a) CARRIAGEWAY:
Width of carriageway 30 mts (11.25X2+2X3+0.75X2) 30 mts (11.25X2+2X3+0.75X2) 30 mts (11.25X2+2X3+0.75X2) 30 mts (11.25X2+2X3+0.75X2) 30 mts (11.25X2+2X3+0.75X2) 30 mts (11.25X2+2X3+0.75X2) 30 mts (11.25X2+2X3+0.75X2)
Design speed in plain &Rolling terrain(Km/hr) 150 150 150 150 150 150 150
Design Speed in Hilly & Mountains(Km/hr) 120 120 120 120 120 120 120
Length of service road(m) 6790 3220 6278 913 850 Nill 6236
Width of service road(m) 7.5(C.W)+2×1(Foot Path Cum Drain) 7.09C.W.)+2×2.5 ES 7.00 7.00 7.00 - 7.00
3.75 C.W. + 2×1 ES 3.75 C.W. + 2×1 ES
Whether SR is continuos or staggered Staggered Staggered Staggered Staggered Staggered - Staggered
Length of cart track(m) - - 2690 3681 3391 2195 2250
Width of cart track(m) - - 3.75 3.75 3.75 3.75 3.75
b) Flyovers: 3 No 7 No 1 No 6 No 12 No Nill 9 No
Length of Flyover(via-duct portion)(m) 1×30=30m (1.334 km) 1×30=30m (38.793 km) 16×30=480m (156.211 km) 18×20=360m (169.778 km) 9×30=270m (219.677 km) - 15×30=450m (308.980 km)
1×30=30m (1.658 km) 2×30=60m (47.088 km) - 10×30=300m (195.880 km) 12×30=360m (220.243 km) - 21×30=630m (319.580 km)
2×30=60m (25.514 km) 1×30=30m (63.712 km) - 7×30=210m (196.630 km) 7×30=210m (221.376 km) - 20×30=600m (320.790 km)
1×30=30m (82.765 km) & 17.5(LHS)
-
32.5(RHS) - 6×30=180m (200.930 km) 13×30=390 (222.050 km) - 13×30=390m (328.070 km)
- 2×20+1×80 - 14×30=420m (202.200 km) 8×30=240m (222.520 km) - 11×30=330m (330.180 km)
- - - 24×25=600m (213.940 km) 7×30=210 (223.031 km) - 7×30=210m (330.660 km)
- - - - 5×30=150 (223.542 km) - 7×30=210m (331.170 km)
- - - - 27×30=810m (230.825 km) - 18×30=540m (332.660 km)
- - - - 10×30=300m (243.370 km) - 26×30=780m (344.960 km)
- - - - 11×40=440m (250.882 km) - -
- - - - 6×30=180m (251.790 km) - -
- - - - 11×15=165m (252.996 km) - -
Top and underside of grade separated Top and underside of grade separated Top and underside of grade separated Top and underside of grade separated Top and underside of grade separated Top and underside of grade separated Top and underside of grade separated
structures including flyovers as well as structures including flyovers as well as structures including flyovers as well as structures including flyovers as well as structures including flyovers as well as structures including flyovers as well as structures including flyovers as well as
underpasses underpasses underpasses underpasses underpasses underpasses underpasses
All service roads in built up area All service roads in built up area All service roads in built up area All service roads in built up area All service roads in built up area All service roads in built up area All service roads in built up area
4 EARTH WORK:(Cum)
a) Earth work excavation in soil 1,423,779.00 5,502,249.00 201,571.10 812,763.67 5,047,195.66 739,591.39 3,630,217.20
Rate/Cum 38.00 38.00 68.00 68.00 68.00 68.00 68.00
b) Excavation in soft rock 474,593.00 1,834,083.00 110,793.46 561,238.65 2,462,046.66 533,651.90 2,481,525.29
Rate/Cum 68.00 68.00 108.00 108.00 108.00 108.00 108.00
c) Excavation in hard rock (Blasting Prohibited) - - 31,719.19 100,610.01 960,198.20 103,506.98 531,379.62
Rate/Cum - - 466.00 466.00 466.00 466.00 466.00
d) Excavation in hard rock (Balsting) 474,593.00 1,834,083.00 126,876.77 402,440.02 3,840,792.79 414,027.92 2,125,518.48
Rate/Cum 523.00 523.00 120.00 120.00 120.00 120.00 120.00
e) Embankment in borrow earth 7,423,745.00 9,486,929.00 22,109,548.23 11,587,206.86 3,645,117.94 8,167,098.43 4,595,505.65
Rate/Cum 474.00 474.00 239.90 239.90 239.90 239.90 239.90
f) Embankment in excavated earth 1,684,806.00 6,510,995.00 292,207.46 1,017,925.49 6,253,598.52 944,635.49 5,385,699.05
Rate/Cum 119.00 119.00 112.00 112.00 112.00 112.00 112.00
g) Sub-Grade with borrow earth 655,247.00 - 2,057,786.54 1,674,567.38 1,210,168.52 1,017,283.48 1,350,846.02
Rate/Cum 577.00 - 249.90 249.90 249.90 249.90 249.90
h) Credit towards exacavated rock 4,745,493.00 1,834,083.00 -142,736.36 -452,745.03 -3,840,792.79 -310,520.94 -2,391,208.29
Rate/Cum 300.00 300.00 300.00 300.00 300.00 300.00 300.00
S.No Description of Item Package-1(Cr) Package-2(Cr) Package-3(Cr) Package-4(Cr) Package-5(Cr) Package-6(Cr) Package-7(Cr)
1 Site Clearance 0.62 1.08 1.65 0.96 0.66 0.73 0.71
2 Earthwork 219.47 387.95 586.39 338.75 224.25 243.20 234.34
3 Subbase and Base Courses 107.71 191.19 241.52 174.97 127.04 111.75 147.89
4 Pavement Courses 144.30 199.11 272.47 201.26 154.69 132.66 189.09
5 Box/Slab Culvert 27.10 42.47 110.47 93.59 28.29 30.73 51.88
6 Minor Bridges 88.18 102.55 150.11 56.77 22.47 35.82 53.79
7 Major Bridges 0.00 74.76 75.89 17.06 17.55 35.82 35.83
8 Vehicular Underpasses 31.77 78.51 74.73 17.21 24.87 39.38 31.38
9 Vehicular Overpasses 33.80 27.8 15.42 36.83 19.91 43.18 21.75
10 Light Vehicular Underpass 9.14 0.00 19.23 5.46 6.23 3.31 31.38
11 Pedestrian Underpasses/Cattle Underpass 20.27 22.83 30.86 24.28 13.96 15.54 15.81
12 Interchanges 171,27 274.76 163.31 138.98 97.06 69.42 113.15
13 Viaduct 0.00 187.16 37.39 149.27 329.31 0.00 308.13
14 Railway Over Bridges 0.00 37.02 26.09 12.65 14.63 0.00 0.00
15 POP/FOB 0.00 0.00 0.00 3.74 8.99 3.84 21.12
16 Canal Bridge 37.60 70.42 - - - - -
17 Canal Culvert 4.34 3.94 - - - - -
18 Drainage and Protection works 108.35 146.75 24.17 19.62 35.98 16.34 31.92
19 Electrical works-Highway Lighting 3.53 5.54 4.05 4.26 3.05 2.14 5.28
20 Road Signages and Kerbs-Road Furniture 29.48 62.82 65.09 41.07 31.31 33.53 41.52
21 Toll Plaza 2nos 20.39 22.12 17.80 1.75 9.09 9.29 38.21
22 Administartive Building (O and M Center) 16.03 16.03 3.81 38.97 3.36 0.00 3.36
23 Service Road 28.72 0.74 44.89 27.49 22.37 10.67 25.75
24 Cart track 0.13 1.34 0.00
25 Construction of Approach Road 0.00 0.00 8.20 9.89 5.92 6.01 4.18
26 Helipad 0.00 4.35 8.70 8.70 4.35 4.35 8.70
27 WUP 0.00 0.00 0.00 4.39 10.09 0.00 0.00
28 WOP 0.00 0.00 0.00 5.32 6.23 0.00 0.00
29 Tunnel 0.00 0.00 - - - - -
30 Service/Rest Area 0.00 0.00 - - - - -
31 Utility Corridor+Utility ox 1.97 1.81 - - - - -
32 Check Dam 0.97 0.71 - - - - -
S.No Description of Schedules Package-1 Package-2 Package-3 Package-4 Package-5 Package-6 Package-7
33 Plantation and Drip Irrigation 13.16 25.4 - - - - -
Environmental mitigation plan 9.94 18.71 - - - - -
Road Safety Amount 0.59 1.1 - - - - -
34 Rain Water Harvesting 0.97 2.02 2.35 0.00 0.00 1.19 1.56
35 Total EPC cost excluding royalty 1129.88 2010.97 1984.59 1433.22 1216.77 848.91 1416.71
36 Royalty 166.61 292.00 455.39 235.69 118.94 190.80 189.94
37 GST @ 12% of EPC cost Excluding Royalty 132.81 236.04 238.15 171.99 146.01 101.87 170.01
Total EPC Cost 1429.3 2539.01 2678.12 1840.90 1481.72 1141.58 1776.65
S.No Description of Schedules Package-3 Package-7
1 The site of this The site of this package starts
package starts from from Banda village at Ch:
Ashta village at Ch: 296+000 and ends at sawargaon
89+300 and ends at mal village at Ch: 347+189.905
wadhona ramanath
village at 162+667.
2 SCHEDULE-B
a) CARRIAGEWAY:
Width of carriageway 30 mts 30 mts (11.25X2+2X3+0.75X2)
(11.25X2+2X3+0.75X
2)
b) Flyovers: 1 No 9 No
b) Service/Rest Area: 2 No 01 No
Area(Ha) each 15 15
Design Chainages 110.500 and 160.400 310.800