You are on page 1of 28
Department of Public Works and Highways Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS LANAO DEL NORTE 2"° DISTRICT ENGINEERING OFFICE REGIONAL OFFICE X Seminary Drive, Del Carmen, tligan City ‘SUPPLEMENTAL BID BULLETIN NO,: 20-0013 February 20, 2020 ‘SUBJECT: ‘D NAMI BRIEF IR PLANS AND EQUIPMENT This Supplemental Bid Bulletin No. 20-0013 is issued to inform all concerned bidders that there was a Revision of Contract Name, Contract Duretion, Brief Description, and Approved Budget for the Contract (ABC), Bill of Quantities (BOQ), Plans and Equipment for the stated Contracts, as follows: | Current Provision of 8Ds (including Previous | Amended Provision of BDs under this _ | Amenciments) Supplemental Bulletin | 1. ContractID: | 20KF0084 Contract Name: Construction of Mess Hall at Slaughter House Compound, Merila, Brgy. Ubaldo Laya, lligan City, Lanao de! Norte Contract Location: Brgy. Ubaldo Laya, Iligan City ‘Approved Budget for the Contract (ABC): Php 1,980,000.00 Contract Duration: 90 Calendar Days A. BRIEF DESCRIPTION FROM | To Construction of &m x 18m Mess Hall Complete as per | Construction of 8m x 16m Mess Hall (Phase 1) Plan Complete Earthworks, Concrete Works, Roof Framing & Roofing Works, Wall Footing and Zocalo, CHB Walling complete w/exception at Toilet Area, 1 unit Door 1,3 units Door 2, 5 units Window 1,1. unit Window 2, 1 unit Window 3 and Provision for Plumbing works. DPWH-INFR-27-2018 Page 1 of $6 B. Revised Bill of Quantities (BOQ) and Plans FROM TO Pay Description | Quantity | Unit Pay Description | Quantity | Unit Ttem No. tem No. PARTIT | OTHER PARTI | OTHER GENERAL | GENERAL REQUIREMENTS | REQUIREMENTS, — | B3 Permits and 100 Ts. BS Permits and 100) Is. Clearances | Clearances | BS Project Bilboard/ | 1.00 | Ea. BS Project Billboard] 10) E ‘Signboard | Signtboard 87 ‘Occupational 380 | Mo. | [ar ‘Occupational Safety | 3.00) Mo. Safety and Health ‘and Health Program | Program || | | PART IIT | CIVIL, PART tr | CIVIL, MECHANICAL, MECHANICAL, ELECTRICAL ELECTRICAL AND AND SANITARY/ ‘SANITARY/ PLUMBING PLUMBING | WORKS a WORKS | PARTA | EARTHWORKS: PARTA | EARTHWORKS | e0xi)a | Stucture 3505 | Gim | | e03q)a | Structure Excavation | 20.44 | Cum. Excavation (Common Sot, (Common soil, Merial Excavation) Manual Excavation) | | S04) | Embankment from | 11488 | Cum. | [O4Ci)b | Embankment from | 28.80 | Cum ‘common Borrow Common Borrow by ‘by Equioment Equioment 8044) | Gravel Bedaing 750 | Cum. | | 8044) | Gravel Bedding 9.04 | Cum, PARTB | PLAIN AND | [PART B | PLAIN AND REINFORCED REINFORCED CONCRETE CONCRETE WORKS WORKS ‘900(1}e2 | Structural 22.75 | Cum. | [S00G)e2 | Structurel Concrete | 30.44 Concrete (Class A, (Class A, 28 days) 28 days) ‘S02{I)ai | Reinforcing Steel | 2,729.87 | Ko. ‘902{i)ai | Reinforcing Stes | 2,453.33 | Ko. (Deformed), Grade | (Deformed) Grade 40 40 044) | Formworks and | 133.84 | Sam. | | B04) | Formworks and 241.68 | Sqm. Falseworks | Falgeworks PARTC FINISHING PARTC | FINISHING 1095(2) | 150mm CHB Non | 174.38 | Sqm. | | 1046(1) | 100mm CHB Non- | 160.91 | Sq.mn. Load Bearing Load Beering (Ineluding {including Reinforcing Stee!) Reinforcing Stee!) 1003(11)a1 | Fascia Board 0.00 | om 1046(2)_| 150mm CHE Non- | 70.46 | Sqm. : Load Bearing ((netuding | Reinforcing Steel DPWH-INFR-27-2016 102701) | Cement Plaster 6620 | Sam. | [2007 | Aluminum Glass | 840 | Sqm. Finish Door (Swing 4032(1)a3 | Painting Works | 37553. Sqm. | [2008 | Aluminum Glass | 15.96 | Sqm. {Metal Painting) Window (Stiding) YOISD)a | Fabricated Metal 23.80 | Sqm. | | J027(4) | Cement Plaster 345.54 | Sqm. Roofing Accessory Finish | (Ridge Roll) __ 10i4(D61 | repainted Metal [213.17 m. | ‘(1003(43) | Fascia Board 6292) om. Sheets ai (Comugeted Long Span, 0.4mm ‘thk) 1047(ija__| Stuctural Steel, | 419632 | Kg. 4032(H)a3 | Painting Works F553 | Sqm. “Trusses, Girt, (Metal Painting) Rafter & Fascia |__| Frame | 1047(3)b | Structural Steel | 1,103.49 1013@2)a_| Fabricated Metal 4252 Sam. Purtins Roofing Accessory | (Ridge Roll) 1047@)a | Bots 7200 | Pe. JOLA()bI | Prepainted Metal | 232.56 | m. Sheets (Corrugated , Long Span, 04mm, x ‘hk 104716) | Wetal Structure [133.00 | Ko. 1097 | Structural Steel, 2,580.70 |G, Accessories (Steel “Trusses, Girt, Rafter Plates). [ & Fascia Frame | I047(7)> | Metal Stucture | 1210 | kg. 1047(1)b | Structural Steel «394.99 Partin 30474) 16190 | Ka. 1047@)a_ | Boits 48.00. | Pc. Ia7Bje 8.00 Pe 10976) _| Metal Structure 70.50 | Xo. Accessories (Stee! Prates) 1047(7)b | Metal Structure Accessories (Sagrods) | 10474) _| Metal Structure 161.90 | a. ‘Accessories (Crossbrecing) TOATG)e | Metal Structure 800 Accessories (Turnbuckle) PART D | SANITARY/ PLUMBING WORKS 4001(1)a | Sommo- 600m. 200mm@PVC Pipe. Series 1,000 2. Contract ID: Contract Name: 20KF0085 Construction of Multi-Purpose Building Acelo Badellessr. Memorial School, Bray. Tipanoy, Tligan City, Lanao del Norte Contract Location: Bray. Tipanoy, Iligan City Approved Budget for the Contract (ABC): Php 3,465,000.00 Contract Duration: 116 Calendar Days ‘A. CONTRACT DURATION FROM To 90 CALENDAR DAYS 116 CALENDAR DAYS. B. BRIEF DESCRIPTION FROM Construction of 15m x 30m Covered Court complete as | Construction of Multi-Purpose Building, Stage per plan (w/Concrete Flooring Overiay w/10mm@ DSB Matting Spaced at 0.50m O.C. bothways, electrical works and movable basketball goal w/fiber glass board) pian and for renovation of exis | and Renovation of Existing Covered’ Court. Construction of MP8 and stage complete as per ting covered | court (Rubberized painting of floor slab, const. of bleacher w/painting, 1 side only and canopy | 1 side only poly carbonate roofing. ] To | | C. Revised Bill of Quantities (BOQ) and Plans FROM TO ‘Pay, Description ‘Quantity ‘Unit ‘Pay Description ‘Quantity [Unit mans nero. PART IT OTHER PARTIT | OTHER GENERAL GENERAL REQUIREMENTS REQUIREMENTS Bs Permits and 1.00, Is. BS Permits and 1,00 Is. eee cee BS | Project Billboard! 1.00, Ea. BS Project Billboard/ 1.00 fa. _Signbosrd eet — _| Signboard _ B87 ‘Occupational 3.60 ‘Mo, B7 | Occupational Safety 3.00 ‘Mo. Safety and Health | and Health Program Pregam PART IT | CIVIL, PART IN | CIVIL, MECHANICAL, | MECHANICAL, HLECTRICAL CuecrRcaL AND AND SANITARY SANITARY PLUMBING | PLUMBING WORKS | LWORKS: - | PARTA | EARTHWORKS [ | DPWIH-INFR-27-2016 Page 4 of 6 80x(i}a | Structure 35.63 | Cum. | [803(1)a | Structure Excavation | 25.74 | Cum. Excavation (Common sol, (Common so, ‘Manual Excavation) Manual |_ Excavation) 804()b | Embankment from | 1555 Cum. | | 1718(4) | Pipe Culverts 35.00 | Linm | Common Borrow by Equipment = | PARTB | PLAIN AND 04(1)6 | Embonkment from | 77.40 | Cusm. REINFORCED Common Borrow by ‘CONCRETE Equipment WORKS ‘s00C}C2 | Structural 7aBi | Cum. | | 804(@) | Gravel Bedding 691 | Cum. Concrete (Class A, | | | 28 cays) == | 902i}at | Reinforcing Steel | 4,634.98 | Ko. PARTB | PLAIN AND ] (Deformed), Gade REINFORCED 40 ‘CONCRETE L WORKS MRI) | Formworks and | 26064 |~sqm. | | SO0(i}e2 | Structural Concrete | 60.52 | Cam Falseworks. (Class A, 28 days) _ PARTC | FINISHING SOa(I)ai_ | Reinforcing Steel | 4,897.21) Kg (Deformed), Grade : “0 | Fasc Boerd 92.00 | m 9031) | Formwvorks and 161.42 | sam. Falseworks, | T0a7{i) | Cement Plaster 17.28 | Sqm. | [PART | FINISHING Finish For Columns) W0S2()ai_ | Painting Works [165.28 | Sam. | [3046() | 100mm CHB 135.46 | Sqm. (Masonry Painting) Non-Load Bearing including Reinforcing Stee!) | 1032(1)a3_| Painting Works 46.99 1046(2) | 150 mm CHB | 86.90 (Metal Painting) Non-Load Bearing - (including Reinforcing Steel) 7 1i3@a_| Fabricated Metal [30.00 | —m. 1007 —-| Aluminum Glass 5.96 | Sq.m. Roofing Accessory Door (Swing |__| (Ridge Rol) = Type) || 1013(2)bi | Fabricated Metal | 93.52 | m. 1008 | Aluminum Glass 10,71 | Sqm. Roofing Accessory Window (Stiding, (Valley Gutter) & Fixed) ashing TOL4(1ybI | Prepanted Metal | 48531 | Sqm | [1027(1) | Cement Paster | 381.70 | Sqm Sheets Finish (Corrugated , Long Span, 0.4mm thk) TOA7(1ja | Structural Steel, | 6,782.00 |g. | | 2051(6) | Railings/ 1.00 ss. Trusses, Git, | Handrails Rafter & Fascia Frame 4047 | Structural Ste! | 2,549.38 | Ko 1003(1) | 4.5mm Fiber 307.40 | Sqm. | Pastins 3047(3)a_| Bons 48.00_| Pe. 1018 DPWH-INFR-27-2015 1047(6) [Metal Structure [230.79 | Kg. | [ f003(2) 29.90 | Sam. Accessories (Steel Plates) 10477) | Metal Structure | 13782 | Kg. TOOR(11) | Fascia Board 3440 | m. ‘Accessories at |__| agrods) 1047(4) | Metal Stwucture [308.26 | Ka. | | 1032()a_| Painting Works 371.88 | Sqm. ‘Accessories (Masonry/Concrete (Crossbracing) Painting) 10473)c | Metal Structure | 40.00 | Pe. | | 032(3)B | Painting Works 107.40 | Sqm. ‘Accessories (Wood Painting) (Tumbuckle) PARTD | ELECTRICAL OB2(H)a3 | Painting Works 25553 | Sqm. WORKS (Metal Painting) _ TH0KIS) | Conduits, Boxes, 1.00 | Ls. 1036(4)a | Polycarbonate 34.20 | Sqm. | - and Fittings Z (Roofing) 3102(21) | Power Loed 400} is. 1014 | Prepainted Metal 113.40 | -m. Center, Sheets ‘Switchgear, and (Corrugated, Panel Boards Long Span, | 0.4mm thk) T0018) | Wires and wing [100 | is. 1013(2) | Fabricated Metal_| 40.00 | _m, Devices Roofing accessory (Gutter & ____| Flashing) | THOS) [Lighting Fatures | 00 [Is 1047(2)a | Structural Steel, 2,420.54) Kg, ‘Trusses, Girt, Rafter, Fascia, Canopy 1047(2)¢ | Structural Steel 824.37 | Ka, ee Purlins | 1047G)a_| Bots 48.00_| Pc. 1047(6) | Metal Structure 47.00 | Ko. Accessories (Steel | ____| Piates) | 3047(7)b | Metal Structure #435 ko, ‘Accessories (Gaqrods) PARTD | ELECTRICAL ] WORKS T100(I3) | Condutts, Boxes, 700) Is and Frings, 1100018) | Wires and Viiring ro) Is | Devices /1102(21) | Power Load Center, | 3.00) Is. | Switchgear, and | Pane! Boards THOS) | Lighting Fixtures To) Ts | DDPWH-INFR-27-2036 Page 6 of 6 20KFO086 Construction of Road Barangay Suarez, llgan City Contract Location: Bray. Suarez, ligan City ‘Approved Budgat for the Contract (ABC): Php 14,850,000.00 Contract Duration: 114 Calendar Days A. CONTRACT DURATION FROM | To 92 CALENDAR DAYS 114 CALENDAR DAYS . Revised Bill of Quantities (BOQ) and Plans FROM TO Pay Description | Quantity) _ Unit Pay Description) Quantity | Unie tem No. tem No. PARTIT | OTHER PARTI | OTHER GENERAL | ] GENERAL REQUIREMENTS REQUIREMENTS. | BS Project Bilboard/ | 200 | Each | [BS Project Blboard 200 Fach _— | Signboard | snboard. B7(2) | Occupational | «3.00 Is. B7@) | Occupational Safety | -100 | Is. te, Saas | Program | “Traffic 7.67 | Mon. | [B8() | Traffic Management -| 3.80 | Non. Management | ‘Mobilization! too | is. Ba Mabiization/ y tor) is |-Demoblization, Demobilization | EARTHWORKS PARTC | EARTHWORKS Foundation Fil ot 103(3) | Foundation Fill 1.35 | Cum, 103(6)a—| Pipe Culverts and [10.14 103(6)_| Pipe Culverts and 21.59 | Cum. Drain Excavation Drain Excavation ‘Common So!) (Common Soi) 05a | Subsrade 7,545.50 | Sam. | [204G@)a | Embankment 150.54 Preparation | from Roadway (Common. | Excavation Matera) | (Common Soil) PARTD | SUBBASE AND 404(2)a_| Embankment 91.71 | Cum. BASE COURSE from Borrow | (Common soil) 20003) | Aagregate 124733 | Gum | [305G)a | Subgrade 6,756.28 | Sam. Subbese Course Preparation _____| | 7 | (Common Material) _| PARTE | SURFACE PARTD | SUBBASE AND COURSE BASE COURSE DPW iH-INFR-27-2018 Paue 7 of $6 3i1(f)b1__| Portland Cement | 7,195.50 | Sqm. ‘200() | Aggregate Subbase | 1,606.26 | Cum. Concrete course Pavement (Unreinforced); (0.20m thick); 14 days PARTG | DRAINAGE AND PARTE | SURFACE COURSE | SLOPE PROTECTION STRUCTURES 500(1}a3 Pipe Culverts; 910 6.00 | Lin.m. 311(1)b1 | Portland Cement 6,576.28 | Sqm. mm Gia Class 11; | ‘Concrete Pavement ROPC (Unreinforced); (0.20m thick); 14 cays | ‘S06(1) ‘Stone Masonry 3.82 Cum. PARTG | DRAINAGE AND SLOPE PROTECTION STRUCTURES SOO)ai | Pipe Culverts; 610 | 1400 | Linm mm dia Class 1; —__| RCPC 505(1) ‘Stone Masonry 56.14 | Cum, (C. EQUIPMENT FROM TO Construction Require | Minimum Construction Requir | Minimum [Laboratory No. of | Capacity/Unit | /Laboratory 4 No, | Capacity/ Unit | Equipment Units ‘Eeaapiment: re 1, Backhoe w/Pavement 1 0.80 cum. ‘Dumptruck 2 yr Breaker - | 2._Payloader 1 150cm. | 2 Concrete Saw __ 75 hp 3._Dumptruck. 2 A2yrd 3.__Boomtruck 1 4. Concrete Saw 1 75 hp 4. Bar Gutter 1 ._Boomtruck 1 5. Ber Bender 1 6. Bar Cutter 1 6. One Bagger Mier 1 7._ Bar Bender 1 7. Plate Compactor z Shp 8. One Bagger Mixer 1 8. Water truck i ©. Motorized Road 1 GTA 9. Concrete Vibrator 2 Grader 10. Vibratory Roller 4 10t 10. Concrete Screeder i 5.5 hp 11. Plate Compactor 1 Shp 11. Vibratory Roller 1 5 tons | 12. Water truck 1 = af — 7 13. Transit Mixer 4 Scum. 4. Concrete Vibrator 2 15, Batching Plant 1 116. Concrete Screedar 1 5.5 hp DPWH-INFR-27-2016 4. Contract ID: 20KF0087 Contract Namé Contract Location: Bray. Pugaan, Tligan City Approved Budget for the Contrect (ABC): Php 19,800,000.00 Contract Duration: 161 Calendar Days A, CONTRACT DURATION Construction of Road Berangay Puga-an, liaan City FROM TO 110 CALENDAR DAYS: 161 CALENDAR DAYS | B. Revi: Bill FROM TO Pay Description ‘Quantity Unit ‘Pay Description ‘Quantity ‘Unit teem No. : Item No. PART IL OTHER: PARTS | OTHER GENERAL | GENERAL REQUIREMENTS REQUIREMENTS BS Project Biliboard/ 2.00 Each BS Project Biliboard/ 2.00 Each ‘Sgnboard Signboard B.7(2) ‘Occupational 1.00 As. B.7(2) ‘Occupational Safety | 1.00 Is. ‘Safety and Health and Health Program Program, B.8(1) Traffic 917 Mon. B.8(1) ‘Treffic Management 5.37 ‘Mon. Management. = | _ ami i BO Mobilization’ 1,00 Is. Bo Mobilization’ 1.00 Is. Demobilization Demobilizetion PARTC | EARTHWORKS PARTC | EARTHWORKS 102(2) ‘Surplus Common | 16,696.10 | Cu.m. 102(2) ‘Surplus Common 24,105.69 Cu.m. Excavation Excavation WOSG)a_—_| Pipe Culverts and | 46.08 | Cum | [103(6)a | PipeCubertsand | 407.52 | Cum, Drain Excavation Drain Excavation (Common Sot) (Common Soil) 104(1)a Embankment from | 614.00 cu.m, 104()a Embankment from 678.33 cum. Roadway Roadway Excavation Excavation (Common Sof) __{Common Soil) } 105(1)a Subgrade 8,432.00 | Sqm. 105(1)a ‘Subgrade 8,722.50 Sq.m. | Preparation Preparation (Common (Common Material) | Material) PARTD | SUBBASE AND PART D | SUBBASE AND BASE COURSE _ _ BASE COURSE 200(1) Aggregate 2,958.80 | Cu.m. 200(1) ‘Aggregate Subbase | 2,958.80 ‘Subbase Course Course, PARTE ‘SURFACE PARTE SURFACE COURSE COURSE DPWIH-INFR- 27-2016 Page 9 of 6 BiG)bI | Portland Cement | 6,125.00 | Sam. | [3ii(4)bi | Portiend Cement — | 6,125.00 | Sq.m. Concrete Concrete Pavement Pavernent SUnreinforced); ‘SUnreinforced); (0.20m thick); 14 (0.20m thick); 14 cays cays PARTG | DRAINAGE AND PARTG | DRAINAGE AND ‘SLOPE SLOPE PROTECTION PROTECTION |_ ‘STRUCTURES STRUCTURES S0O(i}a3 | Pipe Culverts; 910 | 9.00 | Linwm. | [S0O(I)a3 | Pipe Culverts; 910 | 23.00 mm dia. Gass T; mm dia. Class 1; RPC RCPC 506(1) __| Stone Masonry yoo4 | Gum. | [506q) | Stone Masonry 35.06 | Gum. (C. EQUIPMENT FROM To Construction Require | Minimum | Construction Requir | Minimum [Laboratory No, of | Capacity/Unit | /Laboratory ‘ed No. | Capacity/ Unit Equipment Units . Equipment (a T Oaocum. | i. Backhoe 1 O80 cm. | i | i50cum | 2, Payoader 1 150cum. 2 i2yrd 13. Dumptruck 2 Ayr 1 75hp |. Concrete Save 1 75 hp 1 5. Boomtruck 1 1 6. Bor Cutter 1 1 7. Bar Bender 1 '8.__ One Bagger Mixer a ‘8. One Bagae” Mixer 1 9. Motorized Road 1 | G7I0K | 8. Motorized Roed 1- G7IOA Grader Grader [AO Vibratory Roller T 308 10. Vibratory Roler i Or ‘1. Plate Compactor 1 Shp 11. Plate Compactor 1 Shp 12._Water truck i 412.__Water truck 1 13. Transit Mixer 4 Scum. | 13. ‘Transit Mixer 4 Sam. 44, Concrete Vibrator 2 14. Concrete Vibrator 2 Batching Plant i - 15. Batching Plant i. 5. Concrete Scr 1 | -SShp | 16. Concrete Screeder 1 55 hp DPwi-INFR-27-2016 Page 10 of $6 5. Contract ID: 20KF0088 Contract Name: Rehabilitation of Multi-Purpese Building in Brgy. Acmac, Tligan City Contract Location: Bray. Acmac, Iligan City ‘Approved Budget for the Contrect (ABC): Php 2,970,000.00 Contract Duration: 188 Calendar Days A. CONTRACT DURATION FROM To 182 CALENDAR DAYS 188 CALENDAR DAYS | Revised Bill of Quantities (BOQ) and Plans FROM To Description | Quantity | Unit Pay Description | Quantity | Unit Item No. Item No. PARTI | FACT PARTI | FACILITIES FOR ‘THE ENGINEERS "THE ENGINEERS PARTIT | OTHER PART IT | OTHER GENERAL 1 } GENERAL REQUIREMENTS | REQUIREMENTS 5 Project Bilboarcy | 1.00 | each | [BS Project Blboard/ 100] each ‘Signboard ‘Signboard 4 B72) | Occupational io | is B72) | Occupational Safety | 100 | I: Safety and Health and Health Program Program I i = BO ‘Mobilization 100 [Is BS Mobilization? 1.00 Demobilzation Demoblization PART HIT | CIVIL, PART IT | CIVIL, MECHANICAL, MECHANICAL, ELECTRICAL ELECTRICAL AND. AND SANITARY/PLUM SANITARY/PLU BING WORKS MBING WORKS PARTA | EARTHWORKS PART A EARTHWORKS 8011) | Removal of 100 | is 03(1)a | Structure 76.25 | Cum. Structures and Excavation; Obstruction Common Soil SOSi)a | Structure 17.01 | Cum | | 04(1)b | Embankment; from | 66.77 | Cum. Excavation; Borrow ‘Common sol 8040) | Embankment; B65 | Cum. | |804@) | Gravel Fil 508 | Cum. ___| from Borrow __| = et a 6044) | Gravel Fil 248 | Cum. | |PARTB PLAIN AND | REINFORCED J ad LEON fORK DPWIH-INFR-27-2016 Page 11 of $6 PARTB | PLAIN AND ] ‘900(A)ci | Structural Concrete, | 5.75 | Cum. REINFORCED | Class A, 28 days CONCRETE | WORK S00(}e1 | Structural 25.10 | Cum. | [S02()a | Reinforcing Steet | 2,362.56 | Kg Concrete, Class A, (Detormedy; Grace 28 days 40 902(Da_—_| Reinforcing Steel | 21662) Ko. | [903(2) | Formworks and 12.20 | Sam, (Deformed); | Falseworks Grade 40 | = - 9032) | Formworks and | 132.00 | Sqm. | |PARTC | FINISHING Falseworks PARTC | FINISHING 1001(8) | Storm Drainage 100 | hs. and Downspout 100K) | Septic Vault 1.00 is TOLI(A)a? | Fabricated Metal 22.00 | Linm. Roofing accessory; | - — |__| Fleshings ___ 4002(27) | Plumbing Works) 1.00 is. 1013(2) | Fabricated Metal | 10.00 Linm. ba Roofing | ‘Accessory; Gutters VOOR Te [Aluminum Gass | —~S55 | Sqm. | [4014(4)b2 | Prepainted Metal | 740.50] Sqm. Windows; Awning Sheets, Long Span, ‘Type Rib Type, above | 0427 mm 3010(2)a | Doors; Fiush 5e8 | Sq. 3027(1) | Cement Plaster 254.50 | Sam. Finish T0I0(2) | Doors; Wood 672 | Sqm. | | 8027(3) | Decorative Stone 40.00" | Sam. Panel WIAA? | Fabricated Metal | 2340 | Linm. | [1032()a | Painting Works; 988.25 | Sam. Roofing Masonry/Concrete ‘ACESSONYS = | Flashings —_| - | 1013(2)b3 | Fabricated Metal | 55.80 | Lin. 1032()e | Painting Works; «53.50 Roofing Accessory Sted! + YOLA(A}Z | Prepainted Metal | 1740 | Sqm. | | 1046(2)82 | 150mm CHB tion 326.00 ‘Sheets, Long Load Bearing Span, Rib Type, (ecluding above 0.427 mm Reinforcing Stee) W0i6)—_| Glazed Tesend | 38.44 1OHDe 5 604.76 |X. Trims 1018(2) | Unglazed Tiles 2435 1047(20) 10 | ls. W027() | Cement Plaster | 615.80 PARTI | FLOOD CONTROL | Finish AND DRAINAGE T03AT)a__| Painting Works; — | ~33050 PARTJIA_ | EARTHWORKS Masonry) Concrete 1032(0)¢ Painting Works; | 145.78 | Sqm. | |PARTILB | BANK AND SLOPE Stee! PROTECTION _ | WORKS ts. I046(2)ai [100 mmCHBNon | 14980 | Sqm. | [741 (2) | Stone Masonry 50.00 | Cum, Load Bearing (including . Reinforcing Stee!) 3046()a2_| 150 mm CHB Non | 140.90 | Sqm. | [PARTIIC | DRAINAGE Load Bearing | WORKS (including Reinforcing Stee!) DPWH-INFR-27-2016 Page 12 of $6 1047(2)a__‘| Structural Steely] 1,336.51 | kg. 1718(4) | Pipe Culverts 60.00 | Linzm “Trusses 1047(2)b | Structural Steel; | 593.48 %. Purins 1047(3)b | Metal Structure 6.00 each Accessories; | Searods { 1047(6) Metal Structure 101.74 Kg. Accessories; Stee! Plates | 1047(10) Metal Structure 1,00 Ls. sccessories PARTD | ELECTRICAL TLO0(10) | Conduits, Boxes & | 1.00 Ts. Fittings (Conduit ‘Works/Conduit ___| Rough-in) 1161(33) Wires and Wiring: 1.00 As. |__ Devices { 1102(1) Paneliboard with 1,00 As. ‘Main & Branch Breakers TIGA) | Uchting Foaures [00 | Ts. and Lamps. - ‘EQUIPMENT FROM TO Construction Construction Requir | Minimum | [laboratory No. of | Capacity/Unit | /Laboratory ed No. | Capacity/ Unit Equipment Units Eien o ies fT 1. Backhoe w/Pavernent 1 0.80 cu.m. 1. Backhoe w/Pavement 1 0.80 cu.m. Breaker Breaker 2. Dumptruck 1 A2yd 2. Payloader 1 1.50 cu.m. 3. Jackhammer 2 3._Dumptruck 1 127d. 4. Welding Machine 1 4. Jeckhammer 2 5. Cutting Outfit 4 5._Weiding Machine 4 6. Plate Compactor 1 Shp 16. Cutting Outfit i 7. Concrete Vibrator 4 17. Plate Compactor i Shp 8. Bar Cutter 1 | 8. Concrete Vibrator 1 8. Bar Bender i 8. Bar Cutter 1 10. One Bagger Mixer z 10. Bar Bender a ‘1. One Bagger Mixer 2 Page 13 0° §6 PWH-INFR-27-2015 6. Contract ID: 20KF0089 Contract Name: Construction of Flood Mitigation Facilities along Mandulog River at Bray. Mandulog, Iligan City Package 3 Contract Location: Iligan City Approved Budget for the Contract (ABC): Php44,550,000.00 Contract Duration: 231 Calendar Days FROM To | Pay Description] Quantity | _ Unit Pay Description Quantity] unit temo, tem No. | PARTA | FACILITIES FOR PARTA | FACILITIES FOR ‘THE ENGINEERS, “THE ENGINEERS | A14G) | Construction of 1.00 is. ALG) | Construction of Fed | 100 | Is, Field Office for the Office forthe Engineer Engineer a PARTB | OTHER PARTB | OTHER GENERAL GENERAL REQUIREMENTS, REQUIREMENTS. . | BS Project Bilboardy | 200 | each | [BS Project Bilboard/ 200 | each | ‘Signboard signboard | B7(2)__| Occupational 100 is. B7@) | Occupational Safety | 1.00 | ‘Is Safety and Health and Health Progrem | Program — | Bo Mobllzation/ 1.00 Ts BS Mobilization? 100 is. Demobilzation Demobilization PARTC | EARTHWORKS PART | EARTHWORKS 00(3) | Clearing and O44 | Ha. 400(1) | Gearing and 064 | Ha. Grubbing Grubbing_ TG) | Removal oF 100 1s. i04T)a__| Embankment fom - 2,596.74 | aam. ‘Structures and Roadway Excavation | (Common Soi) 103) 842.40] cu.m. 104(@@)a_— | Embankment from | 9,372.63 | Cu.m. | Borrow (Common Sol) IAG) 2,599.01 | cum. | | PARTD | SUBBASE AND BASE COURSE ‘Common Sol) | Waa | Embankment trom | 9,735.80 | Gu 200(1) | Aggregate Subbase 407.35 | Cum. Borrow (Common Course Soll) — —_ a |PARTD | SUBBASE AND PARTE | SURFACE COURSE BASE COURSE OO) | Agaregate 10234 | Gum | [Si1G)bi | Portland Cement C420 | sqm. Subbase Course Concrete Pavement (Unreintorced); (0.20 m thick); 14 days | _ ‘SURFACE PART F | BRIDGE — ——L ______|@OnstRucTION | | Dewe-tNFR-27-2018 Page 14 of 6 [311G)bI | Portland Cement | 604.20 | sam. | [40a [Reinforcing Steel; | 29,403.89] Ko. Concrete | Grade 40 Pavement | (Unreinforced); || (0.20 m thick); 14 te ays PART | BRIDGE ] ‘40S{i)a3 | Structural Concrete; | ~ 325.50 | Cum. | CONSTRUCTION | Glass=A; 20.68Mpa; | 28 day WiCja | Reinforcing Steel; (2531139 | ko. | (4076) | Lean Concrete; Gass | 7.62 | Gam. {__ Grade 40, cil |__| B (16.5 Mpa) 405(1}63 263.90 | Cum. | | PARTG | DRAINAGE AND | SLOPE PROTECTION STRUCTURES 407@)__| Lean Concrete: 782 Cum. | [505(2)a | Grouted Riprap; 843.55 | Cum. {__ Class B (16.5 Mpa) Class A PARTG | DRAINAGE AND ‘S0G(I) | Stone Masonry 997.02 | Cum. SLOPE PROTECTION STRUCTURES ‘S00(H}a3 | Pipe Culverts; S10 | 36.00 Lin. | | SOB(A)bI | Sheet Pies, Steel, | 3,024.00 | Linm, mm dia. Class 1; : Slope Protection RCPC 505(2)a | Grouted Riprap; | 467.81 | Cum. | [Si0(1) | Ged Course Granular | 1152 | Cum. lass A | | Meteriel Concrete _| 4 S06(1) | Stone Masonry 509(1)b1 | Sheet Piles, Steel = Slope Protection | 5100) | Bed Granular Material Concrete B. EQUIPMENT - FROM To Require | Minimum | Minimum No, of | Capacity/Unit | /Laboratory ‘Capacity/ Unit Units Equipment i) 1s0eum: 150 u.m. 2 1ayd yd 1 75 hp. 75hp 1 aT Bar Cutter 1 Bar Bender =i One Beager Mixer z ‘G7I0K Motorized Road G7I0A Grader r Tot 3, Vibratory Roler i cy 1 Shp 10._ Plate Compactor 1_|__5hp 5 i 11. Water truck i 12._Transit Mixer 4 Scum 12._Transtt Mixer 4 Sain. 13. Concrete Vibrator 2 13. Concrete Vibrator 2 DPWH-INFR-27-2016 iT 14, Batching Plant — — al 5.5 hp 15. Concrete Screeder . 55 hp | 16. Backhoe 1 | 17. Welding Machine | 1 3008 T 18. Crawler Crane 1 36-40mt 19. Vibro Hammer 1 60 ton I | 20. Cutting Outfit 1 7.ContractID: — 20KF0090 Contract Name: Construction of Road, Barangay Pala-o, Iligan City Contract Location: Tligan City Approved Budget for the Contract (ABC): Php14,850,000.00 Contract Duration: 100 Calendar Days ‘A. CONTRACT DURATION FROM To 88 CALENDAR DAYS | LOOCALENDAR DAYS ised Bill FROM TO Pay Description | Quantity | Unit Pay Description Quantity | Unit Item No. | PARTB | OTHER fp | — GENERAL REQUIREMENTS REQUIREMENTS | BS Project Bilboaray | 200 | each | [BS Project Bilboard/ 200 | each _ ‘Signboard Sonooard 8.712) | Occupational 100 [is B72) | Occupational Safety «1.00 —~| “IS Safety and Health and Health Program Program | — BB) | Traffic 283 | Mon Traffic Management | 3.33 | Mon, Management BD Mobilzation/ to | is Bo Wobiization] 100 | Ts. Demoblization Demoblization PARTC | EARTHWORKS PARTC | EARTHWORKS: OOG)al | Individual B00 | each | | 100@)ai | Individual Removal | 8.00 | each Removal of Trees; of Trees; 150-300 150-300 mm dia; mm dia; Small small TOOS}a2 | Incividuel Zoo | each | | TO0G}a2 [Individual Removal | 200 | each Removal of Trees; > of Trees; 301-500 301-500 mm dia,; mm dia.; Small Small DPH-INFR-27-2018, | 100¢4), vidual 1.00 ‘each 100(4) | Individual Removal 1.00 Removal of Trees; ‘of Trees; above $00 above 900 mm mm dia,; Large dia. Large. 1022) | Surplus common | 1,860.19) Cum. | [103(@4) | Removal of 1.00 | Is Structures and Obstruction, Cum. | | 4022) | Surplus common | 3,443.40 | Cum. Excavation (Common Soil) 104(}a__| Embankment from | 517.05 | Cum. | | 103(6)a | Pipe Culverts and 35.84 | Cum. Roadway Drain Excavation Excavation (Common Soil) (Common Sot) 105()a_—_| Subgrade 893063 | Sam. | [i04i)a | Embenkmentfrom | 443.55 | Cum Preparation Roadway Excavation (Common (Common Soil) Material) i m| PARTD | SUBBASE AND OS(i)a_—_| Subgrade 6,697.97 | Sqm. BASE COURSE Preperation | (Common Materia!) | 200i) | Aggregate 2,520.01 | Gum. | [PARTD | SUBBASE AND Subbase Course: PARTE | SURFACE 200d) 1,966.13 | Cum. | COURSE | 3HI()bI | Portland Cement PARTE | Concrete Pavement (Unreinforcea); (0.20 m thick); 14 | | days pd PARTG | DRAINAGE AND BGbi | Potand Cement 5,260.12 | Sam. | SLOPE ‘Concrete Pavement PROTECTION (Unreinforcedy; | ‘STRUCTURES (0.20 m thick); 14 - ays Soo(Dai | Pipeauverts;610 | 1.00 | nm. | |PARTF | BRIDGE ] mmm dia, Cass 1; CONSTRUCTION ROC 506(3) | Stone Masonry 251 | Cum | | 404(2)a | Reinforcing Steel; Grade 40_ | ‘405(4)a3 | Structural 69.21 | Gum, Concrete; Class=A;20.68 Mpa; 28 days | [PART | DRAINAGE AND SLOPE PROTECTION STRUCTURES ‘BOO(i}ad | Pipe Culverts; 610 [7.00 _|Lin.m.| mm dia Class 1; RCPC 2027(1) Cement Plaster | 417.20 |Sq.m. z Finish 506G1)___| Stone Masonry 16273 | Cum. DPVIH-INFR-27-2016 Page 17 of $6 20KFO091 Construction/Repair/Rehabilitation of Multi-Purpose Building, ligan City, Lanao del Norte Contract Location: Barangay Sta. Elena, Iligan City Approved Budget for the Contract (ABC): Php 4,950,000.00 Contract Duration: 191 Calendar Days A. Revised Bill of Quantities (BOQ) and Plans FROM TO Pay Description | Quantity | Unit Description Quantity [Unit Item No. | | PARTB | OTHER | PARTI | FACILITIES FOR GENERAL ‘THE ENGINEERS REQUIREMENTS __| — | | BS Project Bilboard/ | 1.00 | each | | PARTI | OTHER GENERAL } Signboard _| REQUIREMENTS: BI) ‘Occupational 1.00 is. B3 Permits and 2.00 | Is. Safety and Health | Clearances Program 2 _ Bo Mobilzation/ 1.00 Is. BS Project bilboard/ 1.00 | each | Demebslization _| | ‘Signboard PARTIIT | CIVIL, B72) | Occupational Safety | 1.00 | Is. MECHANICAL, ‘and Health Program | ELECTRICAL | AND SANITARY/ PLUMBING WORKS | PARTA | EARTHWORKS: 69 Mobilization? 100 | 1s. — ee) ____| Demobilization _|_ 01(6) | Removal of 36.41 PARTIE | CIVIL, Structure and MECHANICAL, Obstruction; ELECTRICAL AND. Concrete ‘SANITARY/ PLUMBING WORKS 03a ‘| Structure 2185 | Cum. | |PARTA | EARTHWORKS Excavation; ‘Common Soll BCA) | Embankment from | 34.56 ®01(6) | Removal of Borrow Structure and Obstruction; Concrete PARTE | PLAIN 03a | Swucture REINFORCED Excavation; CONCRETE Common Soil WORKS i ‘MOE | Structural 67.95 | cum. | | 80a(a)b | Embankment; from | 425.80 | cum. Concrete; Gass A, Borrow | | 28 cay | 92a_—_| Reinforcing Steel | 7,863.74 | Ko. ‘80a(4) | Gravel Fill 73.06 | Cum. (Deformed); |__| Grade 40. 1 L Dpwit-INFR-27-2016 Page 18 of 56 9032) __| Formworks and 12969 | Sam. | [PARTB | PLAIN Falseworks REINFORCED ‘CONCRETE WORKS [PARTC [FINISHING | ‘S00(H}ei_| Structural Concrete; [403.73 | cu.m. Class A, 28 cay 1001(S)a_| Catch Basin 5.00 | each | [902{1)a | Reinforcing Steel | 3,718.00 | Ke. (Deformed); Grade 40 1001(8) | Storm Drainage 1.00 is. 3032) Formworks and 143,35 | Sam. = ‘and Downspout __| Falseworks 1004(11) | Septic Vault too | is. PART C | FINISHING 1002(27) | Plumbing work 1.00 1s. 1010(2)b | Doors; Wood 4.20 Panel 100Xiat | Ceiling 4.5mm | 150.00 | Sam. | | 4033(2) | Fabricated Metal | 47.46 | Metal Frame Fiber a2 Roofing | Cement Board ‘Accessory; | Flashings TOOK a | Aluminum Glass | 1822 | Sqm. | [4013(2) | Fabricated Metal | 42.40 |Lin.m. Windows; Siding bi Roofing Tye Accessory; = | __ - _| Gutters 100Ki}a | Jalousle Windows; 2.08 1014(4) | Prepainted Metal | 616.00 | Sam. Sliding Type b2 Sheets, Long Span, Rib Type, above 0.427 mm TOIO(2 | Doors, Wood (| 10.08) Sam. | | 302701) | Cement Piaster 80.00 | Sam. Panel | Finish Tila | Rollup Door, ——==S20DSStet G2Ha_ | Painting Works; 355.00 | Sam. Ste | 1014(1)b2 | Prepainted Metal 144.00 Sqm. | | 1032(4)c 5200 | Sqm. sheets, Long | Span, Rib Type, above 0.427 mm 10182) | Unglazed Tiles 13001 | Sam. | | 1045(a2 | 150mm CHB Load “| 250.20 | Sqm. Bearing (including Reinforcing Stee!) | __ 1027) | Cement Piaster | 160.62 | Sqm, | | 3047(2)a | Stuctural Steel; 3,461.00 | ka. | Trusses 1032(1)a 405.57 | Sqm. 1047(2)b _| Structural Steel, 2649.60 | Kg. | Puriins 1036(}a 2400 | Linm. | [3047(3)d_ | Metal structure 12.00 | each | ‘Accessories; Cross Bracing 10391) | Alumina 7782 Sam. | [1047(10) | Metal sbucture 100 | is. Ciadcing _| Accessories T04€(2)al | 100 mm CHB Load | 256.74 | Sqm. | | PART | BANK AND SLOPE Bearing (including 1B PROTECTION Reinforcing Stee!) WORKS TOAEZa2 | 180 mm CHE Load 310.25 | Sqm. | | 474i) | Stone Masonry ‘45.00 Bearing (including Reinforcing Stee! Toa7(@a | Stuctural Steel; | 1.90454) Ka, Trusses 7 — _ 1047) | Structural Steel, | 595.67 | Ka. | Puriins Page 19 of $6 1047(3) | Metal Structure | 12.00 | each Accessories; Sagrods T0a7@3)d_—_| Metal Structure | 1400 | each ] Accessories; Cross Bracing 10476) | Metal Structure | 24647_| Ko. ‘Accessories; Steel Plates TO47IO) | Metal Structure 100 Ts. Accessories TOKIO) | Conduits, Boxes& | L.00 | Ls. Fittings (Conduits \Works/Conduit Rough-in)_ H10i(33) | Wires end Wiring [200 | Ts. Devices THO) | Panelboard with | 100} Is. Main & Branch Breakers TOBA) | Lighting Fadures | ~.00] 1s and Laos. 9. ContractID: 20KF0092 Contract Name: Concreting of Kekai-Ronabor-Torong-Torong Provincial Road at Dimaporo, Pigcarangan, Tubod, Lanao del Norte Contract Location: Pigcarangan, Tubod, Lanao del Norte ‘Approved Budget for the Contract (ABC): Php 19,800,000.00 Contract Duration: 154 Calendar Days A. Approved Budget for the Contract (ABC): FROM To PHP 19,900,000.00 PHP 19,800,000.00 Revised Bill of Quantities (BOQ) and PI FROM To Pay Description ‘Quantity Unit [Pay Description ‘Quantity Unit Ttem No. Item No. PARTA FACILITIES FOR PARTA | FACILITIES FOR _____THEENGINEERS | __ THEENGINEERS | | A.1.1(3) | Construction of 1.00 ts, ‘Ai.1@) | Construction of Field | 1.00 Is Field Office for the Office for the Engineer Engineer PART OTHER | [PARTS | OTHER GENERAL GENERAL REQUIREMENTS REQUIREMENTS | “ Page 20 of $6 DPWH-INFR-27-2016 BS Retain | 200] te BS Project Bilbard/ 200 | ca. Signboard Signboard B72) | Occupatonal 1.00 is B.7(4) | Occupational Safety | 1.00 | LS Safety and Health ‘and Health Program Program Ba) | Traffic 33) Mo Bai) | Traffic Management | 513 | Mo. management | 89 Mobilzation/Demo | 100 | LS BS Mobilzation/ 300 | US | bilization _| Demobilization PARTC | EARTHWORKS | PARTC | EARTHWORKS 102@) | Surplus Common [18,3277 | Cum | | 100(3)ai | Individual 10.00 | each Excavation z Removal of Trees | (450-300 mm ___| dia.) 10a()a | Structure 361.14 | Cum | | 404(3)b2 | Removal of Actual | 220.00 | Sqm. Excavation ‘Structures/ (Common Soi) Obstruction (0.20 m thick) | 104@a_—_| Embankment from | 377.94 | Cum | [404(@)a3 | Removal of Actual | 40.00 | Lm. Roadway ‘Structures/ Excovation ‘Obstruction (Common Soi) (910mm dia, RPC) 305(i)a | Subgrade 5583.40 | Sqm | [302(2) | Surplus Common | 4,960.87 | Cum Preparation Excavation (Common | Material) _ | PARTD | SUBABSE AND 1O5(He | Structure Excavation | 72224 | Gu.m | BASE COURSE _ _| (Common Sol) ia 2000) | Aggregate 1,662.75 | Cum. | |103(6) | Pipe Culverts and | 455.56 | Cum. ‘Subbase Course Drain Excavation (Common Soil) PARTE | SURFACE GDAG}a [Embankment from | 4,040.82 | Cum COURSE Roadway Excavation | = __| (Common Sol) 300(8) | Gravel Surface 33750 | cum. | | 105G)a | Subgrade 4,860.40 | Sq.m || Course __| Preparation 311(3)e1 | Portland Cement | 4,575.00 | Sqm | |PARTD | SUBABSE AND Conerate BASE COURSE Pavement (Unreinforcec); | 0.23m thick; 14 | | days PARTG | DRAINAGE AND 200) | Agaregate Subbase | 4,822.50 | Gum. SLOPE | Course PROTECTION ‘STRUCTURES S05(2)a | Grouted Riprap, | 36957 | CUM | [PARTE SURFACE COURSE Cass A PARTH | MISCELLANEOU 30001) | Gravel Surface 33750 [aum. ‘Course ia{i) 18750 | Sam. | | 3ii(i)ei | PCC Pavement 4575.00 | Sam ; (Unreinforced); Pavement 0.23m thick | Markings White DPWH-INFR-27-2016 Page 21 of $6 PARTG | DRAINAGE AND SLOPE PROTECTION STRUCTURES 500(4)b3 | Pipe Culverts, 10.00 | Lm. 910 mm dia. (Class IV) 500(1)b5 | Pipe Culverts, 36.00 1220 mm dia. 5052) 615.62 | Gum. - [ | 5064) 8.22 | Cum. PARTH | MISCELLANEOUS | | STRUCTURES i 61201) | Reflectorized 187.50 | Sqm. | Thermoplastic | Pavement Markings: | White ¢. EQUIPMENT FROM To ‘Construction Require ‘Construction Requir | Minimum [Laboratory No. of JLaboratory 4 No. | Capacity/ Unit Equipment. Units Equipment of i - | Units 1. Payloader 2 __(MAJOR) 2, Dumptruck 2 1, Bulldezer_ 1 16Shp 3, Concrete saw 1 2. Payloader = 1.5 cum/1.95 cud 4, Motorized road greder| ‘1 ‘3. Motorized Road 140hp | Grader 5, Vibratory Roller T 10T 2. Vibratory Roller 1 Ome 6 Water Truck 1 5. Backhoe 1 | eeu.m /104 cuyd 7,__Transit Mixer 4 Scum 4 | S6cuyd ‘8. Concrete Vibrator 2 2 a2ouyd 1 1 25mt 1 U 2-5mt 1 10. Water Truck/Pump. 1 16000 L 1 ‘11, Concrete Batch Plant 1 10 cu.m. _ (MINOR) 1. Concrete Saw 2. er Cutter 3. Concrete Screeder | 4. One Bagger Mier | { 5. Plate Compactor fi ‘Chainsaw _| 7. Applicator Machine | ‘8. Kneading Machine | DPAr-INFR-27-2016 Page 22 of 86 10. Contract ID: Contract Nam 20KF0093 Construction of Road, Barangay Bara-ason, Kauswagan, Lanao de! Norte Contract Location: Barangay Bara-ason, Kauswacan, Lanao del Norte Approved Budget for the Contract (ABC): Php 29,700,000.00 Contract Duration: 176 Calendar Days A. Approved Budget for the Contract (ABC): FROM To B. Revised Bill of Quantities (B00 PHP 29,850,000.00 PHP 29,700,000.00 FROM To Fay Description | Quantity | Unit Pay ‘Description | Quantity] Unit teem No. : tem No. PARTA | FACILITIES FOR ARTA | FACILITIES FOR THE ENGINEERS THE ENGINEERS AAMG) | Construction of [4.00 | is | [ALAG) | Construction of ed | 100. | Is Field Office for the Office for the Engineer | En PARTE | OTHER PARTB | OTHER GENERAL GENERAL REQUIREMENTS REQUIREMENTS BS Project ailboard/ | 200 | Fa a5 Project Bilboard 200 | Each Sianboard | Signboard B72) Occupational 100 | LS | B72) | Occupational Safety | 200 | LS Safety and Health | and Heatth Progrem Program _| 8G) Traffic a3 | Mo. | | BO) | Traffic Management | 5.87 | Mon. | management Bo Mobiization/Demo | 100 | LS | [BS | Wobliatoa/ 00 | Us _bitzation _Demobiliztion PARTC EARTHWORKS PART | EARTHWORKS 3022) Surpus Common | 1837.7 | Cum | | 400(3)ad | Individual 55.00 | each Excavation 2 Removal of Trees; | 150-300 mm dia; _ ‘Small TOS{He Structure BeLa4 | Gum | 1022) | Surpuscommon | 404106 | Cum Exeavation | Excavation (Common Soi), = |_ (04(i)a | Embankment from | 377.54 | Cam | /L03(ja | Structure Bxeavatin | 4,391.00 | Cum Roadway | (Common Soi) Excavation | (Common Sol) a 105(a— Subgrade 6585.40 | Sam | [04a | Embankmentfrom | ~ 616.53 | Gum Preparation Roacwey Excavation (Common (Common Soi) Material) DPWH-INFR-27-2016 PARTD | SUBABSE AND 405(H)a | Subyrede BASE COURSE Preparation | (Common Materia 2000) | Rooregate 166275 Cum. | |PARTD | SUBABSE AND Subbase Course BASE COURSE PARTE | SURFACE 20003) | Aggregate Subbase | 4,347.00 | Cum. __| course Course 300(1) | Gravel Surface | 357.50 | cum. | [PARTE | SURFACE COURSE Course 311(et__ | Portiand Cement | 4575.00 | Sqm | | 311(3)bi | Portland Cement | 8,625.00 | Sa.m Concrete Concrete Pavernent Pavement (Unreinforced); (Unreinforced); (0.20m thick); 0.23m thick; 14 14 cays | days PARTG | DRAINAGE AND PARTG | DRAINAGE AND SLOPE ‘SLOPE PROTECTION PROTECTION STRUCTURES STRUCTURES 7 S05@2)a | Grouted Riprap, | 36957 | CUM | [S05(2)a | Grouted Riprap, 86242 | Cum. | Class A Class A | PARTH | MISCELLANEOU PARTH | MISCELLANEOUS S STRUCTURES: STRUCTURES 1201) | Reflectorized 16750 | Sam. | | 612C) | Rettectorized 125 | Sam ‘Thermoplastic “Thermoplastic Pavement Pavernent Markings Markings White White EQUIPMENT FROM To Construction Require Minimum [Laboratory No. of Capacity/ Unit Equipment Units. Payloader 2 1 150. a.m 2,_Dumptrock 2 2. 2 12 cusyd 3._Concrete saw 1 3 3. 1 o 4. Notorized road grader 1 G7i0K | 4. Motorized road grader | 1 G70 5._ Vibratory Roller t iT 5, Vibratory Roler |) SOT 6. Plate compactor 1 Shp .__Water Truck 1 1 7. Water Truck 1 7._Transit Mixer. 4 | ‘8. Transit Mixer 4 Scum | 8 Concrete vibrator 2 8. Concrete vibrator 2 '9,_Batching plant 1 [20. eatching plant 1 10. Concrete Scresder 1 Shp 11. Bar cutter 1 11. Ber Cutter | | 12. build [4 12. One Bagoe Miner [1 | 33, backhoe | = /13. Bulkdozer iI —] | 14. Backhoe 1 | 15. Chainsaw {1 Ha | al | mt) | | PWH-INFR-27-2016 Page 24 of 56 ee [foster Naive [1 18. Kneading Machine [1 11. Contract ID: 20KF0094 Contract Name: Renovation of the Convergence Hall at Linamon, Lanao del Norte Contract Location: Linamon, Lanao del Norte ‘Approved Budget for the Contract (ABC); Php 4,950,000.00 Contract Duration: 191 Calendar Days A. Revised Bill ies (Bi Pl FROM To Pay Desciipion | Quantity | Unit Pay Description | Quantity] Unit Team No. Ttem No. PARTE | OTHER PART 1 | FACILITIES FOR ] GENERAL ‘THE ENGINEER | REQUIREMENTS —| | 85 Project Bilboard/ | i.00 | fa. | | PARTIT | OTHER GENERAL Signboard aa B72) | Occupational iw) Us| [es | Safety and Health Program 7 BS Mobilzationfbemo | 1.00 | LS | [®7@Q) | Occupational Safety | 200 | LS bilzation and Health Program PARTI | CIVIL, BS ‘Mobilization! 00 | Ls MECHANICAL, Demobilzetion ELECTRICAL AND. | SANITARY /PLU MBING WORKS PARTA | EARTHWORKS PART OE | CiviL, J MECHANICAL, | ELECTRICAL AND | SANITARY/PLUM _BING WORKS. S016) | Removal oF 3641 | Cum | [PARTA | EARTHWORKS Structures and Obstruction; Concrete SOBLa | Structure as | Cum | [ease | Structure 31.86 | Gum | Excavation; Excavation; | Common Sait Common Sol BOAT Embankment from | 34.56 | Cum | | BOA) | Embankmert; fom | 4266 | Cum borrow | | Borrow PART® PLAIN AND ‘g0a(4) | Gravel Fill 1432 | Cum REINFORCED CONCRETE | |____ works | — SOO{A}e Structural 67.95 | cum | 867(9) | Paver Blocks 37.32 | Sam Concrete, Class A, 28d L DPWH-INFR-27-2016 02(1}a | Reinforcing steel | PLAIN AND (deformed); grade REINFORCED 40 ‘CONCRETE WORKS | 9032) | Formworksand | 128.69 | Sqm | | 900(4)b2 | Structural 47.90 | Cum, falseworks Concrete (Footings and _ ‘Slab on Fill) PARTC | FINISHING 900{1}e1 | Stuctural Concrete, | 8.44 | cum L Glass A, 28days = 1001(5)a_| Cateh basin 5.00 | each | | 900(3)c3 | Structural 8.28 Concrete, (Footing Tie Beams) 10039) | Storm drainage 1.00 is 902G)a | Reinforcing Steel_| 2,324.05 | Kg. and downspout (eformed); ____| Grade 40 100133) | Septic vault 100 is '903(2) | Formworks and sam Falseworks 100%27)__[ Plumbing works | 1.00 1S PART _| FINISHING 1003(3)at_| Celing 4.5mm 750.00 | Sqm | | $002(27) | Plumbing Works 100 | Is metal frame fiber | ‘coment board _ 100K a | Aluminum glass | 1822 | Sqm | [4003(1) | Ceiling 4.5mm 221.03 | Sani windows; sting aL Metal Frame Fiber type | ‘Cement Board 3009(3)a | Jalousie windows; | 2.68 | Sam | | 300307) | Flooring; Wood 8277 Sam. geass | TOIO{2)b | Doors; wood panel | 10.08 | Sqm | | 1006(1)a | Aluminum Glass 192 | Sam | Windows; Siding Type TOI) | Roi-up door; steel [200 | set 1OOBG}e | Aluminum Glass 143 | Sam Windows; Awning |__| Type YO14(1)b2 | Prepainted mete! | 14800 [Sam | [1008G)d | Aluminum Glass 2.52 | Sqm sheets, long span, Windows; Freed rib type, above Type 0.427mm | TO18(2)___| Ungiazed tiles 330.01 TOLOQ)6 | Doors; Fush ——|—«B.B6 | Sqam 3027(1) | Cement plaster | 160.62 1010(2\b | Doors; Wood Panel | 4.20 | Saum Finish 1082()a Painting works; | 40557 | Sqm | | TO12(5}¢ | Tempered Glass Sqm. rmasonry/concrete Walls/Barriers, etc. 1B6(Da | Polycarbonate 2.00 | im 1013(2) _ Fabricated Metal Uinm. | az Roofing | Accessory; | | Flashings _ 1039(3) | Numinum 7782 1013(2) | Fabricated dladding bt Roofing ‘Accessory; Gutters 10%6(@al_| TOOMm CHE Won | 236.74 | Sqm | | TOTA(I)B2 | Prepainted Metal 351.23 | Sqm Load Bearing - || Sheets, Long Span, (including Rib Type, above reinforcing Steel) 0.427 mm _ _| DPWH-INFR-27-2016 Page 26 of 56 TO46(2)az_| Simm CHB Non | 31025 | Sqm | 10%6(4)a | Waterproofing 19.00 | Sam iLoad Bearing ‘ncuding reinforcing Stee) Toa7@)a__| Suuctural steel; | 750494 | kg T0270) sea7 | Sqm busses 1047@2) | Stucturalsted; | 59567 | kg | [3032a 36.47 | Sam Purlins TOA7@)B | Metal sbucture | 4200 | each | | i032(a)¢ 5205 | San Accessories; sag | rods T047(3)d_| Metalsmuctire | 1400 | each | | 1086(2)a2 | 150mm CHB Non 3432 | Sqm ‘Accessories; cross Load Bearing bracing Cinctuding | Reinforcing Stee!) | 1047{6) | Netalstructure | 24647 | ka i647G)a_| Suuctural Steel too [is ‘Accessories; steel plates L_ T047{40) | Metal structure io | i0I7%a_ | Strudel Sted; _——-OAL.ES | Ka, Accessories “Trusses | PARTD | ELECTRICAL TOA7Hb_| Structural Sted; 2,298.38 | Ka, T1000) | Conduits boes | 400 | Is TAT 13272 | 6 ‘and ftings : (conduit | wworks/eonduit rovgh in) TIO) | Wires and wiring | 1.00 | is TANG) _| Metal Structure 35.65 devices Accessories; Stee! Prates 1902) | Panelboerd with [00 [Is TAT) | Metal Structure 6398 |g ‘main and branch Accessories; Bolts breakers T0301) | Uphting Fitures [00 [is I6A7G)b_| Metal Structure $8.70 | KG. and Lamps ‘Accessories; Sagrods ] TATE | Metal Structure 173.69 | Xe, | Accessories; “Tumbuckle | 1051(5) Metal Railing; 192.00 | m. | 50mm dia Stainless Pipe Handrail [HLOOGO) | Conduits, Bowes and | 4.00 | ts Fittings (Conduit Wiorks/Cordutt | Rovatn) 110133) | Wires and Wiring i [is L | Devices 1102(1) | Panelboard with 100 | Is | Main and Branch Breakers ] =| [TIO —/Lignting Fitures and | 1.00 | 1s | Lamps ‘opwiINFR-27-2016 Page 27 of $6 20KF0095 Road Concreting, Bray. Bualan, Tubod, Lanao del Norte Contract Location: Bray. Bualan, Tubod, Lanao del Norte Approved Budget for the Contract (ABC): Php 14,850,000.00 Contract Duration: 142 Calendar Days A, Approved Budget for the Contract (ABC): FROM To | PHP 14,925,000.00 PHP 14,850,000.00 | . Revised Bill of Quantities (BOO) and Plans FROM To Pay Description | Quantity | _ unit Pay Description | Quantity) Unit temo. Tem No, | PARTA | FACILITIES FOR PARTA | FACILITIES FOR ‘THE ENGINEERS THE ENGINEERS ‘ALAG)__ | Construction of 100 is AIG) | Construction of Feed | 100. | Ts Field Office forthe Office for the | Engineer “| ___| Engineer PARTB | OTHER PARTB | OTHER GENERAL GENERAL REQUIREMENTS, REQUIREMENTS BS Project Bilboard/ | 200 | Ea. BS Project Bilboard! - 2.00 | Each Signboard Signboard 6.7@) | Occupational roo | US | [B7(2) | Occupational Safety | 100 | LS Safety and Health | and Health Program = Program | __ = Bad) | Treffic 473 | Mo. | | BE) | Traffic Management | 473 | Mon. management _ |__| Bo | Mobilization/Demo | 1.00 | LS Bo Mobilization] 100) LS bilization |_Demobilization PARTC | EARTHWORKS PARTC | EARTHWORKS 02(2) | Surplus Common | 1,543.03 | Cum | | 404(3)e2 | Removal of Actual | 2,031.30 | Excavation Structures/ | Obstruction; 0.10m thick; ACP. 103(6)a | Pihecuverts and | 58.88 | Cum | 1022) | SurplusCommon | 2,523.41 | Gum. drain excavation Excavation {commen sci) || " (Oat) Embankment from | 58334 | Cum | 03(i)a | Structure 11208 | Cum, Roadway | Excavation Excavation “i (Common Soil) (Common Soi) Bowi-iNea.37 2016 Pose 28 of 66

You might also like