TITLE: Ref.

: CIL-DPR-0
PROCEDURE FOR INDUSTRIAL Page : 1 of 2
ENGINEERING ( IE STUDY) Pg.Rev : 00
Date : 03.03.2017

1.0 Purpose and Scope

 Define the Process for performing IE study in a selected process

 This procedure applicable to all plants across group companies.

2.0 Inputs:
2.1 Business targets
2.2 Inputs from Top management review
2.3 New customer requirement

3.0 Process / Procedural Steps

S. No. Procedural Steps Responsibility

3.1 IE study

Select the process for the IE study (CIL-SFS-02) based on Bottleneck


3.1.1 process, Customer requirements, and Business requirements, Value Biz CI/Gr CI
stream map
Seek the approvals/Select the process for conducting IE study as per
3.1.2 customer requirement, business requirement Biz CI/Gr CI

Collect the manpower details and present process flow


3.1.3 Biz CI/Gr CI

3.1.4 Study the present layout & Observe the present process at workplace Biz CI/Gr CI

List all activities and record the cycle time element wise for each
3.1.5 Biz CI/Gr CI
task Ref :CIL-SFS-02

3.1.6 Arrive the capacity of the model based on cycle time Biz CI/Gr CI

Calculate Work content for the manpower and, balance the line and
3.1.7 Biz CI/Gr CI
arrive the required manpower

Identify the scope for the improvements with related to factors like
3.1.8 Biz CI/Gr CI
productivity, cost ,fatigue ,quality .safety

Summarize improvements in a format and present to the


3.1.9 Biz CI/Gr CI
management for approval
TITLE: Ref. : CIL-DPR-0
PROCEDURE FOR INDUSTRIAL Page : 2 of 2
ENGINEERING ( IE STUDY) Pg.Rev : 00
Date : 03.03.2017

3.1.10 Once approved track the Savings from the improvements Biz CI/Gr CI

4.0 Outputs:
4.1 IE study report

5.0 Performance Indicator:


5.1 Number of completed improvement actions