Transmittal
to ate
ones Sis 12Fetnae/207
comey hn ane
‘yp re Tabet 268409 - Pfs aot oat Aon)
sates Leer ores
#0 8018160 Manar sein cunurarra :
‘heaving Atcha [ner separ cove aaa a
[1 Seige [Wheat {Misting ints] ee
[tess chroe Bete contac cs
1 Saree 1 Poe Doms
1 sama Sette 1 cononinate (ERE
1 Piistann eons Cl re
ed 1 vi (te tna
ference amber beseon
onaeroenoauese cre o nes cas Esc Frond
wan Soca
Tia cony
‘hae rane on checked ne
Fora Foto towed pe nda sent
Qa Q Code 1 No exception taken
1 Forevorandsonmets ——)Retucorec in cre thie
Foryuruse esr Gites Abeer
o o Seies Teleacienon
Aerie St dtnon Sra ame
Dertmten Bh Ferdcton
"oy wee set
tesco O ter
spat oxtery 1 emcee at cotton
1D re [Uso
conn
RECENVIED)| suo knseen
seen | SEDI | $n ert na
TES" | ocrvwu”For the Attention of
Hr. George Baan
Cyprus Oybarco Tabet
POBox 13100
Manama, Kingdom of Babin
Foto ours at set
Keg oats
Project: Project Habitat (Deerat Aloyoun)
Contract Socal Vilas, Afordable Viles & Secondary Infrastructure Works
st Diyar Al Muharaq Asset 238.2
‘Subject: 4090-CCT-Approval of Switches, Socks, and Exhaust Fans for
‘At vile
12 Febrary 2017
Dear Si,
wih reterence to tho lator recalved om the Project Manager (HAL)
DAo102030/09s2 dated 9 February 2017, please fd oncosed copy ot
‘esthticcomplance and tectnical compliance reports othe abject ters tat has
‘een aprroves by he Empayer for you record and farther acon.
‘Should you requle any futher infrmaton or claitctions Knaly contact the
Undersigne,
Yours tay,
ffatlsebonaimtea
PotorD.knott-Buxton
Senter Reser Engines
ore rao exes
srs 5822 2508
Pater kt: baton @notmas comPROIECT MANAGERS| uit elja.0
CCHARTESED QUANTITY SURVEYORS | uptigta chio4 galuia
CUNT REPRESENTATIVES|WJiLog Linas
HAJ
Date: 09 February 2017 ‘our Ref: bA/2010/2030/1/0352
MOTT MACDONALD
P.O. Box 10471,
Manama,
Kingdom of Bahratn
[Attn of; Mr, Peter Buxton - Resident Engineer
Dear Sir,
Please find enclosed copy of eesthetic compliance and technical compliance reports
for subject items that has been approved by the Employer for your turther acon.
Yours faithful,
09 FEB OTT
Jon Porritt To [A] | Sign | oate
Project
Encl, as stated above
naj con wrmaptconDEERAT ALOYOUN VILLAS
Contractor ScoPE OF ITEMS - AL
vVitias
SWITCHES & SOCKETS, EXHAUST FANS
Feanussv 05,2017
Al VILLAS
Switches & SOCKETS, EXHAUST
FANS1 Deerar ALovouN Viias fe
eontatd CConteactor ScoPE OF IreMs- At “f
horizoninteriors wu fe Diyar
‘SWITCHES & SOCKETS, EXHAUST FANS,
anu 05,2017
1. Comparison of Prices:
Not applicable, part of contractor scope,
2. Technical Compliance:
Refer to MML report attached in Appendix 1
MML to verify the warranties as per the contract conditions for each
items
However our recommendation to have warranties in effect from practical
completion to contractors.
4. Delivery Period/Procurement Lead Time:
Delivery period to be confirmed by contractors as per project program and
scheduled completion date.
5. Payment Terms:
Part of contractor scope of items.a] DEERAT ALOYOUN VILLAS
Contractor Scope OF ITEMS~ A1
vias
“SWITCHES & SOCKETS, EXHAUST FANS
Feananos,2017
horizoninteriors wu
PES
M/s. Seni (Switehes &
ary
M/s, Bukoral
oa Sockets) (Ghaust Fans)
Yes No ves No
Bea ¥ PR
acs ¥ “
“ a
[I] Mcomolence is va only orate appearance,
7. Recommendation:
In reviewing the above and based on:
* Technical compliance as reflected in MML report (Refer to attached
‘Appendic 01)
We confirm Mjs. Schneider (Pieno series for switches & sockets) and M/s.
Bukamal (Orient Smart Air electric wall mounted fans) are aesthetically
compliance,
Due to the tight project schedule, approval process needs to be concluded
very shortly as the material expected at site ASAP.DeERAT ALOYOUN Vitias fs
Covrtaacror ScoPe OF ews At
vias
‘SWITCHES & SockeETS, EXHAUST FANS,
horizoninteriors ws
Diyar
Al Vittas
SwitcHes & Sockets, EXHAUST
FANS,
APPENDIX -1.
TECHNICAL COMPLIANCE REPORTWiring Devices/ELV Outlets/Ceiling fans/Exhaust fans-Al Villas
me A HAJ lal
so a hotizonintoes
Tlectical Devices Parameters Propeeed aa
|swexsiz-100s0.230vxcare way
te cocer stator mermopte material,
fsa mountesorae and phosgor bronce
tact materia Grays SS (SCHNEIDER)
fswesor0.130,250v3 Gang itched
octet corer ststor:termoplaste mater
all mounted rey FnshP55{SCANEIDER)
[ezsiiir_we-aSpas0 aang twp
juroundpotyearbonate grid plat sh wal
Jounts white ash SCHNEDER-PIENO}
{canbe accomadated in 33 1¥€ Fash bon)
fsz3itiF_we-isasp.2s0v tang way
f2teang 29a st rocker
fcsstoptyarvonte
saroundpoleabonate gid ate fh wall
ound White finch (CHNEDERPIEHO)
o3s-168s.2s0v2Gang way sth iocer
Jcutorpalyearbonte
srroundlyesrbonte art uh walt
Jnourtea, wie fine (CHEER PHENO)
[=23513F_we-16 sp.2s00 ane way
ftenrockeracuatorPoieartonate
frrouncelyearbonte wrt pate ut wal
mounts. inh (SCHNEDER-IENO)
fs215_we-130,250V 16ang ated socket
Joie PayearbenateSurounePlerbonate
fre pacestusn wot mounteate
[sh (scree. Pen}
“Ee L468esor2s_we230V 26ang suche socket,
Jott Poyarbonste surounpolyebanate ingecegl
fri pate tush watt moutec te pieaaed
fini sschneoea eno} ia
es2ssa_we-asa2sa,250v conection
|ri.ctyaroonatesuroundlyearbonste |
fer pate un wall mone Wie
inn (scuneroea eno)
[z3i020n_we 2on7e5n 7500 OF etch
fen ncn ght neater toter
rctsstorplyarboste
round polerbanat gi ate sh wal
[owned fish ISCHNEOER-PIENO) cali
Jsza11vF_We- Gong tv soctetpolarbonate
round polycrbonate gid pate eh wal *
Jrounte,wite nish scaoER ENO)
eszsims_we-s Gag bata oie with
utter Poheabonst SuroundPlyearbonte
ri patesh all mounted ite =
frisnescrmeroeR nena)
Jes231Rs_We-1 Gang Telephone outlet with "
[tte oyeartonsteSurourdalyatbonte
Jd sat.tsh wail mountediwhte =
fnisntscrneroer eno}
ENT ELECTRIC SMART AR
[een 2t0cubiemetr par
fourspp7ips)2000 RPM. 22H. th
ina at oestin: thoes
tell mounted exhaust anit be
frst in ground oor oer nd mad bath
TRONE FAN "AWAITING WAR FROM CONTRACTORS
Tora Tee Soa
echnical Compianc
[Cost Ganpianc
estoles DAWEH Prvioed