FDU 19-23 Rack Mountable - SUPPLYTAP
FDU 19-23 Rack Mountable - SUPPLYTAP
Product Specification
`
`
CONTENTS
A. Features………………………………………….…………… 1
B. Dimensions……………..…………………………..…...... 1
C. Pictures……………………………………………………….. 3
D. Wiring Diagram.…………………………………...…..... 5
E. Installation Manual……..………………………………. 6
`
`
FEATURES
DIMENSIONS
12C 144C
1 of 9
`
PICTURES
1U 2U 4U
178cm
89
44.5
2 of 9
`
WIRING DIAGRAM
3 of 9
`
INSTALLATION PROCEDURE
2. Mounting
3. Cable Preparation
4 of 9
`
INSTALLATION PROCEDURE
5 of 9
`
4. Cable Clamping
6 of 9
`
7. Cable Routing
8. Pigtail Insertion
7 of 9
`
8 of 9
`
9 of 9
China Telecommunication Technology Labs
TEST REPORT
TEST REPORT
Sample Qty ODF *1 , Patchcord 10 pcs , splicing tray and distribution tray 2 pcs
Sample Status The sample is in good condition,Comply with the inspection requirements
Inspection List
Unqulified Classfies
NO. TEST ITEM Conclusions
CLASS B CLASS C
Ⅰ.Frame
7 Appearence 〇 Qualified
10 Appearence 〇 Qualified
13 Appearence 〇 Qualified
2 Ruturn Loss 〇
3 radius of curvature 〇
End Face
4 Apex Offset 〇
Size
5 Fiber Sunken (Bulge) 〇
China Telecommunication Technology Labs
Inspection List
Unqulified Classfies
NO. TEST ITEM Conclusions
CLASS B CLASS C
8 Appearence 〇 Qualified
Mechanical
9 Additional losses 〇 Qualified
durability test
10 Return Loss Variation 〇 Qualified
11 Appearence 〇 Qualified
14 Appearence 〇 Qualified
17 Appearence 〇 Qualified
20 Appearence 〇 Qualified
26 Appearence 〇 Qualified
Test Report
Ⅰ. Test Conclusion
1. GPX167 Frame
1. GPX167 Frame
NO
TEST ITEM Unit Technical Requirement Test result Conclusions
.
mm Optical entry , fasten and protect Height x Width Qualified
function : Should have optical entry and x depth
ground wire unit . a.) Entry optical cable 2200*840*300
and fasten it on the frame , protect the
fiber and confirm do not damage fiber. b.)
After stripe cable,should have device to
protect them . c.)Partial insulation of
metal. d.) The fixed metal cable
sheath should be able to connect to the
Function high voltage grounding device.
2 Requirement --- Fiber end connect : Should have end Compliant Qualified
connector unit . This unit should easier
for pigtail connect ,fiber splicing ,protect
the pigtail .
--- Line function : There should be set a Compliant Qualified
vertical line channel .Quick and
convenient scheduling fiebr number
--- Capacity : Every ODF capacity and unit Compliant Qualified
capacity should describe in the manual ,
It should be configured in a complete set
--- Marking Function : Frame and unti should Compliant Qualified
have complete record part , for easier to
recognize the fiber number.
--- Fiber storage function : Fame and Unti Compliant Qualified
should have enough space to storage
redundant fiber cable .
--- PLC Splitter installation and connect Compliant Qualified
(optional) :Should have space for PLC
splitter use
China Telecommunication Technology Labs
1. GPX167 Frame
NO Conclusio
TEST ITEM Unit Technical Requirement Test result
. n
Use metal parts with coating Compliant Qualified
treatment,The coating should have
good adhesion Adhesion
3 Coating adhesion mm cannot lower than GB/T
9286-1998 requirement .
4 Voltage tolerance level -- Frame High pressure protection No Qualified
grounding with frame ≥ 3000V , breakdown,
No breakdown, no flying arc no flying arc
5 Insulation resistance MΩ Frame High pressure protection >1x105 Qualified
grounding with frame ≥ 1000MΩ
6 Burning test s Match standard below : a. The test Burning time Qualified
sample is not burning b.The after leaving
combustion time does not exceed fire:
10s after leaving the flame. First : 2 s
Second: 3s
No falme
7 High -- ODF surface should clear and Compliant Qualified
Temp smooth and clear , The color is
test Appearence uniform and without coating
leak .No rust of metal.Plastic parts
have no deformation .
8 Voltage -- Frame High pressure protection Compliant
tolerance grounding with frame ≥ 3000V ,
level No breakdown, no flying arc
9 Insulation MΩ Frame High pressure protection Compliant
resistance grounding with frame ≥ 1000MΩ
10 Low ODF surface should clear and Compliant Qualified
Temp smooth and clear , The color is
test Appearence uniform and without coating
leak .No rust of metal.Plastic parts
have no deformation .
11 Voltage Frame High pressure protection No
tolerance grounding with frame ≥ 3000V , breakdown,
level No breakdown, no flying arc no flying arc
12 Insulation MΩ Frame High pressure protection >1x105
resistance grounding with frame ≥ 1000MΩ
China Telecommunication Technology Labs
No content
China Telecommunication Technology Labs
1# A 14.54
B 14.29
2# A 13.24
B 13.64
3# A 11.83
NO Technical
TEST ITEM Unit Test Conclusions Conclusions
. Requirement
code End face Value
1# A 35.37
B 22.78
2# A 27.31
B 36.89
3# A 42.31
6# A 38.02
B 40.04
7# A 27.86
B 19.11
8# A 36.05
B 42.34
9# A 29.51
B 40.74
10# A 25.76
B 41.44
China Telecommunication Technology Labs
NO Technical
TEST ITEM Unit Test Conclusions Conclusions
. Requirement
code End face Value
1# A 21
B 23
2# A 30
B 9
3# A 30
Test Report
NO Conclusi
TEST ITEM Unit Technical Requirement Test result
. ons
23 - No mechanical Compliant
damage, shedding or Conclusi
Appearence
deformation will be ons
allowed after the test.
24 dB ≤0.2 1310nm: 0.00~0.08
Salt spray
test Additional losses
25 dB ≤5 1310nm:0~0
Return Loss Qualified
Variation
26 - No mechanical Compliant
damage, shedding or
Appearence
deformation will be
allowed after the test.
27 dB ≤0.2 1310nm: 0.01~0.02
Shaking
Test Additional losses
28 dB ≤5 1310nm:1 ~ 1
Return Loss
Variation
No Content
China Telecommunication Technology Labs