You are on page 1of 13
File: SERVICE MANUAL. Section 240 $240-502SB/JUN 81 Replaces: $240-86 SB/J69 Dit: 3,36,3¢ rd FPICK Installation - Operation - Maintenance - Service FRICK SHELL - ICE” MAKERS MODELS: SA150 and SA300 RQ» FRICK SHELL - ICE MAKERS ‘TABLE OF CONTENTS GENERAL Description... Model No. Explanation Desian Dats INSTALLATION Inspection Hanging Locations and Foundations ReStarting Shaft Control Arm and Micro Switeh ‘aut Electrical Connections. Water Connections Refrigerant Piping. ‘Muitible toe Makers. thor Evaporators in 8 ‘Obtaining Hot Gas for Marverting | ih Side Volume and Reciever Oversizing- ‘System Leak Test zs ‘System Evacustion =. Refrigorant Charging. Lubrication Of Piston Valves ‘Shel ioe Maker Eneiosures OPERATION How the Shell-lce Maker Produces lee. Initial Starting Procedure . MultiCam Timer. ‘ Dry les Production « Quality of ee ‘Storage and Handling OF tee Overnight Shutdown Procedure. ‘Long Shutdown Period Conditions of Normal Operation MAINTENANCE Preventive Maintenance Oil Collecting Pot. ‘Water Nozzles. ‘ater Pan Detrosting Pan at Top af Tubes SERVICE Pumping Down for Repairs Servicing Piston Vals... ‘Changing Time Gyele-MuitiCam Timer. Freezing Tube REDSIS. v1... ‘Adjustment of Mutti-Cam Timer ‘Abnormal Operation Analysis. | e FRICK SHELL ICE MAKERS GENERAL INSTALLATION “This manual has been prepared to acquaint the serviceman with the Installation, operation, maintenanes snd service procedures recon ‘mended by Frick Company for tie SA Shel oe Makers, DESCRIPTION — The Frick ShelLice Makers are automatic ice mak: Ing units designed to economically produce clear, sold fragmented fee in large quantities ~ 13 thru 43 tons par 24 hours, ‘The two models of Frick Shl-lee Makers ae similiar in construction ‘and consist basically of a freezing section; harvesting ection and ‘control panel. Each sation i factory assembled for easy installation The freezing section includes supporting frame, stainless stl resz: Ing tubes with iqud and gas headers, sccumulstor with fost snitch level contol, stainless steel drip pan, cil and liquid traps, water dit bution system, automaticaly operated suction, liquid and hot gee valves, necessary solenoids and stop valves. 24050288 Poge 3 “The control panel i factory wired and includes timer, terminal board relay restarter mechanism, ice solector switch and pressure gauges To facilitate handling the freezing snd harvesting sections are ship od soparataly ‘Gotional festures, available a extra cost, include oversize ice breaker motor for ice thickness over 3/8 inch and ice nandling equipment. MODEL NO, EXPLANATION Size Designation (10x Nominal Tors) “The harvesting section consists of supporting bas, ie bresker ane —L- Sholl-co Moker ‘ly and motor ies sizer, water drain pan with fost valve, recirculat. SSO ing ump and motor, baile plates and water od, TABLE 1 ~ SHELLICE MAKER DESIGN DATA ‘Breaker Motor HP Pumps Nominal Model No, of, Motor td Oversize Operating Number Tubes HP Motor Motor Ws, ‘SA150 15 1s 2 3 0001 'sA300 30 1 5 742 +6000 INSTALLATION INSPECTION LOCATION AND FOUNDATIONS Frick Shl-tce Makar se shipped in two sctions — base assambly The Shell-loo Makar should be located in a convenint area and as with ice breaker mechanism and water pan; freezing section with tubes and secumulator. The control panel end other hardware will be shipped in a separate carton ‘Carefully inspect the shipment for demages on atval, Make 8 note of any damages on tho carriers bill of lading before signing an Tile sll claims for damages apainst the carier immociately, Friek Company Should also be notified as to the nature and extent of any damages foun HANDLING When the Shell-lce Makar arives on the job ste precautions must be taken to prevent damage to the machine during unloading and ree: tion. Do not attach hoists or slings to the freezing tubes, These tubes constructed of No. 16 gauge materil are easily damaged, Protect the ‘tubes at all times during unloading and erection and Keep the wooden ‘sipportng frame and clamps in postion until the unit sin a vertical Boston init final location. Lifting lugs have been provided to facil tate handling of the freezing section. Do not attach hols to other points when transporting the unit, cose as posible to the place where the ice wil be used. f possible, the machine should be mounted directly over the ica storage room ‘This eliminates complicated and exponsive conveyor equipment need 1d to transport the ice from the Shellee Maker ta the storaye aea, ‘Aa opening in the roof of the storage area wil sllow the ice to fa ireetly trom the machine into the lee storage, Ifthe room is square and the ies sie is located in the center of the elling, the ice wil ci. ‘rioute Wel eveny in the room, Hitt decided to mount the Shll-lce Maker inthis fasion, the stor: ‘ge area must be constructed so thet I wll support the welght ofthe ‘machine. A steel framework on concrete foundtion is recor mend S, Nominal oosating weight for your Shel-ice Maker fisted in Fable It itis necesory to place the Shel-lce Maker on the same level with ‘the storage r00m a sultable conveyor must be used to raise the ice to ‘the proper height for dropping it nto the storage. An enclosed serew ‘ype conveyor i satisfactory Tor this purpose. 24052088 Page 4 IGE STORAGE It isnot preeties! to store large quantities of fragmentary ie for tong periods of time, "Shell co” is no exception; however, due to the Carved surface there i les tendency for Shellie to stick together in forage, A storage of sufficient size to Hold not more than 3 devs sup- ly is recommended, Since “Shel Ico" weighs approximately 34 ls er eubie foot, the storave should be constructed accordingly. Be {ure to insulate the storage with urethane or ingulation equivalent to retard melting and sticking of the ice It is nat resommended to store "Sh Lee ins bin with sides sloping {toward a amaler opening in the Bottom. After several eves the ice ‘ll bridge over making removal difieult.Storags with vertical sides ire the most satisfactory ERECTION All erection and other sstembly work should be carried out by qual ited riggers and eractors who ore familiar with refrigeration and ice ‘making equipment. [tf highly recommended that this work be done by # Frick Factor to insure satisfactory installation and adjustment of ‘your new Frick Shales Maker. Frick Shel-lce Makers are shipped in two sections — base assembly with fee breaker and water box; freezing soction with tubes and ac Cumulator. Erection drewings are furnished with each machine ond Should be followed crefly. It is necesary to mount the base 3s- Sembly fir, If the Shell-ee Maker ie to be located over the storage tea, soe ralls or plate should be plaead under the mounting legs St rdht angee to the root members to distribute the weight of the ‘machine and prevent the mounting les ftom damaging the roofing ‘material. The steel rails should atleast be 6 inches wide and extend the entre length of the Shell-ce Maker base so that two ofthe four ‘mounting legs rest on each rail. Be sure to level the machine bofore fnchoring oF seeuting with suitable anchor bots. f the Shel-le Make i to be located on the same level asthe storage trea, itis recommended thatthe bare be mounted and lealed on @ Concrete foundation, Elevate the les Makar to alow sufficient room {ore hopper an serew conveyor with suitable drain ping. The steel raile may be omitted when mounting inthis manne ‘Attachthe hoisting equipment securely to the lifting lugs on the 2c- ‘umulator and rate the freezing section to Its proper position over the bare, Carefully remove the wooden supporting frame and clamps land lower the freezing section into the base. Bolt in place at the four points drown on the assembly drawings. “The ice and water spin sheets should be installed next. These sheets sr in sections and wil bo shipped ina separate erate with the ma thine. Install the end water shoots withthe slotted end down and the flanges facing each other as shown onthe assembly drawings. Fasten the sheets to the frame at points shown using the round head serews and mute provided. D9 not omit the lock washes. Draw the bolts finger tight only. The end ice sheets are bent at an angle of aporox. imately 10° and should be attached vo the flanged end sheets so that ‘they extond inward towards the ies breaker. ‘Now install the ice breaker side sheets. Faston thom along their bot ‘tom edge to the top ee Breaker stationary bar using the U-bolts pro- vided. Tighten the U-bols, keeping the ioe side plates inside the Insert the flat water side sheets keeping them outside the ice si sheets ang inside the flange on the ond water shets. Tighten all bolts fn the ice and water splash sheets. Install the ict bresker motor, pulleys and belt guard, Carefully align pulleys and adjust the belt for proper tension, Install the electrical control panel at shown on the drawings. Be sure 10 install the spacing washers betwoan the frame and the pane. FRICK SHELL - ICE MAKERS RESTARTING SHAFT ‘Now install the restorting device (Fa. 1) in its proper position onthe frame ae shown on the drawing Inert the long end of the shaft (Fig 2} through the opening in the back of the contol panel. Be sure the water defeeting rubber washers are in place Bolt the bearing brackets in place and tighten al bolts. Adjust the thrust clamps on each end ofthe restarting shaft (Fi 2) for minimum tend movement of this shaft. 1/16” movement is desirable, Check ster adjusting to Insure that there is no binding of this shaft ‘Aajust the feler arms on the restartr shaft so that ll feelers touch ‘the tubes at the some time. This is best accomplished by adjusting ‘wo end feeler arms first Tighten all clamping bolts securely. Fig, 1 — Restarting Device Fig, 2— Control Box End of Restarting Devies ADJUSTMENT OF CONTROL ARM AND MICROSWITCH [Now install the counterweighted control arm on the ond of the r= ‘darter daft which extends through the contol box. (See Fig. 3) Pesition the contra! arm on the restarter svat 20 thet it will pot bind ‘on the magnet housing, Rotate the restarter shaft so that the fooler Bars rest against he tubes. Manually if the half moon weight so that itis In the "UP” or energize position Clamp the control arm to the re-start shat allowing 1/16” to 1/8" clearance between the contol farm and the half moon weight. (See Fig. 4). Be sure the feeler arms fre eguinst the tubes and hat the half moon weight fall the way Up when the clamping operstion is done. ‘Adjust the cireut breaking screw next. (S80 Fig. 4). With the half moon weight held manually in the “up” position, inset a 1/16 ‘Spacer between one of the feeler arms and one of the tubes. Ad: jt the ccut breaking serew s0 thatthe micro-switch button de & FRICK SHELL ICE MAKERS 240.0288 INSTALLATION aoe 5 premes sufficiently to operate te switch — Int for alight ck. Be || ire'thet ne sper reins between the fel arm an the tube and ‘that the half'moon weight is completely reisad when the circuit letra sre cats Fig. 3 ~ Control Box end Components Fig. 4 — Adjustments of Restarter Controls a Fig. 5 — Typleal Electrical Witing Diagram ELECTRICAL CONNECTIONS. NOTE: All wiring must comply with all existing nations! and local he terminal strip to the solenoid valves, water pump, and ie break codes ‘& motor. (See Fis. 6). Control wiringhas been made atthe factory end should nat be chang- 4. Wire only from the power source to the terminal strip an from Page 6 WATER CONNECTIONS Water conneetions ta the recirculating pump, water pan, water make- ‘up sourae and drains should be made t this time REFRIGERANT PIPING. ‘CAUTION: All models ofthe Shell-Ice Maker are foctory sealed anc Contain a holding charge of dry nitrogen. Do act open piping with ‘ut bleeding off this holding charge by slowly opening the main ‘tction vale locvted onthe accumulator. NOTE: All refrigerant piping must comply with al exiting national ‘and local codes. Refrigerant ping for tho Sho Ice Maker consists of taking auction, liquid and hot gas connections to the machine. A

You might also like