Pos Guard
Pos Guard
TH 2020
1
NO. DESCRIPTION
SPESIFI VOL. SPESIFICATION UNIT
TOTAL PRICE (RP.)
A PEKERJAAN PERSIAPAN
1 Pek.pengukuran lokasi dan Bowplank 1.00 ls
Sub Total
1 Exavation 3.24
2 Exavation tone foundation 5.72
3 Back fill 5.40 m2
4 Found. Work
Concrete K-300 0.90 m3
5 SLoof work
6 Columnolom 20/20
ConcreteK-300 0.56 m3
7 Ringbalk 15/20
Sub Total
II ROOF WORK
1 Stell Alumn Trus 24.00 m2
2 Plat alumn 3mm 11.20 m'
3 Pipe PVC Ø 4“ Wavin Tipe AW 12.00 m'
4 Elbow PVC Ø 4“ 4.00 bh
Sub Total
Sub Total
`
IV PEKERJAAN PENGECATAN
Sub Total
Sub Total
TOTAL
HAR SAT JUMLAH
( Rp ) ( Rp )
750,000.00 750,000.00
750,000.00
61,440.00 199,065.60
61,440.00 351,521.94
29,260.00 158,004.00
5,157,645.66 4,641,881.09
5,157,645.66 2,888,281.57
8,238,754.20
245,000.00 5,880,000.00
75,000.00 840,000.00
178,783.00 2,145,396.00
178,783.00 715,132.00
9,580,528.00
157,044.00 3,769,056.08
86,570.00 1,558,260.00
800,000.00 800,000.00
950,000.00 38,760,000.00
3,200,000.00 9,600,000.00
1,500,000.00 1,500,000.00
3,545,000.00 3,545,000.00
232,830.40 523,868.40
232,830.40 2,561,134.40
302,209.60 10,879,545.60
232,830.40 349,245.60
232,830.40 223,517.18
74,069,627.26
39,281.00 2,906,794.00
39,281.00 1,620,341.25
4,527,135.25
267,373.26 11,731,001.78
123,767.88 5,105,424.84
16,836,426.63
145,000.00 1,160,000.00
250,000.00 750,000.00
425,000.00 1,700,000.00
75,000.00 150,000.00
1,450,000.00 1,450,000.00
450,000.00 450,000.00
75,000.00 675,000.00
125,000.00 1,125,000.00
7,460,000.00
1,000,000.00 1,000,000.00
31,137,528.66 31,137,528.66
32,137,528.66
153,600,000.00
153600000
-