QUALITY SYSTEM PROCEDURE DOCUMENT REF: PROCESS FLOW CHART
ANNEXURE—1 REV. NO :— 1.0
INPUT PROCESS QUALITY CONTROL DEPARTMENT OUTPUT RESPOND
START
ATTEND INTERNAL ]
KICK OFF MEETING uy Hop oc
CALLED BY PROJECT —
ION. OF
NTRACT RELATED Hoo
Hop
Kick OFF
MEETING
NTRACT FILE.
Ce
"ONTRACT
= 01-08-2012
EFFECTIVE DATE
SHEET 1 OF 5
1
APPROVED BY
= Hop-0C
MANAGEMENT REPRESENTATIVE
ISSUED BYQUALITY SYSTEM PROCEDURE
DOCUMENT REF: PROCESS FLOW CHART
ANNEXURE-1 REV. NO 1.0
INPUT PROCESS QUALITY CONTROL DEPARTMENT OUTPUT RESPOND
B
ORGANISE FOR
CUENT NSPECTION
secon nispecton
OR DISPOSITION ENGR.
RECEWE MATERIAL, MATERIAL ]
RELEASE. NOTE WEES Ho-ae
FeoM CUM OTE
VATE] ‘ORWARO WATERIAL 10.000
‘ee | RELEASE NOTE TO
we Rover
END
APPROVED BY :~ HOD-QC
EFFECTIVE DATE
(01-08-2012
ISSUED BY :— MANAGEMENT REPRESENTATIVE
SHEET 3 OF 5GUALIY SYSTEN PROCEDURE DOCUMENT REF? PROCESS FLOW CHART
ANNEXURE—1 REV. NO :— 1.0
INPUT PROCESS QUALITY CONTROL DEPARTMENT OUTPUT RESPOND
VENDOR EVALUTION
pues LETTER FROM NEW auatity
SUPPLIERS SCRUTINIZE THE SCRUTINIZED | HOD
LETTER fi FORMATE, ~
ZN
SUPPLIER >
7 SUPPLIER “"NO__[REIEGT
YES
VENDOR EVALUS GIVE INFORMATION VENDOR EVALUATION nee
ORM ITH TO PURCHASE FORM FOR PURCHASE oa
APPROVED BY :— HOD—QC EFFECTIVE DATE 01-08-2012
ISSUED BY = MANAGEMENT FESRESENTATIVE SHEET 4 OF 5QUALITY SYSTEM PROCEDURE
DOCUMENT REF: PROCESS FLOW CHART
ANNEXURE- 1 REV. NO: 1.0
INPUT PROCESS QUALITY CONTROL DEPARTMENT output RESPOND
ry
RECEVE PURCHASE |
7 5 TNEPECTION = Hop-ec
ORDER + DESPATCH A
oe I Leu
PLAN FOR INSPECTION
a
WY
INSPECTION OF
MATERIAL AT SUPPLIER
DESIGN SHOP OR STORTS
ourPut aT
is
atrRial ~~ NO RECOWMEND
APPROVED. FOR. DISPOSITION
a
PREPARE PROGESS ee
INSPECTION REPORT/ NSPECTION INSPECTION
) OFSIGN INSPECTION REPO! ENGR.
oureut
FORWARD
_ INSPECTION _[ inspection
REPORT TO REPORT (~ Lieoeerion
PROJECT ENGG.
‘APPROVED BY :— HOD-QC EFFECTIVE DATE :- 01-08-2012
ISSUED BY :—
MANAGEMENT REPRESENTATIVE
SHEET 2 OF 5QUALITY SYSTEM PROCEDURE
DOCUMENT REF: PROCESS FLOW CHART
CONTINUOUS MONITOR
( OF SUPPLIERS
conTIUUS INTIMATION OF EVALUATION
EVALUATION OF SUPPLIER TO SUPPLIER
RECORD & PURCHASE
PPLIER
END
raamH
RCHASE
ANNEXURE-1 REV. NO 1.0
INPUT PROCESS QUALITY CONTROL DEPARTMENT OUTPUT RESPOND
A
A
Tra 080E NO UP RADE
“\peRFORMANCE-~ SUPPLIERS
RANE
Sok
YES
SuSE SnEN oPoaTED —_
sie onDeS eer See ON ct lav. IeTMaTES hoD-oc
wonTo® AEPROVED VENDOR fv INTIMATES
REPONSE
APPROVED BY
= Hop—ac
EFFECTIVE DATE
(01-08-2012
ISSUED BY
MANAGEMENT REPRESENTATIVE
SHEET 5 OF 5