You are on page 1of 3

Manholes Tunnel Inbound Tightness Test Pipes Tunnel Inbound

IK122B Needed From


IK90 Needed IK90
SF90 Needed IK90
IK89 Needed IK89
SF89 Needed IK88
IK88 Needed IK122B
SF88 Needed SF90
IK126 Needed SF89
SF126 Needed SF88
IK90
Manholes Tunnel OutboundTightness Test IK89
IK86B Needed IK88
IK85 Needed IK126
SF85 Needed
IK84 Needed Pipes Tunnel Inbound
SF84 Needed From
IK62 Needed IK86B
SF62 Needed SF85
IK34 Needed SF84
SF34 Needed SF62
IK85
IK84
IK62
IK85
IK84
IK62
IK34
O33
es Tunnel Inbound
Tightness Test Video Inspection
To Needed
IK85 Needed Needed Part of it
IK89 Needed Part of it OK
IK88 Needed OK N/A
IK126 Needed Part of it
SF90 N/A Needed
SF89 N/A Part of it
SF88 N/A OK
SF126 N/A Part of it
SF90 N/A Needed
SF89 N/A Part of it
SF88 N/A Part of it
SF126 N/A Needed

es Tunnel Inbound
Tightness Test Video Inspection
To
SF85 N/A Needed
SF84 N/A Part of it
SF62 N/A OK
SF34 N/A Part of it
IK84 Needed Part of it
IK62 Needed OK
IK34 Needed OK
SF85 N/A Needed
SF84 N/A Part of it
SF62 N/A Needed
SF34 N/A Part of it
IK85 Needed Needed
Documents we need
We just have a part of it, so we need from manhole to manhole
We have the documentation
Not Applicable