You are on page 1of 4

TRAINING MANUAL- PIPING DOC No.

: 29040-PI-UFR-0003

Rev. : R0
INTRODUCTION TO OTHER BRANCHES OF
Uhde India Limited ENGINEERING
Page : 1

CONTENTS

Page

0.0 Cover Sheet 1

1.0 Introduction 2

2.0 Knowledge of Process Engineering 2–3

3.0 Knowledge of Other Branches of Engineering 3

4.0 Interface with other Departments 3–4

Applicable Revision:
Prepared: Checked: Approved:

Date: Date: Date:


First Edition: R0
Prepared: DNL Checked: AKB Approved: RUD

Date: Date: Date:


File Name: C-3 Server: Pune : KUMUS 207 VKO: KUMUS 209

Directory: Pune: Refer \ Pi \Training Manual VKO: Refer \ Training Manual


TRAINING MANUAL- PIPING DOC No. : 29040-PI-UFR-0003

Rev. : R0
INTRODUCTION TO OTHER BRANCHES OF
Uhde India Limited ENGINEERING
Page : 2

1.0 INTRODUCTION:

Since piping engineering is central to detail engineering activity and the piping engineer more
or less acts as the chief co-ordinator, a good grasp of the working and requirement of the
other engineering disciplines is essential for successfully delivering quality detailed
engineering within the allotted time. Let us briefly discuss the issues concerning the piping
engineer and knowledge level required in other branches of engineering to discharge his
duties.

2.0 KNOWLEDGE OF PROCESS ENGINEERING

A Piping Engineer is not expected to know Reaction kinetics or sizing of a Control or a Safety
Valve. However, a basic understanding of the process is essential since the plant concept in
the form of P&ID’s, piping specifications, equipment data sheets, instrument specs, etc.,
requires to be translated into an operating plant through detailing followed by procurement of
the right equipment and other items and their proper assembly/ erection. To understand a
P&ID well, an understanding of the flow of material/ fluids and their control through instrument
loops is essential. For example, the P&ID may show a drain line with a slope. In reality,
however, the starting end of the line, may be at a lower elevation. It therefore becomes quite
difficult to run the line on the pipe rack. Under such circumstances an appropriate solution has
to be found in consultation with the process department. Similarly, ball valves might have
been shown for isolation of a level gauge. The ball valve handle may obstruct either the
instrument or may foul with the vessel. It would, therefore, be preferable to change the above
valve to a gate valve in this instance in consultation with Process Group.

Many a time gravity flow lines are not clearly shown and unless the process is fully
understood, it may be difficult to route them at the correct elevation. Where gravity flow lines
are shown, piping has to ensure that there is no loop in the circuit and if provision of a loop
becomes unavoidable, one has to ensure that the outlet nozzle of the tank from which the
fluid flows, is always at a higher elevation than the inlet nozzle of the tank in to which the fluid
flows. Wherever there is separator of two miscible liquids, the bottom liquid is removed
through a siphon and the siphon height should be shown on the P&ID. In gas lines,
connection must be taken from the top and must be clearly indicated on the P&ID.
Concerning heat exchangers, co-current or counter-current, P&ID must match with equipment
data sheet.

Simple details like vents of safety valves, flare height etc. as shown in the P&ID has to be
checked by piping to ensure that they are practicable and conform to the standards.

Utility requirement at different consumer points must be clearly indicated, as the utility flow
distribution chart is to be prepared by the Piping Department.

Acid proof tiling or requirement of a special floor finish should be reflected in the P&ID.
Wherever acid or corrosive chemicals are used appropriate chemical resistant tiling should be
considered in all such area where the acid / chemical is likely to come in contact with.

Wherever glass lined equipment are shown in P&ID, care must be taken to ensure that the
temperature differential is within the specified limits as otherwise the vessel can get damaged.
A base understanding of the process can help avoiding any such eventuality.

In all the Process & Instrument Diagrams, the process department gives the line size, fluid
media and material of construction. Further filling up of P&ID, line list etc. is carried out by the
piping group. A thorough study of the process can help in the proper selection of rating for
components and help reduce the overall cost of the project.
TRAINING MANUAL- PIPING DOC No. : 29040-PI-UFR-0003

Rev. : R0
INTRODUCTION TO OTHER BRANCHES OF
Uhde India Limited ENGINEERING
Page : 3

Many a time, the process department would indicate on the P&ID, gravity flow lines with the
maximum number of bends permitted. Piping Engineer must make every effort to reduce the
number of bends without affecting the aesthetic appearance of the piping scheme.

The other important aspect to be noted in the P&ID, are the Symbols. The Symbols used
must be of international Standard so that there is no confusion in understanding or reading a
P&ID. A good knowledge of fluid flow and understanding of pressure drop is very useful.

3.0 KNOWLEDGE OF OTHER BRANCHES OF ENGINEERING

The P&ID indicates each and every instrument required for indicating or controlling the
process variable / parameter. Instruments may be local indicators, like temperature or
pressure gauges or may be remote transmitters feeding data to panel instruments –
indicators, recorders or controllers. Controllers could be P, PI or PID (i.e. Proportional,
integral and derivative) types. Control instruments may be electronic or pneumatic types. The
piping Engineer must have working knowledge of various instruments and their types.
Pneumatic instrumentation will have compressed instrument air connections and electronic
type will have electric power / signal connection. The P&ID also indicates the interlocking
scheme for process control or emergency shut down system.

The P&ID shows each and every motor required for rotating equipment, agitator or any other
electrically driven equipment. Gearbox requirements, if any, are to be indicated in the P&ID,
which should be understood correctly. In some cases process control may be through
electrical means and must be so indicated.

Piping Engineer should have a fairly good idea about sizing of equipment, various codes and
engineering practices, stress and strain theory and such other basic principles. This is
required, as many a times, he has to check vendor drawings and clear them for fabrication
with the help of the Mechanical Engineer.

A basic knowledge of metallurgy is required. This will help the Piping Engineer in analyzing
the reasons for selection of particular material of construction for pipes and piping items vis-a-
vis the fluids that are required to be handled by them. Knowledge of metallurgy makes it
easier to understand why code specifies certain heat treatment requirements and why quite
often a higher corrosion allowance is provided.

The other branch of engineering where a lot of close co-ordination is required is Civil
Engineering. Knowledge of columns, beams and other structural items / details help in
fulfilling the requirements of piping in an effective manner. Requirements of insert plates,
culverts and drains, pipe bridges or sleepers and other requirements are indicated by piping.
Similarly, floor finish or slopes in the right direction etc,. are indicated by the Piping
department.

4.0 INTERFACE WITH OTHER DEPARTMENTS:

The following are the highlights of the major activities where interdepartmental discussions
are necessary before the documents are released for execution.

Piping / Civil:

• Civil Skeleton/ Civil Information Drawings of Units, Pipe Rack and Tank Farms.
• Civil Drawing review/ release for construction.
• Release of HOLDS at subsequent dates.
TRAINING MANUAL- PIPING DOC No. : 29040-PI-UFR-0003

Rev. : R0
INTRODUCTION TO OTHER BRANCHES OF
Uhde India Limited ENGINEERING
Page : 4

Piping/ Mechanical:

• Nozzle Index and Nozzle Orientation.


• Foundation Bolt details and orientation.
• Platforms Cleats on Equipment – its orientation and levels etc.

Piping/ Process:

• Review/ Markup on PID’s


• Package Units Drawings from Vendors – its review fir fixing the Battery Limit supply,
General Arrangement, Civil details etc.
• Special Parts List – fixing responsibility for procurement action (i.e. by PI, PE or MQ
Group).

Piping/ Procurement:

• Issue Enquiry Specification for PI Items.


• Issue Revision of MTO at subsequent dates for necessary procurement action.
• Issue Order Specification for Valves/ Special Parts. For Piping items like Flanges,
Fittings, Fasteners, Gaskets etc. Procurement Department issues the Order
Specifications.
• Discussions with various Vendors during bid evaluation.

Piping/ Project Management:

• Finalization of Master Plot Plan after getting clearance/ agreement with Licensor, Client,
Statutory Bodies etc.
• Finalization of Procurement Philosophy/ Spare Philosophy with Client
• Monitoring of Project Schedule and updating the month wise activity and follow-up/ co-
ordination with Client, Vendor and Licensor.
• Progress Report/ Constraint Report.

Piping/ Electrical:

• Finalization of Cable Tray Layout and requirement of Insert Plates on RCC Column/
Beam, Floor opening for Cables etc.
• Cable connection/ Push Button supports near the Terminal Box of all motors.
• Finalization of location of Switchboards, Lighting Fixtures floor wise.

Piping/ Instruments:

• Review of IC comments on the PID revision due to change in any instrument.


• Finalization of Instrumentation GES regarding connection details of Instruments and
delineation of scope of procurement between PI and IC.
• Details of Instrument mountings/ dimensions.
• Review of approved Vendor Drawings for Instruments with respect to Isometrics (released
for construction) as well as the piping arrangement around the Instrument.
• Finalization of IC Cable Tray requirement.
• Review of field routed instrument Cable Trays, keeping provision of accessibility, free
space and interference with piping arrangement.