You are on page 1of 1

WV.12 WV.

16
CL CL

Beton = 1.53 m2
95 Beton = 1.53 m2
95
94
2.29 1.37 94 1.59 2.23
Pre-Cast = 0.29 m2 Pre-Cast = 0.29 m2

93
+92.82 93 +92.74
Galian = 2.47 m2 Galian = 0.35 m2
1 1
1 1
1 1

Timbunan = 2.23 m2 92 +91.79 Timbunan = 3.11 m2 92


1

+91.71
1

Join Sealant Join Sealant


91 BETON COR INSITU K-225, 91
14.00 t =12cm 14.00 BETON COR INSITU K-225,
t =12cm
90 90

bidang persamaan89 bidang persamaan89


reference level 88 reference level 88
87.00 87.00

93.428

94.281

94.378

94.035
94.017
92.757
92.749
91.867

91.736

92.718
92.741
94.034
0.54 94.211
0.88 94.208

94.128

94.106

94.342

92.778

93.375

93.702

94.038

93.521
92.537
0.40 91.963

91.544

91.790
92.628

94.130
0.50 94.285
0.69 94.268

94.228

93.905

92.499

92.470
ELEVASI TANAH ASLI ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL

1.42
0.28
0.58
0.13
0.88

0.17
1.49

1.45

1.18

1.17
JARAK (m) JARAK (m)
13.00 3.39 9.61 8.84 2.99 2.76 15.49 6.35 5.84 3.47 3.08 9.74 8.22 1.53 3.08 2.51 10.62 5.56
DISTANCE (m) DISTANCE (m)

WV.13 WV.17
CL CL

Beton = 1.53 m2
95
Beton = 1.53 m2
95
2.07 2.07 Pre-Cast = 0.29 m2 94 2.07 1.49
Pre-Cast = 0.29 m2 94
+92.80 Galian = 1.15 m2 93 +92.72
Galian = 0.40 m2 93 1 1
1 1

Timbunan = 4.42 m2 92
1
1

+91.77
1
1
Timbunan = 5.06 m2 92 +91.69
Join Sealant
Join Sealant
91 BETON COR INSITU K-225,
91
14.00 BETON COR INSITU K-225, 14.00 t =12cm
t =12cm 90
90
bidang persamaan89
bidang persamaan89
reference level 88
reference level 88 87.00
87.00

93.065

93.913

93.959

94.096

93.570
1.02 92.815

91.103

91.581

92.146
0.67 92.691

94.102
0.53 94.186
0.79 94.192

94.180

93.964

93.441

93.370
93.766

94.554

94.654

94.030
94.036
92.719
92.699
92.075

91.515

91.494
92.779
92.767
94.074
94.219
94.083

94.060

93.873

93.829
ELEVASI TANAH ASLI
ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL

1.48

1.36
JARAK (m)
6.82 2.16 2.92 2.13 7.76 9.86 2.05 2.89 3.22 2.26 7.83
0.23
0.39
0.24
0.73

0.98
0.35
1.23
0.59
1.11

1.49
JARAK (m)
5.71 5.65 3.75 2.14 9.98 7.52 2.62 1.84 DISTANCE (m)
DISTANCE (m)

WV.14 WV.18
CL
CL

Beton = 1.53 m2
95 95
Beton = 1.53 m2
94 1.71 2.05 0.43
Pre-Cast = 0.29 m2 0.29 m2 94
Pre-Cast =
Galian = 1.03 m2 93
+92.78 +91.79
1 1
Galian = 1.65 m2 93
1 1

Timbunan = 3.72 m2 92 +91.75 Timbunan = 4.20 m2 92


1
1

+91.79
1
1

Join Sealant
Join Sealant
91 BETON COR INSITU K-225, 91
14.00 t =12cm 14.00 BETON COR INSITU K-225,
90 t =12cm
90
bidang persamaan89 bidang persamaan89
reference level 88 reference level 88
87.00 87.00
94.120

94.502

94.631

94.073
94.080
92.765
92.766
92.175

91.548

91.543
0.94 92.765
0.13 92.732

94.105
0.62 94.260
94.156

94.131

93.938

93.181

93.130

91.385

91.195

93.760

94.008

93.701
92.798

90.865

91.368

92.223
0.86 93.131

93.063

94.190
0.49 94.347
94.291

94.263

93.792

93.261

93.280
ELEVASI TANAH ASLI ELEVASI TANAH ASLI
ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL
0.23
0.48
0.20
0.58

1.44

1.15
JARAK (m)

1.26

1.38

1.38

1.09
6.95 3.60 3.36 1.89 11.85 6.06 3.10 2.16 7.04 8.25 JARAK (m)
DISTANCE (m) 9.51 3.19 4.83 2.03 7.52 6.78 3.48 2.27 2.40 4.16 10.85
DISTANCE (m)

WV.15
CL CL
WV.19

95 Beton = 1.53 m2
95
Beton = 1.53 m2
94 2.23 1.93 Pre-Cast = 0.29 m2 94 2.13 1.59
Pre-Cast = 0.29 m2
+91.79 Galian = 0.43 m2 93 +92.68
Galian = 2.63 m2 93
1 1
1 1
1 1

Timbunan = 1.52 m2 92
1

+91.79
1
Timbunan = 3.70 m2 92 +91.65
Join Sealant Join Sealant
91 91 BETON COR INSITU K-225,
14.00 BETON COR INSITU K-225,
t =12cm
14.00 t =12cm
90 90

bidang persamaan89 bidang persamaan89


reference level reference level 88
88
87.00 87.00

90.063

89.554

93.476

93.534
92.577
0.71 92.438
0.37 91.473

91.475

92.087
1.00 92.985

93.006
0.89 93.928
0.43 94.124
0.55 94.030

94.059

93.738

93.301
93.437

93.785

93.881
93.398
0.72 92.733
0.64 92.290

91.510

92.701
92.667
94.034
94.268
94.167

94.166

93.842

93.458

ELEVASI TANAH ASLI ELEVASI TANAH ASLI


ORIGINAL GROUND LEVEL ORIGINAL GROUND LEVEL

1.16

1.22
JARAK (m)
1.19

0.30
1.00
0.76
0.87

JARAK (m) 6.81 9.71 9.26 3.28 11.00 6.91 2.54 2.54 4.80
6.60 3.97 4.18 10.11 9.08 2.22 1.92 8.52 DISTANCE (m)
DISTANCE (m)

Provinsi
KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT SUMATERA SELATAN
DIREKTORAT JENDERAL SUMBER DAYA AIR
SATUAN KERJA BALAI BESAR WILAYAH SUNGAI SUMATERA VIII Pekerjaan
JL S OEK A RNO HA TT A NO.8 69 RT.1 2 K E LU RA HA A N TA LA NG K E LA P A K E CA MA TA N A L A NG-A L AN G L E BA R P A L EM BA N G
SID - DAERAH IRIGASI / RAWA KEWENANGAN PUSAT
DI BBWS SUMATERA VIII (IPDMIP)
GAMBAR

Kabupaten
Lubuk Linggau & Musi Rawas

No. Lembar :

0 2 6 12 20 m No. Register :

PT. WIDYA GRAHA ASANA KETUA TIM Ir. Sarwanta Tanggal No. Kontrak / Amandemen
SKALA H / V. 1 : 200 KSO
PT.MITRA KARYA SANJAYA DIREKTUR Ir. Adi Sarwoko, Dipl. He
NO. TANGGAL YANG DIREVISI DIGAMBAR DIPERIKSA DISETUJUI
02 JANUARI 2019 01/SP/Ah-pp.IPDMIP - PUSAT/2019
DIPERIKSA DIREKSI Aldila Miralti, S.T.

DISETUJUI PPK PERENCANAAN & PROGRAM Doddy Meidiansyah, S.T., M. Eng