.000 0.000 0.000 0.000

Prepared By Checked By Page 59 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Slab Top BBS DRAWING NO : S-PE-GN-32 - (R0) , S-PE-GN-34 - (R0) BBS No :
Spacing Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Bar No Description Shape of Bar
Bars Mem Bars
8mm 10mm 12mm 16mm 20mm 25mm 32mm
(mm)
( mm ) (M)
Top Reinforcement-pour-2

41 Main Bar 0.1 0.92 250 8 6 1 6 1.020 6.120

Dist 250 8 2 1 2 1.956 3.912


1.96
42 Main Bar 0.85 225 8 7 1 7 0.850 5.950

Dist 1.96 250 8 3 1 3 1.956 5.868

43 Main Bar 0.1 0.94 250 8 9 1 9 1.040 9.360

Dist 3.30 250 8 2 1 2 3.300 6.600

44 Main Bar 3.30 225 8 25 1 25 3.300 82.500

Dist 250 8 9 1 9 4.086 36.774


4.09
45 Main Bar 0.85 225 8 11 1 11 0.850 9.350

Dist 3.30 250 8 3 1 3 3.300 9.900

46 Main Bar 0.1 0.92 250 8 15 1 15 1.020 15.300

Dist 4.89 250 8 2 1 2 4.885 9.770

47 Main Bar 4.89 225 8 18 1 18 4.885 87.930

Dist 4.39 250 8 13 1 13 4.394 57.122

48 Main Bar 0.85 225 8 16 1 16 0.850 13.600

Dist 4.89 250 8 3 1 3 4.885 14.655

49 Main Bar 0.1 1.17 250 8 15 1 15 1.270 19.050

Dist 250 8 3 1 3 4.115 12.345


4.12
50 Main Bar 1.35 225 8 19 1 19 1.350 25.650

Dist 4.55 250 8 5 1 5 4.547 22.735

51 Main Bar 1.50 225 8 17 1 17 1.500 25.500

Dist 4.12 250 8 6 1 6 4.115 24.690

52 Main Bar 2.38 225 8 20 1 20 2.375 47.500

Prepared By Checked By Page 60 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Slab Top BBS DRAWING NO : S-PE-GN-32 - (R0) , S-PE-GN-34 - (R0) BBS No :
Spacing Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Bar No Description Shape of Bar
Bars Mem Bars
8mm 10mm 12mm 16mm 20mm 25mm 32mm
(mm)
( mm ) (M)
Dist 4.87 250 8 9 1 9 4.872 43.848

53 Main Bar 0.1 1.02 250 8 11 1 11 1.120 12.320

Dist 250 8 3 1 3 2.985 8.955


2.99
54 Main Bar 1.95 225 8 23 1 23 1.950 44.850

Dist 5.54 250 8 9 1 9 5.538 49.842

55 Main Bar 0.1 0.59 225 8 11 1 11 0.690 7.590

Dist 3.20 250 8 2 1 2 3.200 6.400

56 Main Bar 0.1 1.02 225 8 15 1 15 1.120 16.800

Dist 4.16 250 8 3 1 3 4.160 12.480

57 Main Bar 0.1 0.70 250 8 15 1 15 0.795 11.925

Dist 4.05 250 8 3 1 3 4.050 12.150

58 Main Bar 0.1 2.88 225 8 17 1 17 2.975 50.575

Dist 250 8 12 1 12 4.160 49.920


4.16
59 Main Bar 1.15 225 8 37 1 37 1.150 42.550

Dist 8.75 250 8 4 1 4 8.745 34.980

60 Main Bar 2.95 225 8 37 1 37 2.950 109.150

Dist 8.75 250 8 4 2 8 8.745 69.960

61 Main Bar 1.15 225 8 13 1 13 1.150 14.950

Dist 250 8 4 1 4 3.288 13.152


3.29
62 Main Bar 1.10 225 8 14 1 14 1.100 15.400

Dist 3.62 250 8 4 1 4 3.615 14.460

63 Main Bar 3.44 225 8 26 1 26 3.440 89.440

Dist 6.20 250 8 9 1 9 6.200 55.800

64 Main Bar 2.85 225 8 26 1 26 2.850 74.100

Prepared By Checked By Page 61 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Slab Top BBS DRAWING NO : S-PE-GN-32 - (R0) , S-PE-GN-34 - (R0) BBS No :
Spacing Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Bar No Description Shape of Bar
Bars Mem Bars
8mm 10mm 12mm 16mm 20mm 25mm 32mm
(mm)
( mm ) (M)
Dist 6.20 250 8 4 2 8 6.203 49.624

65 Main Bar 3.50 225 8 13 1 13 3.500 45.500

Dist 250 8 12 1 12 3.288 39.456


3.29
66 Main Bar 0.1 0.57 250 8 10 1 10 0.670 6.700

Dist 2.80 250 8 3 1 3 2.797 8.391

67 Main Bar 0.1 0.52 250 8 20 1 20 0.620 12.400

Dist 5.30 250 8 2 1 2 5.303 10.606

68 Main Bar 0.1 0.57 250 8 4 1 4 0.670 2.680

Dist 1.40 250 8 3 1 3 1.400 4.200

69 Main Bar 0.1 0.57 250 8 4 1 4 0.670 2.680

Dist 1.40 250 8 3 1 3 1.400 4.200

70 Main Bar 2.20 225 8 15 1 15 2.200 33.000

Dist 250 8 10 1 10 4.053 40.530


4.05
71 Main Bar 0.1 0.57 250 8 13 1 13 0.670 8.710

Dist 3.60 250 8 3 1 3 3.600 10.800

72 Main Bar 0.1 0.57 250 8 14 1 14 0.670 9.380

Dist 3.81 250 8 3 1 3 3.807 11.421

73 Main Bar 2.20 225 8 15 1 15 2.200 33.000

Dist 250 8 10 1 10 4.050 40.500


4.05
74 Main Bar 0.1 0.57 250 8 30 1 30 0.670 20.100

Dist 7.90 250 8 3 1 3 7.900 23.700

75 Main Bar 0.1 0.57 250 8 30 1 30 0.670 20.100

Dist 7.90 250 8 3 1 3 7.900 23.700

76 Main Bar 0.1 0.57 250 8 12 1 12 0.670 8.040

Prepared By Checked By Page 62 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Slab Top BBS DRAWING NO : S-PE-GN-32 - (R0) , S-PE-GN-34 - (R0) BBS No :
Spacing Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Bar No Description Shape of Bar
Bars Mem Bars
8mm 10mm 12mm 16mm 20mm 25mm 32mm
(mm)
( mm ) (M)
Dist 3.50 250 8 3 1 3 3.500 10.500

77 Main Bar 0.1 0.57 250 8 13 1 13 0.670 8.710

Dist 250 8 3 1 3 3.500 10.500


3.50
78 Main Bar 0.1 0.57 250 8 8 1 8 0.670 5.360

Dist 2.27 250 8 3 1 3 2.270 6.810

79 Main Bar 1.25 225 8 27 1 27 1.250 33.750

Dist 6.17 250 8 4 1 4 6.170 24.680

80 Main Bar 1.20 250 8 11 1 11 1.200 13.200

Dist 3.20 250 8 5 1 5 3.200 16.000

81 Main Bar 1.58 250 8 19 1 19 1.580 30.020

Dist 5.88 250 8 9 1 9 5.875 52.875

82 Main Bar 0.1 0.80 250 8 15 1 15 0.895 13.425

Dist 250 8 3 1 3 4.070 12.210


4.07
83 Main Bar 2.15 225 8 16 1 16 2.150 34.400

Dist 4.07 250 8 6 1 6 4.072 24.432

84 Main Bar 0.1 3.69 200 8 15 1 15 3.786 56.790

Dist 3.49 250 8 5 1 5 3.485 17.425

85 Main Bar 0.1 3.06 200 8 9 1 9 3.161 28.449

Dist 250 8 7 1 7 2.265 15.855


2.27
86 Main Bar 0.1 0.92 100 8 74 1 74 1.020 75.480

Dist 7.90 250 8 4 1 4 7.900 31.600

87 Main Bar 0.1 0.87 200 8 16 1 16 0.970 15.520

Dist 3.69 250 8 4 1 4 3.690 14.760

88 Main Bar 2.75 225 8 38 1 38 2.750 104.500

Prepared By Checked By Page 63 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Slab Top BBS DRAWING NO : S-PE-GN-32 - (R0) , S-PE-GN-34 - (R0) BBS No :
Spacing Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Bar No Description Shape of Bar
Bars Mem Bars
8mm 10mm 12mm 16mm 20mm 25mm 32mm
(mm)
( mm ) (M)
Dist 5.19 250 8 12 1 12 5.190 62.280

89 Main Bar 2.75 150 8 16 1 16 2.750 44.000

Dist 250 8 11 1 11 2.820 31.020


2.82
90 Main Bar 2.88 225 8 17 1 17 2.875 48.875

Dist 4.22 250 8 4 2 8 4.220 33.760

91 Main Bar 2.80 225 8 22 1 22 2.800 61.600

Dist 5.26 250 8 8 1 8 5.260 42.080

92 Main Bar 0.1 1.02 200 8 34 1 34 1.120 38.080

Dist 7.20 250 8 3 1 3 7.200 21.600

93 Main Bar 0.1 3.87 0.1 200 8 34 1 34 4.070 138.380

Dist 7.20 250 8 7 1 7 7.200 50.400

94 Main Bar 0.1 2.15 250 8 13 1 13 2.250 29.250

Dist 250 8 6 1 6 3.480 20.880


3.48
95 Main Bar 0.1 0.62 250 8 15 1 15 0.720 10.800

Dist 4.10 250 8 2 1 2 4.100 8.200

96 Main Bar 2.30 225 8 28 1 28 2.300 64.400

Dist 6.60 250 8 8 1 8 6.600 52.800

97 Main Bar 1.85 225 8 11 1 11 1.850 20.350

Dist 250 8 7 1 7 2.820 19.740


2.82
98 Main Bar 2.18 150 8 39 1 39 2.175 84.825

Dist 6.35 250 8 10 1 10 6.350 63.500

99 Main Bar 2.10 225 8 30 1 30 2.100 63.000

Dist 6.95 250 8 8 1 8 6.950 55.600

100 Main Bar 0.1 2.90 225 8 22 1 22 2.995 65.890

Prepared By Checked By Page 64 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Slab Top BBS DRAWING NO : S-PE-GN-32 - (R0) , S-PE-GN-34 - (R0) BBS No :
Spacing Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Bar No Description Shape of Bar
Bars Mem Bars
8mm 10mm 12mm 16mm 20mm 25mm 32mm
(mm)
( mm ) (M)
Dist 5.30 250 8 11 1 11 5.300 58.300

101 Main Bar 1.25 225 8 7 1 7 1.250 8.750

Dist 250 8 5 1 5 1.975 9.875


1.98
102 Main Bar 0.1 3.02 225 8 16 1 16 3.120 49.920

Dist 3.89 250 8 12 1 12 3.886 46.632

103 Main Bar 1.55 225 8 8 1 8 1.550 12.400

Dist 2.19 250 8 6 1 6 2.189 13.134

104 Main Bar 0.1 0.67 250 8 16 1 16 0.770 12.320

Dist 4.26 250 8 3 1 3 4.260 12.780

105 Main Bar 2.40 225 8 19 1 19 2.400 45.600

Dist 4.75 250 8 5 2 10 4.750 47.500

106 Main Bar 1.63 225 8 16 1 16 1.625 26.000

Dist 250 8 7 1 7 4.100 28.700


4.10
107 Main Bar 0.1 0.67 250 8 9 1 9 0.770 6.930

Dist 2.68 250 8 3 1 3 2.680 8.040

108 Main Bar 0.1 0.52 250 8 25 1 25 0.620 15.500

Dist 6.69 250 8 2 1 2 6.690 13.380

109 Main Bar 1.98 225 8 13 1 13 1.975 25.675

Dist 250 8 8 1 8 3.400 27.200


3.40
110 Main Bar 0.1 0.77 250 8 15 1 15 0.870 13.050

Dist 4.12 250 8 3 1 3 4.120 12.360

111 Main Bar 2.44 225 8 15 1 15 2.436 36.540

Dist 3.70 250 8 5 2 10 3.700 37.000

112 Main Bar 2.55 225 8 19 1 19 2.550 48.450

Prepared By Checked By Page 65 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Slab Top BBS DRAWING NO : S-PE-GN-32 - (R0) , S-PE-GN-34 - (R0) BBS No :
Spacing Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Bar No Description Shape of Bar
Bars Mem Bars
8mm 10mm 12mm 16mm 20mm 25mm 32mm
(mm)
( mm ) (M)
Dist 4.60 250 8 5 2 10 4.600 46.000

113 Main Bar 0.1 2.97 225 8 22 1 22 3.065 67.430

Dist 250 8 11 1 11 5.275 58.025


5.28
114 Main Bar 1.20 225 8 8 1 8 1.200 9.600

Dist 2.17 250 8 5 1 5 2.170 10.850

115 Main Bar 0.1 2.64 225 8 17 1 17 2.740 46.580

Dist 4.30 250 8 8 1 8 4.300 34.400

116 Main Bar 1.30 225 8 9 1 9 1.300 11.700

Dist 2.29 250 8 5 1 5 2.290 11.450

117 Main Bar 2.66 225 8 7 1 7 2.660 18.620

Dist 1.97 250 8 7 1 7 1.970 13.790

118 Main Bar 0.1 0.62 225 8 23 1 23 0.720 16.560

Dist 250 8 3 1 3 5.465 16.395


5.47
119 Main Bar 2.63 225 8 20 1 20 2.625 52.500

Dist 4.78 250 8 9 1 9 4.775 42.975

120 Main Bar 0.1 1.45 225 8 16 1 16 1.545 24.720

Dist 4.30 250 8 5 1 5 4.300 21.500

121 Main Bar 0.1 1.00 225 8 16 1 16 1.095 17.520

Dist 250 8 5 1 5 5.104 25.520


5.10
122 Main Bar 2.66 225 8 7 1 7 2.659 18.613

Dist 1.92 250 8 10 1 10 1.920 19.200

123 Main Bar 0.1 1.77 0.1 250 8 5 1 5 1.970 9.850

Dist 5.74 250 8 6 1 6 5.742 34.452

124 Main Bar 1.30 225 8 7 1 7 1.300 9.100

Prepared By Checked By Page 66 of 68 Requested By Approved By


BAR BENDING SCHEDULE

Name of the Project : Purva Somerset

Name of the Client : Puravankara Projects Ltd Name of the Contractor : JMC Projects India Ltd

Tower A Stilt Floor Slab Top BBS DRAWING NO : S-PE-GN-32 - (R0) , S-PE-GN-34 - (R0) BBS No :
Spacing Cutting
Dia Length Total length in metres
c/c No.of No.of Total
Bar No Description Shape of Bar
Bars Mem Bars
8mm 10mm 12mm 16mm 20mm 25mm 32mm
(mm)
( mm ) (M)
Dist 1.92 250 8 5 1 5 1.920 9.600

Total length ( in RM ) 4934.743 0.000 0.000 0.000 0.000 0.000 0.000

Unit Weight ( in kg / RM ) 0.395 0.620 0.890 1.580 2.470 3.858 6.320

Total Weight ( in kg ) 1949.223 0.000 0.000 0.000 0.000 0.000 0.000

Prepared By Checked By Page 67 of 68 Requested By Approved By