You are on page 1of 86

Tutorial mh-software BIM

Tutorial RaumGEO

Guide to a complete heating planning, starting with the acquisition of


Chamber geometry, on heating load, radiator design, pipe network calculation, valve design to
the output of the pipe network as a DWG drawing in a
perform practice session.

• copyright mh-software GmbH mh-software BIM


Table of Contents

mh-software GmbH

Greschbachstr. 29

D-76229 Karlsruhe

Tel. ++ 49 (0) 721/62 52 0-0

Fax ++ 49 (0) 721/62 52 0-11

Email: info@mh-software.de

www.mh-software.de

The information and data contained in this document without prior

Announcement to be changed. The information and data used in the examples

are fictitious. All names and trademarks are properties of their

respective owners. mh-software without the express written permission of the GmbH

no part of these documents reproduced or transmitted for any purpose

become.

© copyright mh-software GmbH. All rights reserved. Date: August 2018

Tutorial • 2• mh - RaumGEO
Table of Contents

Table of Contents

1. Welcome ................................................. .................................................. ............................................... 4


Second Introduction ................................................. .................................................. .................................................. 5
2.1. Basics ................................................. .................................................. ............................................... 5
2.1.1. Benefits of working with the chamber geometry ........................................... .......................................... 5
2.1.2. Graphical representation ................................................ .................................................. ................................. 6
2.1.3. Generating the data ............................................... .................................................. ................................ 6
2.1.4. The importance of space type .............................................. .................................................. ...................... 6
2.2. Method ................................................. .................................................. ........................................ 7
2.3. Important relationships ................................................ .................................................. ......................... 8th
2.4. Basic knowledge ................................................. .................................................. .............................................. 9
2.4.1. The canvas ................................................ .................................................. ....................................... 9
2.4.2. The data area ................................................ .................................................. ..................................... 10
2.4.3. Dots ................................................. .................................................. ........................................... 10
2.4.4. Supportive evidence ................................................ .................................................. .......................... 10
2.5. Several important functions ............................................... .................................................. ............ 10
2.5.1. Saving the network .............................................. .................................................. ......................... 10
2.5.2. Undo and Redo ............................................... .................................................. ............. 11
2.5.3. Tools ................................................. .................................................. .............................................. 11
2.5.4. The context menu ................................................ .................................................. ..................................... 11
2.5.5. Deleting the wrong drawing objects ............................................. .................................................. ... 12
2.5.6. Zooming ................................................ .................................................. ............................................. 12
2.5.7. Changing the view .............................................. .................................................. ......................... 12
Third Introductory example ................................................ .................................................. ............................... 14
3.1. Create building structure ................................................ .................................................. ........................ 14
3.1.1. Applying the exercise project ............................................... .................................................. ................... 14
3.1.2. Building quick definition ............................................... .................................................. ......................... 15
3.1.3. Assigning floor plans ................................................ .................................................. ......................... 17
3.1.4. Set the default values ​............................................... .................................................. .................. 18
3.2. Acquisition of the room geometry ............................................... .................................................. .................. 19
3.2.1. The detection of the outer walls .............................................. .................................................. .................. 19
3.2.2. The detection of the interior walls .............................................. .................................................. .................... 22
3.2.3. The detection of the windows and doors ............................................ .................................................. ............ 25
3.2.4. Set room stamp ................................................ .................................................. ............................ 27
3.2.5. Providing the data ............................................... .................................................. .............................. 28
3.2.6. Global change ................................................ .................................................. ..................................... 30
3.2.7. Radiators ................................................. .................................................. ............................................... 31
3.2.8. Additional radiators ................................................. .................................................. ..................................... 32
3.2.9. Copy Floor ................................................ .................................................. .................................. 33
3.2.10. Create attic ................................................ .................................................. ............................ 35
3.2.11. Edit Information messages ................................................ .................................................. .................. 39
3.2.12. Create roof ................................................ .................................................. ........................................... 41
3.2.13. Skylights draw ................................................ .................................................. .......................... 43
3.2.14. Draw shed dormer ................................................ .................................................. ....................... 44
3.2.15. assign volumes of air for ventilation and air-conditioning ............................................ .................................................. .......... 48
3.2.16. Staircase linking ................................................ .................................................. .......................... 48
3.3. calculate heat load ................................................ .................................................. ................................... 49
3.3.1. complete project data for heating load .............................................. .................................................. ............. 49
3.3.2. Building heating identify ................................................ .................................................. ........................ 50
3.3.3. Navigation ................................................. .................................................. ............................................... 50
3.3.4. Analysis examples ................................................ .................................................. ..................................... 51
3.4. Radiator design ................................................. .................................................. ............................... 54
3.5. Pipework calculation ................................................. .................................................. ............................... 55
3.5.1. Radiators automatically place ............................................... .................................................. ............. 58
3.5.2. Distribution lines are characterized ................................................ .................................................. .......................... 59
3.5.3. Create upper floors ................................................ .................................................. ........................... 64
3.5.4. Drawing a riser .............................................. .................................................. ................. 65
3.5.5. The drawing of the heating system .............................................. .................................................. ................... 66
3.5.6. Radiators connect ................................................ .................................................. ............................... 74
3.5.7. delete open pipe ends ............................................... .................................................. ......................... 74
3.5.8. To calculate ................................................. .................................................. ............................................... 75
3.5.9. Balance of the strands ............................................... .................................................. ................................. 77
3.5.10. Network analysis ................................................. .................................................. ............................................ 78
3.6. Plans ................................................. .................................................. .................................................. ..... 79
3.6.1. Labeling ................................................ .................................................. ........................................ 80
3.7. Subsequent changes ................................................ .................................................. ....................... 82
3.7.1. Change south facade ................................................ .................................................. .................................. 82
3.8. The volume rendering ................................................ .................................................. ............................ 84
3.9. Objects isolating ................................................ ..................................... Error! Bookmark not defined.
10.3. Experiment! .................................................. .................................................. .............................. 86

Tutorial • 3• mh - RaumGEO
welcome

1. welcome

Thank you for using MH software.

With the technical calculation programs MH software you have very powerful programs to perform effectively the occurring in daily practice calculations in the
TGA.

About mh-software

develops the mh-software GmbH and distributes since 1985 technical calculation programs and is among the leading providers in Germany. For more information
on mh-software or programs you call us.

mh-software GmbH Greschbachstr. 29


D-76229 Karlsruhe

Tel .: (0721) 62 52 0 - 0

Fax.: (0721) 62 52 0-11

E-mail: info@mh-software.de

Web: www.mh-software.de

How do I learn how to operate the programs?

• To get started:

Revise the present introductory example of RaumGEO by. They learn this way know in compressed form all the important functions of the mh tools. ,
The operation after editing the example image is easy.

• During work:

Use the integrated help system. The Help buttons and the F1 key, you will each receive help for the current function.

• Any questions:

Use the forum below www. MH software.de/forum , Look to see if your questions have already been asked by others or create new topics.

Introductory example • 4• mh - RaumGEO


Second introduction

2.1. Basics

Detecting the spatial geometry or the building via the architectural floor plans, the conventional tabular capture of the components is clearly superior for the
heating and cooling load. The huge time savings, the visual control possibilities, the direct linkage of the walls, windows, doors with a tabular representation of the
components in the heating load and the elegant variation possibilities are the main points that speak for the graphic recording of room components.

Through the concept of mh-software, the data in the graph directly connected to the heating and cooling load calculations, and the radiator design and piping
calculation. Does not require any data acquisitions or -Übergaben.

The program supports your work including through

• Intelligent drawing functions for the components

• powerful copy functions that reduce input costs dramatically

• automatic generation of components for the heating and cooling load

• Relations between adjoining rooms are made automatically

• automatically correcting the data according to changes in the spatial geometry

• flexible functions for subsequent change of data in the entire building, buildings or any component groups.

• Textured 3D representation of the building

• automatic creation of the radiator design

• automatic placing of radiators for pipeline calculation

Due to the object-oriented structure of the program, the work of the natural way of thinking is adapted humans. Compared to working in tabular calculation
programs, this has several advantages, including:

• Input errors by forgotten, duplicate or incorrect component dimensions are virtually eliminated.

• They recognize immediately which areas are already covered, or rooms need to be acquired.

• Changes of individual data can be made via the graphics much more effective, such as the replacement of windows in the south facade. About the
tabular editing such changes with a considerable amount of time are connected, and also error-prone.

• Access to individual components on the graphics are much faster than on tables.

• Direct optical access to radiator over the room, with the global changes related possibilities.

• Nevertheless, you have direct access to the clear tabular presentation. You can always choose where you want to submit it, or change, in the table
or on the graph.

• With an analysis function, the objects are colored according to the values ​of any data. So you can be colored as the rooms according to the specific
heating power or the components of the transmission heat loss.

• jump over the textured 3D representation of the building input errors immediately apparent

You can always display the data of a component shown in the diagram and edit and with a single click directly to the heating, cooling load calculation, radiator
design and piping calculation change.

If desired, the objects may be labeled with any input or calculation results.

2.1.1. Benefits of working with the chamber geometry


The program mh-RaumGEO accelerates the detection of spatial data for the heating or cooling load considerably. In addition, the spatial data are also used for
further processing within the heating planning, where there is also a significant time savings.

Generating Data

By pressing a button the components for the heating and cooling load calculation are generated from the acquired spatial geometry, which only the calculation
specific data needs to be supplemented in these programs. Subsequent changes as
as moving, deleting or adding walls, windows, doors, rooms or assigning data on powerful global change functions are performed in the image and automatically
have an effect on the heating or cooling load calculation.

• copyright MH software GmbH MH BIM software


Preparation for radiator design

Radiators can for an automatic interpretation for each subscribed within the window radiator design
be provided. Also drawing the installation position of additional radiators, eg for indoor application, facilitates further processing.

Preparation for pipeline calculation

Using the spatial geometry, the radiators can in the pipe network calculation automatically with the correct
Radiator dimensions are placed in the desired distance from the wall, so that only the distribution and risers must be drawn.

Easy data access

Access to the data of the various calculation modules is much easier through the graphical work. By clicking on an object in the image data can be viewed
immediately and modified.

Elegant modification of data

Changes to the data of the whole object groups are settled on the room geometry in a few moments. Just a selection set, for example, put together, the radiators
in the bathrooms or all walls of the south facade, and copy the desired values ​in all objects in the selection set.

navigation Help

The chamber geometry is also used after the detection of building data as a welcome navigation aid access to the room data in the heating load or the cooling
load calculation or else to the appropriate place of the heater or pipe network calculation to jump.

Graphical data analysis

In addition, the spatial geometry is used for the analysis of data entries or calculation results. In the graph, for example the spaces may be colored according to
the specific heating load, whereby input errors or critical planning situations quickly analyzed and corrected.

2.1.2. graph
Even for users with no CAD experience capturing the spatial geometry is particularly easy, as used by mh-software advanced features that are specifically
tailored to the simple drawing of components.

The architectural floor plans are displayed as DWG or DXF file each storey and simply traced the components. Each chamber is then provided with a space
temple.

For data entry, a click is the right mouse button on an object (wall, window, door, room stamp, ...) in the graphic display to the corresponding data sheet. All
subsequent data changes, such as the replacement of U-values ​in the "south facade" are completed in seconds.

2.1.3. Generation of the data


When generating the data records are created for the heating or cooling load calculation for graphically captured components. The program generates this for
every room the extensive components. In addition, to determine the following data:

• component dimensions

• Height of the space above the floor

• Floor surface and volume

• Footprint of the base plate for rooms against soil

• for spaces that extend partially into the ground, soil touched components and components are generated against outside air.

Information will be provided for the radiator design and piping calculation that allow for quick editing. For this purpose, placed in front of each window (in the pipe
network calculation) a radiator. Is in front of individual windows, no heating required, this can be labeled natural. If necessary, the positions of additional heating
element can be drawn (in particular for internal spaces) in RaumGEO.

2.1.4. The importance of habitat type


It makes sense to divide the rooms into types such as office, hall, toilet, living room, bedroom, etc. The room type, consisting of a 3-digit alphanumeric
abbreviation, used in different parts of the program for allocating

• copyright MH software GmbH MH BIM software


Default values ​and can be also used also as a reference for information about how eg room air temperature or the minimum air change. For more information
about the room type in the manual of the heating load.

After a heating load, the radiator design can almost automatically be carried out as part of an initialization. It is possible to assign a separate radiator type from
any manufacturer every room type, thereby assigned to a button every room in the entire building of the desired radiator and designed.

The room type is converted into the radiator design in a radiator group. The radiator group is very similar to using the room type in the heating load. It is used
primarily to automatically assign data or to carry out subsequent changes easier. Each radiator is automatically given during initialization by the data of the
heating load, a heating-group short term corresponding to the room type short name. It can furthermore additional radiator groups defined and the radiators are
allocated. For more information about Radiator group, refer to the radiator design.

In the pipe network calculation, the designed heater can be automatically placed with the correct dimensions, wherein each radiator is assigned on the radiator
group is an individual connection, a distance from the wall, and an installation height above the floor.

The processing time of a project is reduced considerably by the use of room types and the radiator groups derived therefrom.

2.2. method

The screen mask of the program mh-RaumGEO is divided into two main areas. In the right pane the graphical recording of room geometry is and the left side of
the data of the individual objects are displayed. The program will be largely free hand, typing in what order the data. However, the following approach is likely to
be the most effective:

1. From project management to a document (attached) for the chamber geometry. In the mask buildings Quick Definition enter the characteristics of the
projectiles. Then you read a one floor plan for each floor. ( Working with layout plans ).

2. Then enter defaults for space and component data that the drawn elements
are automatically assigned.

3. Enter the room geometry in which the Outside - and interior walls and Windows and doors in the
Floor plan tracing (see Detecting the spatial geometry ). An automatic Fang makes drawing. Make sure that the display type 'System' is selected in
the drawing that you select with the F9 key (see select Display ). The presentation 'System' is preferable for drawing.

4. After you set a room stamp in any room.

5. Enter one by one all floors. For this purpose, you can copy one floor to another floor the objects. To switch to another floor, call the Ansichts mask or in
the footer set the desired floor.

6th Place over the North arrow the direction determined.

7. Do not forget to save the time data from time.

8. Start the to generate the spatial data. If you have not drawn correctly the room geometry, receive
a error list You make the necessary changes in the drawing with the aid.

9. The drawn elements are now data masks assigned, in which you enter any necessary changes.

10. About Quick Clicks You can directly jump to other calculation modules, such as heating, cooling load or
Radiator design.

11. For first heating planning to switch to the heating load to still complete the missing data there. Then you run into the radiator design by initializing, with
the almost fully automatically a complete radiator design is performed. Afterwards, you can place all designed radiators in the pipe network
calculation. After drawing the storey and risers and the connection of the radiator to the floor conduits an interpretation of the pipe network can be
performed.

12. About the Flight mode You can virtually move through the network, the Objects Isolate mode allows
(Even over several floors) to cut them any area in any expansion of the building and its details.

13. If you are happy with your design, you can use the Paper Plan Administration Creating plans. Here Are
You know no bounds. You can create as many plans and views. Each plan can have its own individual label. With a few clicks you export your plans
in your format.

Before you perform your first plan, you must follow the introductory example work through. After a few minutes will give you the basic procedure significantly. To
quickly learn to fully exploit the many possibilities of the program.

• copyright MH software GmbH MH BIM software


Begin then edit their own small project, in which you get to know all the features playful. After a short time you will be able to handle larger projects in no time.

2.3. Important relationships

Important relationships between RaumGEO, heating load, cooling load, radiator design and piping calculation

The individual program modules of mh-software access to a common data Master to, so error-prone data transfers and acquisitions not required. Nevertheless,
the relationships are essential skills to enable effective processing.

Each program module has its own calculation core that is not initiated by the other program modules. Change eg a value in the heating load, this, the radiator
design is initially not affected. Only when you re-perform the calculation in the radiator design, the changed values ​of the heating load are considered.

RaumGEO

Similarly, the program module RaumGEO behaves in connection with the heating load. Change, has RaumGEO the geometry of the first no effect on the results
of the heating load. First, the modified geometry must be analyzed and the components are regenerated. When generating the components is simultaneously a
heating load calculation carried out of the territories involved, so the results displayed in the room geometry is updated.

The generation of the components is only required if the room geometry (drawing) has been changed. Change by replacing the data of individual objects, for
example, by a change in the component Global abbreviation of exterior walls, a generation of the components is not required. But even in this case: the changes
in the data are only taken into account by re-calculating the heating or cooling load.

Note: The program module RaumGEO the data can only be displayed or modified after the generation of the components was performed.

Recommendation:

Generate "safety's sake" after a change once the entire building.

heating load

The calculation of the heating load is automatically performed for a room as soon as the space data of the room to be called or displayed. The heating load but is
performed only for the displayed area. The results of all the other rooms may not be up to date. Therefore, it is recommended a calculation of the building to
perform to the data to update all the rooms. This is especially required when you change values, which could affect several or all rooms, such as the standard
outdoor temperature, the basic water depth, the room master data or the component data in the component catalog, such as U-value or window or door
-Dimensions.

A smaller change in the chamber geometry, as moving an inner wall, the impact may have several rooms. Therefore, it is always useful to regenerate the
components to calculate the entire building again in the heating load.

recommendation : Calculate "safety's sake" after a change in the flanking modules RaumGEO, U value calculation or manual changes to the room
components (walls, windows, ...) in the cooling load again the entire building.

radiator design

The (detailed) Initialize the radiator design lays out for all new rooms radiators that were not created in the program module HkCALC. Here, a heater is
automatically provided for each window. To be placed in front of a window, no radiator, deactivate in RaumGEO for this window, select "Radiator for windows
provide." Check before initializing if you have already performed the heating load for all spaces. Otherwise (0 = heating load) no radiators are provided in the
radiator design for the rooms without heat load.

Insert after already taken radiator design in RaumGEO or heating load new spaces, then take into account only the new and not yet processed spaces at
initialization. Spaces for the initialization has already been done will not be re-initialized again (unless you activate the tab "initialization" or "Detailed Initialization"
option "designed radiator should be deleted").

Changes in Heizlastdaten or other constraints, such as new radiators catalogs or the air pressure is only through an update (Reiter Project data> Update) into
account all the rooms. To the selected

• copyright MH software GmbH MH BIM software


maintain radiator and to adapt only the changed conditions, you can simultaneously "fix".

Recommendation: If you are not sure if current Heizlastergebnisse for the radiator design are available, you should "safe side" again calculate the
entire building heating load in the module and then perform only the changes in the radiator design.

Pipeline calculation

The pipeline calculation uses the calculation results of the radiator design without performing an interpretation. It is therefore necessary to provide in the radiator
design for current results.

By using the program module RaumGEO radiator can be placed automatically with the determined in the radiator design radiator dimensions. If the position of the
radiators, have changed by moving the window in RaumGEO example, the new position in RohrSYS is not adjusted, as well as the connecting lines or distribution
lines must be laid. Perform such changes by manually. One option is to remove the radiators concerned together with the connecting lines in RohrSYS and place
again automatically.

Changed radiators dimensions are tracked by automatically placing in RohrSYS if the connecting lines can be routed automatically. Otherwise warning
messages. You can then decide individually whether it is necessary to incorporate the changes. Also delete in this case, the affected radiator together with the
connecting lines and run the automatic placement through again.

Recommendation: If you are not sure if current radiators are available, you should "safe side" again calculate the entire building heating load in the
module and perform the update in the radiator design and then perform only the changes to the pipe network calculation.

Cooling load calculation

The calculation of spatial data for the cooling load is automatically performed for a room as soon as the space data of the room to be called or displayed. The
calculation of the cooling load of the building must separately via the tab calculation are triggered. are otherwise similarly to the same conditions described for the
heating load (see above).

Recommendation:

Calculate "safety's sake" after a change once the entire building.

2.4. basic knowledge

Before you start entering the building as part of the introductory example, you should be familiar with some concepts and principles. The knowledge of the
mentioned tips and settings are required for the effective use of the program and should be worked through in any case!

In this Preliminary example of the spatial geometry of the module mh-RaumGEO particular addressing the processing and functions. We assume that
the user already mastered the functions of the corresponding modules Component, heating load, radiator design and piping calculation. Please refer
to the respective separate manuals For more information on these modules.

Note :
The actual processing of the sample project begins "create 12.3 .Gebäudestruktur" with the chapter. But first, the basics:

2.4.1. The canvas


In the drawing area in the right area of ​the screen, only the floor plan is initially (if selected) and a reticle visible. The crosshairs can be moved with the mouse.
Starting from the first operating point a dashed reference line is drawn to the cross-hairs. When starting a new system, the first operating point is at the origin of
the x, y, zKoordinaten (0,0,0). Where do you usually start your drawing, but does not matter. So this does not necessarily have to be at the origin. You can see in
the status bar, the current position of the crosshairs right below.

• copyright MH software GmbH MH BIM software


2.4.2. The data area
On the left side of the screen, the data area is located. In this area, data entry can be made to the building and individual
objects and components. Also the final calculation results calculated any objects and components are delivered here.

In addition to the data inputs can use the tab " Calc are set to "various parameters for the calculation and data analysis. Note
- and error messages are also displayed here. The tab " plans "You get to the paper plan management. Here the plans,
including marking contents and scope are defined. A very important function has the tab " To draw ". This provides access to
the various drawing tools and drawing objects.

2.4.3. dots
The crosshair moves on invisible grid points whose distance can you claim free. By default, a grid spacing of 10 cm is set. With the help of the grid, a construction
is unrelated to the plan (for example, when placing additional radiators) to perform quick and easy.

The detection of the walls, doors and windows is usually done in conjunction with floor plans. mh-RaumGEO interprets the stored floor plan and automatically
generates snap points. To avoid a conflict with the rigid grid, you should therefore avoid the use of the grid. The grid is disabled by default, but can be enabled via
the "grid" or F7 at the bottom.

2.4.4. Supportive evidence


Right below the mouse messages will be displayed on the currently selected mode, to assist in particular the training phase. If you are more familiar with the
program you can hints about
options • Settings ... switch off.

2.5. Several important functions

In this chapter we will briefly on some key commands you need again and again.

2.5.1. Saving the network


From time to time you should save your work so far. As usual in drawing or CAD programs, determines the

User when a drawing is to be stored. To do this on the 'Save' icon in the


Toolbar. When you finish editing a system without saving, you can return to the last stand to your work from there continue.

In order to be "remember" to save, you can options • Settings ... Setting a time interval. Once the preset time has elapsed, a mask in which you will choose
whether now or should be saved for the next action.

• copyright MH software GmbH MH BIM software


2.5.2. Undo and Redo

Drawing commands you can Edit Undo cancel. Alternatively, you can click the icon in

the toolbar. The command Edit Redo or by clicking on to the last


Undone Commands discard them.

2.5.3. Tools
is the most important drawing tools left in the data area on the tab " To draw "Access. Here you can (such as objects to select, delete, copy ...) and new objects
are selected for subscription in addition to the tools for editing and manipulation already drawn objects. Besides the pure selection of objects you can here
already defaults Assign the objects to be drawn - for example, you can specify that the outer wall receives the specifications of a sand-lime brick wall, the inner
wall of a light construction wall is the allocation of pipe in both the hydraulic program modules - making and channel properties.

Another option of quick access to the tools offered by the toolbox. You can access by right-clicking in any part of the plot area.

In the introductory example we will largely eliminate the use of the toolbox and the tools under the tab " To draw use ". However, it is up to you to work the tool
access to the variant that suits you best.

2.5.4. The context menu


If you click with the right mouse button on any drawn object, a context menu opens. From this menu, you can display the calculation and labeling data of a single
object, add this object in a selection set or remove, delete it directly or call the toolbox.

• copyright MH software GmbH MH BIM software


2.5.5. Deleting the wrong drawing objects
If you accidentally drawn objects (such as walls, windows, doors .....) wrong, you can simply delete it. First, you gather that you want to delete all the objects in a
selection list. To select the

Tools mode

Move the mouse on the object that you want to add to the selection list. Once you come up with the mouse in the proximity of an object, it is displayed in bold. By
clicking take the object in the selection list. Repeat this process to accommodate more objects. If you want to add multiple objects at once, you can draw a
border. To do this, release the left mouse button and move the mouse until the frame the size you want. Release the mouse button, all objects will be included in
the list contained in the frame.

Note: Drag the frame from left to right, all objects are selected which are located completely within this framework. If the frame is raised from right to left, the
objects are selected, which lie within the frame or the frame crosses. It is also possible to remove objects from the selection list. For processing pick lists, there
are several powerful commands.

To delete the objects in a list, click the Tools icon or on


"Del" on your keyboard.

2.5.6. zooming
To facilitate the drawing, you will always want to represent the network part you are editing. this RaumGEO and RohrSYS provide various options.

Note : The easiest and fastest way to change the visible section is to use the mouse wheel. the cut is increased by rotating the mouse wheel or
reduced. Click with the mouse wheel to move the cut and moving the mouse while pressing the wheel to the new location. After releasing the mouse
wheel, the section is moved.

If you want to see only a specific element of the network, select the menu item "Zoom" in the

Menu bar at the top of the screen or from the toolbox icon from the tool box to
to zoom in a sub-region.

Now drag with the mouse a frame over the desired portion. If you to the previous

To return view, select , To present the complete network, select the icon

or double-click the middle mouse button (scroll wheel) in the drawing area.

If you want to drag the highlighted, select , Select a point by


On the current crop. Set by clicking on a second point where the first selected point should be in the new cut.

but elegant, you can panen with pushed mouse wheel. Just click with the mouse wheel in the workspace and hold the mouse wheel down while you move the
screen section.

Zooming You can also use the mouse wheel make.

Also note the additional keyboard shortcuts. A brief description you can at any time Help Keyboard Shortcuts
call.

2.5.7. Changing the View


When three-dimensional viewing, it can happen to objects that overlap each other. Depending on your perspective, it is sometimes not easy to see the
connections. Even the selection of objects is sometimes a bit more difficult, if not impossible. In these cases, you have to change the "View".

1. Click with the left mouse button on an object to which you want to rotate the view.

• copyright MH software GmbH MH BIM software


Second Move the mouse to the side and press now simultaneously the space bar and the middle mousekey respectively.
the mouse wheel. When you move the mouse with the pressed keys, the display is rotated around the current point.

By selecting a suitable viewing direction you get a view in which you can already better understand the connections.

Another elegant way to change the view angle provides the displayed in the upper left corner of the canvas "3D house".

If you move your mouse over the cottage, the standard views (top view 45 °
Isometric, side view) shown on a gray highlighting. Click on it to view the respective set. You can also click on the house, holding down the mouse button and
move the mouse in the desired direction - the angle of view changes, the cottage turns analogously with.

In the lower left corner of the canvas can be found for further orientation an XYZ
Coordinate cross.

Overlaps can be resolved if the individual floors are not displayed in real-floor distance. Click on the tab building and then check the box "Equalization". Now the
stories are pushed apart. The offset will be "moved" by which the floors, specify for each floor separately in the mask "offset" one.

To return to the "normal" view, remove the checkmark "Equalization" or close the small window " Equalize " which is displayed on the left below.

So much for the important basics, now we start to practice and edit the "Introductory example":

• copyright MH software GmbH MH BIM software


Third Introductory example

To get the fastest possible entry into operation of RaumGEO, we recommend that you work through the example image. To learn after a short time the extensive
possibilities of RaumGEO know. In the introductory example does not address all the features. Only required for the example data entry fields are explained
briefly. You should just one of many ways are described briefly to acquire a building quickly and effectively and to calculate here. Soon after you have made your
first detections, you will enjoy your own work style developed to accommodate building. Another note: use the built-in help system (F1) or the manual in your
work. Here you will repeatedly come across important information that will facilitate your work.

At the end of the introductory example, we are a building have captured and the associated heating load, radiator design and piping calculation conducted. The
following steps are carried out:

• Create Project

• walls capture

• capture windows / doors

• Room stamp record

• Additional radiator-maintain

• Providing the data

• complete project data for heating load

• 1. Create OG

• Create DG

• identify building heating

• analysis

• design radiators

• place radiators automatically

• distribution lines draw

• Risers draw

• Radiators automatically connect

• calculate pipe network

• power analysis

3.1. Create building structure

The first step is to create through the building quickly define the structure of the current construction project. Then, each floor is assigned a DWG layout plan and
imported. The layout plans facilitate the rapid detection of the spatial geometry and drawing of the distribution in the pipe network calculation. Also, all lengths are
automatically taken from the floor plans. During the subsequent graphical output of the pipe network the plans may also optionally isometric - are represented.

3.1.1. Applying the exercise project


After starting the program, you are in the project management.

1. After installation, is set at the first call of the program, the "Project" folder of the installation path. but you can also select a folder in which you want to
create the test project.

2. Click on the "New Project" and enter a project name, for example, an "Introductory example". Ok, the project is created.

Third Enter, if desired, in the right area of ​the screen, the addresses and a project description.

Below the scale project all calculation modules are listed. The calculation modules for which you will have a license displayed in black, the other gray.
Double-click on RaumGEO a "room geometry system" is created.

• copyright MH software GmbH MH BIM software


Now, a mask in which you a chance to review the project name and path opens

Subsequently, the masks are:

• Building Quick Definition


• building structure
called in turn to facilitate the entry into the processing of the project.

3.1.2. Building Quick Definition


The quick definition of a building makes editing a project. It will automatically be the floors of the building to be processed is defined, so easier to draw the access
to the individual floors. With only a few data entries the projectiles generated a building.

1. Enter a max. 3-digit short term one of a building, for example, "OST". Optionally, you can enter an additional explanatory long text.

Second Enter 1 for the Number of floors above ground and basement floors, and storey height 3.00, m is the clearance 2.35 m and the sill height 0.90 m
as shown above on the upper floor, ground floor and basement. Do not forget to register at "Number of cellar" "1". The figures for the amount
FBAufbau and thickness of the ceiling are optional.

• copyright MH software GmbH MH BIM software


3. Click on the button Invest to the quick definition perform.

4. After applying the mask opens Building structure in which the projectiles are listed individually.

For example, if the upper floors of the building have identical heights, the values ​of the different floors can be changed later. In this mask more
rounds can be supplemented at a later date. You can reach the building structure at any time via the menu Data> building structure.

In the lower part of the screen you will see a schematic representation of storeys of the building. Errors regarding the floor heights jump immediately
apparent.

Important NOTE : During the subsequent drawing of the walls and the generation of spatial data, the vertical dimensions of the individual floors are
used in the building structure. Check therefore it is imperative prior to further processing anew all heights.

In our example, no changes are initially performed, you therefore close the screen with a click OK. Next, the mask opens manage floor plans.

• copyright MH software GmbH MH BIM software


3.1.3. Assigning floor plans
For the trades detection, it is helpful to use floor plans. These plans are loaded as a background image and serve as a guide. So the lines and objects can be
drawn into it directly into the plans, the dimensions of which result automatically.

The level ranges of the individual floors are automatically generated from the data of the building structure.

To facilitate the drawing, each floor is assigned a DWG layout plan.

1. Wear one for each floor Domain name on.

2. Double box Symbols: Date i in the line of the "1st Floor" opens a dialog that allows you to
Select the desired file. Select the "mh_og.dwg" file that is included with the downloaded from them introductory example folder.

3. Select the unit the layout plan - the top right flashes the corresponding area green. the SAMPLE
Floor plan was in " mm " created.

4. Now click the right of the unit selection to "read".

5th Now you see for the first time within the mh-software architect their floor plan. Left and below the floor plan you can see lengths - so you can check
at a glance whether the set scale is correct. The red icon refers to the zero point.

6. Repeat the process for the ground floor.

7. You will now see the layout of the ground floor. Behind you see displayed in red in some places the plan of
1st floor - this is stored as a reference plan. Thus, one would notice immediately if the floor plans would not overlap.

8th. Read last one the floor plan of basement.

9. Click Conclude to close the mask "plan administration". The floor plan is now on
Floor level of the selected floor (= visible range) displayed. To fully represent the floor select from the toolbar or the menu zoom > All or double-click
with the mouse wheel in the workspace.

• copyright MH software GmbH MH BIM software


3.1.4. Set the default values

In the next step (exterior walls, interior walls, windows, doors ...) default values ​are set for the respective component types.

When generating the parts are the defaults the newly drawn objects allocated. If necessary, the data can be customized later (see also Default Values ​and Global
Change ).

Enter the values ​shown.

• • In the left part of the screen on the "Draw".

• • With F2 or double-click in the fields " component " the component catalog is opened.

For the type of component outer wall and floor additionally a field exists " against soil "To different U values ​to specify for with soil touched walls.

Here "used parts" and "catalog" lists the existing components there in the tab. The components for the Introductory example, are all located in the
"Catalog". Once you have used these components, they are listed for a better overview also been "used parts". With a double click or by clicking the
"Apply" the component selected is added to the suggestion list.

• • Select for the various Component species (Change may have to again, 'the components used' in the tab 'Catalog') following default values ​from the
"Catalog".

Important: Do not just type the abbreviation of BT, but also take them each by double-clicking the component calculation.

The non-mentioned component types are not used in the example.

• copyright MH software GmbH MH BIM software


Note: During the entire processing in RaumGEO the default values ​can be changed at any time for a component types. Double click in the box
component and then select the component catalog to another component made. When drawing the component newly elected is used from that date.

3.2. Acquisition of the room geometry

As a basis for further processing to capture graphically the spatial data in the program module space geometry, with all relevant data (eg U-values ​as) are
assigned. The allocation of room types (such as office, toilet, hall, Conference, ...) facilitates further processing.

3.2.1. The detection of the outer walls


Now we can start to draw. However, If necessary, read the important theoretical basis of the final sections through again.

• • Set is sure that at the bottom of the floor selection "EC" will be displayed.

• • If the floor plan visible? If not, click the top of the toolbar on the "floor plan on / off" ,

• • Turn if not yet done with the function key F5 in the presentation Top view.

• • This means that all snap points are determined solely by the floor plan, make sure that the buttons grid and ortho are disabled at the lower edge of
the mask.

• • Select the tab "drawing" in the toolbar command

• • We start recording the room geometry on the left side of the building.

to move the mouse with the green crosshairs to the point shown above. Once you are with the mouse to the "right" position, engages the internal
catch and the mouse cursor a green square appears. The detection of the external walls is carried out according Heizlastnorm on the wall outside.

• copyright MH software GmbH MH BIM software


• • In the desired point start The detection of the outer walls with a Double-click. Move the crosshairs clockwise to the bottom left corner of the building.

With a simple click this distance is fixed.

Note: The "outer wall" function remains active through "simple clicks." As long as you so "easy" button at the end of a wall, drawing the next outer
wall continues in this click point. Double-click to fix the route and finish at the same time drawing. With another double-start again drawing the outer
wall. Move the crosshairs to the top left corner of the building

and click again once. In order not to exceed the maximum number of spaces in the mh tools and mhDemoversion, in this Introductory example only
the left part of the building is detected.

therefore move the crosshairs until the end of space N 005. This point is to form our sample building in the top right corner. click You will also find once.

• copyright MH software GmbH MH BIM software


• • Move the crosshairs of the wall line along down. At each change of direction click she once.

• • To the rounded sections of the conference room better grasp, it is recommended to increase the left pane. The drawing functions from
mh-RaumGEO are "transparent functions"
ie you can - zooming perform other functions, such as - without drawing interrupting. Move (without clicking!) First the mouse near the round and turn
the mouse wheel forward. so they magnify the area around the current cursor position. With pushed mouse wheel section can be moved (panen).

Now is the rounded window to better recognize the range. Click on the corner of the window segment to fix the lower wall.

•• • Then roll along the individual segment strips and click each at the vertex. The auto-catching with the green square will support you. With a Double in
starting point, you complete the detection of the exterior walls.

•• •

• copyright MH software GmbH MH BIM software


•• • Double click with the mouse wheel (carried out by "Zoom All") and view the previously edited "complete works". At least now also is the time to save
your work so far. click

They use the 'Save' icon- in the toolbar. (It came just now the memory to store!)

3.2.2. The detection of the interior walls


Now we begin to grasp the interior walls. To do this, select from the toolbar menu item

1. We start again in the corner on the left side of the building. our starting point we mark with a
Double-click.

• copyright MH software GmbH MH BIM software


we then move the cross obliquely upward to the opposite outer wall "trapped" is. Worry not initially on the slanting across the room line.
mh-RaumGEO has intelligent drawing routines that automatically detect, as the wall in the underlying plan runs. You must specify only the general
direction.

Finish the inner wall acquisition with a Double on the outer wall. The alignment of the inner wall takes place automatically centered in the illustrated
inner wall.

Important: On your intersections walls must be always connected. Interconnect recognize (with strong zoom in) on the basis of small black squares
that endpoints are generated at the intersection /. Connections are created with simple clicks once you with a wall a different crosses. Do you want to
stop drawing on a wall, create the connection point using a double click.

• copyright MH software GmbH MH BIM software


In the next step we want to capture the walls of the stairwell. Move the mouse to the inner wall between Staircase N006 and Office N003. Start the
acquisition with a space Double-click.

Move the mouse to the opposite wall and fix the track with a simple click.

Now move along this inner wall. Intermediate points can be fixed with a simple click. Finish the partial acquisition with a double click.

Note : Interior walls are between the two inner lines of aligned mh-RaumGEO automatically center of the layout plan. So you need to click while
drawing in most cases only "approximately" to the right place. If automatic alignment is not done centrally so are probably too many lines present, so
that can not be correctly recognized the actual wall. In this case, there are several ways to find the right position to find:

1. Align : Switch on the toolbar in the mode and


point your mouse to the inner wall at a location with as little "disturbing" lines. With a
Double aligning is repeated.

2. Move : Switch on the toolbar in the mode and


move with the mouse the drawn wall at the desired location. A parallel shift can be reached at ortho Mode.

This method is described in detail in the chapter " move objects using drag and drop "Described and should definitely be read by you.

3. redraw : Draw the wall again at the desired position and prevent the automatic alignment by simultaneously while drawing the end point, the CTRL Press
button.

• copyright MH software GmbH MH BIM software


Second Drive she with of the recording of the remaining interior walls how described continued.

Important note on Number of rooms:

If you or a demo version work with the mh tools, you must not exceed the maximum number of 30 rooms. Therefore, in this Introductory example only
the left half of the building is processed as shown below. As users of the full version, you can also rest, contained in the plan rooms capture.

3.2.3. The detection of the windows and doors


Directly into the walls, we draw the windows and doors, which are interpreted as a deduction surfaces in the heating and cooling load calculation. A special
fishing function makes it easier to millimeter precision alignment to the floor plan. The heights of the windows and doors are already specified in the component
calculation. If required, the values ​can be customized for individual components.

The windows have an additional importance because before each window heater is later installed automatically with the proportionate thermal performance. Make
already draw the window on their orientation. Where they started to draw the window, there is the connection of the supply line with the thermostatic valve. This
page is shown in red.

window

First we choose the first this purpose from the toolbar.

• copyright MH software GmbH MH BIM software


Second Zoom in on any portion of the plan that are located outside window in the. With a simple click the starting point of the window is placed.

Now move the crosshairs to the outer wall line along. With one more clicking the window is fixed.

3. Now enter the remaining exterior windows. Do not forget to save your work every now and then.

Note: On the side of the window where you begin drawing is issued a small red bar. In the pipe network calculation of the radiator is later aligned so that here the
supply line is connected to the thermostat valve. So you can already influence the future pipeline network in detecting the spatial geometry. If necessary, the
connection side can still be reversed by a calculation that later.

External / internal doors

1. What is the Interior doors are detected, should now on hallway N007 to be shown. Choose

Move the crosshairs to the bottom left door.

2. Begin with the detection of internal doors with a simple click.

Third Lock the door at the end also with a simple click. The red line on one side of the door is not significant and does not need attention.

4th now enter the remaining doors. Note for the acquisition of the entire building: The procedure for

Exterior doors are identical. You only have to from the toolbox
choose.

• copyright MH software GmbH MH BIM software


3.2.4. Set room stamp

1. After all the components are detected, we put the room stamp. Each room should have a temple Room type
be assigned, which serves to assign additional space specifications, such as indoor air temperatures and minimum air change
in the heating load. In the radiator design can then automatically depending on the room type
individual radiator types and specific in the pipeline calculation connection types are specified. The air volume determination for HVAC systems in
the heating load and the air duct network calculation can be centrally managed through the room type.

We want to use this room types such as office, conference hall and toilet. If space types are not associated directly with the setting of the room
stamp is equal to a plurality of spatial temples, the space type to be assigned at a later stage by means of selection sets in a single step.

We first select a double click in the Room type field or


about the F2 key to Space Master Data Catalog.

Sign up with a double click on the symbol type " bu " or the button Take over the data for the office.

2. Choose from the toolbox

3. Move now to the office N001. Run over the lettering N001 with the crosshairs the
> > Lasso movement (1-2 small circles within ½ second).

If the lasso gesture is detected, a small animation above the word appears. The crosshairs is now in a small yellow tooltip N001.

• copyright MH software GmbH MH BIM software


4th Now add a Double in office N001 a room stamp added. In the room name is now automatically N001 entered. Adding the space temple automatically
the data form opens on the left side.

5. The full flat number a space is composed of the Building Feature, the current Floor, of the
(Residential or office) unit and the flat number together. With each set of a space temple is automatically incremented the room number. Of course
you can intervene at any time and change the proposed flat number, such as when the order is not continuous or if, for example, is changed the unit.
The floor designation is automatically detected and taken from the building structure, so that it does not have to worry.

Apply for the room number following a name

Note: Unless the Data tab of the temple space, the space-Bez field is empty is also taken over the room name from the room master data catalog.

Now set for the remaining rooms Offices a room temple and perform the lasso gesture, to take over the room name. It is advantageous if you continue setting the
room stamp in ascending order, as you will then have to carry out any more changes to the room number. If the room stamp for all

Offices are set, select the type field space by double


"Corridor", and put a space temple in the stairwell. Then place a space temple in the hallway. Then select the space type "Tea kitchen", and put a space temple in
the room "Tea K N008". Do the same for the toilet and then for the conference room. Them referring please contact the labels of the rooms on the floor plan.

3.2.5. Providing the data

Insert North Arrow

For the heating / cooling load calculation and it is necessary to add a north arrow. About this Nordpfeil the location of the building is clearly defined.

1. Select the toolbar With a double click, you can use


begin defining the north. In the lower left corner of the floor plan you will find a template for the north arrow. Double-click the center of the template
and align the north arrow like that the arrow points down. Once you have aligned the north arrow in the right direction, click once to the north
direction finalize.

Note: Enable to align Ortho function in the status bar at the bottom of the screen to the north arrow on one of the main axes.

• copyright MH software GmbH MH BIM software


Show intermediate values ​in the heating load

Now the collection of data is completed the EC. In the same way, we could now work through the other floors. However, we want to show how this data already
collected are interpreted in the heating load initially.

1. To do this on the "Calc".

A dialog to generate the data can be restricted to individual floors. In addition, here, "Additional calculations" can be turned off to shorten the
calculation time. But this is only for very frequent (intermediate) generation and even for larger projects of importance. For the example image we will
stay with the already set properties.

Note Normally recognizes RaumGEO which neighbor room temperatures were set in the above and below floors and "automatically patches"
calculates the necessary. Also, the components are (U values) basically taken from the overlying floor to ceiling.

As long as the building is not fully covered, this neighborhood relationship can not be definitively identified. For example, is not yet processed the
underlying floor is called the floor "DL" or if lying set in the ground as "ERD". Lacking the overlying floor, RaumGEO interprets the ceiling first as
ROOF. The results in the heating load are thus only "intermediate values".

Once all floors of the building are covered, relations are automatically detected correctly - and the heating load thus recyclable.

2. Start the generation of data on the button

Third In the tab " Calc "Now flashes a red exclamation point and some indication messages appear - ignore this at first, we'll go into it later. However, if you
receive an alert with a red exclamation mark, double click on it to display the error in the drawing and fix the incorrect place.

4. With the so-called Quick-clicks on the right side of the toolbar, the heating load is called

5. Note the new tab "EN12831" for the heating load on the navigation bar at the top of the screen.

About this tabs you have ever overview of open projects and equipment. You can switch by clicking on one of these tabs between the program parts
herwechseln.

6. Now the last worked in the room geometry space is automatically set. All parts of the room are included. The calculation result can be read for the room
immediately.

• copyright MH software GmbH MH BIM software


tip : When generating the data also a review of the drawing data. If errors are included in the drawing, you get an error list. It is recommended that
after the detection of a section from time to time perform a calculation.

3.2.6. global change

Now click in the navigation bar, click "RaumGEO" to go back into the building acquisition. All walls newly drawn, doors, windows, etc. received when generating
the U-value of "default values ​..." unless there one is registered.

Consider more closely the interior is easy to see that some of the dashed lines are not congruent with the wall thickness on the architectural floor plan. Obviously
an incorrect component has been used herein. With a "global change" this can be corrected easily.

1. First create a selection set. Do this, select the toolbar and


click successively on the respective inner walls, or drag a box over the affected internal walls (if other objects, such as exterior walls, doors,
windows, etc. are in the select set it does not matter).

Note: There are two different methods over the drag from frame to form selection sets. If you draw a box from left to right, all objects are contained in
the selection set that are completely enclosed by the frame. Drag a box from right to left, all objects are contained that are touched by the frame.

2. Click the right mouse button on one of the selected interior walls and select from the popup menu "object data". Open the calculation component with a
further double-clicking the present component (TW2).

• copyright MH software GmbH MH BIM software


3. Click on the "Catalog" and take the "LBW" component.

4. The component calculation closes and you are back on the tab inside wall. Now click with the right mouse button on the newly acquired value "LBW" and
select from the mouse menu "Global change".

5. This will open the mask "Global change". previously because a selection set was created, the objects in question are already set to "selected".

OK with the change is performed, and all selected IW the "LBW" component assigned.

6th To check, click with the right mouse button on some of the selected interior walls and from the context menu object data. There, all the new
component "LBW" must be present.

7th Now run through the calculator top left of the toolbar a calculation. Ignore
continue the error messages. The dotted lines of the interior walls now match the wall lines of the plan.

3.2.7. radiator

So far we have recorded for the EC all the data required to generate the component data for the heating load. However, we want to think already a step already
prepare the radiator design. That is automatically provided in the radiator design before each window a radiator, we had already mentioned.

However, in the conference room no heater should be placed in front of a window.

1. Click you so that the associated data is displayed with the right mouse button on the designated window and select "object data" on the left of the
screen.

2. Turn off there in the data group, select Radiators provide for windows.

• copyright MH software GmbH MH BIM software


3.2.8. additional radiator

In our project, but we will also provide for some interior rooms radiators, the position of equal

is located. You use , Again, you put on the orientation


the radiator location of the feed line firmly.

1. While displaying the EC in mh-RaumGEO.

2. Using a Double start adding an additional radiator. Move the crosshairs a small
little in the direction in which the heater is to be aligned. Now witness lines display the crosshairs. You have now, in addition to drawing the
crosshairs can enter the length of the radiator by hand. Tap in our example 0.65m (You can go tap, without needing to click into the field just that!)
And press Enter.

Draw the two additional radiators one as shown in the image. The length of the subscribed additional heater is used later in the radiator design as
the maximum radiator length.

3. Generate again using the "calculator" icon - check now whether below the rider
"Calc" error messages with a red exclamation mark are, and fix them. Yellow warning messages may continue to be ignored.

Tip: If you have not drawn the auxiliary heater exactly to the desired position, you can move it in the mode "Free movement (green crosshairs)" simply
by holding the left mouse button.

Note: In the pipe network calculation, the flow line is drawn with the thermostat valve on the side of the radiator later, is located at the RaumGEO in a
small red bar at the window or additional radiator.

,
You can swap the connection side afterwards, redraw without windows or additional radiator.

• copyright MH software GmbH MH BIM software


3.2.9. copy floor

Invest

Before we look at how the data are processed in the radiator design, an additional floor in the program module to space geometry are acquired. Since the floors
are often structured similarly in multi-storey buildings, it makes sense to copy the data.

1. If any items are included in the selection set will copy the floor the entire floor copied.

Therefore, select the function from the Edit menu or the


Toolbox to delete objects in the selection set that should be there be comprehensive.

2. Make sure that the floor selection for EC is safe set. Select the function copy stories

from the menu bar or the toolbox.

In the following dialog the current floor is gray because it is the source for copying. Select the check box for the 1ST FLOOR and stop the dialogue
with the OK Button. Now you get the message

Please run again on a calculation by, ignore warning messages.

Note: If only individual objects are copied to another floor, then before copying you create a selection set with these objects. If no selection set
present, all objects are copied of the floor.

Revise

Switch on the floor selection below the graphic in the first floor

On the 1st floor a few modifications need to be made now, but they are quickly dealt with by deleting individual objects or complete
newly added components. You can easily guided by the displayed floor plan. The changes are
in detail here
listed:

1. Room N 4 - Meeting:

On the ground floor two rooms are available here, so you delete the partition between these spaces, both interior doors and the right space temple.
To delete objects, you first create a selection set.

Choose to and click the left mouse button in succession to delete the
Objects. On the "Remove" button, the selected objects are deleted. Draw the new inner door.

If you accidentally select the wrong object, you can deselect this help from again.

Room N 7 - Land:

Delete the outer door

Room N 8 - Dressing room:

Delete the extra radiator. For individual objects, you can click and directly select "Delete object" with the right mouse button on the red dot in the
center of the radiator.

• copyright MH software GmbH MH BIM software


Click with the right mouse button on the room stamp, select by double-clicking the room type "neb" (next room).

2. Generate via the "Calculator" icon (To perform a control of the drawing data).

3. The "rooms Delete" dialog opens now. The previously deleted space of the former office N 005 still exists in space book, however, no room temple is
gone. This is automatically checked - you must now confirm "Delete All" only on that this room should really be deleted from the room book.

4. Click after generation with the right mouse button on the 1st floor to the punch of the new meeting room and choose from the menu " Property Data ". Make
left in the data form the FB (floor) Reiter one.

• copyright MH software GmbH MH BIM software


In the calculation, it was found that there are on the ground floor below this room two rooms. The floor surface is therefore divided into two
sub-areas, and each separately cyan displayed. In the heating load also two floor components are listed. Using the arrow symbols you can switch
back and forth between the subareas.

3.2.10. Create attic

extend building structure

1. In the building structure, the attic is yet not included. therefore open left with the tab

" building " the

and enter here in the first free line data For the attic one.
Pay particular attention to the specification of Above floor FB soil ER, is always drawn on the floor level as in RaumGEO. The floor height to here
(including the roof) and the ceiling height 4.00m
3.75m, respectively. Pay attention to the schematic representation of the building at the bottom of the building structure - here the floor has been
added. When closing the mask, the bullets are sorted according to their height above the ground and displayed at the next opening in the correct
order.

Second Close the building structure With OK. The following message

points out that after a change to the building structure to generate must be carried out "forcibly". click on Conclude and click on the tab " Calc ".
Activate the option "Changed floor heights / Page name correct.

Third Click now ,

• copyright MH software GmbH MH BIM software


Important NOTE: The height FB changed on ER in the building structure, first the existing components need to be moved to this new height. Serves
the generate with the "Altered floor heights correct".

The building structure is not only in RaumGEO available, but also in all other modules (heating load, RohrSYS, SanSYS, ...). The data registered in it
are valid for the entire project. Changes to the building structure thus have an impact on other calculations!

Assigning plan

Open the tab " building " , Enter the field name "attic"
and assign the new Floor to floor plan "Mh_dg.dwg" too. Right-click the green flashing area

, Now you can close the mask.

Copy components from the lower floor

First, go back to the first floor.

The attic should receive a slightly different division, which is why also incurred some changes. Therefore, we take on a selection set only the lower part of the
floor.

1. Select the function from the toolbar and drag a box from the left
top to bottom right across the lower portion of the ground floor up to the staircase. Make sure that the top of the window and flat temples are not
included in the selection.

2. The function Object Selection + is still active. Drag a box, this time from the bottom right to left
above , On the right lower side of the building and yet another via the Gebäudeeck in the middle.

• copyright MH software GmbH MH BIM software


Make sure that you create the selection set exactly the picture above it. If you accidentally unwanted components added to the selection set, you can
shift hold button and click on the objects.

3. Then select the function Copy stories ... , Select the check box for the
Attic and stop the dialogue with the OK Button. Ignore the message first - we are equal to perform a calculation, after the walls were tracked correctly
in the attic.

4. Return to the attic. You should now get the following picture

5. Add to the outer wall parts that were not copied.

6. The conference room will initially not be detected. Clear the room stamp.

7th Clear in the stairwell of the three doors in the upper left.

• copyright MH software GmbH MH BIM software


8. Increase the area around the stairwell. In the displayed floor plan can be seen is that the top

Wall at another location is. switch on and select from the toolbox to

mode , Click on the left mouse button to the crosshair to the right place
Move.

Click with the left mouse button on the wall and move the crosshair with the mouse to the new position. When you release the mouse button, the wall
will be moved and the side walls automatically shortened. Under certain circumstances, the right is a wall piece are free - you delete this manually.

9. Call the spatial data of the room temple on (former office space) located in the left part. Clear the room name and assign it to a room type "neb". To the
last digit of the room number please enter instead of "1" is now "CUA" one.

10. Generate via the "Calculator" icon . a control of the drawing data to perform and
To determine the heating load. If the error message

get (the element number may vary.), then it is probably because the staircase still two short inner wall pieces from the copying process are present
which now divide the new space "CUA".

Delete these two sections.

• copyright MH software GmbH MH BIM software


Calculate again now.

Click the "Delete All".

11. The staircase is now completely surrounded by the rest of the roof space, so it creates a kind of "Islander". This situation requires a special "treatment."
In order to conduct a proper investigation area within a floor, all walls must be connected together. In order to have such contact in island areas, use
the Virtual Component VI from the toolbox.

Characters, shown at a small distance, 2 virtual components as in the image to the connection between the "island staircase" with the remaining
walls to manufacture. then perform a calculation.

12. The attic will initially not be removed and therefore will not get any radiator. You may sort the data of the windows and turn off "Radiator provide". click
with the right mouse button on the disabled field and select from the popup menu "Global change". Perform a change for by "all the current altitude
range" existing objects.

3.2.11. Edit Information messages

Beneath the rider Calc several times the error message


By double clicking on one of these error messages the object in the drawing area will flash and the data screen is red pointed flashing on the surface of the
component - in the case 0m². This is because, as in the component calculation no height information was provided. You can either into the field clear height

manually enter a value or set the level in the component calculation itself afterwards. In this case, we will pay the amount of the component calculation. Double
click on the entry next to the field "BT". This will open the

• copyright MH software GmbH MH BIM software


Component calculation. Apply at here below the rider " used Components "the
following values ​by:

DIT 2,05m

DMM 2.20m

S2E 1.20m

Change lead to RaumGEO and now over a further calculation. Now the message list should be up to

no more entries included. For the remaining message we come at a later date.

• copyright MH software GmbH MH BIM software


3.2.12. Create roof
With RaumGEO almost any roofs with dormers and windows can be created.

An ornate roof structure can be found for example in the enclosed "EXAMPLE" project.
There are also on our website some movies that show you the basic procedure when creating roofs and dormers. It is recommended to inform themselves in this
way in advance.

In this introductory example, a simple roof will now be drawn:

1. Select the function from the tools and enable


Start at the right edge of first drawing with a double click and draw clockwise total of four polygonal lines on.

2. Click the right mouse button on the red roof line and select "object data". At the corners of their current altitude is displayed. At the same time 3 vertices
are marked.

In the tab top surface (on the left side of the page) can vary the position of the roof above the height of these vertices. (The position of the three
points can be with you in the drawing differ). Look for

• copyright MH software GmbH MH BIM software


the ridge line at a height of 10,00m and for the roof to the eaves a height of 6.00m. In "wall distance to the roof skin" (meaning the thickness of the
roof) enter 0.25m.

3. Select again from the toolbox and draw the lower


Half of the roof as shown. also arise for the second half of the roof must be a closed polygon, that is, the first line is 'wicked' here. Start drawing best
in a corner where no other roofline is present, for example, at the point marked "3" at the bottom position. In order to draw the slope roof line must ORTHO
off. In this half of the roof, you can easily move along the roof line, the use of drawing aid as in the upper half of the roof is not necessary.

The height determination of point 2 in our case is unfavorable (to you it may look quite different), so its location is moved using the arrow icons to the
left in the data form.

First is aligned m here to 10.0, but the facade side m to a height of 8.0. Lay purchased as the highlights as well.

4. Generate via the "Calculator" icon , Rotate the view to the isometric by the
holding down the space bar and the mouse wheel and move the mouse. Consider by repeatedly pressing the button F9 your work in volume
rendering. Alternatively, in the navigation bar at " RaumGEO Select "tab from the drop-down box, select the display type.

• copyright MH software GmbH MH BIM software


,

In the lower part of the data screen, you can switch the roof representation and off.

Here you can switch the view of the roof surface or hide all the walls to display only the roofs.

3.2.13. Draw skylight


1. Go back to the top view of the DG and return to System Line display by pressing the F9 key.

2. Select the function from the toolbox and draw


They outlined a closed polyline to, the floor plan, skylights.

Note: For the heating load will be charged the actual opening dimensions of the skylight on the roof pitch.

• copyright MH software GmbH MH BIM software


3.2.14. Draw shed dormer

1. Select the function from the toolbox and draw a


closed polygon about the, in plan view above drawn from the staircase dormer.

2. Click the right mouse button on the red polygon. The intersections with the roof are calculated and displayed on the graph. Lift the front side of the
dormer in which you / s the / the corresponding point Height 8.00 m to assign. one (in our example, at point 1) and enter the distance from the wall to
the roof membrane with 0.25 m.

3. Select the function from the toolbox and draw


a closed polygon to those outlined in plan, the dormer wall.

4. Select the toolbox function "AF exterior windows (deduction)" and draw an outside window (deduction) on the front side of the dormer.

5. Generate via the "Calculator" icon ,


6th Click on the external window with the right mouse button. Wear as sill height and minimum distance from roof each 0.10 m on.

• copyright MH software GmbH MH BIM software


7. Generate via the "Calculator" icon . Rotate the view to the isometric view and consider
"Your work" in the volume display.

Note: If you want, you can now as shown in the picture still draw a gable dormer next to the shed dormer.

From the toolbox function

Draw a closed polygon around the left half of the outlined in the plan gable dormer.

Draw another closed traverse to the right half. Start drawing the best on a free corner. The mean ridge line is indeed included in the first traverse, it is
well again "departed" for the second traverse.

• copyright MH software GmbH MH BIM software


From the toolbox function and draw
a closed polygon to those outlined in plan, the dormer wall.

From the toolbox function "AF exterior windows (deduction)" and draw an outside window (deduction) on the front side of the dormer.

Click on a polygon with the right mouse button. The amount of points that intersect with the roof can be calculated. Put these points the hook
"calculate". In our example, at point 2 and 3. Enter at "distance from the wall to the roof skin" 0.25m. Lift point 1 to the amount of point 2

Do the same with the second traverse.

• copyright MH software GmbH MH BIM software


Generate about the "Calculator" icon

Click on the external window with the right mouse button. Wear as sill height and minimum distance from roof each 0.10 m on.

8. Clear the check mark "Radiator for windows provide" in the data form the window.

9. Generate again using the "calculator" icon . rotate the view to the isometric view and
consider "your work" in the volume display. (4 x F9)

To see all the floors, select "everything" in the status bar below the graph.
In the "representation roofs / ceilings" You can also switch the appearance of the roof surface.

• copyright MH software GmbH MH BIM software


3.2.15. assign volumes of air for air conditioning plant

The conference room N 10 on the ground is to be supplied via a ventilation system. Found at the moment the corresponding amounts of air have to be registered.

1. Go tab building on the tree on the left side in space OST - EC - 1 - 10 (or
click with the right mouse button on the room stamp). be on the left side of the screen dates of the room displayed. Below the tab "room" for the "heat
load" tab. Expand the node where "HVAC system".

Open the drop-down box next to exhaust (and supply) by clicking on the displayed triangle and set "RaumGEO" one. The supply air temperature should be 20 °
C.

Navigate to the tab Air.

Set the method, "specifically for people" and contribute including 20 m³ / h and 5 m² / person a. The air quantities are now determined by the selected method
and put the heating load is available. Note: The room master data, you can at a central location define the calculation of the amounts of air for each room type.

3.2.16. link stairwell


The staircase has been detected separately in each floor. Rooms can be combined for the heating load to a single room on the so-called father / daughter
association. All components (and later the radiator) of the daughters are then listed room Father.

Change to the ground and click with the right mouse button on the room stamp of the stairwell N 6 (in the left part of the building). On the left side of the screen tab
data is in the Object no. the room temple displayed.

• copyright MH software GmbH MH BIM software


Select the object number with the mouse and copy it to this over CTRL + C to the clipboard.

1. Go to the first floor and open the Data tab from the staircase.

Select "Assign parent object" and copy with you CTRL + V the object number of father space in the open field. The object number will not match in
their example to the one used here object number!

2. Do the same with the overlying stairwell.

Third Generate conclusion about the "Calculator" icon ,

Note :.
In RaumGEO subsidiary offices of entry for floor while father and ceiling / roof takes place at father / default at the "top" daughter.

In the heating load the daughters are not recognized and therefore not calculated. All components of the father / daughter-rooms are listed
with the Father, where the heating load is calculated and output.

3.3. calculate heat load

By pressing a button you can generate from the room geometry, the spatial data for the heating load (or cooling load). The addition of further data for the heating
load is done by powerful commands in a short time. In the mh-software is a direct link between the Heizlastdaten with the spatial geometry. Thereby lost for
subsequent changes any data. Anytime you can add more space in the room geometry or change existing rooms or summarize.

With simple means you prepare any data by "coloring" the room geometry graphically. Here the rooms, for example, colored according to their specific heating
load. So input errors or critical planning situations are quickly analyzed and resolved.

3.3.1. complete project data for heating load


For the heating load or the characteristics of the building must be specified, such as outside air temperatures and information on the building's location and type
of building. In the message list below the rider "CALC" still this

Message available. Double-click this message. Now automatically opens the heating load below the rider "project data." The field "ambient temperatures" flashes
red. You can now double-click in the field " country "" Germany "Select and double-click on" Postcode "For white" 76131 "Apply for Karlsruhe.

• copyright MH software GmbH MH BIM software


If necessary, correct the building height to 13.0 m and the number of floors on the third

3.3.2. identify building heating


only one building overall calculation must be performed for the heating load. Go to the tab in Heizlastmodul Building.

The building load is in the sub-dialog calculation determined. Start the calculation using the button To calculate.
After a few seconds the heating load is calculated for the entire building and is represented graphically. in the tab Characteristics ventilation receive detailed
information about the ventilation heat loss.

3.3.3. navigation
As you can see, the navigation is both the tree structure in the heating load as possible about the graphics of the room geometry.

Set any space in the heating load. By clicking on the tab in the
Navigation bar, the space immediately displayed on the graph. Of course, you can also use the right mouse button

Data Form View any component in RaumGEO and click. Now, not only the
corresponding space opened in the heating load, also the line of the selected previously in RaumGEO component is in the table view marked.

You can also change space and component data at will either RaumGEO or the heating load.

If you want to capture other components in the heating load manually, which can not be drawn on the graph, you add these components simply manually in the
heating load on the lower end of the components produced by RaumGEO. Even if you have to modify the data of the room graphically later in the room geometry,
for example, add additional windows or move a wall, so the manual in the heating load captured data is retained.

• copyright MH software GmbH MH BIM software


3.3.4. analysis examples

The chamber geometry can be used to change data not only. Also for analyzing data input or calculation results it is ideal.

3.3.4.1. Analysis of transmission heat losses of individual components


Now click on the tab " Calc "And check the box" analysis turn ". Here the choice between "Predefined" and "Custom" analysis parameters is possible.

Now click on "Predefined" and select "component transmission loss" from. Switch to the 3D volume model, turn the view in any isometric view and select from the
floor selection right below "everything" from. Now you see that the individual components of their small building are shown in color. Links you get a color key that
you about summarizes the transmission losses associated values. Blue hues show them low, red shades are high grade.

For a better overview to get over the individual stories, you can use the tab " building " the " equalization Enable ". To do this, under the heading " visibility " on " equalization
". Now the individual floors of their building to be a in " offset "Adjustable vertical distance from each other shown.

• copyright MH software GmbH MH BIM software


To disable equalization and system analysis again, quit in the bottom left of the data screen using the red the two modes.

Switch from the "3D" representation back into the "System" display.

3.3.4.2. Analysis of standard internal temperatures

In addition to selecting the tab " Calc "It means you can also access directly from the data mask a room or part of the analysis. Change View any room temple to
the ground floor and check all the data mask. Find the "standard internal temperature" under the "heat load" in the first line. Click the right mouse button on the
numerical value and select "Analysis" from the context menu.

Now the mask of network analysis opens. Make sure that the right mask area, the "Auto" button. Threshold determination "is enabled.

Click OK. The EC is colored, a legend is displayed again left to the different temperature values.

• copyright MH software GmbH MH BIM software


3.3.4.3. Areas with the highest area-related heating load
Want to see where the space is the highest area-related heating load?

Switch on the navigation bar to the heating load. In the heating load on the rider
building • calculation • heating load the display of the (per unit area) Building profile.

If no graphic is displayed, a calculation must be performed first. Just click on "Calculate". Click on the highest value in the graph, the space will jump with the
largest area-related heating power. Now switch on the navigation bar back to the room geometry

The space is represented already highlighted.

Further analysis of options

The scenarios presented here are only a small insight into the range of graphical analysis. You should be well acquainted with the powerful theme analysis
because it can bring you in your daily work tremendous relief. Be it efficiently uncover in plausibility questions or possible to easily input errors. You can display
all input values ​and calculation results graphically. Just call in RaumGEO any data mask of any object on and analyze interesting values.

Loosen but once the following questions:

Which component properties are assigned to the exterior windows?

Volume flows entered the HVAC system correct?

What are the windows no radiators are to be placed (see 3.2.7.)?

"Playing" with the analysis tool to accurately get to know it!

• copyright MH software GmbH MH BIM software


3.4. radiator design

Note In this Preliminary example of the spatial geometry of the module mh-RaumGEO particular addressing the processing and functions. We
assume that the user has the functions of the corresponding modules such as already mastered the radiator design mh-HkCALC. Please refer to the
respective separate manuals For more information on these modules.

With the data from the room geometry and the heating load set in no time radiator, being used for the individual room types individual radiators for the
interpretation (eg plate heating unit of a given product for offices, convectors, conference rooms, ...).

Of course, individual adjustments are easily possible here. All subsequent changes, such as the height or the product is done in a few moments.

Now let us turn to the radiator design, we use the Quick Clicks Create new top right
or open. As will be scheduled depending on the room type individual radiator, the rider opens
Project Data / Initialization.

There the desired radiator (manufacturer and product) can be selected for each room type (= group), as well as the design temperatures and the layout mode can
be set.

In addition, can be defined for each group individual constraints. To do this, first to the desired group, so that the entire line (as in the picture above for group
"bu") is stored. Now can range
to be observed dimensions for group "bu" Be made more information such as maximum length. Then select one after each group and each carry a additional
constraints. The radiator catalog can be opened with a double click in the "Pricing".

Water heaters should be designed with the following conditions (tv / tr and mode are applied as already entered):

The mandatory dimensions refer to the radiator size. Therefore click for each group on the "heater size" before you enter the dimensions.

to be maintained Dimensions For


radiator size

length height depth

Grp Herst Art Prod designation OPTION type Min Max Min Max Min Max

bü Bud 1 7 Logatrend length 500 500 103 103

fl ZEH 2 270 Universal power

kon ZEH 4 30 Radiavector length 210

tk ZEH 3 10 Charleston power 550 100 100

wc ZEH 3 10 Charleston power 460 450 550

• copyright MH software GmbH MH BIM software


The line proposal remains free in our example. This can be used when the conditions for a large part of all room types are the same. The data are stored there,
and "transferred" by clicking copied to all room types.

After these data are all collected, just click on the button Initialize, which takes place the interpretation of the radiator for the entire project. Just go to any room, to
display to the designed radiators.

You can of course always individually engage and display on the boundary conditions other radiators in the leaderboard or directly select a desired radiator.

Important :

the reference is made to RaumGEO about initializing. This is indicated by the RG ID (see picture above). The RG ID is necessary so that the radiator
can then be automatically placed in the pipe network calculation. If you want to change the designed radiators, simply modify the relevant data, but
you should never remove the radiator completely and lay by hand Otherwise, the RG ID is lost and the heating element can not be placed
automatically.

A complete overview of the designed radiators available through the radiator list:

As you have seen from this example is a radiator design using the room types on the " Initialize "Done in no time.

3.5. Pipeline calculation

By pressing a button you place automatically in complete building the laid heating elements from the windows, or to the pre-defined spatial position (eg interior
rooms), with the correct radiator dimensions are used. A preselected thermostat and the associated screw is also placed, and the data from the VDI3805

• copyright MH software GmbH MH BIM software


put record of the valve design available. After drawing the distribution pipes, radiators are automatically linked. Also the assigning of materials (pipes, insulation,
valves) can be done quickly thanks to powerful commands, so that after a short time are present calculation results.

The "coloring" of the network helps here in the analysis of any data. No residual pressures may be present in a balanced network.

mh-RohrSYS calculates any residual pressures and features over the network analysis, the sections affected by color. You the weaknesses of the current design
are thus shown and you can specifically find the cause about the graphics and correct. The inking of the residual pressures is of course only one example of
many types of analysis, with speed, mass flow, material etc. offers almost unlimited display options.

Note In this Preliminary example of the spatial geometry of the module mh-RaumGEO particular addressing the processing and functions. We assume that the
user has the functions of the corresponding modules such as already dominates the pipeline calculation mh-RohrSYS. Please refer to the respective separate
manuals For more information on these modules.

Then the pipeline calculation turn that is opened from the Project Manager or created us now.

When you first open RohrSYS you get a warning message to automatically place radiator. This we will do at a later date, click "No".

Set the default values

When drawing of pipes and valves (analog to components in RaumGEO) in advance default values ​are set. If necessary, the data can be customized later
granted.

1. Click on the tab " To draw ".

2. Click , Now opens under " defaults "A mask to the


can store desired specifications.

3. Double in row Manufacturers, material or strategy select the desired tube material
the catalog. Make sure that you choose a calculation strategy that match the sizes of the pipe material. For example, select the manufacturer sta, the
material st1 and calculating strategy
S01. The calculation strategy you may need under the tab Catalog Select if the strategy, see " strategies used "Does not exist.

4. Under the group insulation choose the insulation type "E" after EnEV.

5. With a double in row Manufacturer or material select any insulation material from the
Catalog (eg poor - SH). The line thickness You can leave.

• copyright MH software GmbH MH BIM software


6. Under the group Miscellaneous enter the ambient temperature t environment the tubes at. select Q-
Verlus t, when the heat loss of the tubes to be calculated.

7. Now click successively on the buttons . and

. to double-click in the boxes Manufacturer, valve type or Fitting type a valve


to take over from the catalog. but they can also leave blank the values ​if you do not need or, for example, the data of individual objects want to enter
the data later directly into the drawn objects. In our example, we exercise - arbitrary and without judgment -
following default values ​selected:

Manufacturer valve type Fitting type

HK thermostatic valves Ove 2 1

HK Fittings IMI 2 50

mixer IMI 5 91

(Other) valve ARI 4 2

then close the mask over the button OK.

determine altitude areas

To facilitate the drawing and navigation on the floors, scroll now under the tab " To draw "Up to the level indicator. Enter in the fields below offset the following
values:

• copyright MH software GmbH MH BIM software


3.5.1. place radiators automatically
Another highlight of mh-BIM is the automatic placement of radiators.

Switch to the isometric view (click on a corner of the cottage top right) and set the visibility range at the bottom right of the status bar on "everything".

Note : If you have not closed RaumGEO and the pipe network calculation was also open, you are now in the planning and coordination of both calculations are
displayed. The navigation bar allows you to control over the check mark in front of each asset, whether it is displayed. Disable the display of RaumGEO.

You can reach the data of the radiator design with the tab HK on the left side of the screen.

The button is the following dialog " radiators automatically


place" open:

• copyright MH software GmbH MH BIM software


dialog place radiators automatically may, individually for each room type or radiator group, some values ​are entered, such as distance from the wall, installation
height and connection of the radiator; and an additional
Flow and return valve. Here are no valves entered the general default data are used for the valves. Please change
the connections as shown from - double-click on the small radiator icon, you can select a different port situation.

By clicking on the button Carry out the radiators are placed automatically in the drawing. Please pay attention to the
drawing when the button Carry out
was pressed. Such as with magic all radiators with the correct
Wall clearances automatically added into the drawing.

3.5.2. distribution lines draw

Now only the distribution lines must be drawn yet, so we start on the ground.

• • In the status line the ground floor. Switch to the top view and turn on you in the above
Menu bar, displaying a of the floor plan. If necessary, clear the ortho Mode.

• • Before you start drawing the distribution lines, switch the tab " To draw "To" options "And make sure that the following settings are selected:

• • With a few clicks, the two pipes are marked. To do this, the Mode.
In the level indicator below the rider " To draw "The red arrow should 0m Show up. If not, click

to the lowest button.

Now, the operating at the level jump z = 0m.

• copyright MH software GmbH MH BIM software


• • Draw the tube guide as illustrated. To start drawing a wall distance of 20 cm in the hallway N007 at the height of the toilet. Perform the highlighted in the
image below inside wall line the >> Lasso movement (1-2 small circles within ½ second). now you get left and right appear at a distance of 20cm this inner
wall line purple guides. Move the crosshairs to the upper auxiliary line - the cross is "sucked".

With a double click you can now start drawing. Move a few centimeters to the right and click once. Move the mouse a piece in the hallway inside - the
drawing tool, a small arrow appears, you can now fix the position of the return with one click. Now draw the line in the picture drawn in the hallway to about
level with office N005. Orient yourself always forward, the return is automatically carried.

• copyright MH software GmbH MH BIM software


• • Now run without click a lasso gesture on the right wall by the Office N005. Now, another auxiliary line that intersects with the existing appear. Click once at
the crossing point and draw on up to the next wall of N005.

• • Run there again the gesture by Lasso and draw further in the X direction up to the wall of N002 - with the same procedure until, as shown in the drawing,
outside wall of the office N001. Finish the drawing office N001 just before the wall of the conference room with a double click.

• • Now we draw on the wall of the conference room along. Start drawing but at the marked in the image location.

• copyright MH software GmbH MH BIM software


• • Draw the line between staircase and conference room towards the office and perform the lasso gesture now on the wall between the office and conference
room N001 through. Click once at the crossing point. Draw normally. Proceed to the sloping walls as well as to the orthogonal - as soon as you want to
draw on the next wall, do the lasso gesture and use the intersection again for guidance. Draw on the radiators over and then draw on the outside wall of the
conference room along and quit the drawing at the height of the toilet with a double click.

• • To supply the floor completely with distribution lines, are still missing the connections for the tea kitchen and toilet. Draw the lines a as shown in the image.
Make use of the correct distance from the wall again, the lasso gesture to display a guide. The intersection of the auxiliary line with the drawn pipe is their
tether - double-click here with the left mouse button to start drawing. Perhaps the return is now on the wrong side - with pressed Ctrl - key to change the
location of the return.

In preparation for future platforms point you draw now of the tea kitchen a line into the stairwell. And the pipeline should roughly look like this:

• copyright MH software GmbH MH BIM software


•• • Consider their previous body of work - it should look like this picture:

Here, the great advantage of showing mh-software compared to tabular or tree structures working calculation programs. The lines are optically transferred directly
into the floor plan - and directly related to the building. The removal of trade fairs and manually entering cable length is not complete. it is not necessary also to
establish logical links in the table between the individual strands of wire. They are characterized by simple means only the tube guide - without tedious and
error-prone abstraction in the tabular presentation. Each line represents an object with the associated data. The cable lengths are then automatically. The pipe
links automatically generates mh-RohrSYS. So you can fully concentrate on the constructive task.

• copyright MH software GmbH MH BIM software


3.5.3. Create upper floors
Before we connect the radiator to the connecting lines, the distribution lines should be drawn in the other floors. For this we use again a special copy function to
copy the EG in the other upper floors to the already drawn distribution lines.

Since the radiator should not be copied, create a selection set of all supply and return lines.

To do this, the functions and click on the appropriate lines or draw


A frame over the desired area with lines. Make sure there are no heaters in the selection set that are.

to select an elegant method to each other hanging cables offers the function Click in
the vicinity of a pipe end are selected, all lines which are connected to this line end. A selection set to generate, you can alternately use the various methods of
object selection.

Unless you have the wiring done exactly as suggested, then meet four clicks of the function object selection Ast + to take the entire distribution line in the
selection set. Click on the marked with green dots flow and return.

Choose and deselect the marked with the red arrow supply and return line.

Call function copy floor from the menu bar at the top. The current floor is gray.
Select the check box for the first floor and then close the dialog with the
OK.

• copyright MH software GmbH MH BIM software


3.5.4. Drawing a riser

In this chapter, a riser is to be drawn, which connects all floors with one another.

1. Go to the ground floor.

2. Turn on, if not already done so by pressing the "F5" in the top view.

3. Select the tool box the command ,

4. Double-click on the end of the existing supply line in the stairwell N006 drawing starts.

5. Click below the tab "Draw" in height display to "OKRD" 3,00m. Now the next bullet is automatically drawn to the upper edge of the floor + screed. Finish
the drawing with ESC.

Do the same with the lines in the conference room - tie with a double click on the Set below the toilet pipe end to, and click in the level display to
"OKRD".

6. Now select an isometric view and switch on the bottom right of the floor selection to "everything" about. Check her drawing - you should see the following
picture:

• copyright MH software GmbH MH BIM software


7. The risers are to be extended down into the underlying basement now. Select this again

the Mode, and double-click on the lower end of one of the two risers.

Activate the ortho Mode. In the field and you press Enter. break up
The drawing with a double click and proceed the same way with the other riser.

3.5.5. The drawing of the heating system


In order to perform the calculation, the two risers must now be connected even to a common manifold. The lines are to be performed in the basement to the
ceiling along with a two-pipe distance of 100 mm.

1. Go to the basement and in the top view. Select below the rider drawing the

Mode. Now click the left of the altitude display on and start
The drawing at the Steigerwald in the stairwell with a double click.

Second Draw up roughly in the middle of the room "heating system" (see figure). then click the

Height indicator . to its operating point to put on 30cm above unfinished floor. Finish
drawing with a double click.

• copyright MH software GmbH MH BIM software


Third Draw another line from Steiger coming parallel to the first at a distance of 20cm up to the same height and then verspringen also to 30cm above the
upper edge of unfinished floor.

4. Start drawing shown a small piece of the coming from the staircase line with a

click on in 30cm height above floor level. Draw flow and return horizontally
adjacent to each other a. First click twice to start drawing. then specify the location of the return line determines where you move the mouse in the
direction of "camp", click once.

5. Then click each just at the two supply lines to link and draw on the second line for about 30cm on. Finish the drawing with a double click.

6. Place one on pointing towards the stairwell line ends

• copyright MH software GmbH MH BIM software


7. Representing the heating system, it suffices, at the end of the drawn line the to
put. Select this. Move the crosshairs to the end of the newly subscribed feed line and start drawing with a double click. Move the crosshairs to the
return line and click one more time.

Next, set the calculation direction. Move the mouse towards the subscribed network, and click again to install tightly around the start object.

• copyright MH software GmbH MH BIM software


OPTIONAL:

The drawing of the heating system

Optionally, you can construct even a small heating system in the basement. Make sure that the "basement" is selected.

Delete the just drawn startup item. Tie with to the now vacant positions

on. Click on the altitude display , Draw 1.50m towards outer wall and

click on , Construct another approximately 30cm long horizontal line segment. break up
The drawing with a double click.

Set a start object to the open end of the line.

Note the connection of the pipes to the distribution manifold. Delete both pros and

Return line pairs and tie them again to exercise with Mode. The result
should look like this:

• copyright MH software GmbH MH BIM software


Take particular when connecting the return line of the 3D cube (Tip: Start drawing not on distribution manifold, but directly at the open end of the line).

Installing valves, mixers, pump components and

Disable the Ortho mode. Select the out. Put the crosshairs on
about half the height of the flow line of the distributor outlets. Place the blender with one click. Switch with F5 in the plan view. At the cursor arrow
appears - move it to the return line and click once to change the orientation of the mixer set.

Now switch back to the isometric view. From the mixer, the bypass line is now growing - it and put it on with a Double-click to the return.

• copyright MH software GmbH MH BIM software


To draw valves select , With simple clicks on the pipes, the
Valves installed (see also Valve ). The positions of the valves to be installed and components you acknowledge the drawing below.

Important: Edit the time being only a distributor outlet!

Check valves, strainers or similar fixtures are considered as components. Choose

the command toolbar and place the components as shown in the picture (see
also components ).

As will last now nor the pumps installed. From the toolbox

, Move the mouse to the illustrated in the image position and click the left
Mouse button. Then define nor the alignment of the pump with another click (see also
pump ).

• copyright MH software GmbH MH BIM software


1. Data entry

For data entry, call the data screen where you click with the right mouse button and select an object from the context menu "object data".

In some forms, the data are summarized multiple objects. For example, radiators and their valves are displayed in a mask. When the corresponding supply and
return lines are known in a calculation both tubes are also displayed in a mask. To do this, a tab of the desired data.

Call first, the data on some pipes or the drawn radiators or valves. The data from the default values ​mask have already been registered and can be subsequently
changed now. Please note that the performance of the radiator will be displayed only after the first calculation.

The following values ​must be supplemented:

mixer

1. Click with the right mouse button on the 3-way mixer and select "Object Data". With a double in one of the fields Manufacturer, valve type or Fitting
type call the valve catalog.

2. Choose a 3-way valve, eg Heimeier, Fittings for fixed resistors ( Index 5) Fittings Type 91 3 ways-
Switching valve. Double-click on the valve type, or by clicking " Take over" The abbreviations are transferred to the data mask.

3. The DN value, they leave because the nominal size is to be determined by the program. You can change the values ​for well t-flow and t-return set free. In
this case, the temperatures of the start object are automatically entered, as will be discussed later (see also 3-way mixer ).

• copyright MH software GmbH MH BIM software


components

1. Click the right mouse button on the component in the return

2. Call by pressing F2 or double click in the box, Manufacturer, Group or product the components catalog at. Choose
A check valve (eg STD - RSK -01).

3. Double-click on a product or with the " Take over" are the abbreviations in the
acquired data mask (see also components ).

4. The lying in the flow component is to be defined as a strainer.

valves

1. Select all valves, except for the valve in the flow in manifold bar nearby. Assign one of these valves from the catalog to a value (for example, ARI - 4 - 2
Eurovedi shut-off valve).

2. About global change can transfer the data to the other valves on the manifold.

3. The unassigned valve in the flow to serve as balancing valve - eg ARI - 4 - third

copy components

1. Use all now just drawn components and valves , Choose

. then click once on any component and double-click


the same height in the adjacent finish.

Second Then draw as shown, a pump and appropriate valves and components into the string after the start object. You can decide here freely what data you
want to assign the valves and components.

• copyright MH software GmbH MH BIM software


3.5.6. connect radiators

After all risers and distribution lines are drawn, only the radiators must now be connected. Again, there is a special function. The procedure is simple and quick
performed:

1. Let the complete network view and select an isometric view.

2. Create a selection set ,

3. Select from the menu To edit • connect radiators

4. Double-click on any red supply line all the radiators in the selection set are automatically connected to the distribution line.

Note All objects in the selection set are displayed in a pale color. The normally red supply line is therefore difficult to detect. However, once you touch
an object with the mouse, the original color is displayed.

3.5.7. delete open pipe ends


During automatic tying open pipe ends are left, which now need to be removed. To do this, select the menu item Edit the sub-item delete open ends.

In the dialog that opens, select all open tube ends

After the dialog with the button OK have closed all the (short) pipe ends are removed automatically.

Remember to save the project now and then.

• copyright MH software GmbH MH BIM software


3.5.8. To calculate
Before a first calculation can be performed, some general data must be set for the network.

1. From the menu Start data object (pipe network data) or click with the right mouse button on the
Start object.

2. The heat transfer is defined as default on H2O. Enter the temperatures for t forward and t return With
70 ° C and 50 ° C on. Enter the remaining data exactly as shown in the image. (See also pipe network data / start object)

3. Now click on the icon on the toolbar to start the calculation. If you error free the network
drawn and the data entered as described, no error messages are displayed and you can view the results.

4. If (s) the message

receive, run the automatic deletion of open pipe ends by again.

5. You may receive messages

Double-click one of these messages - the data form one of the strainer in the first distributor outlet is called. The pipe was dimensioned as DN10, but
in the Component Catalog is no definition for a strainer in DN10. Double-click in the "DN" and choose the lower-right table DN15 with a double-click.

Note : If RohrSYS discovered mistakes, they are collected and in Reiter reports displayed in a list. Double-clicking on an error message, the fault is
displayed. When you click on an error message and F1 press, you get a further explanation of the current error (see error messages).

Fix the problems described above and repeat the calculation.

6. After successful calculation should definitely out the string data to be viewed as. This mask opens
automatically, if this is set in the calculation dialogue like this.

• copyright MH software GmbH MH BIM software


The string data will provide a concise overview of the pressure conditions in the network. The strand with the greatest pressure drop is paramount.
The highest pressure drop in each strand is marked in yellow. The associated object is displayed together with the train in the background in the
graphic. the train data is closed via the Close button.

7th Now you can view the calculation results of the individual objects. As with the object data entry, call the accompanying data mask with a click of the
right mouse button on an object. In the start object, the most important data are issued that affect the entire network.

Note: If red error messages, the calculation could Not be performed. The results have been issued may in no way be considered and evaluated. Only
when you can perform a calculation without red error messages that calculation results are recyclable. Yellow warning messages, however, may or
may not be edited.

• copyright MH software GmbH MH BIM software


3.5.9. Balance of the strands
To carry out the adjustment of the network not only through the thermostatic valves and radiator fittings, usually balancing valves are used.

1. Let the EC in plan view and zoom in on the area around the two risers.

2. Select and placing one valve icon to the


Floor outlets.

3. click button with the right mouse button on one of the just-drawn valves in the flow of the data.

4. Double-box manufacturers, the valve opens catalog. Select an orifice valve, eg Honeywell / Hon, valve type 4, type of fitting 12 (Combined 3-plus red
VL).

5. Assign the adjacent return valve, a balancing valve to such Honeywell / Hon, valve type 4, type of fitting 16 (Combined 3-plus blue RL). Also make sure
that the option "all throttle" is enabled. Otherwise, no preference would be calculated and remain the valve "open".

6. Do the same with the other two valves.

7. From the toolbox and click on the four valves in order


to form a selection set.

8. Copy the valves on floor copying to the first floor.

9. Click the icon on the toolbar . to start the calculation.

10. Check the calculated valve settings. To do this, right-click on a valve. In Data Group results is the attitude displayed.

• copyright MH software GmbH MH BIM software


3.5.10. power analysis

Do you want to get an overview of the default settings of thermostatic valves? The inked network is worth a 1000 words. Click the Right on any thermostatic valve.
On the left side of the data of this valve will be displayed.

Choose a right-click on the result of the field attitude the menu item - analysis from the context dialogue. It opens the dialogue Network analysis. The output of
the calculated setting is already preset. AUTO LIMIT DETERMINATION

A legend below the rider Calc shows which setting associated with the colors.

Do you want to see the temperature drop in the supply lines? Select from the Result Group any part of the track with Right T emperature (t).

In this way, all input and output values ​can be analyzed graphically in seconds.

Click the bottom left of to complete the network analysis.

3.5.11. Direction of flow analysis

For large, complex networks, it is sometimes difficult to understand in which direction the media flow. In the area of ​analysis, you have the option to display the
flow directions in mh-BIM. To do this in the "analysis" the hook In "flow direction".

It points to run the system lines in the direction of flow along, comparable to an ant road.

• copyright MH software GmbH MH BIM software


If you additionally set the hook in and click on eg a pipe, only the flow direction of will
this pipe up to the start object displayed.

Disable the flow direction display.

3.6. plans

The subscribed pipe network can be labeled with any data yet now, such as the pipe sizes, valve settings, radiators dimensions, etc. Powerful commands make it
easier to place the label flags.

With the paper plan management, you are able to produce several different views. You must not be limited to the "classical" representation in plan view it. The
output of 3-dimensional isometric drawings offer completely new ways of presenting as well as additional information for the execution, such as the type of
connectors on the radiators. Also Versprünge and the positions of the risers fall more striking in this illustration.

An export mask, you can export all your predefined paper plans into common file formats. In addition to traditional DWG and PDF exports, and exports to
AutoCAD® MEP and Revit®MEP are possible. Likewise, you can export your mh-planning as IFC file. The software mh-in plans drawn up to your company
convention are referenced, which you have created in your "favorite" dental CAD system to a suitable layout. Finished the detailed design.

• copyright MH software GmbH MH BIM software


3.6.1. labeling
So far we have dealt with the input, calculation and analysis of data. Data output mh-BIM provides powerful functions for labeling - and output data. You can
create either completely individual labels, or use the generic label that is used in the mh-software as standard.

For printing or for the control of some data on the screen, the objects can be equipped with the "default label". Although a variety of data for labeling is available,
should always only one or two values ​are output as the standing for a caption available space in the drawing is very limited. If you select more values, the
workspace is cluttered with labels so that nothing will be visible. Although you may change the font size, the overview is quickly lost in a too large amount of data.
Less is sometimes more.

First, we lie in the paper plan administration an EC plan.

1. Let the pipe network on the ground floor show and go to the top view.

Second

3. Go to the left of the data screen for riders plans and click New.

4. Name the plan "Heizung_EG". Leave the remaining settings as specified. Confirm your entry by clicking on the button OK. The plan has been created.

In the next step we want to prepare the output of the radiator data.

• copyright MH software GmbH MH BIM software


5. Select to just created plan in the paper plans.

6. Make sure that "Default label" is selected as the label variant of "hooks show the

Scale ... "and then click on ,

7. Select the tab "Default label for paper plan" the Radiator.

8. Select Manufacturer and Product.

9. If you switch to the tab "general labeling requirements", you find the same list of labeling options in the tab above. You will also find the manufacturer and
the product. The text in the description to be set in the label just prior to the associated value. You can also change our proposed names and enter
your own text.

10. Close the mask with OK. The plan you have selected label contents are now visible.

11. Close the mask with OK. Do not scare - at first glance, the label may

very unstructured. Now click below the tab "plans" on ,

12. Set the options as shown and click "Execute".

13. If the number of labels issued to is great, you can turn off individual "flags". Select this> from the menu caption> a / and click on the objects or the flags
that should not be labeled.

• copyright MH software GmbH MH BIM software


14. About the "different" tool below the tab "plans" you can label flags if desired position by hand.

Note: Do not confuse "lettering on / off", the impact on individual objects, not with "all on / off", with the label side or from peeled whole.

3.7. Subsequent changes

Imagine the following situation: you have edited a project already completed and only have to work in a "small change", as the architect on the south facade now
want to install another window with a different U value of the project.

With mh-RaumGEO this is not a problem. Directly in the graphic make a selection set of objects to be changed together. Then you can replace all the windows of
this selection set by other windows. The changes are immediately available in the heating load and cooling load calculation available - no separate data transfer!
everything is done in a few seconds. How long have you had this hand with traditional programs? This is just one of countless examples that are elegantly solved
only with a "real" CAE system. Changed data affect all planning steps. A change in the spatial geometry not only affects the calculation results of the heating and
cooling load in. With a few clicks new radiators are designed, in turn, are taken into account immediately and without further reworking the pipework calculation.

3.7.1. change south facade


The room geometry is highly suitable also for other things. We now want to replace all the windows on the south side by other windows from the component
catalog. Using the spatial geometry no problem.

1. First, we take all windows on all floors of the south facade in a selection set.

2. Set the view on everything

3. Create a selection set over the entire south facade. To do this, the function

4. Use the right mousekey any window from the south facade. The Dates- Mask on the left
Page opens.

5. With the help of a double click on the component abbreviation BT or the F2 Button to enter the component catalog.
Highlight below the rider Catalog the new short name S3W and one wearing a height of 0.95 m. By clicking on Take over the short name is
transferred to the window.

• copyright MH software GmbH MH BIM software


Press 6. Then, with a right-click in the component short name from the pop-up menu
in point Global change ... The following dialog closed with the button OK.

7th In seconds, these windows are replaced. Now you can see the results - click with the right mouse button on a room stamp of any area on the south
side.

8. Open with top right of the screen or on the already opened tab the
Heating load. The last selected space will be displayed immediately in the heating load.

Although the changes have been made within the module chamber geometry, a "handoff" to the heating load or the cooling load is not necessary.

The changes are all calculations immediately available. This is holistic working on the project and only works with integrated systems.

How long have you had this hand with a conventional software? And you would then have been sure to have actually made the change in all relevant
areas?

• copyright MH software GmbH MH BIM software


3.8. Volume Rendering

Will you like to see your work to date three-dimensional solid model as?

Just press several times F9. Each time you press the display of system after system + Wireframe, after two graduations, according wireframe, by volume model,
according to texture model, and so on system changes ...

With the shortcut SHIFT + F9 You can reverse the display order. If several trades are open simultaneously, all objects are displayed. If radiators and pipes
currently not displayed

are set in the tab the hook.

Uncheck . to throw a glance into the "inner workings" of the building - switch
For example, the EC.

1.1. define cut

to define cut-outs is another powerful help. You can have only certain parts of a building show - with large construction projects can be "cut out" a slice of the
building to a better overview to gain over this part and construct without disturbing, lying in the field of view objects!

Switch to the top view. Below the tab "building" You go to the "Out".

• copyright MH software GmbH MH BIM software


By clicking on "New" you can cut out a rectangular area of ​the building. Select a single click the first point of the rectangle out. Click once, and then define the
second point. Now you can "span" the rectangle and set the depth. With another click you have determined to be isolated area.

If you are satisfied with your selection, you can save this snippet by clicking on the "Save" button. Enter only another name for the neck and you can call this cut
again and again.

Experiment necessarily with this feature! You can create many interesting views imaginable. You can also change the height by adjusting the corresponding floor
or "everything".

• copyright MH software GmbH MH BIM software


You should also read the chapter ' Generate single-line representation wire and solid models ' and coordination in Handbook of RaumGEO.

3.9. Experiment!

Congratulations! If you have completely worked through the introductory example, you are a big step forward. The essential features you have come to know and
thus have the tools to own first tentative steps.

You should check with your building initially perform some 'experiments', to know better about the capabilities of the program to learn.

You can also learn one after all commands in the menus, the toolbox and the toolbar know. Please refer to the manual or online help and experiment!

• copyright MH software GmbH MH BIM software