You are on page 1of 1

KEY PLAN

R1

Detail Scale
Name
001

1 2 3 3' 4 5 6 7 8 9 10
52000
6000 5550 6000 6000 6000 5500 5500 5500 5500
DRP001-OUF-940060-C-CON-401

450 FOR TRANSFORMER FOUNDATION REFER


DWG. NO. DRP001-OUF-940060-C-CON-002-001

THIS DRAWING

CL OF COLUMN NOTES
CL OF COLUMN 50
1. ALL ELEVATIONS AND COORDINATES ARE IN METER AND DIMENSIONS ARE IN
50mm MILLIMETERS UNLESS NOTED OTHERWISE.
CL OF COLUMN

150
EXPANSION JOINT 2. CENTER LINE OF COLUMNS AND FOUNDATIONS MATCH UNLESS NOTED
OTHERWISE.
1500 3800
1350 1200 1200 1200 1200 1200 1200 3. FOR SITE COORDINATES/ DATUM AND PLANT COORDINATES, REFER UNIT
(TYP) 1650 1200 PLOT PLAN DRAWING NO. DRP001-OUF-900060-P-PP-002-001.
4. HPP EL 100.000M EQUALS 17.000 M ABOVE MSL.
200

5. EARTHWORKS, EXCAVATION AND BACKFILL SHALL BE IN ACCORDANCE WITH

(TYP)
DRP001-OUF-SPE-C-000-500, SPECIFICATION FOR SITE PREPARATION
C 2800 EXCAVATION & BACKFILL.

1000

1000

1000

1000

1000

1000

1000
1200
1300
1300

F3 F3 F3 F3 F3 F3 F3 6. ALL CONCRETE WORK SHALL BE IN ACCORDANCE WITH DRP001-OUF-SPE-


F2 C-000-005 AND STANDARD DRAWING NO. DRP001-OUF-000010-C-TS-101.
F2a F6
7. CLASH WITH EXISTING UG/ABOVE GROUND SERVICES/STRUCTURES IF ANY
4500

1350 1200
1100 1100 1100 1100 1100 1100 SHALL BE CHECKED AND VERIFIED AT SITE BEFORE EXECUTION. IN CASE OF
ANY CLASH IDENTIFIED, IT SHALL BE BROUGHT TO THE NOTICE OF THE
1500
9000

ENGINEER IN CHARGE FOR REMEDIAL ACTION.

1200
1100

1100

1100

1100

1100

1100

1100
(TYP)
8. NET SAFE BEARING CAPACITY OF SOIL AT FOUNDATION BASE LEVEL IS

2200
B CONSIDERED AS 400KN/SQ.M.
F1a F1 F1 F1 F3 F1 F1 F1a 9. FUSION BONDED EPOXY COATED REINF. BARS SHALL BE PROVIDED
F2
4500

2200 UP TO 3M ABOVE HPP.


1100 5825
(TYP) 10. ALL FOUNDATIONS AND FACILITIES IN SWELLING ZONE AREA SHALL BE
(NTS)

850
3325 1200 1200 1200 1350 1350 1912.5 PROVIDED WITH MITIGATION MEASURES AS PER SWELLING ZONE LAYOUT
1350
AND MITIGATION MEASURES DRAWING NO. DRP001-OUF-000010-C-CVL-
1300

1300

1000

1000

1000
005-002 & 003.

850

850
N=1325.000
(TYP)

(TYP)
A

2400
3000

REFERENCE DRAWINGS

1550

1550
2100

2050
(TYP)

(TYP)

(TYP)
4000

4000

3700
DRAWING NO. TITLE

700
F3
200

F3
CL OF COLUMN

F3
F2 DRP001-OUF-000010-P-PP-001 OVERALL PLOT PLAN
F2a
E=1817.900

1350 1500
1050

1050

1050

1050
ST-1 2400 ST-1 UNIT PLOT PLAN - OPS BUILDING AREA
3000 F4 F5 DRP001-OUF-900060-P-PP-002-001
3000 (TYP) F4 F4 SUBSTATION
(TYP) F7 1125 DRP001-OUF-000010-C-TS-101-001
5200 2700 GENERAL NOTES - COMMON, STRUCTURAL
(TYP) TO 003 CONCRETE & STRUCTURAL STEEL
(TYP) 2700
A' (TYP) DRP001-OUF-000010-C-TS-102 ABBREVIATIONS AND SYMBOLS
FOR STAIRCASE FOUNDATION
FOR HVAC FOUNDATION DETAILS REFER DWG. NO. DRP001-OUF- FOR SHELTER FOUNDATION DETAILS REFER DWG. NO. DRP001-OUF-000010-C-TS-103-001
REFER DWG. NO. DRP001-OUF- 940060-C-CON-405-001. DRP001-OUF-940060-C-CON-405-008. REINFORCEMENT DETAIL (1/3,2/3,3/3)
TO 003
940060-C-CON-006-001.
DRP001-OUF-940060-C-CON-402-001 COLUMN LAYOUT & RC DETAILS

FOUNDATION LAYOUT DRP001-OUF-940060-C-CON-404-001 GRADE BEAM LAYOUT AND REINFORCEMENT


DETAILS
(SCALE - 1:100)
DRP001-OUF-940060-C-CON-002-001 DETAILS OF TRANSFORMER FOUNDATION
REFERENCE DRAWINGS & DOCUMENTS 2m 0 2m 4m 6m 8m
DRAWING NO. TITLE

DRP001-OUF-SPE-C-000-011 STRUCTURAL DESIGN CRITERIA SCALE 1:100


DRP001-OUF-SPE-C-000-001 CIVIL ENGINEERING DESIGN CRITERIA 3
DRP001-OUF-RPT-C-000-001 GEOTECHNICAL INTERPRETATIVE REPORT
SITE PREPARATION EXCAVATION AND
DRP001-OUF-SPE-C-000-500
FOOTING SCHEDULE BILL OF MATERIAL (APPROX.) BACK FILL
NO. OF DIMENSION TOP REINF BOTTOM REINF DRP001-OUF-SPE-C-000-005 SPECIFICATION FOR CONCRETE WORKS
SL. NO. MARK a b c d EL + BOC. SL. NO. DESCRIPTION UNIT QUANTITY
FOOTINGS A B T R1 03/JUNE/19 ISSUED FOR CONSTRUCTION (WITH HOLDS) Sk SIMI/SG NCS/VC
DRP001-OUF-940060-C-CON-405-001 GA & REINF. DETAILS OF ACCESS STAIRS
1 F1&F1a 7 2200 2200 600 D12 @ 150 D12 @ 150 D16 @ 150 D16 @ 150 98.000 R1/A 20/MAY/19 ISSUED FOR CONTRACTOR REVIEW Sk SIMI/SG NCS/VC
1 BLINDING CONCRETE C30 CUM 12.50 DRP001-OUF-940060-C-ARC-006-001 GROUND FLOOR PLAN
2 F2 3 3000 3000 600 D12 @ 175 D12 @ 175 D16 @ 175 D16 @ 175 98.000
3 F2a 2 3000 3000 700 D12 @ 125 D12 @ 125 D16 @ 125 D16 @ 125 98.000 2 CONCRETE C40 CUM 130 DRP001-OUF-940060-C-ARC-006-002 FIRST FLOOR PLAN
4 F3 11 2400 2400 600 D12 @ 150 D12 @ 150 D16 @ 150 D16 @ 150 98.000 DRP001-OUF-940060-C-ARC-006-003 ROOF PLAN
3 REINFORCEMENT MT 15
5 F4 3 2700 4000 600 D12 @ 150 D12 @ 150 D16 @ 150 D16 @ 150 98.000
DRP001-OUF-940060-C-ARC-006-004 ELEVATION
6 F5 1 2700 3700 600 D12 @ 150 D12 @ 150 D16 @ 150 D16 @ 150 98.000 4 EXCAVATION CUM 550
DRP001-OUF-940060-C-ARC-006-005 SECTION
7 F6 1 3800 2800 600 D12 @ 150 D12 @ 150 D16 @ 150 D16 @ 150 98.000
DRP001-OUF-940060-C-CON-002-001 TRANSFORMER FOUNDATION
8 F7 1 5200 4000 600 D12 @ 150 D12 @ 150 D16 @ 150 D16 @ 150 98.000 CNT-1100-1000-007
DRP001-OUF-940060-C-CON-405-001 STAIRCASE FOUNDATION JI-2037/SO0267 PROJECT INTERNAL

DRP001-OUF-940060-C-CON-405-008 SHELTER FOUNDATION UNIT 940


DRP001-OUF-940060-C-CON-006-001 HVAC FOUNDATION
CONCRETE DRAWING
STRUCTURAL CALCULATION FOR S940 - OPS BUILDING AREA SUBSTATION
DRP001-OUF-CAL-C-940-401 S940-OPS BUILDING AREA SUBSTATION FOUNDATION LAYOUT & RC DETAILS
THIS DWG. SHALL BE READ IN CONJUNCTION WITH
DWG. NO. DRP001-OUF-940060-C-CON-401-002, 003 1:100 DRP001-OUF-940060-C-CON-401 001 R1
DRP001-OUF-940060-C-CON-402-002,
SO0267-EQ2D-BDG-940060-C-CON-401-001
DRP001-OUF-940060-C-ARC-006 (ALL SHEETS)
DRP001-OUF-940060-C-CON-401-001-R1.DWG

You might also like