You are on page 1of 3

Step 1: Research

● Asbestos

○ First responder, construction workers, maintenance workers, students, teachers,

district?, administrator

○ Threats

○ Environmental Impact

● Opinion

Pre-Production: Research: Topic (students, teacher, etc), Health Threats, Environmental Threats

Production:

Post-Production:

Pre-Production:

1. Assigned a group (student, teacher, admin, school police, maintenance worker)

2. Research asbestos (threats, environmental impact), why was it used, how were dangers

discovered)

3. Identify person to interview

4. Prepare interview questions (get them approved)

5. Design Graphic

Production:

1. Film the interview

2. Film the factual information

Post-Production:
1. Information, order of interview questions, graphic location.

● What is your name?

● What subject do you teach?

● Do you have a lot of background knowledge about asbestos? Is there anything

that you do know about it?

● Was the closing of school for two weeks a major challenge for your class?

● Are you in fear that your health may have been affected by exposure to asbestos?

● Was coming back to the school a concern for you?

Research: safe unless disturbed, found in buildings prior to 1990, asbestos is a mineral found in

rocks.

Voice Over: Asbestos is a common material found in buildings made prior to 1990. It is not

usually harmful, but it can lead to respiratory impairment to individuals who breath it in after it is

disturbed.

Final Cut Pro

● auto save

● Three level of organizations:

○ Library

○ Events (i.e., folders)


○ Projects (i.e., draft, sequences)

You might also like