1. ALL DIMENSIONS ARE IN MILLIMETER AND LEVELS ARE IN METERS UNO.


2. HPP EL 100.00M EQUALS 17.000 M ABOVE MSL.
002

3. EARTHWORKS, EXCAVATION AND BACKFILL SHALL BE IN ACCORDANCE WITH


DRP001-OUF-SPE-C-000-500, SPECIFICATION FOR SITE PREPARATION
DRP001-OUF-930060-C-CON-001

EXCAVATION & BACKFILL.


4. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH DRP001-OUF-SPE-
C-000-005 AND STANDARD DRAWING NO. DRP001-OUF-000010-C-TS-101.
5. CLASH WITH EXISTING UG/ABOVE GROUND SERVICES/STRUCTURES IF ANY
SHALL BE CHECKED AND VERIFIED AT SITE BEFORE EXECUTION. IN CASE OF
ANY CLASH IDENTIFIED, IT SHALL BE BROUGHT TO THE NOTICE OF THE
ENGINEER IN CHARGE FOR REMEDIAL ACTION.
6. NET SAFE BEARING CAPACITY OF SOIL AT FOUNDATION BASE LEVEL IS
CONSIDERED AS 220 KN/SQM.
7. ALL FOUNDATIONS AND FACILITIES IN SWELLING ZONE AREA SHALL BE
PROVIDED WITH MITIGATION MEASURES AS PER SWELLING ZONE LAYOUT
AND MITIGATION MEASURES DRAWING NO. DRP001-OUF-000010-C-CVL-
005-002 & 003.
8. FUSION BONDED EPOXY COATED REINFORCEMENT BARS SHALL BE PROVIDED
UP TO 3m ABOVE HPP.
9. FOR ISOLATION JOINT DETAILS REFER STANDARD DRAWING NO.
3 4 5 6 7 8 DRP001-OUF-000010-C-CVL-501-001.
10. FOR TRANSFORMER SHED FOUNDATION REFER DWG.NO.
DRP001-OUF-930060-C-CON-007-001.

6000 6000 6000 4500 4550

REFERENCE DRAWINGS
DRAWING NO. TITLE
UNIT PLOT FOR WARE HOUSE,
CL OF TRANSF.FDN. CL OF TRANSF.FDN. CL OF TRANSF.FDN. CL OF TRANSF.FDN. CL OF TRANSF.FDN. DDRP001-OUF-900060-P-PP-002-001 MEDICAL CENTER, FIRE STATION,
CENTRAL CONTROL BUILDING AND LAB.
DRP001-OUF-930060-C-ARC-005-001 UNIT 930 ARCHITECTURAL DRAWING
TO 005 S930-ADMIN BUILDING AREA SUBSTATION
1880 4750 4670 5325 4910 965 4550
DRP001-OUF-000010-C-TS-101-001 TO 003 STANDARD DRAWING
GENERAL NOTES
DRP001-OUF-000010-C-TS-102-001 ABBREVIATIONS AND SYMBOLS
DRP001-OUF-000010-C-TS-103-001 REINFORCING DETAIL (1/3, 2/3, 3/3)
TO 003
SITE PREPARATION EXCAVATION AND
DRP001-OUF-SPE-C-000-500
BACK FILL

CL OF TRANSF.FDN.
CL OF TRANSF.FDN.

DRP001-OUF-SPE-C-000-005 SPECIFICATION FOR CONCRETE WORKS

CLOF TRANSF.FDN.
EL. 100.300 EL. 100.300 EL. 100.300 EL. 100.300
(TOG) (TOG) EL. 100.300 (TOG) (TOG) DRP001-OUF-2037-PL-EL-0081-G61-0006 GA DWG /FDN DWG & HV/LV CABLE
(TOG) ARRANGEMENT DWG FOR DISTRIBUTION
2100 2100 2100 2100
2000 TRANSFORMER-2000kVA,11/0.433kV,
930-TX-301A/B & TX-304A/B
DRP001-OUF-930060-E-ELY-001 TO 003 ELECTRICAL EQUIPMENT LAYOUT
1300

1300

1300

1300
S930-ADMIN BUILDING AREA SUBSTATION
1100
2850

2850
2650

930-TX-301A 930-TX-301B 930-TX-305 930-TX-304B 930-TX-304A

1m 0 1m 2m 3m 4m

SCALE 1:50
3

FOR S930-ADMIN BUILDING AREA SUBSTATION FOUNDATIONS


REFER DWG. NO. DRP001-OUF-930060-C-CON-401-001
S1 13/DEC/19 ISSUED FOR CONSTRUCTION RPJ NIH/SG NCS/VC

TRANSFORMER FOUNDATION LAYOUT

TABLE-1 (STEEL WORK) TABLE -2 (CONCRETE WORK)


LEGEND
BILL OF MATERIAL (APPROX.) BILL OF MATERIAL (APPROX.) REFERENCE DRAWINGS
FDN. - FOUNDATION
DRP001-OUF-SPE-C-000-011 STRUCTURAL DESIGN CRITERIA
MEMBER DESCRIPTION UNIT QUANTITY SL. NO. DIMENSION UNIT QUANTITY
MARK DRP001-OUF-SPE-C-000-001 CIVIL ENGINEERING DESIGN CRITERIA TRANSF - TRANSFORMER CNT-1100-1000-007
25THK. PLATE MT 0.08 1 BLINDING CONCRETE C30 CUM 0.952 DRP001-OUF-RPT-C-000-001 GEOTECHNICAL INTERPRETATIVE REPORT BOC - BOTTOM OF CONCRETE JI-2037/SO0267 PROJECT INTERNAL

2 CONCRETE C40 CUM 22.950 DRP001-OUF-2037-PL-EL-0081-G61-0010 GA DWG /FDN DWG & HV/LV CABLE TOG - TOP OF GROUT
10THK. PLATE MT 0.34
ARRANGEMENT DWG FOR DISTRIBUTION UNIT 930
3 REINFORCEMENT MT 1.150 TRANSFORMER-1000kVA,11/0.433kV. 930-TX-305
S930-ADMIN BUILDING AREA SUBSTATION
4 EXCAVATION CUM 20.655
GA & REINFORCEMENT DETAILS OF TRANSFORMER FOUNDATIONS

1:50 DRP001-OUF-930060-C-CON-001 002 S1


THIS DWG. SHALL BE READ IN CONJUNCTION WITH SO0267-EA0D-BDG-930060-C-CON-001-002
DWG. NO. DRP001-OUF-930060-C-CON-001 (ALL SHEETS)
DRP001-OUF-930060-C-CON-001-002-S1.DWG