3B16

Head code: Malaysia (BS), design code: BS 8110-1 (1997)


Static
3B16 - 1 150x1200 - Critical
Longitudinal Bars - Critical
Top: 2.775 - 3.700 - Critical
FE Chase Down - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Tension steel utilization ratio Ast,reqd / As,prov = 0.114
Provided tension bars: 2T12
Pass
Compression steel utilization ratio As'reqd / As'prov = 0.000
Provided compression bars: 2T12
Pass
Bottom: 0.555 - 3.145 - Critical
FE Chase Down - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Tension steel utilization ratio Ast,reqd / As,prov = 0.118
Provided tension bars: 2T12
Pass
Compression steel utilization ratio As'reqd / As'prov = 0.000
Provided compression bars: 2T12
Pass
Deflection Check - Critical
FE Chase Down - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Beam bw = 150.0 mm
width
Effective d = 1158.0 mm
depth in
region
Clear span L = 3.500 m
length
Span/effective
(L / d)basic = 26.000 BS 8110-
depth ratio 1:1997
Section
3.4.6.3
Table 3.9

ModificationMFt = MIN[ 0.55 + ((477 – fs) / (120 × (0.9 + (M /(bw × d2))))) , 2.0 ] = 2.000 BS 8110-
factor 1:1997
(Tension) Section
3.4.6.5
Table
3.10
equation
7
ModificationMFc = MIN[ (1 + ((100 × As'prov)/(bw × d))) / ( 3 + (100 × As'prov)/(bw × d)) , 1.5 ] = BS 8110-
factor 1.042 1:1997
(Compression) Section
3.4.6.6
Table
3.11
equation
9
Maximum (L / d)max = (L / d)basic × MFt × MFc = 54.163 BS 8110- BS 8110-
allowable 1:1997 1:1997
span/effective Section Section
depth ratio 3.4.6.6 3.4.6.5
Actual (L / d)actual = 3.022
span/effective
depth ratio

Deflection
check: (L /
d)actual ≤ (L /
d)max

Pass
Increase Not required
reinforcement
if
deflection
fails :
Shear Links - Critical
0.000 - 3.700 - Critical
3D Building Analysis - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Link Checks - Critical
Link utilization ratio (Asv / sv)reqd / (Asv / sv)prov =
0.000
Pass
(Asv / sv)prov ≥ (Asv / sv)nom

Pass
3B16 - 2 150x1200 - Critical
Longitudinal Bars - Critical
Top: 0.000 - 0.925 - Critical
FE Chase Down - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Tension steel utilization ratio Ast,reqd / As,prov = 0.126
Provided tension bars: 2T12
Pass
Compression steel utilization ratio As'reqd / As'prov = 0.000
Provided compression bars: 2T12
Pass
Bottom: 0.555 - 3.145 - Critical
3D Building Analysis - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Tension steel utilization ratio Ast,reqd / As,prov = 0.027
Provided tension bars: 2T12
Pass
Compression steel utilization ratio As'reqd / As'prov = 0.000
Provided compression bars: 2T12
Pass
Deflection Check - Critical
3D Building Analysis - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Beam bw = 150.0 mm
width
Effective d = 1158.0 mm
depth in
region
Clear span L = 3.500 m
length
Span/effective
(L / d)basic = 26.000 BS 8110-
depth ratio 1:1997
Section
3.4.6.3
Table 3.9

ModificationMFt = MIN[ 0.55 + ((477 – fs) / (120 × (0.9 + (M /(bw × d2))))) , 2.0 ] = 2.000 BS 8110-
factor 1:1997
(Tension) Section
3.4.6.5
Table
3.10
equation
7
ModificationMFc = MIN[ (1 + ((100 × As'prov)/(bw × d))) / ( 3 + (100 × As'prov)/(bw × d)) , 1.5 ] = BS 8110-
factor 1.042 1:1997
(Compression) Section
3.4.6.6
Table
3.11
equation
9
Maximum (L / d)max = (L / d)basic × MFt × MFc = 54.163 BS 8110- BS 8110-
allowable 1:1997 1:1997
span/effective Section Section
depth ratio 3.4.6.6 3.4.6.5

Actual (L / d)actual = 3.022


span/effective
depth ratio

Deflection
check: (L /
d)actual ≤ (L /
d)max

Pass
Increase Not required
reinforcement
if
deflection
fails :
Shear Links - Critical
0.000 - 3.700 - Critical
3D Building Analysis - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Link Checks - Critical
Link utilization ratio (Asv / sv)reqd / (Asv / sv)prov =
0.000
Pass
(Asv / sv)prov ≥ (Asv / sv)nom

Pass
3B16 - 3 150x1200 - Critical
Longitudinal Bars - Critical
Top: 2.775 - 3.700 - Critical
FE Chase Down - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Tension steel utilization ratio Ast,reqd / As,prov = 0.126
Provided tension bars: 2T12
Pass
Compression steel utilization ratio As'reqd / As'prov = 0.000
Provided compression bars: 2T12
Pass
Bottom: 0.555 - 3.145 - Critical
3D Building Analysis - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Tension steel utilization ratio Ast,reqd / As,prov = 0.027
Provided tension bars: 2T12
Pass
Compression steel utilization ratio As'reqd / As'prov = 0.000
Provided compression bars: 2T12
Pass
Deflection Check - Critical
3D Building Analysis - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Beam bw = 150.0 mm
width
Effective d = 1158.0 mm
depth in
region
Clear span L = 3.500 m
length
Span/effective
(L / d)basic = 26.000 BS 8110-
depth ratio 1:1997
Section
3.4.6.3
Table 3.9

ModificationMFt = MIN[ 0.55 + ((477 – fs) / (120 × (0.9 + (M /(bw × d2))))) , 2.0 ] = 2.000 BS 8110-
factor 1:1997
(Tension) Section
3.4.6.5
Table
3.10
equation
7
ModificationMFc = MIN[ (1 + ((100 × As'prov)/(bw × d))) / ( 3 + (100 × As'prov)/(bw × d)) , 1.5 ] = BS 8110-
factor 1.042 1:1997
(Compression) Section
3.4.6.6
Table
3.11
equation
9
Maximum (L / d)max = (L / d)basic × MFt × MFc = 54.163 BS 8110- BS 8110-
allowable 1:1997 1:1997
span/effective Section Section
depth ratio 3.4.6.6 3.4.6.5

Actual (L / d)actual = 3.022


span/effective
depth ratio

Deflection
check: (L /
d)actual ≤ (L /
d)max

Pass
Increase Not required
reinforcement
if
deflection
fails :
Shear Links - Critical
0.000 - 3.700 - Critical
3D Building Analysis - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Link Checks - Critical
Link utilization ratio (Asv / sv)reqd / (Asv / sv)prov =
0.000
Pass
(Asv / sv)prov ≥ (Asv / sv)nom

Pass
3B16 - 4 150x1200 - Critical
Longitudinal Bars - Critical
Top: 0.000 - 0.925 - Critical
FE Chase Down - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Tension steel utilization ratio Ast,reqd / As,prov = 0.114
Provided tension bars: 2T12
Pass
Compression steel utilization ratio As'reqd / As'prov = 0.000
Provided compression bars: 2T12
Pass
Bottom: 0.555 - 3.145 - Critical
FE Chase Down - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Tension steel utilization ratio Ast,reqd / As,prov = 0.118
Provided tension bars: 2T12
Pass
Compression steel utilization ratio As'reqd / As'prov = 0.000
Provided compression bars: 2T12
Pass
Deflection Check - Critical
FE Chase Down - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Beam bw = 150.0 mm
width
Effective d = 1158.0 mm
depth in
region
Clear span L = 3.500 m
length
Span/effective
(L / d)basic = 26.000 BS 8110-
depth ratio 1:1997
Section
3.4.6.3
Table 3.9

ModificationMFt = MIN[ 0.55 + ((477 – fs) / (120 × (0.9 + (M /(bw × d2))))) , 2.0 ] = 2.000 BS 8110-
factor 1:1997
(Tension) Section
3.4.6.5
Table
3.10
equation
7
ModificationMFc = MIN[ (1 + ((100 × As'prov)/(bw × d))) / ( 3 + (100 × As'prov)/(bw × d)) , 1.5 ] = BS 8110-
factor 1.042 1:1997
(Compression) Section
3.4.6.6
Table
3.11
equation
9
Maximum (L / d)max = (L / d)basic × MFt × MFc = 54.163 BS 8110- BS 8110-
allowable 1:1997 1:1997
span/effective Section Section
depth ratio 3.4.6.6 3.4.6.5

Actual (L / d)actual = 3.022


span/effective
depth ratio

Deflection
check: (L /
d)actual ≤ (L /
d)max

Pass
Increase Not required
reinforcement
if
deflection
fails :
Shear Links - Critical
0.000 - 3.700 - Critical
3D Building Analysis - Critical
1 Cb1-1.4D+1.6I+1.6RI - Critical
Link Checks - Critical
Link utilization ratio (Asv / sv)reqd / (Asv / sv)prov =
0.000
Pass
(Asv / sv)prov ≥ (Asv / sv)nom

Pass