Professional Documents
Culture Documents
Project no: Q07019 Date: 6/6/2007 Sheet no.: 1 of 1 Computed by: A.B
3
Checked by: A.K
Subject: Transformer room forced ventilation
Approved by: T.Z
= 34121.4 BTH
Qs = 1.08 x CFM x ∆T
= 100.4 Degree F
= 1379.89 L/s
an exhaust fan will be provided with the above rate & fresh air intake louver will be provided for air make up