You are on page 1of 3

HOLA AMIGOS Y BIENVENIDOS AL NUEVO PROYECTO DE TUTORIALES TALPAC

TITULO Material

PASO 01

MATERIAL

- Abrimos el Talpac 10.2

- PRACTICA JOSE

- Material

- ADD (Para crear uno nuevo)

PASO 02

DESMONTE

- Name:

“ DESMONTE “

- Ptoduction Measurement:

Weight
Insitu … Density = 2.74

- Swell Factors:

Bank to … Bucket = 1.4


Bank to … Truy = 1.45

- Loader Bucket Fill Factor:

Front End Loader = 0.982

- OK

HECHO POR: J.PALACIOS 07


PASO 03

ARENA

- Name:
“ ARENA“

- Ptoduction Measurement:

Weight
Insitu … Density = 1.83

- Swell Factors:

Bank to … Bucket = 1.4


Bank to … Truy = 1.45

- Loader Bucket Fill Factor:

Front End Loader = 0.907

- OK

PASO 04

OXIDOS

- Name:
“ OXIDOS“

- Ptoduction Measurement:

Weight
Insitu … Density = 3.89

- Swell Factors:

Bank to … Bucket = 1.4


Bank to … Truy = 1.45

- Loader Bucket Fill Factor:

Electric …. Shovel = 1.013

- OK

HECHO POR: J.PALACIOS 07


PASO 05

PRIMARIO

- Name:
“ PRIMARIO “

- Ptoduction Measurement:

Weight
Insitu … Density = 4.29

- Swell Factors:

Bank to … Bucket = 1.4


Bank to … Truy = 1.45

- Loader Bucket Fill Factor:

Hydraulic Shovel = 0.95

- OK

HECHO POR: J.PALACIOS 07