Paragraph Page
Introduction III
General Information 1 III
Materiel 2 III
Projectile-Fuze Combinations and Mean Weights 3 III
Fuze Setting Data 4 III
Propelling Charge Data 5 III
Firing Tables 6 IV
Explanation of Tables 7 IV
Expression Rules 8 VI
Sample Problem 9 VII
Tables 1
II
FT 155 ADD-AB-1
INTRODUCTION
1. General Information
2. Materiel. The data in this addendum are applicable to Projectile, HE, M692
with Cannons, 155MM Howitzer, M185, M199, M776 and M284 with charges,
propelling, M119A1, M119A2, M231, M232 and M232A1. Projectile, HE, M731
is identical to the M692 with the exception of the self-destruct time of the mines.
Therefore all comments applying to the M692 are applicable to the M731.
4. Fuze Setting Data. The fuze setting data for Fuze, MTSQ, M577 are also
applicable to Fuze, MTSQ, M577A1, Fuze, ET, M762 and M762A1.
A. M119 Series. The data for Charge, Propelling, M119A2, Zone 7R are
also applicable to Charge, Propelling, M119A1, Zone 8.
B. M231 Series. The Charge, Propelling, M231, has two increments, 1L
and 2L.
C. M232 Series. The Charge, Propelling, M232, has two increments, 3H
and 4H.
D. M232A1 Series. The Charge, Propelling, M232A1, has two incre-
ments, 3H and 4H.
III
FT 155 ADD-AB-1
6. Firing Tables. The tables published herein are applicable for use with FT
155-AR-2 with Change 1.
This addendum is divided into seven sections, and provides addendum data for
charges 7R thru 4H (M232A1). The data for charge 7R are also applicable to
charge 8, M119A1, after a muzzle velocity correction. Bold data in tables A and
B indicate to fire the next higher or lower charge or fire under combat conditions
only. The contents of the addendum tables are described as follows:
Table Column
IV
FT 155 ADD-AB-1
Table Column
5 Correction for Low Level Wind of 1 Knot - The
distance the chart location of the target must be
displaced to correct for a low level wind of 1 knot.
V
FT 155 ADD-AB-1
Table Column
8. Expression Rules.
Expressed
Expressed To
Enter With Value Obtained To The
The Nearest
Nearest
Quadrant QE Correction As Listed
A 5 mils
Elevation Defl Correction As Listed
Fuze
B 0.1 FS Correction As Listed
Setting
Azimuth Correc-
C Entry Range 100 M As Listed
tion for Drift
VI
FT 155 ADD-AB-1
A. Known Conditions
Charge 7R
Chart Deflection 3355 mils
Chart Range 14000 m
Site +5 mils
Battery Laying
Azimuth 6350 mils
Deflection 3200 mils
Range Correction =
Chart Range in Thousands multiplied by RG K =
14.0 x (+30) = + 420 m
Corrected Chart Range = 14000 + (+420) = 14420 m
Elevation for Range 14420 = 424.9 = 425 mils
(Inspection from FT 155 – AR – 2)
Quadrant Elevation = Elevation + Site = 425 + 5 = 430 mils
VII
FT 155 ADD-AB-1
(1) Determine the wind direction and speed from line 02 of the met
message.
(2) Enter Table A of addendum (Charge 7R) with the quadrant eleva-
tion for Projectile, HE, M795 rounded to the nearest 5 mils (430 mils) and de-
termine the low level wind correction.
(3) Multiply the wind speed (36 knots) by the low-level wind correc-
tion (7.7 m/knot) and express the result to the nearest 10 meters.
(4) On the firing chart, displace the target plot (Deflection 3355 mils,
Range 14000 m), by the amount determined above (280 m), into the direction of
the wind (3400 mils) and read a new chart deflection and range.
Note – Target Displacement. Place the center of the target grid over the target
and set off wind direction (3400 mils) opposite the North index. The heavy ar-
row on the target grid is oriented into the wind. Displace the target by the target
displacement computedabove (280 m) into the direction of the wind (towards the
arrowhead).
(5) Determine the elevation and corrected fuze setting for the new
chart range.
VIII
FT 155 ADD-AB-1
(7) Add, algebraically, the corrected elevation (432 mils) and site (+5
mils) to obtain the corrected quadrant elevation.
(1) Enter Column 1 of Table A with quadrant elevation (437 mils) ex-
pressed to the nearest 5 mils (435) and obtain the correction to quadrant elevation
(33 mils) from column 2, and the correction to deflection (R3.7) from column 8.
Add these corrections algebraically to the corrected quadrant elevation (437 mils)
and the corrected deflection to obtain the quadrant elevation and the deflection to
be fired.
(2) Enter Column 1 of Table B with the corrected fuze setting (41.4)
and obtain the correction to fuze setting from Column 2 (-0.6). Add this correc-
tion algebraically to the corrected fuze setting to obtain the fuze setting to be
fired.
Time 40.8
Deflection 3344
Quadrant 470
IX
FT 155 ADD-AB-1
E. Observer Adjustment.
(1) Assume that the fire commands of paragraph D. (3) above have
been executed. Further assume that an observer, in making his surveillance of
the fire, decides that additional effect could be obtained by shifting to another
portion of the target area. An extract of his transmission is as follows – (observer
target direction 120 miles from north) -
(2) Plot the correction on the firing chart by use of the target grid. The
target grid must be oriented to the observer’s reported direction and the correc-
tion plotted from the location of the pin as displaced for low level wind. (No
further wind correction need be made.)
(3) Determine chart range and deflection from the firing chart.
(4) Using RG K, fuze correction and the chart range, determine the
quadrant elevation and corrected fuze setting for Projectile, HE, M795.
(5) Using the Total Deflection Correction and the Chart Deflection,
determine the corrected deflection.
(6) With the quadrant elevation of 450 mils expressed to the nearest 5
mils (450), enter Table A and determine the correction to QE for Projectile,
M692 from column 2 (32) and the correction to quadrant elevation for an in-
crease of 50 meters to height from column 3 (4.0) and the correction in deflec-
tion, from column 8 (R 3.8).
X
FT 155 ADD-AB-1
(7) Enter Table B with the corrected fuze setting (42.7) and determine
the correction to fuze setting for Projectile, M692 and the correction to fuze set-
ting for an increase of 50 meters in height.
Up 100/50 = Up 2
+0.0 x 2 = 0.0
Time 42.1
Deflection 3345
Quadrant 490
XI
FT 155 ADD-AB-1
XII
FT 155 ADD-AB-1
m/s
M119A2
M231
1L 296 Increment 1
M232
M232A1
1
FT 155 ADD-AB-1
2
FT 155 ADD-AB-1
Charge 7R
3
CHARGE TABLE A F T 1 5 5 ADD AB 1
7R
QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
4
F T 1 5 5 ADD AB 1 TABLE A CHARGE
7R
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
5
CHARGE TABLE A F T 1 5 5 ADD AB 1
7R
QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
6
F T 1 5 5 ADD AB 1 TABLE A CHARGE
7R
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
7
CHARGE TABLE A F T 1 5 5 ADD AB 1
7R
QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
8
F T 1 5 5 ADD AB 1 TABLE A CHARGE
7R
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
9
CHARGE TABLE B F T 1 5 5 ADD AB 1
7R
FUZE SE TT I NG P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
12 . 6 15 . 2 0. 8 0. 0 0. 3
15 . 3 27 . 2 0.9 0. 0 0. 3
27 . 3 34 . 0 0. 8 0. 0 0. 4
34 . 1 38 . 9 0. 7 0. 0 0. 4
39 . 0 42 . 9 0. 6 0. 0 0. 5
43 . 0 46 . 2 0. 5 0. 1 0. 5
46 . 3 48 . 9 0. 4 0. 1 0. 6
49 . 0 51 . 0 0. 3 0. 1 0. 6
51 . 1 52 . 6 0. 2 0. 1 0. 7
52 . 7 54 . 0 0. 1 0. 1 0. 7
54 . 1 55 . 2 0. 0 0. 1 0. 8
55 . 3 56 . 2 0. 1 0. 2 0. 9
56 . 3 57 . 0 0. 2 0. 2 1. 0
57 . 1 57 . 7 0. 3 0. 2 1. 0
57 . 8 58 . 2 0. 4 0. 2 1. 1
58 . 3 58 . 7 0. 5 0. 2 1. 2
58 . 8 59 . 2 0. 6 0. 3 1. 3
59 . 3 59 . 6 0. 7 0. 3 1. 4
59 . 7 60 . 0 0. 8 0. 3 1. 5
60 . 1 60 . 3 0. 9 0. 3 1. 6
60 . 4 60 . 6 1. 0 0. 4 1. 8
60 . 7 60 . 8 1. 1 0. 4 1. 9
60 . 9 61 . 1 1. 2 0. 4 2. 1
61 . 2 61 . 3 1. 3 0. 5
61 . 4 61 . 5 1. 4 0. 5
61 . 6 61 . 7 1. 5 0. 6
61 . 8 1. 6 0. 6
61 . 9 1. 7 0. 7
62 . 0 62 . 1 1. 8 0. 7
62 . 2 1. 9 0. 8
62 . 3 2. 0 0. 9
62 . 4 2. 1
62 . 5 2. 2
62 . 6 2. 3
62 . 7 2. 5
62 . 8 2. 7
10
F T 1 5 5 ADD AB 1 TABLE B CHARGE
7R
P r o j , HE , M69 2 FUZE SE TT I NG
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
62 . 8 2. 7
62 . 9 2. 9
63 . 0 3. 2
*********************************************************************
74 . 0 4. 8
74 . 1 4. 6
74 . 2 4. 4
74 . 3 4. 3
74 . 4 4. 1 1. 1
74 . 5 4. 0 1. 0
74 . 6 3.9 0.9
74 . 7 3. 8 0. 8
74 . 8 3. 7 0. 8
74 . 9 3. 6 0. 7
75 . 0 75 . 1 3. 5 0. 7 2. 7
75 . 2 3. 4 0. 6 2. 2
75 . 3 75 . 4 3. 3 0. 6 2. 0
75 . 5 75 . 6 3. 2 0. 6 1. 7
75 . 7 75 . 8 3. 1 0. 5 1. 5
75 . 9 76 . 1 3. 0 0. 5 1. 4
76 . 2 76 . 3 2.9 0. 5 1. 2
76 . 4 76 . 6 2. 8 0. 4 1. 1
76 . 7 77 . 0 2. 7 0. 4 1. 0
77 . 1 77 . 4 2. 6 0. 4 0.9
77 . 5 77 . 8 2. 5 0. 4 0. 8
77 . 9 78 . 4 2. 4 0. 3 0. 8
78 . 5 78 . 9 2. 3 0. 3 0. 7
79 . 0 79 . 6 2. 2 0. 3 0. 6
79 . 7 80 . 4 2. 1 0. 3 0. 5
80 . 5 81 . 3 2. 0 0. 3 0. 5
81 . 4 82 . 4 1.9 0. 2 0. 4
82 . 5 83 . 6 1. 8 0. 2 0. 4
83 . 7 85 . 1 1. 7 0. 2 0. 3
85 . 2 86 . 8 1. 6 0. 2 0. 3
86 . 9 88 . 9 1. 5 0. 2 0. 2
89 . 0 91 . 8 1. 4 0. 2 0. 2
11
CHARGE TABLE C F T 1 5 5 ADD AB 1
7R
BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
12
F T 1 5 5 ADD AB 1 TABLE C CHARGE
7R
P r o j , HE , M69 2 BAS I C DA TA
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
13
CHARGE TABLE C F T 1 5 5 ADD AB 1
7R
BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
14
F T 1 5 5 ADD AB 1 TABLE C CHARGE
7R
P r o j , HE , M69 2 BAS I C DA TA
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
15
CHARGE TABLE C F T 1 5 5 ADD AB 1
7R
BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
16
F T 1 5 5 ADD AB 1 TABLE C CHARGE
7R
P r o j , HE , M69 2 BAS I C DA TA
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
***********************************************************************
17900 838 . 8 70 . 4 70 . 4 27 . 5
17800 880 . 9 73 . 1 73 . 1 30 . 1
17700 903 . 5 74 . 5 74 . 5 31 . 7
17600 920 . 9 75 . 6 75 . 6 32 . 9
17500 935 . 5 76 . 5 76 . 5 34 . 0
17400 948 . 4 77 . 3 77 . 3 35 . 0
17300 960 . 1 77 . 9 77 . 9 35 . 9
17200 970 . 8 78 . 6 78 . 6 36 . 8
17100 980 . 8 79 . 1 79 . 1 37 . 7
17000 990 . 1 79 . 7 79 . 7 38 . 5
16900 999 . 0 80 . 2 80 . 2 39 . 3
16800 1007 . 4 80 . 7 80 . 7 40 . 1
16700 1015 . 4 81 . 1 81 . 1 40 . 9
16600 1023 . 1 81 . 5 81 . 5 41 . 7
16500 1030 . 4 81 . 9 81 . 9 42 . 4
16400 1037 . 5 82 . 3 82 . 3 43 . 2
16300 1044 . 4 82 . 7 82 . 7 43 . 9
16200 1051 . 0 83 . 0 83 . 0 44 . 7
16100 1057 . 5 83 . 4 83 . 4 45 . 4
16000 1063 . 7 83 . 7 83 . 7 46 . 2
15900 1069 . 8 84 . 0 84 . 0 46 . 9
15800 1075 . 7 84 . 3 84 . 3 47 . 6
15700 1081 . 5 84 . 6 84 . 6 48 . 4
15600 1087 . 2 84 . 9 84 . 9 49 . 1
15500 1092 . 7 85 . 2 85 . 2 49 . 9
15400 1098 . 1 85 . 5 85 . 5 50 . 6
15300 1103 . 3 85 . 7 85 . 7 51 . 4
15200 1108 . 5 86 . 0 86 . 0 52 . 1
15100 1113 . 6 86 . 2 86 . 2 52 . 9
15000 1118 . 5 86 . 5 86 . 5 53 . 6
17
CHARGE TABLE C F T 1 5 5 ADD AB 1
7R
BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
18
F T 1 5 5 ADD AB 1 TABLE C CHARGE
7R
P r o j , HE , M69 2 BAS I C DA TA
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
19
FT 155 ADD-AB-1
20
FT 155 ADD-AB-1
Charge 1L
21
CHARGE TABLE A F T 1 5 5 ADD AB 1
1L
QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
22
F T 1 5 5 ADD AB 1 TABLE A CHARGE
1L
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
23
CHARGE TABLE A F T 1 5 5 ADD AB 1
1L
QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
24
F T 1 5 5 ADD AB 1 TABLE A CHARGE
1L
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
25
CHARGE TABLE A F T 1 5 5 ADD AB 1
1L
QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
26
F T 1 5 5 ADD AB 1 TABLE A CHARGE
1L
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
27
CHARGE TABLE B F T 1 5 5 ADD AB 1
1L
FUZE SE TT I NG P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
12 . 9 13 . 0 0.9 0. 5
13. 1 14. 6 0. 8 0. 0 0. 4
14 . 7 17 . 5 0.9 0. 1 0. 5
17 . 6 24 . 3 0. 8 0. 1 0. 6
24 . 4 27 . 8 0. 7 0. 2 0. 7
27 . 9 30 . 1 0. 6 0. 3 0. 9
30. 2 31. 6 0. 5 0. 4 1. 1
31 . 7 32 . 6 0. 4 0. 5 1. 4
32 . 7 33 . 4 0. 3 0. 6 1. 8
33 . 5 33 . 9 0. 2 0. 7 2. 3
34 . 0 34 . 4 0. 1 0. 9
34 . 5 34 . 7 0. 0 1. 2
34 . 8 35 . 0 0. 1
35 . 1 35 . 2 0. 2
35 . 3 0. 3
35 . 4 35 . 5 0. 4
35 . 6 0. 5
35 . 7 0. 6
35 . 8 0. 7
35 . 9 0. 9
*********************************************************************
41 . 1 2.9
41 . 2 2. 7
41 . 3 2. 5
41 . 4 2. 4
41 . 5 2. 3
41 . 6 2. 2
41 . 7 2. 1
41 . 8 41 . 9 2. 0
42 . 0 42 . 2 1.9 1. 6
42 . 3 42 . 4 1. 8 1. 3
42 . 5 42 . 8 1. 7 1. 0
42 . 9 43 . 3 1. 6 0.9 1.9
43 . 4 43 . 9 1. 5 0. 7 1. 4
WARN I NG. . . . . Bo l d da t a i nd i ca t e t o f i r e t he ne x t h i ghe r o r l owe r c ha r ge
o r f i r e unde r comba t co nd i t i o ns o n l y .
28
F T 1 5 5 ADD AB 1 TABLE B CHARGE
1L
P r o j , HE , M69 2 FUZE SE TT I NG
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
43 . 4 43 . 9 1. 5 0. 7 1. 4
44 . 0 44 . 8 1. 4 0. 6 1. 0
44 . 9 46 . 1 1. 3 0. 5 0. 8
46. 2 47.9 1. 2 0. 4 0. 5
48 . 0 50 . 6 1. 1 0. 3 0. 3
50 . 7 53 . 5 1. 0 0. 3 0. 2
WARN I NG. . . . . Bo l d da t a i nd i ca t e t o f i r e t he ne x t h i ghe r o r l owe r c ha r ge
o r f i r e unde r comba t co nd i t i o ns o n l y .
29
CHARGE TABLE C F T 1 5 5 ADD AB 1
1L
BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
30
F T 1 5 5 ADD AB 1 TABLE C CHARGE
1L
P r o j , HE , M69 2 BAS I C DA TA
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
31
CHARGE TABLE C F T 1 5 5 ADD AB 1
1L
BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
Charge 2L
33
CHARGE TABLE A F T 1 5 5 ADD AB 1
2L
QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
34
F T 1 5 5 ADD AB 1 TABLE A CHARGE
2L
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
35
CHARGE TABLE A F T 1 5 5 ADD AB 1
2L
QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
36
F T 1 5 5 ADD AB 1 TABLE A CHARGE
2L
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
37
CHARGE TABLE A F T 1 5 5 ADD AB 1
2L
QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
38
F T 1 5 5 ADD AB 1 TABLE A CHARGE
2L
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
39
CHARGE TABLE B F T 1 5 5 ADD AB 1
2L
FUZE SE TT I NG P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
12 . 4 17 . 3 0.9 0. 0 0. 4
17 . 4 22 . 3 0. 8 0. 0 0. 4
22 . 4 25 . 6 0. 7 0. 1 0. 4
25 . 7 28 . 2 0. 6 0. 1 0. 5
28 . 3 30 . 3 0. 5 0. 1 0. 5
30 . 4 32 . 0 0. 4 0. 1 0. 5
32 . 1 33 . 5 0. 3 0. 1 0. 6
33 . 6 34 . 8 0. 2 0. 1 0. 6
34 . 9 36 . 0 0. 1 0. 1 0. 7
36 . 1 37 . 0 0. 0 0. 2 0. 7
37 . 1 37 . 8 0. 1 0. 2 0. 8
37 . 9 38 . 5 0. 2 0. 2 0. 8
38 . 6 39 . 2 0. 3 0. 2 0. 9
39 . 3 39 . 7 0. 4 0. 2 0. 9
39 . 8 40 . 3 0. 5 0. 3 1. 0
40 . 4 40 . 7 0. 6 0. 3 1. 1
40 . 8 41 . 1 0. 7 0. 3 1. 1
41 . 2 41 . 5 0. 8 0. 3 1. 2
41 . 6 41 . 8 0. 9 0. 4 1. 3
41.9 42. 1 1. 0 0. 4 1. 4
42. 2 42. 4 1. 1 0. 4 1. 5
42 . 5 42 . 7 1. 2 0. 5 1. 6
42 . 8 42 . 9 1. 3 0. 5 1. 7
43 . 0 43 . 1 1. 4 0. 5 1. 9
43 . 2 43 . 3 1. 5 0. 6 2. 1
43 . 4 1. 6 0. 6 2. 3
43 . 5 43 . 6 1. 7 0. 7
43 . 7 1. 8 0. 7
43 . 8 43 . 9 1. 9 0. 8
44 . 0 2. 0 0. 9
44 . 1 2. 1 1. 0
44 . 2 2. 2 1. 1
44 . 3 2. 3
44 . 4 2. 5
44 . 5 2. 6
WARN I NG. . . . . Bo l d da t a i nd i ca t e t o f i r e t he ne x t h i ghe r o r l owe r c ha r ge
o r f i r e unde r comba t co nd i t i o ns o n l y .
40
F T 1 5 5 ADD AB 1 TABLE B CHARGE
2L
P r o j , HE , M69 2 FUZE SE TT I NG
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
44 . 5 2. 6
44 . 6 2. 8
44 . 7 3. 0
44 . 8 3. 3
44 . 9 3. 6
*********************************************************************
55 . 9 5. 2
56 . 0 4.9
56 . 1 4. 6
56 . 2 4. 4
56 . 3 4. 3
56 . 4 4. 1 1. 2
56 . 5 4. 0 1. 1
56 . 6 3.9 1. 0
56 . 7 3. 8 0.9
56 . 8 3. 7 0. 8 2. 6
56 . 9 3. 6 0. 8 2. 2
57 . 0 57 . 1 3. 5 0. 7 1.9
57 . 2 3. 4 0. 7 1. 7
57 . 3 57 . 4 3. 3 0. 7 1. 5
57 . 5 3. 2 0. 6 1. 4
57 . 6 57 . 7 3. 1 0. 6 1. 3
57 . 8 57 . 9 3. 0 0. 6 1. 2
58 . 0 58 . 2 2.9 0. 5 1. 1
58 . 3 58 . 4 2. 8 0. 5 1. 0
58. 5 58. 7 2. 7 0. 5 0.9
58. 8 59. 0 2. 6 0. 4 0. 8
59. 1 59. 3 2. 5 0. 4 0. 8
59. 4 59. 7 2. 4 0. 4 0. 7
59. 8 60. 1 2. 3 0. 4 0. 6
60 . 2 60 . 6 2. 2 0. 4 0. 6
60 . 7 61 . 1 2. 1 0. 3 0. 5
61 . 2 61 . 7 2. 0 0. 3 0. 5
61 . 8 62 . 3 1.9 0. 3 0. 4
62 . 4 63 . 0 1. 8 0. 3 0. 4
63 . 1 63 . 8 1. 7 0. 3 0. 3
63 . 9 64 . 6 1. 6 0. 2 0. 3
64 . 7 65 . 6 1. 5 0. 2 0. 3
WARN I NG. . . . . Bo l d da t a i nd i ca t e t o f i r e t he ne x t h i ghe r o r l owe r c ha r ge
o r f i r e unde r comba t co nd i t i o ns o n l y .
41
CHARGE TABLE B F T 1 5 5 ADD AB 1
2L
FUZE SE TT I NG P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
64 . 7 65 . 6 1. 5 0. 2 0. 3
65 . 7 66 . 6 1. 4 0. 2 0. 2
66 . 7 67 . 7 1. 3 0. 2 0. 2
67 . 8 69 . 1 1. 2 0. 2 0. 2
69 . 2 70 . 1 1. 1 0. 2 0. 2
42
F T 1 5 5 ADD AB 1 TABLE C CHARGE
2L
P r o j , HE , M69 2 BAS I C DA TA
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
43
CHARGE TABLE C F T 1 5 5 ADD AB 1
2L
BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
44
F T 1 5 5 ADD AB 1 TABLE C CHARGE
2L
P r o j , HE , M69 2 BAS I C DA TA
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
45
CHARGE TABLE C F T 1 5 5 ADD AB 1
2L
BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
46
F T 1 5 5 ADD AB 1 TABLE C CHARGE
2L
P r o j , HE , M69 2 BAS I C DA TA
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
47
FT 155 ADD-AB-1
48
FT 155 ADD-AB-1
Charge 3H
49
CHARGE TABLE A F T 1 5 5 ADD AB 1
3H
M23 2 QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
50
F T 1 5 5 ADD AB 1 TABLE A CHARGE
3H
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON M23 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
51
CHARGE TABLE A F T 1 5 5 ADD AB 1
3H
M23 2 QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
52
F T 1 5 5 ADD AB 1 TABLE A CHARGE
3H
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON M23 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
************************************************************************
920 76 6. 5 73 . 9 14416 R15 . 5
925 64 18 . 1 6. 5 74 . 8 14376 R15 . 0
930 56 12 . 2 6. 5 75 . 4 14337 R14 . 6
935 50 9.7 41 . 3 6. 4 76 . 0 14298 R14 . 4
940 46 8. 1 31 . 8 6. 4 76 . 4 14258 R14 . 2
945 42 7. 0 26 . 9 6. 4 76 . 9 14217 R14 . 1
950 39 6. 3 23 . 6 6. 4 77 . 3 14175 R14 . 0
955 36 5. 6 21 . 3 6. 4 77 . 7 14132 R14 . 0
960 33 5. 1 19 . 5 6. 4 78 . 0 14088 R13 . 9
965 31 4. 7 18 . 0 6. 3 78 . 4 14043 R13 . 9
970 29 4. 4 16. 8 6. 3 78. 7 13996 R13.9
975 27 4. 1 15. 8 6. 3 79. 0 13949 R13.9
980 26 3. 8 14.9 6. 3 79. 4 13900 R13.9
985 24 3. 6 14. 2 6. 3 79. 7 13849 R13.9
990 22 3. 4 13. 5 6. 3 80. 0 13798 R13.9
995 21 3. 2 12.9 6. 3 80. 3 13745 R13.9
1000 20 3. 0 12 . 3 6. 2 80 . 6 13691 R13 . 9
1005 19 2.9 11 . 8 6. 2 80 . 8 13635 R14 . 0
1010 18 2. 7 11 . 4 6. 2 81 . 1 13578 R14 . 0
1015 17 2. 6 11 . 0 6. 2 81 . 4 13520 R14 . 1
1020 16 2. 5 10 . 6 6. 2 81 . 7 13461 R14 . 1
1025 15 2. 4 10 . 2 6. 2 81 . 9 13400 R14 . 2
1030 14 2. 3 9.9 6. 2 82 . 2 13338 R14 . 2
1035 13 2. 2 9.6 6. 2 82 . 4 13274 R14 . 3
1040 12 2. 1 9.3 6. 2 82 . 7 13209 R14 . 3
1045 11 2. 0 9.0 6. 1 83 . 0 13143 R14 . 4
1050 11 1.9 8. 8 6. 1 83 . 2 13075 R14 . 5
WARN I NG. . . . . Bo l d da t a i nd i ca t e t o f i r e t he ne x t h i ghe r o r l owe r c ha r ge
o r f i r e unde r comba t co nd i t i o ns o n l y .
53
CHARGE TABLE A F T 1 5 5 ADD AB 1
3H
M23 2 QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
54
F T 1 5 5 ADD AB 1 TABLE A CHARGE
3H
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON M23 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
55
CHARGE TABLE B F T 1 5 5 ADD AB 1
3H
M23 2 FUZE SE TT I NG P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
12 . 4 18 . 1 0. 8 0. 0 0. 3
18 . 2 23 . 7 0. 7 0. 0 0. 4
23 . 8 27 . 5 0. 6 0. 0 0. 4
27 . 6 30 . 5 0. 5 0. 0 0. 4
30 . 6 32 . 9 0. 4 0. 0 0. 4
33 . 0 35 . 1 0. 3 0. 1 0. 5
35 . 2 36 . 9 0. 2 0. 1 0. 5
37 . 0 38 . 3 0. 1 0. 1 0. 5
38 . 4 39 . 6 0. 0 0. 1 0. 6
39 . 7 40 . 8 0. 1 0. 1 0. 6
40 . 9 41 . 9 0. 2 0. 1 0. 6
42 . 0 42 . 8 0. 3 0. 1 0. 7
42 . 9 43 . 7 0. 4 0. 1 0. 7
43 . 8 44 . 4 0. 5 0. 1 0. 7
44 . 5 45 . 1 0. 6 0. 1 0. 8
45 . 2 45 . 7 0. 7 0. 2 0. 8
45 . 8 46 . 3 0. 8 0. 2 0. 8
46 . 4 46 . 8 0. 9 0. 2 0. 9
46 . 9 47 . 3 1. 0 0. 2 0. 9
47 . 4 47 . 7 1. 1 0. 2 1. 0
47 . 8 48 . 1 1. 2 0. 2 1. 0
48 . 2 48 . 4 1. 3 0. 2 1. 1
48 . 5 48 . 7 1. 4 0. 3 1. 1
48 . 8 49 . 0 1. 5 0. 3 1. 2
49 . 1 49 . 3 1. 6 0. 3 1. 2
49 . 4 49 . 6 1. 7 0. 3 1. 3
49 . 7 49 . 8 1. 8 0. 3 1. 4
49 . 9 50 . 0 1. 9 0. 4 1. 4
50 . 1 50 . 2 2. 0 0. 4 1. 5
50 . 3 50 . 4 2. 1 0. 4 1. 6
50 . 5 50 . 6 2. 2 0. 4 1. 7
50 . 7 2. 3 0. 4 1. 8
50 . 8 50 . 9 2. 4 0. 5 2. 0
51 . 0 2. 5 0. 5 2. 1
56
F T 1 5 5 ADD AB 1 TABLE B CHARGE
3H
P r o j , HE , M69 2 FUZE SE TT I NG M23 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
51 . 0 2. 5 0. 5 2. 1
51 . 1 2. 6 0. 5 2. 3
51 . 2 51 . 3 2. 7 0. 6
51 . 4 2. 8 0. 6
51 . 5 2. 9 0. 7
51 . 6 3. 0 0. 7
51 . 7 3. 1 0. 8
51 . 8 3. 3
51 . 9 3. 4
52 . 0 3. 6
52 . 1 3. 8
*********************************************************************
66 . 4 6. 6
66 . 5 6. 3
66 . 6 6. 1
66 . 7 5. 8 1. 2
66 . 8 5. 7 1. 0
66 . 9 5. 5 0.9
67 . 0 5. 4 0. 8
67 . 1 5. 2 0. 8
67 . 2 5. 1 0. 7 2. 3
67 . 3 5. 0 0. 7 2. 0
67 . 4 4.9 0. 6 1. 8
67 . 5 4. 8 0. 6 1. 7
67 . 6 4. 7 0. 6 1. 6
67 . 7 4. 6 0. 6 1. 5
67 . 8 67 . 9 4. 5 0. 5 1. 3
68 . 0 4. 4 0. 5 1. 2
68 . 1 68 . 2 4. 3 0. 5 1. 2
68 . 3 4. 2 0. 5 1. 1
68 . 4 68 . 5 4. 1 0. 5 1. 0
68. 6 68. 7 4. 0 0. 4 1. 0
68. 8 68.9 3.9 0. 4 0.9
69. 0 69. 2 3. 8 0. 4 0. 8
69. 3 69. 4 3. 7 0. 4 0. 8
69. 5 69. 7 3. 6 0. 4 0. 7
69. 8 70. 0 3. 5 0. 3 0. 7
WARN I NG. . . . . Bo l d da t a i nd i ca t e t o f i r e t he ne x t h i ghe r o r l owe r c ha r ge
o r f i r e unde r comba t co nd i t i o ns o n l y .
57
CHARGE TABLE B F T 1 5 5 ADD AB 1
3H
M23 2 FUZE SE TT I NG P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
69. 8 70. 0 3. 5 0. 3 0. 7
70 . 1 70 . 3 3. 4 0. 3 0. 6
70 . 4 70 . 6 3. 3 0. 3 0. 6
70 . 7 71 . 0 3. 2 0. 3 0. 6
71 . 1 71 . 4 3. 1 0. 3 0. 5
71 . 5 71 . 8 3. 0 0. 3 0. 5
71 . 9 72 . 3 2.9 0. 3 0. 5
72 . 4 72 . 8 2. 8 0. 3 0. 4
72 . 9 73 . 4 2. 7 0. 2 0. 4
73 . 5 74 . 1 2. 6 0. 2 0. 3
74 . 2 74 . 8 2. 5 0. 2 0. 3
74 . 9 75 . 5 2. 4 0. 2 0. 3
75 . 6 76 . 4 2. 3 0. 2 0. 3
76 . 5 77 . 3 2. 2 0. 2 0. 2
77 . 4 78 . 3 2. 1 0. 2 0. 2
78 . 4 79 . 6 2. 0 0. 2 0. 2
79 . 7 82 . 3 1.9 0. 2 0. 2
WARN I NG. . . . . Bo l d da t a i nd i ca t e t o f i r e t he ne x t h i ghe r o r l owe r c ha r ge
o r f i r e unde r comba t co nd i t i o ns o n l y .
58
F T 1 5 5 ADD AB 1 TABLE C CHARGE
3H
P r o j , HE , M69 2 BAS I C DA TA M23 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
59
CHARGE TABLE C F T 1 5 5 ADD AB 1
3H
M23 2 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
60
F T 1 5 5 ADD AB 1 TABLE C CHARGE
3H
P r o j , HE , M69 2 BAS I C DA TA M23 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
61
CHARGE TABLE C F T 1 5 5 ADD AB 1
3H
M23 2 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
62
F T 1 5 5 ADD AB 1 TABLE C CHARGE
3H
P r o j , HE , M69 2 BAS I C DA TA M23 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
***********************************************************************
14400 851 . 8 62 . 5 62 . 5 25 . 2
14300 884 . 0 64 . 2 64 . 2 27 . 2
14200 906 . 4 65 . 4 65 . 4 28 . 8
14100 924 . 6 66 . 3 66 . 3 30 . 2
14000 940 . 4 67 . 1 67 . 1 31 . 4
13900 954 . 4 67 . 9 67 . 9 32 . 6
13800 967 . 2 68 . 5 68 . 5 33 . 7
13700 979 . 0 69 . 1 69 . 1 34 . 8
13600 990 . 1 69 . 6 69 . 6 35 . 9
13500 1000 . 5 70 . 1 70 . 1 36 . 9
13400 1010 . 3 70 . 6 70 . 6 37 . 9
13300 1019 . 7 71 . 0 71 . 0 39 . 0
13200 1028 . 7 71 . 4 71 . 4 40 . 0
13100 1037 . 3 71 . 8 71 . 8 41 . 0
13000 1045 . 6 72 . 2 72 . 2 42 . 0
12900 1053 . 5 72 . 6 72 . 6 43 . 0
12800 1061 . 3 72 . 9 72 . 9 44 . 0
12700 1068 . 7 73 . 2 73 . 2 45 . 0
12600 1076 . 0 73 . 5 73 . 5 46 . 0
12500 1083 . 1 73 . 9 73 . 9 47 . 0
12400 1089 . 9 74 . 2 74 . 2 48 . 1
12300 1096 . 6 74 . 4 74 . 4 49 . 1
12200 1103 . 2 74 . 7 74 . 7 50 . 2
12100 1109 . 5 75 . 0 75 . 0 51 . 2
12000 1115 . 8 75 . 2 75 . 2 52 . 3
11900 1121 . 9 75 . 5 75 . 5 53 . 4
11800 1127 . 8 75 . 7 75 . 7 54 . 5
11700 1133 . 7 76 . 0 76 . 0 55 . 6
11600 1139 . 4 76 . 2 76 . 2 56 . 8
11500 1145 . 1 76 . 4 76 . 4 57 . 9
63
CHARGE TABLE C F T 1 5 5 ADD AB 1
3H
M23 2 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
64
FT 155 ADD-AB-1
Charge 4H
65
CHARGE TABLE A F T 1 5 5 ADD AB 1
4H
M23 2 QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
66
F T 1 5 5 ADD AB 1 TABLE A CHARGE
4H
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON M23 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
67
CHARGE TABLE A F T 1 5 5 ADD AB 1
4H
M23 2 QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
68
F T 1 5 5 ADD AB 1 TABLE A CHARGE
4H
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON M23 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
************************************************************************
895 40 6. 3 83 . 8 18237 R12 . 6
900 33 14 . 6 6. 3 84 . 6 18206 R12 . 3
905 27 10 . 6 6. 3 85 . 2 18175 R12 . 1
910 23 8. 4 46 . 9 6. 3 85 . 8 18142 R12 . 0
915 20 7. 0 33 . 1 6. 2 86 . 3 18108 R11 . 9
920 18 6. 0 27 . 2 6. 2 86 . 8 18073 R11 . 8
925 16 5. 2 23 . 2 6. 2 87 . 2 18036 R11 . 9
930 14 4. 7 20 . 4 6. 2 87 . 6 17997 R11 . 9
935 12 4. 3 18 . 4 6. 2 88 . 0 17957 R11 . 9
940 11 3.9 16 . 8 6. 2 88 . 3 17915 R12 . 0
945 10 3. 6 15 . 6 6. 2 88 . 7 17871 R12 . 0
950 9 3. 4 14 . 6 6. 2 89 . 1 17826 R12 . 1
69
CHARGE TABLE A F T 1 5 5 ADD AB 1
4H
M23 2 QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
70
F T 1 5 5 ADD AB 1 TABLE A CHARGE
4H
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON M23 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
71
CHARGE TABLE B F T 1 5 5 ADD AB 1
4H
M23 2 FUZE SE TT I NG P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
12 . 8 15 . 0 0. 8 0. 0 0. 3
15 . 1 29 . 0 0.9 0. 0 0. 3
29 . 1 35 . 5 0. 8 0. 0 0. 4
35 . 6 40 . 4 0. 7 0. 0 0. 4
40 . 5 44 . 3 0. 6 0. 0 0. 5
44 . 4 47 . 5 0. 5 0. 1 0. 5
47 . 6 50 . 2 0. 4 0. 1 0. 6
50 . 3 52 . 4 0. 3 0. 1 0. 6
52 . 5 54 . 0 0. 2 0. 1 0. 7
54 . 1 55 . 3 0. 1 0. 1 0. 8
55 . 4 56 . 5 0. 0 0. 1 0. 8
56 . 6 57 . 5 0. 1 0. 2 0. 9
57 . 6 58 . 3 0. 2 0. 2 1. 0
58 . 4 59 . 0 0. 3 0. 2 1. 1
59 . 1 59 . 6 0. 4 0. 2 1. 2
59 . 7 60 . 0 0. 5 0. 3 1. 3
60 . 1 60 . 5 0. 6 0. 3 1. 4
60 . 6 60 . 9 0. 7 0. 3 1. 5
61 . 0 61 . 2 0. 8 0. 3 1. 6
61 . 3 61 . 5 0. 9 0. 4 1. 7
61 . 6 61 . 8 1. 0 0. 4 1. 9
61 . 9 62 . 1 1. 1 0. 4 2. 1
62 . 2 62 . 3 1. 2 0. 5 2. 3
62 . 4 62 . 5 1. 3 0. 5
62 . 6 62 . 7 1. 4 0. 6
62 . 8 1. 5 0. 6
62 . 9 63 . 0 1. 6 0. 7
63 . 1 1. 7 0. 7
63 . 2 1. 8 0. 8
63 . 3 1. 9 0. 8
63 . 4 2. 0 0. 9
63 . 5 2. 1
63 . 6 2. 2
63 . 7 2. 3
63 . 8 2. 4
63 . 9 2. 6
72
F T 1 5 5 ADD AB 1 TABLE B CHARGE
4H
P r o j , HE , M69 2 FUZE SE TT I NG M23 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
63 . 9 2. 6
64 . 0 2. 9
64 . 1 3. 3
64 . 2 3. 7
*********************************************************************
74 . 9 4. 7
75 . 0 4. 5
75 . 1 4. 3
75 . 2 4. 2
75 . 3 4. 1 1. 1
75 . 4 3.9 1. 0
75 . 5 3. 8 0.9
75 . 6 3. 7 0. 8
75 . 7 75 . 8 3. 6 0. 8
75 . 9 3. 5 0. 7 2.9
76 . 0 3. 4 0. 7 2. 6
76 . 1 76 . 2 3. 3 0. 6 2. 2
76 . 3 76 . 4 3. 2 0. 6 1.9
76 . 5 76 . 6 3. 1 0. 5 1. 7
76 . 7 76 . 8 3. 0 0. 5 1. 5
76 . 9 77 . 1 2.9 0. 5 1. 4
77 . 2 77 . 4 2. 8 0. 4 1. 2
77 . 5 77 . 7 2. 7 0. 4 1. 1
77 . 8 78 . 1 2. 6 0. 4 1. 0
78 . 2 78 . 5 2. 5 0. 4 0.9
78 . 6 79 . 0 2. 4 0. 4 0. 8
79 . 1 79 . 6 2. 3 0. 3 0. 7
79 . 7 80 . 2 2. 2 0. 3 0. 7
80 . 3 81 . 0 2. 1 0. 3 0. 6
81 . 1 81 . 9 2. 0 0. 3 0. 5
82 . 0 82 . 9 1.9 0. 3 0. 4
83 . 0 84 . 1 1. 8 0. 2 0. 4
84 . 2 85 . 5 1. 7 0. 2 0. 3
85 . 6 87 . 2 1. 6 0. 2 0. 3
87 . 3 89 . 2 1. 5 0. 2 0. 2
73
CHARGE TABLE B F T 1 5 5 ADD AB 1
4H
M23 2 FUZE SE TT I NG P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
87 . 3 89 . 2 1. 5 0. 2 0. 2
89 . 3 92 . 0 1. 4 0. 2 0. 2
92 . 1 93 . 4 1. 3 0. 2 0. 1
93 . 5 94 . 9 1. 4 0. 2 0. 1
95 . 0 1. 5 0. 2 0. 1
74
F T 1 5 5 ADD AB 1 TABLE C CHARGE
4H
P r o j , HE , M69 2 BAS I C DA TA M23 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
75
CHARGE TABLE C F T 1 5 5 ADD AB 1
4H
M23 2 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
76
F T 1 5 5 ADD AB 1 TABLE C CHARGE
4H
P r o j , HE , M69 2 BAS I C DA TA M23 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
77
CHARGE TABLE C F T 1 5 5 ADD AB 1
4H
M23 2 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
78
F T 1 5 5 ADD AB 1 TABLE C CHARGE
4H
P r o j , HE , M69 2 BAS I C DA TA M23 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
79
CHARGE TABLE C F T 1 5 5 ADD AB 1
4H
M23 2 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
80
F T 1 5 5 ADD AB 1 TABLE C CHARGE
4H
P r o j , HE , M69 2 BAS I C DA TA M23 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
81
CHARGE TABLE C F T 1 5 5 ADD AB 1
4H
M23 2 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
82
FT 155 ADD-AB-1
Charge 3H
83
CHARGE TABLE A F T 1 5 5 ADD AB 1
3H
M23 2 A1 QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
84
F T 1 5 5 ADD AB 1 TABLE A CHARGE
3H
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
85
CHARGE TABLE A F T 1 5 5 ADD AB 1
3H
M23 2 A1 QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
86
F T 1 5 5 ADD AB 1 TABLE A CHARGE
3H
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
87
CHARGE TABLE A F T 1 5 5 ADD AB 1
3H
M23 2 A1 QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
88
F T 1 5 5 ADD AB 1 TABLE A CHARGE
3H
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
89
CHARGE TABLE B F T 1 5 5 ADD AB 1
3H
M23 2 A1 FUZE SE TT I NG P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
12 . 4 20 . 2 0. 8 0. 0 0. 3
20 . 3 25 . 3 0. 7 0. 0 0. 4
25 . 4 28 . 9 0. 6 0. 0 0. 4
29 . 0 31 . 9 0. 5 0. 0 0. 4
32 . 0 34 . 3 0. 4 0. 0 0. 5
34 . 4 36 . 4 0. 3 0. 1 0. 5
36 . 5 38 . 3 0. 2 0. 1 0. 5
38 . 4 39 . 8 0. 1 0. 1 0. 5
39 . 9 41 . 2 0. 0 0. 1 0. 6
41 . 3 42 . 3 0. 1 0. 1 0. 6
42 . 4 43 . 3 0. 2 0. 1 0. 6
43 . 4 44 . 3 0. 3 0. 1 0. 7
44 . 4 45 . 1 0. 4 0. 1 0. 7
45 . 2 45 . 9 0. 5 0. 1 0. 7
46 . 0 46 . 6 0. 6 0. 1 0. 8
46 . 7 47 . 2 0. 7 0. 2 0. 8
47 . 3 47 . 8 0. 8 0. 2 0. 8
47 . 9 48 . 3 0. 9 0. 2 0. 9
48 . 4 48 . 8 1. 0 0. 2 0. 9
48 . 9 49 . 2 1. 1 0. 2 1. 0
49 . 3 49 . 6 1. 2 0. 2 1. 0
49 . 7 49 . 9 1. 3 0. 2 1. 1
50 . 0 50 . 3 1. 4 0. 3 1. 1
50 . 4 50 . 6 1. 5 0. 3 1. 2
50 . 7 50 . 8 1. 6 0. 3 1. 2
50.9 51. 1 1. 7 0. 3 1. 3
51 . 2 51 . 3 1. 8 0. 3 1. 4
51 . 4 51 . 5 1. 9 0. 3 1. 4
51 . 6 51 . 7 2. 0 0. 4 1. 5
51 . 8 51 . 9 2. 1 0. 4 1. 6
52 . 0 52 . 1 2. 2 0. 4 1. 7
52 . 2 2. 3 0. 4 1. 8
52 . 3 52 . 4 2. 4 0. 5 1. 9
52 . 5 2. 5 0. 5 2. 1
WARN I NG. . . . . Bo l d da t a i nd i ca t e t o f i r e t he ne x t h i ghe r o r l owe r c ha r ge
o r f i r e unde r comba t co nd i t i o ns o n l y .
90
F T 1 5 5 ADD AB 1 TABLE B CHARGE
3H
P r o j , HE , M69 2 FUZE SE TT I NG M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
52 . 5 2. 5 0. 5 2. 1
52 . 6 52 . 7 2. 6 0. 5
52 . 8 2. 7 0. 6
52 . 9 2. 8 0. 6
53 . 0 2. 9 0. 6
53 . 1 3. 0 0. 7
53 . 2 3. 1 0. 7
53 . 3 3. 2 0. 8
53 . 4 3. 3
53 . 5 3. 5
53 . 6 3. 6
53 . 7 3. 8
*********************************************************************
68 . 0 6. 5
68 . 1 6. 2
68 . 2 6. 0
68 . 3 5. 8 1. 1
68 . 4 5. 6 1. 0
68 . 5 5. 5 0.9
68 . 6 5. 3 0. 8
68 . 7 5. 2 0. 7
68 . 8 5. 1 0. 7
68 . 9 5. 0 0. 7 2. 0
69 . 0 4.9 0. 6 1. 8
69 . 1 4. 8 0. 6 1. 7
69 . 2 4. 7 0. 6 1. 6
69 . 3 4. 6 0. 6 1. 5
69 . 4 69 . 5 4. 5 0. 5 1. 4
69 . 6 4. 4 0. 5 1. 3
69 . 7 69 . 8 4. 3 0. 5 1. 2
69 . 9 4. 2 0. 5 1. 1
70. 0 70. 1 4. 1 0. 4 1. 0
70. 2 70. 3 4. 0 0. 4 1. 0
70. 4 70. 5 3.9 0. 4 0.9
70. 6 70. 8 3. 8 0. 4 0.9
70.9 71. 0 3. 7 0. 4 0. 8
71. 1 71. 3 3. 6 0. 4 0. 8
71. 4 71. 6 3. 5 0. 3 0. 7
WARN I NG. . . . . Bo l d da t a i nd i ca t e t o f i r e t he ne x t h i ghe r o r l owe r c ha r ge
o r f i r e unde r comba t co nd i t i o ns o n l y .
91
CHARGE TABLE B F T 1 5 5 ADD AB 1
3H
M23 2 A1 FUZE SE TT I NG P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
71. 4 71. 6 3. 5 0. 3 0. 7
71. 7 71.9 3. 4 0. 3 0. 7
72. 0 72. 2 3. 3 0. 3 0. 6
72. 3 72. 6 3. 2 0. 3 0. 6
72 . 7 73 . 0 3. 1 0. 3 0. 5
73 . 1 73 . 5 3. 0 0. 3 0. 5
73 . 6 73 . 9 2.9 0. 3 0. 5
74 . 0 74 . 5 2. 8 0. 3 0. 4
74 . 6 75 . 1 2. 7 0. 2 0. 4
75 . 2 75 . 7 2. 6 0. 2 0. 4
75 . 8 76 . 4 2. 5 0. 2 0. 3
76 . 5 77 . 2 2. 4 0. 2 0. 3
77 . 3 78 . 1 2. 3 0. 2 0. 3
78 . 2 79 . 0 2. 2 0. 2 0. 2
79 . 1 80 . 0 2. 1 0. 2 0. 2
80 . 1 81 . 2 2. 0 0. 2 0. 2
81 . 3 84 . 5 1.9 0. 2 0. 2
WARN I NG. . . . . Bo l d da t a i nd i ca t e t o f i r e t he ne x t h i ghe r o r l owe r c ha r ge
o r f i r e unde r comba t co nd i t i o ns o n l y .
92
F T 1 5 5 ADD AB 1 TABLE C CHARGE
3H
P r o j , HE , M69 2 BAS I C DA TA M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
93
CHARGE TABLE C F T 1 5 5 ADD AB 1
3H
M23 2 A1 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
94
F T 1 5 5 ADD AB 1 TABLE C CHARGE
3H
P r o j , HE , M69 2 BAS I C DA TA M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
95
CHARGE TABLE C F T 1 5 5 ADD AB 1
3H
M23 2 A1 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
96
F T 1 5 5 ADD AB 1 TABLE C CHARGE
3H
P r o j , HE , M69 2 BAS I C DA TA M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
97
CHARGE TABLE C F T 1 5 5 ADD AB 1
3H
M23 2 A1 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
98
F T 1 5 5 ADD AB 1 TABLE C CHARGE
3H
P r o j , HE , M69 2 BAS I C DA TA M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
99
FT 155 ADD-AB-1
100
FT 155 ADD-AB-1
Charge 4H
101
CHARGE TABLE A F T 1 5 5 ADD AB 1
4H
M23 2 A1 QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
102
F T 1 5 5 ADD AB 1 TABLE A CHARGE
4H
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
103
CHARGE TABLE A F T 1 5 5 ADD AB 1
4H
M23 2 A1 QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
104
F T 1 5 5 ADD AB 1 TABLE A CHARGE
4H
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
************************************************************************
890 52 6. 3 83 . 5 18595 R13 . 3
895 38 6. 3 84 . 7 18565 R12 . 5
900 31 13 . 9 6. 3 85 . 5 18536 R12 . 2
905 26 10 . 2 6. 3 86 . 1 18505 R12 . 1
910 22 8. 2 45 . 5 6. 2 86 . 7 18473 R11 . 9
915 19 6.9 32 . 8 6. 2 87 . 2 18439 R11 . 9
920 17 6. 0 27 . 1 6. 2 87 . 6 18404 R11 . 8
925 15 5. 2 23 . 4 6. 2 88 . 1 18367 R11 . 8
930 13 4. 6 20 . 6 6. 2 88 . 5 18329 R11 . 9
935 11 4. 2 18 . 4 6. 2 88 . 9 18289 R11 . 9
940 10 3.9 16 . 7 6. 2 89 . 3 18247 R12 . 0
945 9 3. 5 15 . 5 6. 2 89 . 6 18203 R12 . 0
950 8 3. 3 14 . 4 6. 1 90 . 0 18158 R12 . 1
105
CHARGE TABLE A F T 1 5 5 ADD AB 1
4H
M23 2 A1 QUADRAN T ELEVA T I ON P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 5 0 M 1 0 0 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
106
F T 1 5 5 ADD AB 1 TABLE A CHARGE
4H
P r o j , HE , M69 2 QUADRAN T ELEVA T I ON M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5 6 7 8
CORREC T I ONS TO CORR CORR TO
QUADRAN T CORR TO QUAD ELEV FOR LOW DEFL
ELEVA T I ON QUAD ELEV FOR AN I NC OF LEVEL T I ME RANGE FOR
FOR PROJ , FOR PROJ , 50 M 100 M W I ND OF OF TO PROJ ,
M79 5 M69 2 I N HGT I N RG 1 KNO T FL I GH T I MPAC T M69 2
107
CHARGE TABLE B F T 1 5 5 ADD AB 1
4H
M23 2 A1 FUZE SE TT I NG P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
12 . 4 14 . 8 0. 8 0. 0 0. 3
14 . 9 30 . 6 0.9 0. 0 0. 3
30 . 7 36 . 8 0. 8 0. 0 0. 4
36 . 9 41 . 7 0. 7 0. 0 0. 5
41 . 8 45 . 6 0. 6 0. 0 0. 5
45 . 7 48 . 8 0. 5 0. 1 0. 5
48 . 9 51 . 5 0. 4 0. 1 0. 6
51 . 6 53 . 7 0. 3 0. 1 0. 7
53 . 8 55 . 3 0. 2 0. 1 0. 7
55 . 4 56 . 6 0. 1 0. 1 0. 8
56 . 7 57 . 8 0. 0 0. 1 0. 9
57 . 9 58 . 7 0. 1 0. 2 0. 9
58 . 8 59 . 5 0. 2 0. 2 1. 0
59 . 6 60 . 2 0. 3 0. 2 1. 1
60 . 3 60 . 8 0. 4 0. 2 1. 2
60 . 9 61 . 2 0. 5 0. 3 1. 3
61 . 3 61 . 7 0. 6 0. 3 1. 4
61 . 8 62 . 0 0. 7 0. 3 1. 6
62 . 1 62 . 3 0. 8 0. 3 1. 7
62 . 4 62 . 6 0. 9 0. 4 1. 8
62 . 7 62 . 9 1. 0 0. 4 2. 0
63 . 0 63 . 1 1. 1 0. 4 2. 2
63 . 2 63 . 4 1. 2 0. 5 2. 5
63 . 5 1. 3 0. 5
63 . 6 63 . 7 1. 4 0. 6
63 . 8 63 . 9 1. 5 0. 6
64 . 0 1. 6 0. 7
64 . 1 1. 7 0. 7
64 . 2 64 . 3 1. 8 0. 8
64 . 4 1. 9 1. 0
64 . 5 2. 1
108
F T 1 5 5 ADD AB 1 TABLE B CHARGE
4H
P r o j , HE , M69 2 FUZE SE TT I NG M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
64 . 5 2. 1
64 . 6 2. 2
64 . 7 2. 3
64 . 8 2. 5
64 . 9 2. 7
*********************************************************************
75 . 4 5. 5
75 . 5 5. 1
75 . 6 4. 8
75 . 7 4. 6
75 . 8 4. 4
75 . 9 4. 2
76 . 0 4. 1
76 . 1 4. 0 1. 1
76 . 2 3.9 1. 0
76 . 3 3. 8 0.9
76 . 4 3. 7 0. 8
76 . 5 3. 6 0. 8
76 . 6 76 . 7 3. 5 0. 7
76 . 8 3. 4 0. 7 2. 7
76 . 9 77 . 0 3. 3 0. 6 2. 3
77 . 1 3. 2 0. 6 2. 1
77 . 2 77 . 3 3. 1 0. 6 1.9
77 . 4 77 . 5 3. 0 0. 5 1. 7
77 . 6 77 . 7 2.9 0. 5 1. 5
77 . 8 78 . 0 2. 8 0. 5 1. 4
78 . 1 78 . 3 2. 7 0. 4 1. 2
78 . 4 78 . 7 2. 6 0. 4 1. 1
78 . 8 79 . 1 2. 5 0. 4 1. 0
79 . 2 79 . 6 2. 4 0. 4 0.9
79 . 7 80 . 1 2. 3 0. 3 0. 8
80 . 2 80 . 8 2. 2 0. 3 0. 7
80 . 9 81 . 5 2. 1 0. 3 0. 6
81 . 6 82 . 4 2. 0 0. 3 0. 5
1 09
CHARGE TABLE B F T 1 5 5 ADD AB 1
4H
M23 2 A1 FUZE SE TT I NG P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4
M58 2 CORREC T I ON TO CORREC T I ONS TO FUZE SE TT I NG
FUZE SE TT I NG FUZE SE TT I NG FOR AN I NCREASE OF
FOR PROJ , FOR PROJ , 5 0 ME TERS 1 0 0 ME TERS
M79 5 M69 2 I N HE I GH T I N RANGE
81 . 6 82 . 4 2. 0 0. 3 0. 5
82 . 5 83 . 4 1.9 0. 3 0. 5
83 . 5 84 . 5 1. 8 0. 2 0. 4
84 . 6 85 . 9 1. 7 0. 2 0. 4
86 . 0 87 . 5 1. 6 0. 2 0. 3
87 . 6 89 . 4 1. 5 0. 2 0. 2
89 . 5 91 . 8 1. 4 0. 2 0. 2
91 . 9 95 . 2 1. 3 0. 2 0. 2
95 . 3 96 . 2 1. 4 0. 2 0. 1
110
F T 1 5 5 ADD AB 1 TABLE C CHARGE
4H
P r o j , HE , M69 2 BAS I C DA TA M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
111
CHARGE TABLE C F T 1 5 5 ADD AB 1
4H
M23 2 A1 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
112
F T 1 5 5 ADD AB 1 TABLE C CHARGE
4H
P r o j , HE , M69 2 BAS I C DA TA M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
113
CHARGE TABLE C F T 1 5 5 ADD AB 1
4H
M23 2 A1 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
114
F T 1 5 5 ADD AB 1 TABLE C CHARGE
4H
P r o j , HE , M69 2 BAS I C DA TA M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
115
CHARGE TABLE C F T 1 5 5 ADD AB 1
4H
M23 2 A1 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
***********************************************************************
18600 832 . 2 71 . 6 71 . 6 27 . 6
18500 880 . 4 74 . 8 74 . 8 30 . 6
18400 904 . 1 76 . 3 76 . 3 32 . 2
18300 921 . 7 77 . 4 77 . 4 33 . 5
18200 936 . 3 78 . 4 78 . 4 34 . 6
18100 949 . 1 79 . 2 79 . 2 35 . 6
18000 960 . 6 79 . 9 79 . 9 36 . 5
17900 971 . 2 80 . 5 80 . 5 37 . 4
17800 981 . 0 81 . 1 81 . 1 38 . 2
17700 990 . 2 81 . 6 81 . 6 39 . 1
17600 998 . 9 82 . 1 82 . 1 39 . 9
17500 1007 . 1 82 . 6 82 . 6 40 . 7
17400 1014 . 9 83 . 1 83 . 1 41 . 4
17300 1022 . 5 83 . 5 83 . 5 42 . 2
17200 1029 . 7 83 . 9 83 . 9 42 . 9
17100 1036 . 6 84 . 3 84 . 3 43 . 7
17000 1043 . 4 84 . 7 84 . 7 44 . 4
16900 1049 . 9 85 . 0 85 . 0 45 . 1
16800 1056 . 1 85 . 4 85 . 4 45 . 9
16700 1062 . 3 85 . 7 85 . 7 46 . 6
16600 1068 . 2 86 . 0 86 . 0 47 . 3
16500 1074 . 0 86 . 3 86 . 3 48 . 0
116
F T 1 5 5 ADD AB 1 TABLE C CHARGE
4H
P r o j , HE , M69 2 BAS I C DA TA M23 2 A1
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
117
CHARGE TABLE C F T 1 5 5 ADD AB 1
4H
M23 2 A1 BAS I C DA TA P r o j , HE , M69 2
F uz e , MTSQ , M57 7
1 2 3 4 5
R E FS FOR T I ME AZ I MU TH
A L GRAZE OF CORREC T I ON
N E BURS T FL I GH T FOR DR I F T
G V ( CORR
E TO L )
FUZE
M57 7
118
FT 155 ADD-AB-1
119
FT 155 ADD-AB-1
The proponent agency of this firing table is the U.S. Army Armament
Research, Development and Engineering Center. Users are invited to send
comments and suggested improvements on DA Form 2028 (Recommended
Changes to Publications and Blank Forms) to the Commander, U.S. Army
ARDEC, ATTN: AMSRD-AAR-WSF-T (Firing Tables and Ballistics
Division), Aberdeen Proving Ground, Maryland 21005-5001.