Backup Volume

OWNER PT. SAGARA PURNAMA Kontraktor _________

Pekerjaan : Klinik Marwah Jatinangor

Opname 6 :
Lokasi :

No. Item
Estimasi
Pembayar Uraian Kuantitas Satuan Panjang Lebar
an
1 Beton 93.28 m3
1.1 B1 3.47 m3 7.60 0.30
1.2 B2 5.18 m3 14.80 0.25
14.60 0.25
17.20 0.25
16.70 0.25
2.60 0.25
1.3 B3 0.00 m3 7.60 0.20
15.40 0.20
2.80 0.20
5.80 0.20
4.80 0.20
3.50 0.20
4.25 0.20
2.15 0.20

1.4 Plat Lantai 50.92 m3 29.00 x 16.00


1.5 K2 14.90 m3 0.40 x 0.40
K4 2.03 m3 0.50 x 0.25
Anak Tangga 0.91 m3 1.25 x 0.30
Bordes 1.24 m3 3.30 x 1.25
Tangga 1.54 m3 8.24 x 1.25
Balok tangga 1.20 m3 0.40 x 0.25

2 Bekisting 829.82 m2
2.1 B1 alas 9.12 m2 7.60 x 0.30
2.2 B1 samping 23.10 m2 7.60 x
2.3 B2 alas 22.20 m2 14.80 x 0.25
2.4 B2 samping 49.73 m2 14.80 x
B2 alas 19.60 m2 19.60 x 0.25
B2 samping 43.90 m2 19.60 x
2.5 B3 alas 4.53 m2 7.55 x 0.20
B3 samping 8.15 m2 7.55 x
B3 alas 7.77 m2 5.55 x 0.20
B3 samping 51.62 m2 5.55 x
B3 alas 4.44 m2 5.55 x 0.20
B3 samping 7.99 m2 5.55 x
B3 alas 6.37 m2 4.55 x 0.20
B3 samping 11.47 m2 4.55 x
B3 alas 2.20 m2 2.75 x 0.20
B3 samping 3.96 m2 2.75 x
B3 alas 0.43 m2 2.15 x 0.20
B3 samping 0.77 m2 2.15 x
K2 149.04 m2 0.40 x 4.00
K4 24.30 m2 1.50 x
plat tangga m2 8.60 x 1.50
bordes m2 4.00 x 1.50
anak tangga m2 1.25 x 0.17
balok tangga alas m2 6.00 x 0.25
balok tangga samping m2 6.00 x
dinding samping+dilatasi 19.34 m2 161.20
2.7 Plat lantai 360.81 m2 8x 5
8 6
3 5
3 6
6 6
6 6
6 5
6 5
Diketahui Oleh,
____

(…………………………………………….)
Perhitungan
Luas Tinggi Volume N(buah) Volume Tot

x 0.38 = 0.87 4.00 3.47


x 0.28 = 1.04 5.00 5.18
x 0.28 = 1.02 1.00 1.02
x 0.28 = 1.20 3.00 3.61
x 0.28 = 1.17 1.00 1.17
x 0.28 = 0.18 4.00 0.73
x 0.18 = 0.27 3.00 0.82
x 0.18 = 0.55 1.00 0.55
x 0.18 = 0.10 3.00 0.30
x 0.18 = 0.21 11.00 2.30
x 0.18 = 0.17 6.00 1.04
x 0.18 = 0.13 1.00 0.13
x 0.18 = 0.15 1.00 0.15
x 0.18 = 0.08 1.00 0.08

424.31 x 0.12 = 50.92 39.688 = 50.92


x 4.05 = 0.65 x 23 = 14.90
x 4.05 = 0.51 4 = 2.03
0.03 x 0.17 = 0.03 23 = 0.91
x 0.15 = 4.13 2 = 1.24
x 0.15 = 10.29 1 = 1.54
x 6.00 = 0.60 2 = 1.20
93.28

2.28 x 4.00 = 9.12


0.38 x 8.00 = 23.10
3.70 x 6.00 22.20
0.28 x 12.00 = 49.73
4.90 x 4.00 = 19.60
0.28 x 8.00 = 43.90
1.51 x 3.00 = 4.53
0.18 x 6.00= 8.15
1.11 x 7.00 = 7.77
0.18 x 14.00 = 13.99
1.11 x 4.00 = 4.44
0.18 x 8.00 = 7.99
0.91 x 7.00 = 6.37
0.18 x 14.00 = 11.47
0.55 x 4.00 = 2.20
0.18 x 8.00 = 3.96
0.43 - x 1.00 = 0.43
0.18 x 2.00 = 0.77
1.60 4.05 x 23.00 = 149.04
4.05 x 4.00 = 24.30
= 12.90
= 6.00
24.00 = 5.10
1.50 2.00 = 3.00
0.40 4.00 = 9.60
0.12 = 19.34
40 6.25 33.75 2= 67.5
48 6.7 41.3 1= 41.3
15 2.6 12.4 2= 24.8
18 2.85 15.15 1= 15.15
36 5.4 30.6 2= 61.2
36 7.6 28.4 1= 28.4
30 4.95 25.05 4= 100.2
30 7.74 22.26 1= 22.26
0 0 =
0 0 = 0
829.82
Diajukan Oleh,
Kontraktor

(…………………………………………...)
Backup Volume
OWNER PT. SAGA Kontraktor _________

Pekerjaan : Klinik Marwah Jatinangor

No Kontrak :
Lokasi :

No. Item
Estimasi
Pembayar Uraian Satuan
Volume Tot Kuantitas D16
an
Pembesian
B1 Err:509 kg Err:509
B2 Err:509 kg Err:509
B3 Err:509 kg Err:509
Plat Lan#NAME? kg
4.75
2.3
3.7
24.00

13

360.81
Diketahui Oleh,
____

(…………………………………………….)
Perhitungan
D13 D10 D6 Total

Err:509 Err:509 Err:509


Err:509 Err:509 Err:509
Err:509 Err:509 Err:509
#NAME? #NAME?
Diajukan Oleh,
Kontraktor

(…………………………………………...)
……...)
PROJECT NAME : MARWAH JATINANGOR
CONTRACTOR : PT. KIRATAMA ABDI KARYA

Dia Besi Jml Pjg Jumlah Sisa


Type Pjg Pot m1 Jml Pot bh
mm m1 Pot / btg Pot / btg
TOP BARS & BOTTOM BARS (X)
a D16 6.21 20.00 124.20 1 5.79

HOOPS
END
a D10 1.72 27.0 46.44 6 1.68
MIDDLE D10 1.0 27 27.00 12 -
b D10 1.72 81.0 139.32 6 1.68

TOTAL KEB BESI D10 131.2 Kg


COLUMN K1
D16 196.0 Kg

TOTAL BETON 59.6 m3


TOTAL BEKISTING 298.08 m2

TOTAL KEB BESI D10 3,016.83 Kg 241.10032 242 Btg


KOLOM K2 D16 4,508.40 Kg 97.426264 98 Btg
TOTAL BETON 59.6 m3
TOTAL BEKISTING 298.08 m2

PROJECT NAME : MARWAH JATINANGOR


CONTRACTOR : PT. KIRATAMA ABDI KARYA
Dia Besi Jml Pjg Jumlah Sisa
Type Pjg Pot m1 Jml Pot bh
mm m1 Pot / btg Pot / btg
TOP BARS & BOTTOM BARS (X)
a D16 6.06 18.00 109.08 1 5.94

HOOPS
END
a D10 1.62 27.00 43.74 7 0.66
MIDDLE D10 0.6 27 16.20 20 -
b D10 1.62 81.0 131.22 7 0.66

TOTAL KEB BESI D10 107.9 Kg


COLUMN K1
D16 688.6 Kg

TOTAL BETON 10.4 m3


TOTAL BEKISTING 51.84 m2

TOTAL KEB BESI D10 431.45 Kg 34.480911 35 Btg


KOLOM K1 D16 688.62 Kg 14.880987 15 Btg
TOTAL BETON 10.4 m3
TOTAL BEKISTING 51.84 m2

TOTAL KEB BESI D10 3,448.28 Kg 275.58123 276 Btg


KOLOM K1 D16 5,197.02 Kg 112.30725 113 Btg
TOTAL BETON 51.8 m3
TOTAL BEKISTING - m2

PROJECT NAME : MARWAH JATINANGOR


CONTRACTOR : PT. KIRATAMA ABDI KARYA
Dia Besi Jml Pjg Jumlah Sisa
Type Pjg Pot m1 Jml Pot bh
mm m1 Pot / btg Pot / btg
TOP BARS & BOTTOM BARS (X)
a D16 8.81 6.00 52.86 1 3.19
D16 3.06 12.00 36.72 3 2.82
D16 8.81 6.00 52.86 1 3.19

b D16 8.81 6.00 52.86 1 3.19


D16 5.30 6.00 31.80 2 1.40
D16 8.81 6.00 52.86 1 3.19
HOOPS
END
a D13 1.72 109.00 187.48 6 1.68
MIDDLE D6 0.68 109.00 74.12 17 0.44
b D13 1.72 109.00 187.48 6 1.68

TOTAL KEB BESI D13 390.7 Kg


TB2 D6 16.5 Kg
D16 441.8

TOTAL BETON 4.8 m3


TOTAL BEKISTING m2

TOTAL KEB BESI D13 1,562.66 Kg 124.88538 125 Btg


B1 D6 65.8 Kg 1.4219508 2 Btg
D16 1,767.38 kg 38.192896 39 Btg
TOTAL BETON 4.8 m3
TOTAL BEKISTING - m2

PROJECT NAME : MARWAH JATINANGOR


CONTRACTOR : PT. KIRATAMA ABDI KARYA

Jumlah Sisa
Dia Besi Jml Pjg
Type Pjg Pot m1 Jml Pot bh
mm m1 Pot / btg Pot / btg

TOP BARS & BOTTOM BARS (X)


a D16 6.81 5.00 34.05 1 5.19
D16 2.06 10.00 20.60 5 1.70
D16 6.81 5.00 34.05 1 5.19

b D16 6.81 5.00 34.05 1 5.19


D16 4.12 5.00 20.60 2 3.76
D16 6.81 5.00 34.05 1 5.19
HOOPS
END
a D13 1.42 82.00 116.44 8 0.64
MIDDLE D6 0.78 82.00 63.96 15 0.30
b D13 1.42 82.00 116.44 8 0.64

TOTAL KEB BESI D13 242.6 Kg


COLUMN K1 D6 14.2 Kg
D16 280.0 Kg

TOTAL BETON 76.8 m3


TOTAL BEKISTING 384.00 m2

TOTAL KEB BESI D13 4,852.68 Kg 387.8188 388 Btg


KOLOM K1 D16 5,599.60 Kg 447.51082 448 Btg
D6 283.9 Kg 6.1351842 7 Btg
TOTAL BETON 76.8 m3
TOTAL BEKISTING 384.00 m2

PROJECT NAME : MARWAH JATINANGOR


CONTRACTOR : PT. KIRATAMA ABDI KARYA

Dia Besi Jml Pjg Jumlah Sisa


Type Pjg Pot m1 Jml Pot bh
mm m1 Pot / btg Pot / btg
TOP BARS & BOTTOM BARS (X)
a D16 5.81 5.00 29.05 2 0.38
D16 1.97 10.00 19.70 6 0.18
D16 5.81 5.00 29.05 2 0.38
b D16 5.81 5.00 29.05 2 0.38
D16 3.62 5.00 18.10 3 1.14
D16 5.81 5.00 29.05 2 0.38
HOOPS
END
a D13 1.42 68.00 96.56 8 0.64
MIDDLE D6 0.78 68.00 53.04 15 0.30
b D13 1.42 68.00 96.56 8 0.64

TOTAL KEB BESI D13 201.2 Kg


COLUMN K1 D6 11.8 Kg
D16 243.0 Kg

TOTAL BETON 38.4 m3


TOTAL BEKISTING 192.00 m2

TOTAL KEB BESI D13 2,414.51 Kg 192.9635 193 Btg


KOLOM K1 D16 2,916.59 Kg 233.08906 234 Btg
D6 141.3 Kg 3.0526282 4 Btg
TOTAL BETON 38.4 m3
TOTAL BEKISTING 192.00 m2

PROJECT NAME : MARWAH JATINANGOR


CONTRACTOR : PT. KIRATAMA ABDI KARYA

Dia Besi Jml Pjg Jumlah Sisa


Type Pjg Pot m1 Jml Pot bh
mm m1 Pot / btg Pot / btg
TOP BARS & BOTTOM BARS (X)
a D16 3.81 5.00 19.05 3 0.57
D16 1.56 10.00 15.60 7 1.08
D16 3.81 5.00 19.05 3 0.57

b D16 3.81 5.00 19.05 3 0.57


D16 2.62 5.00 13.10 4 1.52
D16 3.81 5.00 19.05 3 0.57
HOOPS
END
a D13 1.42 42.00 59.64 8 0.64
MIDDLE D6 0.78 42.00 32.76 15 0.30
b D13 1.42 42.00 59.64 8 0.64

TOTAL KEB BESI D13 124.3 Kg


COLUMN K1 D6 7.3 Kg
D16 165.6 Kg

TOTAL BETON 7.7 m3


TOTAL BEKISTING 38.40 m2

TOTAL KEB BESI D13 497.10 Kg 39.72778 40 Btg


KOLOM K1 D16 662.23 Kg 52.924335 53 Btg
D6 29.1 Kg 0.6284823 1 Btg
TOTAL BETON 7.7 m3
TOTAL BEKISTING 38.40 m2

PROJECT NAME : MARWAH JATINANGOR


CONTRACTOR : PT. KIRATAMA ABDI KARYA

Dia Besi Jml Pjg Jumlah Sisa


Type Pjg Pot m1 Jml Pot bh
mm m1 Pot / btg Pot / btg
TOP BARS & BOTTOM BARS (X)
a D16 8.81 3.00 26.43 1 3.19
D16 2.56 10.00 25.60 4 1.76
D16 8.81 5.00 44.05 1 3.19

b D16 8.81 5.00 44.05 1 3.19


D16 5.12 5.00 25.60 2 1.76
D16 8.81 5.00 44.05 1 3.19
HOOPS
END
a D13 1.12 108.00 120.96 10 0.80
MIDDLE D6 0.68 108.00 73.44 17 0.44
b D13 1.12 108.00 120.96 10 0.80

TOTAL KEB BESI D13 252.1 Kg


COLUMN K1 D6 16.3 Kg
D16 331.1 Kg

TOTAL BETON 15.4 m3


TOTAL BEKISTING 76.80 m2

TOTAL KEB BESI D13 756.16 Kg 60.430989 61 Btg


KOLOM K1 D16 993.25 Kg 79.378935 80 Btg
D6 48.9 Kg 1.056679 2 Btg
TOTAL BETON 15.4 m3
TOTAL BEKISTING 76.80 m2

PROJECT NAME : MARWAH JATINANGOR


CONTRACTOR : PT. KIRATAMA ABDI KARYA

Dia Besi Jml Pjg Jumlah Sisa


Type Pjg Pot m1 Jml Pot bh
mm m1 Pot / btg Pot / btg
TOP BARS & BOTTOM BARS (X)
a D16 6.81 3.00 20.43 1 5.19
D16 2.06 6.00 12.36 5 1.70
D16 6.81 3.00 20.43 1 5.19

b D16 6.81 3.00 20.43 1 5.19


D16 4.12 3.00 12.36 2 3.76
D16 6.81 3.00 20.43 1 5.19
HOOPS
END
a D13 1.12 81.00 90.72 10 0.80
MIDDLE D6 0.68 81.00 55.08 17 0.44
b D13 1.12 81.00 90.72 10 0.80
TOTAL KEB BESI D13 189.0 Kg
COLUMN K1 D6 12.2 Kg
D16 168.0 Kg

TOTAL BETON 46.1 m3


TOTAL BEKISTING 230.40 m2

TOTAL KEB BESI D13 2,268.48 Kg 181.29297 182 Btg


KOLOM K1 D16 2,015.85 Kg 161.1039 162 Btg
D6 146.7 Kg 3.170037 4 Btg
TOTAL BETON 46.1 m3
TOTAL BEKISTING 230.40 m2

PROJECT NAME : MARWAH JATINANGOR


CONTRACTOR : PT. KIRATAMA ABDI KARYA

Dia Besi Jml Pjg Jumlah Sisa


Type Pjg Pot m1 Jml Pot bh
mm m1 Pot / btg Pot / btg
TOP BARS & BOTTOM BARS (X)
a D16 5.81 3.00 17.43 2 0.38
D16 1.81 6.00 10.86 6 1.14
D16 5.81 3.00 17.43 2 0.38

b D16 5.81 3.00 17.43 2 0.38


D16 3.62 3.00 10.86 3 1.14
D16 5.81 3.00 17.43 2 0.38
HOOPS
END
a D13 1.12 68.00 76.16 10 0.80
MIDDLE D6 0.68 68.00 46.24 17 0.44
b D13 1.12 68.00 76.16 10 0.80

TOTAL KEB BESI D13 158.7 Kg


COLUMN K1 D6 10.3 Kg
D16 144.3 Kg
TOTAL BETON 22.4 m3
TOTAL BEKISTING 112.00 m2

TOTAL KEB BESI D13 1,110.90 Kg 88.781329 89 Btg


KOLOM K1 D16 1,010.20 Kg 80.733576 81 Btg
D6 71.8 Kg 1.552405 2 Btg
TOTAL BETON 22.4 m3
TOTAL BEKISTING 112.00 m2

PROJECT NAME : MARWAH JATINANGOR


CONTRACTOR : PT. KIRATAMA ABDI KARYA

Dia Besi Jml Pjg Jumlah Sisa


Type Pjg Pot m1 Jml Pot bh
mm m1 Pot / btg Pot / btg
TOP BARS & BOTTOM BARS (X)
a D16 3.81 3.00 11.43 3 0.57
D16 1.56 6.00 9.36 7 1.08
D16 3.81 3.00 11.43 3 0.57

b D16 3.81 3.00 11.43 3 0.57


D16 2.62 3.00 7.86 4 1.52
D16 3.81 3.00 11.43 3 0.57
HOOPS
END
a D13 1.12 41.00 45.92 10 0.80
MIDDLE D6 0.68 41.00 27.88 17 0.44
b D13 1.12 41.00 45.92 10 0.80

TOTAL KEB BESI D13 95.7 Kg


COLUMN K1 D6 10.3 Kg
D16 99.3 Kg

TOTAL BETON 5.8 m3


TOTAL BEKISTING 28.80 m2
TOTAL KEB BESI D13 287.06 Kg 22.941394 23 Btg
KOLOM K1 D16 298.00 Kg 23.815951 24 Btg
D6 30.9 Kg 0.6685778 1 Btg
TOTAL BETON 5.8 m3
TOTAL BEKISTING 28.80 m2

TAKING OFF STRUCTURE


Proyek : 0
Lantai : lantai 1
Pekerjaan : Pelat

Dimensi Jarak
No Tipe Lokasi
m mm

LANTAI 3 segmen 1

. Horizontal Atas 16.30 D 10


Bawah D 10
Vertikal Atas 3.20 D 10
Bawah D 10

. Horizontal Atas 12.30 D 10


Bawah D 10
Vertikal Atas 5.30 D 10
Bawah D 10

. Horizontal Atas 6.30 D 10


Bawah D 10
Vertikal Atas 18.30 D 10
Bawah D 10

. Horizontal Atas 10.10 D 10


Bawah D 10
Vertikal Atas 5.30 D 10
Bawah D 10

. Horizontal Atas 2.70 D 10


Bawah D 10
Vertikal Atas 2.20 D 10
Bawah D 10
. Horizontal Atas 6.30 D 10
Bawah D 10
Vertikal Atas 5.30 D 10
Bawah D 10

. Horizontal Atas 9.60 D 10


Bawah D 10
Vertikal Atas 3.35 D 10
Bawah D 10

total
LANTAI 2 Segmen 2
. Horizontal Atas 9.60 D 10
Bawah D 10
Vertikal Atas 16.30 D 10
Bawah D 10

total

D 10 ###
395.6199

PROJECT NAME : MARWAH JATINANGOR


CONTRACTOR : PT. KIRATAMA ABDI KARYA

Dia Besi Jml Pjg Jumlah Sisa


Type Pjg Pot m1 Jml Pot bh
mm m1 Pot / btg Pot / btg
TOP BARS & BOTTOM BARS (X)
a D16 8.79 7.00 61.52 1 3.21
D10 1.50 131.00 196.50 8 -
D16 8.79 13.00 114.24 1 3.21

b D16 8.80 7.00 61.60 1 3.20


D10 1.50 110.00 165.00 8 -
D16 8.80 13.00 114.40 1 3.20
HOOPS
END
a D8 0.77 168.00 129.36 15 0.45
MIDDLE D8 1.75 72.00 126.00 6 1.50
b D13

TOTAL KEB BESI D10 222.9 Kg


COLUMN K1 D8 100.8 Kg
D16 555.2 Kg

TOTAL BETON - m3
TOTAL BEKISTING - m2

TOTAL KEB BESI D13 Kg 0 0 Btg


KOLOM K1 D16 Kg 0 0 Btg
D6 Kg 0 0 Btg
TOTAL BETON - m3
TOTAL BEKISTING - m2
CUTTING LIST
TITLE
DIMENSION
DIMENSION
TOTAL COLUMN
TOTAL CONCRETE
Berat per Total berat
m1 Kg bending Kg

1.58 196.02

END a 0.38
0.2
0.62 28.63
0.62 16.65 0.38
0.62 85.89
0.38
Note :
- Dimensi Kolom 400 x 400
0.64 m2
- Jumlah KOLOM K2
23 Bh

CUTTING LIST
TITLE
DIMENSION
DIMENSION
TOTAL COLUMN
TOTAL CONCRETE
Bentuk
Berat per Total berat Besi
m1 Kg bending Kg

1.58 172.15

END a 0.23
0.2
0.62 26.97
0.62 9.99 0.48
0.62 80.90
0.23
Note :
- Dimensi Kolom 250 x 500
0.64 m2
- Jumlah KOLOM K4
4 Bh

CUTTING LIST
TITLE
DIMENSION
DIMENSION
TOTAL BEAM
TOTAL CONCRETE
Berat per Total berat
m1 Kg bending Kg

1.58 83.43
1.58 57.95
1.58 83.43

1.58 83.43
1.58 50.19
1.58 83.43
END a 0.48
0.2
1.04 195.33
0.22 16.45 0.28
1.04 195.33
0.48
Note :
- Dimensi 500 x 300
0.16 m2
- Jumlah balok B1
4 Bh

CUTTING LIST
TITLE
DIMENSION
DIMENSION
TOTAL
TOTAL CONCRETE

Berat per Total berat


m1 Kg bending Kg
1.58 53.74
1.58 32.51
1.58 53.74

1.58 53.74
1.58 32.51 END a 0.23
1.58 53.74 0.2

0.38
1.04 121.32
0.22 14.20 0.23
1.04 121.32 Note :
- Dimensi 250 x 400
0.64 m2
- Jumlah B2
20 Bh

CUTTING LIST
TITLE
DIMENSION
DIMENSION
TOTAL
TOTAL CONCRETE
Berat per Total berat
m1 Kg bending Kg

1.58 45.85
1.58 31.09
1.58 45.85
1.58 45.85
1.58 28.57 END a 0.23
1.58 45.85 0.2

0.38
1.04 100.60
0.22 11.77 0.23
1.04 100.60 Note :
- Dimensi 250 x 400
0.64 m2
- Jumlah B2
12 Bh

CUTTING LIST
TITLE
DIMENSION
DIMENSION
TOTAL
TOTAL CONCRETE
Berat per Total berat
m1 Kg bending Kg

1.58 30.07
1.58 24.62
1.58 30.07

1.58 30.07
1.58 20.67 END a 0.23
1.58 30.07 0.2

0.38
1.04 62.14
0.22 7.27 0.23
1.04 62.14 Note :
- Dimensi 250 x 400
0.64 m2
- Jumlah B2
4 Bh

CUTTING LIST
TITLE
DIMENSION
DIMENSION
TOTAL
TOTAL CONCRETE
Berat per Total berat
m1 Kg bending Kg

1.58 41.71
1.58 40.40
1.58 69.52

1.58 69.52
1.58 40.40 END a 0.18
1.58 69.52 0.2

0.28
1.04 126.03
0.22 16.30 0.18
1.04 126.03 Note :
- Dimensi 200 x 300
0.64 m2
- Jumlah B3
3 Bh

CUTTING LIST
TITLE
DIMENSION
DIMENSION
TOTAL
TOTAL CONCRETE
Berat per Total berat
m1 Kg bending Kg

1.58 32.24
1.58 19.51
1.58 32.24

1.58 32.24
1.58 19.51 END a 0.18
1.58 32.24 0.2

0.28
1.04 94.52
0.22 12.22 0.18
1.04 94.52 Note :
- Dimensi 200 x 300
0.64 m2
- Jumlah B3
12 Bh

CUTTING LIST
TITLE
DIMENSION
DIMENSION
TOTAL
TOTAL CONCRETE
Berat per Total berat
m1 Kg bending Kg

1.58 27.51
1.58 17.14
1.58 27.51

1.58 27.51
1.58 17.14 END a 0.18
1.58 27.51 0.2

0.28
1.04 79.35
0.22 10.26 0.18
1.04 79.35 Note :
- Dimensi 200 x 300
0.64 m2
- Jumlah B3
7 Bh
CUTTING LIST
TITLE
DIMENSION
DIMENSION
TOTAL
TOTAL CONCRETE
Berat per Total berat
m1 Kg bending Kg

1.58 18.04
1.58 14.77
1.58 18.04

1.58 18.04
1.58 12.40 END a 0.18
1.58 18.04 0.2

0.28
1.04 47.84
0.37 10.31 0.18
1.04 47.84 Note :
- Dimensi 200 x 300
0.64 m2
- Jumlah B3
3 Bh
Panjang Jumlah Sub Jumlah Volume Besi / D
Jarak Berat
Potongan Potongan Jumlah D6 D8
mm m bh kg/m' kg bh mm mm

- 100 16.30 33.00 0.62 331.64 1.00 - -


- 200 16.30 17.00 0.62 170.84 - -
- 100 3.20 164.00 0.62 323.56 - -
- 200 3.20 83.00 0.62 163.75 - -
- -
- 100 12.30 54.00 0.62 409.50 1.00 - -
- 200 12.30 28.00 0.62 212.34 - -
- 100 5.30 124.00 0.62 405.19 - -
- 200 5.30 63.00 0.62 205.86 - -
- -
- 100 6.30 184.00 0.62 714.69 1.00 - -
- 200 6.30 93.00 0.62 361.23 - -
- 100 18.30 64.00 0.62 722.09 - -
- 200 18.30 33.00 0.62 372.33 - -
- -
- 100 10.10 54.00 0.62 336.26 1.00 - -
- 200 10.10 28.00 0.62 174.36 - -
- 100 5.30 102.00 0.62 333.30 - -
- 200 5.30 52.00 0.62 169.92 - -
- -
- 100 2.70 23.00 0.62 38.29 1.00 - -
- 200 2.70 12.00 0.62 19.98 - -
- 100 2.20 28.00 0.62 37.98 - -
- 200 2.20 15.00 0.62 20.35 - -
- -
- 100 6.30 54.00 0.62 209.75 1.00 - -
- 200 6.30 28.00 0.62 108.76 - -
- 100 5.30 64.00 0.62 209.13 - -
- 200 5.30 33.00 0.62 107.83 - -
- -
- 100 9.60 35.00 0.62 207.16 1.00 - -
- 200 9.60 18.00 0.62 106.54 - -
- 100 3.35 97.00 0.62 200.34 - -
- 200 3.35 49.00 0.62 101.20 - -
- -
- -
- -

- 100 9.60 164.00 0.62 970.68 1.00 - -


- 200 9.60 83.00 0.62 491.26 - -
- 100 16.30 97.00 0.62 974.81 - -
- 200 16.30 49.00 0.62 492.43 - -
- -

- -

CUTTING LIST
TITLE
DIMENSION
DIMENSION
TOTAL
TOTAL CONCRETE
Berat per Total berat
m1 Kg bending Kg

1.58 97.09
0.62 121.14
1.58 180.30

1.58 97.22
0.62 101.72 END a
1.58 180.55

0.17
0.39 51.04 1.45
0.39 49.71 0.15 0.15 0.30
Note :
- Dimensi 0 x 0
m2
- Jumlah
Bh

878.8
G LIST
: COLUMN REINFORCEMENT,
: 0.40 x 0.40 x 4.05
: 0.38 x 0.38 x 4.05
: 23
: 59.6 m3

Bentuk Besi

6.05

0.16
0.38 MIDDLE
0.2

0.38

0.38

G LIST
: COLUMN REINFORCEMENT,
: 0.25 x 0.50 x 4.05
: 0.23 x 0.48 x 4.05
: 4
: 10.4 m3

5.90

0.16

0.23 MIDDLE
0.2

0.48

0.23

G LIST
: BEAM REINFORCEMENT,
: 0.50 x 0.30 x 8
: 0.48 x 0.28 x 8
: 4
: 4.8 m3
Bentuk Besi

8.65
3.06

0.16
0.48 MIDDLE
0.2

0.28

0.48

G LIST
: BEAM REINFORCEMENT,
: 0.25 x 0.40 x 6
: 0.23 x 0.38 x 6
: 20
: 76.8 m3

Bentuk Besi
6.65 2.06

0.16
0.23 MIDDLE
0.2

0.38

0.23

G LIST
: BEAM REINFORCEMENT,
: 0.25 x 0.40 x 5
: 0.23 x 0.38 x 5
: 12
: 38.4 m3

Bentuk Besi

0.16

5.65 1.81
0.16
0.23 MIDDLE
0.2

0.38

0.23

G LIST
: BEAM REINFORCEMENT,
: 0.25 x 0.40 x 3
: 0.23 x 0.38 x 3
: 4
: 7.7 m3

Bentuk Besi

3.65 1.56

0.16
0.23 MIDDLE
0.2

0.38

0.23

G LIST
: BEAM REINFORCEMENT,
: 0.20 x 0.30 x 8
: 0.18 x 0.28 x 8
: 3
: 15.4 m3

Bentuk Besi

8.65 2.56

0.16
0.18 MIDDLE
0.2

0.28
0.18

G LIST
: BEAM REINFORCEMENT,
: 0.20 x 0.30 x 6
: 0.18 x 0.28 x 6
: 12
: 46.1 m3

Bentuk Besi

6.65 2.06

0.16
0.18 MIDDLE
0.2

0.28

0.18
G LIST
: BEAM REINFORCEMENT,
: 0.20 x 0.30 x 5
: 0.18 x 0.28 x 5
: 7
: 22.4 m3

Bentuk Besi

5.65 1.81

0.16
0.18 MIDDLE
0.2

0.28

0.18
G LIST
: BEAM REINFORCEMENT,
: 0.20 x 0.30 x 3
: 0.18 x 0.28 x 3
: 3
: 5.8 m3

Bentuk Besi

3.65 1.56

0.16
0.18 MIDDLE
0.2

0.28

0.18
Volume Besi / Diameter Jumlah
D 10 D 13 ### ### D 22 ### D 29 D 32 Besi
mm mm mm mm mm mm mm mm kg

- - ###### - - - 331.64
- - ###### - - - 170.84
- - ###### - - - 323.56
- - ###### - - - 163.75
- - ###### - - - 989.79
- - ###### - - - 409.50
- - ###### - - - 212.34
- - ###### - - - 405.19
- - ###### - - - 205.86
- - ###### - - - 1,232.89
- - ###### - - - 714.69
- - ###### - - - 361.23
- - ###### - - - 722.09
- - ###### - - - 372.33
- - ###### - - - 2,170.34
- - ###### - - - 336.26
- - ###### - - - 174.36
- - ###### - - - 333.30
- - ###### - - - 169.92
- - ###### - - - 1,013.83
- - ###### - - - 38.29
- - ###### - - - 19.98
- - ###### - - - 37.98
- - ###### - - - 20.35
- - ###### - - - 116.59
- - ###### - - - 209.75
- - ###### - - - 108.76
- - ###### - - - 209.13
- - ###### - - - 107.83
- - ###### - - - 635.47
- - ###### - - -
- - ###### - - -
- - ###### - - -
- - ###### - - -
- - ###### - - -
- - ###### - - - - 12,317.80 6,158.90
- - ###### - - - 6,158.90 9,088.07

- - ###### - - - 970.68 9,088.07


- - ###### - - - 491.26 9,088.07
- - ###### - - - 974.81
- - ###### - - - 492.43
- - ###### - - - 2,929.17

- - ###### - - - -

G LIST
: Plat Tangga,
: x x
: x x
:
: - m3

Bentuk Besi

0.1

5.838 2.45 1.30

0.5
0.1
MIDDLE

0.3
K2 Total Besi
4.05 (LxWxH) 1 D16
4.05 (LxWxH) selimut beton 0.02 21,015

b 0.38
0.2

0.38 0.38

0.38

K4
4.05 (LxWxH)
4.05 (LxWxH) selimut beton 0.02
b 0.23
0.2

0.48 0.48

0.23

B1
8 (LxWxH)
8 (LxWxH) selimut beton 0.02
9.87 5.3

0.16
b 0.48
0.2

0.28 0.28

0.48

B2
6 (LxWxH)
6 (LxWxH) selimut beton 0.02
6.65 4.12

0.16
b 0.23
0.2

0.38 0.38

0.23

B2
5 (LxWxH)
5 (LxWxH) selimut beton 0.02

5.65 3.62
0.16
b 0.23
0.2

0.38 0.38

0.23

B2
3 (LxWxH)
3 (LxWxH) selimut beton 0.02

4.30 2.62

0.16
b 0.23
0.2

0.38 0.38

0.23

B3
8 (LxWxH)
8 (LxWxH) selimut beton 0.02

9.30 5.12

0.16
b 0.18
0.2

0.28 0.28
0.18

B3
6 (LxWxH)
6 (LxWxH) selimut beton 0.02

7.30 4.12

0.16
b 0.18
0.2

0.28 0.28

0.18
B3
5 (LxWxH)
5 (LxWxH) selimut beton 0.02

6.30 3.62

0.16
b 0.18
0.2

0.28 0.28

0.18
B3
3 (LxWxH)
3 (LxWxH) selimut beton 0.02

4.30 2.62

0.16
b 0.18
0.2

0.28 0.28

0.18
(LxWxH)
(LxWxH) selimut beton

2.45
3.62
3.9
2.45

b 0.00
0

0.00 0.00
0.00
Besi
D13 D10 D8 D6 total
13,750 12,759 100.8 818 48,443
TOTAL KEB BESI D16 21,015.3 Kg
Kolom Lt3 D13 13,749.5 Kg
D10 12,759.2 Kg
D8 100.7548 Kg
D6 818.4 Kg
Total 48,443 Kg Rp 133,218,838.38
TOTAL BETON 93.3 m3 Rp 10,727,570.08
TOTAL BEKISTING 829.8 m2 Rp 136,920,630.00
Rp 280,867,038.47
oknam pekerjaan lantai 3

no uraian vol sat harga jumlah


1 kolom k1
-pembesian 23
besi D16 4355.942 kg
besi D10 1091.113 kg
-begisting 134.32 m2
-beton 13.432 m3
2 Kolom k3
-pembesian 4
besi D16 757.5552
besi D10 179.7714
-begisting 21.9
-beton 1.825
3 Plat tangga
-pembesian 12
besi D16 443.4854
besi D10 200.5783
besi D8 93.74746
-begisting 29.369
-beton 3.1356
4 Balok tangga 25/40
-pembesian 12
besi D16 266.0913
besi D10 80.145
besi D8 0
-begisting 12.6
-beton 1.2
5 Balok B1 30x50
-pembesian 8
besi D16 1049.21 kg
besi D13 416.75 kg
besi D6 88.91 kg
-begisting 12.232 m2
-beton 4.8 m3
6 Balok B2 25x40 18
-pembesian
besi D16 2840.832
besi D13 1312.775
besi D13 56.26179
-begisting 25.394
-beton 7.68
6 Balok B2 25x40
-pembesian 21
besi D16 2509.402
besi D13 1021.047
besi D13 65.63876
-begisting 22.816
-beton 10.08
6 Balok B3 20x30
-pembesian 23
besi D16 428.4922
besi D13 199.6946
besi D13 47.92671
-begisting 4.3
-beton 1.4
6 Balok B3 20x30
-pembesian 35
besi D16 549.2275
besi D13 303.8831
besi D13 72.93195
-begisting 10.8
-beton 4.2
7 balok b3 20x30
-pembesian 20
besi D16 1022.7
besi D10 520.9425
besi D8 125.0262
-begisting 17.23
-beton 5.76
8 balok b3 20x30
-pembesian 11.3
besi D16 197.0
besi D10 98.98
besi D8 24.0
-begisting 2.27
-beton 0.66
9 Dinding samping 19.3
10 Lantai
-pembesian
besi D16 0
besi D10 0
besi D8 0
-begisting 419.3
-beton 0
4355.942 1.578
1091.113 0.617 27 1.7 1.15
134.32
13.432

757.5552 1.578
179.7714 0.617 27 1.6 1.1
21.9
1.825

443.4854 1.578
200.5783 0.617 241
93.74746 0.395 144
29.369
3.1356

266.0913 1.578
80.145 0.617 50 100
0.395
12.6
1.2

1049.214 1.578
416.754 1.042 67
88.90752 1.042 53
12.232
4.8

2840.8 1.578 150


1312.8 1.042 53
56.3 1.042 120
25.4
7.7
2509.4 1.578
1021.0 1.042 175
65.6 1.042 140
22.8
10.1

428.5 1.578
199.7 1.042 192
47.9 1.042 153
4.3
1.4

1098.5 1.578 549.2


607.7663 1.042 292 303.9
145.8639 1.042 233 72.9
10.75 5.4
4.2 2.1

1022.7 1.578 1022.7


520.9 1.042 167 520.9
125.0 1.042 133 125.0
17.23 8.6
5.76 2.9

196.9644 1.578 196.9644


99.0 1.042 95 99.0
24.0 1.042 77 24.0
2.3 2.3
0.7 0.7
19.3

419.3 464 44.7


Tangga Kolom
Besi 1084.047 $1,138,250 Besi 6384
begisting 42 $3,147,675 begisting 156
beton 4.3 $216,780 beton 15.3

Jumlah
besi 20262.0
bekisting 689.9
beton 47.7
PROYEK RUMAH KECANTIKAN MARWAH
JATINANGOR
Lantai 4 Pengecoran tanggal 9 juli 2018
Zona 1
No Uraian Pekerjaan Volume Satuan HARGA UPAH

1 Pek. Balok Beton


- Cor Beton K-250 1.12 m3
- Besi Beton 5,322.04 kg
- Bekisting Balok 133.50 m2

2 Pek. Kolom K2 40/40


- Cor Beton K-250 14.90 m3
- Besi Beton 7,525.23 kg
- Bekisting Kolom struktur 149.04 m2

3 Pek. Kolom K4 25/50


- Cor Beton K-250 2.03 m3
- Besi Beton 1,120.07 kg
- Bekisting Kolom struktur 24.30 m2

JUMLAH TOTALBORONGAN UPAH ZONA 1


Zona 2
No Uraian Pekerjaan Volume Satuan HARGA

2 Pek. Kolom K1 40/40


- Cor Beton K-250 m3
- Besi Beton kg
- Bekisting Kolom struktur m2

JUMLAH TOTALBORONGAN UPAH ZONA 2

1 Pek. Tangga
- Cor Beton K-250 4.89 m3
- Besi Beton 961.60 kg
- Bekisting Tangga 10.92 m2
JUMLAH TOTALBORONGAN UPAH TANGGA

JUMLAH TOTAL
JUMLAH

-
-
-

-
-
-

-
-
-

JUMLAH

-
-
-

-
-
-
-

You might also like