68) Consider to install check valve at steam supply stream to reboiler E-504
3) Consider to install cooling water flow meter and low flow alarm at cooling coils
of condenser E-503.
35) Consider to install cooling water flow meter and high flow alarm at cooling
water supply pipeline to condenser E-503.
10) Consider to install steam flow meter and low flow alarm at steam supply stream
to reboiler E-504.
33) Consider to install bypass valve and isolation valves around TV-509.
41) Consider to install bypass valve and isolation valves around TV-508.
52) Consider to install flow meter and high flow alarm at distillation column
bottom outlet stream.
18) Consider to install flow meter and low flow alarm at distillation column inlet
stream.
24) Consider to install flow meter and low flow alarm at distillation column bottom
outlet stream.
20) Consider to install flow meter and low flow alarm at pump P-501 inlet stream.