Professional Documents
Culture Documents
HW 5
HW 5
systems can either be described as off-grid solar with utility backup power, or grid-tied solar with
extra battery storage. Id the house has 3 rooms with 1 refrigerator, and 2 AC. Please design how
much area PV and the battery required if 30% of electricity produced can still be exported to PLN
interconnected grid, estimate total investment and LCOE and electricity tariff for IRR of 12%. Discuss
and compare LCOE, tariff and current FiT (MEMR 50/2017). Please mention values of solar radiation
in Jakarta, type of PV technology and battery (IRENA) and the assumptions. For guideline, see