S PECIAL U GOCHUKWU N DUKWE , PMP, CMRP, R.

COREN, MNSE
| P I P I N G - M E C H A N I C A L - S T R U C T U R A L - D E S I G N | P R O J E C T C O N T R O L S | T U R N A R O U N D -R O U T I N E MAINTENANCE|
|Tel: +234 (0) 8038913492 | Email: ugo.special@yahoo.com|
|Address: 17 Amadi Drive Off NTA Road, Mgbuoba, Port Harcourt Rivers State, Nigeria|

Professional Summary
Certified and Licensed Professional (PMI, SMRPCO, COREN) leveraging a strong technical background with practical hands-on Plant
Maintenance and Project Planning, Scheduling, Execution, Monitoring/Supervision, and Closeout; with a demonstrated capability to
work with a multidisciplinary team and having a track record of successfully meeting project KPI and Zero LTI

Education
 Masters of Engineering M.Eng: Production Engineering-(Major: Industrial Engineering), 2018
Minor: Manufacturing Engineering and Engineering Management: University of Benin-Benin, Nigeria

 Bachelor of Engineering B.Eng.: Mechanical Engineering-(Second Class Upper Division-2:1), 2012


Rivers State University of Science and Technology-Port Harcourt, Nigeria

Professional Certification
 Certified Maintenance and Reliability Professional CMRP-2020
 Project Management Professional (PMP)® -2019
 Chartered Engineer Certification with COREN (R.COREN)- 2018
 NSE Corporate Membership Certification(MNSE)-2018
 Risk Analysis, Evaluation, and Assessment -2018
 Managerial (Cost) Accounting: From Beginner to Advanced-2018
 Hazard Identification HAZID-2015
 Safety Management System Evaluation OSHA-2013
 Safety Supervision and Leadership OSHA-2013
Work Experience
Maintenance and Reliability Coordinator | 2019 to Present
Pivot-GIS @ Nigeria LNG, Integrated Maintenance Service Contract and Projects-| Bonny Island
 Reviews and development of maintenance strategies for static and rotating equipment and compliance of the planned preventive
maintenance program to the company’s Safety & Environment Critical Element (SECE) performance standards,
 Development and reviews of the Static and rotating equipment planned preventive and monitoring maintenance program settings, to
ensure that the maintenance tasks undertaken are adequate to prevent unplanned equipment failure.
 Collaborate with the Inspection team and provide support for inspection requirements on the mechanical equipment assets as
necessary
 Interface with vendors and the original equipment manufacturers for all queries regarding maintenance, modifications, spare parts,
drawings and the resolution of technical problems
 Work with the Operations team during commissioning phase for all rotating equipment, provision of technical support on deviations
and maintenance engineering input into design, 3D model and constructability reviews as well as Factory and Site Acceptance
Testing.
 Development of the scope of works for Static and Rotating equipment Maintenance for Turnarounds Long Term Plans
 Act as an Independent Competent Person (ICP) to carry out studies to repetitive failures and all other problems that adversely affect
plant operations
 Ensure RAM is assessed and compliant during project and handover
 Ensure Availability and Reliability of plant and equipment
 Ensure Goal Zero in all maintenance Support Services and to ensure a safe work environment for all company employees and
contractors.
 Manages strategies to ensure safe and reliable work access, and lifting and rigging provision at all company controlled facilities, thus
providing Subject Matter Expert (SME) inputs in work access provision and leadership in lifting and rigging, including

|
leading/participating in Root Cause Analysis (RCA) as may be required in compliance with Company HSE requirements to ensure
optimal production of LNG.
 Drive development of Field improvements such as Capex Project, liaising with suppliers/vendors/manufacturers on tools and
equipment purchases, and development of method and efficiency improvements to meet company Safety and Productivity goals.
 Drive compliance with field services methodologies, personnel competence requirements, new technology training and transfer, and
adhere to proper Management of Change (MOC) where required to assure safety, quality and reduction in OPEX cost of service
provision.

Senior Mechanical and Reliability Engineer- | 12/2016 to 2019


Pivot-GIS @ Nigeria LNG, Integrated Maintenance Service Contract _IMSC-| Bonny Island
 Responsible for the review and management of equipment and maintenance data within the Computerized Maintenance
Management System (Pacer)
 Maintenance of MOC focal point, Executes Maintenance MOCs and Participates in constructability/maintenance design for Routine
and Turnaround Maintenance MOCs
 Monitoring and assuring technical integrity and reliability (production availability) of allocated rotating equipment, including possible
troubleshooting and resolving related technical integrity and reliability issues
 Supporting the assets medium- to long-term plans by identifying and initiating life-cycle management plans for allocated rotating
equipment such as Pumps, Gear and Belt drives, compressor system, Expanders, etc
 Planning, developing and administers risk-management initiative; Risk assessment, which involves analyzing risks as well as
identifying, describing and estimating the risks affecting the business –Turnaround
 Applied best practices for installation and maintenance of Static Mechanical equipment such as Heat Exchanger, Pressure vessels,
Valves, Columns, Cooling Water Tower, etc.
 Carried out spading, de-spading and overhaul maintenance in Heat exchangers for Train 1,2,3 for unit 1100(Acid Gas Removal
unit), 1400(liquefaction unit) and 1500 (Fractionation unit) Heat Exchangers
 Planned, designed and executed the change out of Pressure vessel such as De-propanizer Condenser at over 18metres height
 Implemented the Valve Maintenance Strategy (VMS) by supervising the removal and retrofit of over 30 numbers of valves with sizes
of over 24” up to 66” and pressure class up to 600# rating on Train 3 2017 Turnaround
 Prepared Method Statements, Test packs, Bill of material, Equipment and Manpower Requirement, Activity List, WBS, Activity
Duration, work packs and High-level plan for Turnaround and routine maintenance works.
 Carried out a good communication and workflow interface between Bolting contractor team, Hydro-jetting Contractor, Project
Contractor, Inspection contractor for seamless execution of planned job during execution

Construction Engineer (Mechanical, Piping and Structural) | 06/ 2015 to 12/2016


Alcon, FYIP Central Compressing Plant /Central Processing Facility (CCP/CPF)
 Implement the re-route piping of source of seal gas for compressor system unit and report progress report based on installation and
construction works
 Carried out piping and mechanical design review, root cause analysis, brownfield modifications, equipment and materials
specifications, and standards update
 Develop fabrication drawings, sketches for workshop fabrication and checkout fabrication at each stage to verify conformance
 Scheduling work tasks to ensure efficient resource utilization, excellent coordination between operations (equipment readiness /
permitting), material availability, construction equipment
 Lead technology testing and piloting activities, as well as economic analysis of existing and potential new technologies, as related to
maintenance management
 Construction of 900m pipeline linkage, North end Valve Access Platform and Manifold; Perform field verification activities
 Developed valve list and material requirement for valves to combine new and old scope and monitor installation
 Carried out the drafting of pipe support, fire, and gas transmitter support, field instrument support, etc.
 Installation of piping spools for new onshore scope implementation works and plant upgrade
 Designed pipe support to align with stress analysis report and piping system for CCP/CPF and NBFS
 Advanced the requisite shell test pressure and seal test pressure works for valves based on ASME B16.34 and API6D.
 Identified pipelines that require PWHT and NDT based on ASME B31.3 requirements
 Designed the potable water distribution piping system from CCP to Field Logistic Base FLB.
 Managed fit-up and welding of spool to spool or spool to field run pipe together and welding supports
 Generated technical drawings, Work method statements, schematics, and computer-generated reports.
 Supervised shop and field fabrication of piping spool and painting yard activities

Mechanical Engineer (Mechanical & Piping) | 05/2013 to 06/2015


Alcon, Nigeria Forcados Yokri Integrated Project (FYIP) North Bank Flow Station
 Reviewed design deliverables and ensured Manufacturers Data Sheet meets the requirement for equipment’s
 Tracked construction and Installation Project Management System(PMS) to efficiently complete large scale scopes
 Installation and Maintenance of pumps, compressors and similar rotating equipment
 Make sure the latest inputs of Equipment Vendor Data, Equipment Layouts, Equipment List, Plot Plans, and etc are implemented.
 Maintain conformity with project specifications and requirements, and with respect to accessibility, operations and maintainability of
equipment e.g nozzle orientation, equipment elevations, orientation and adequacy of ladders, service platforms, PSV lines, outlet fire
water network for hydrants, monitors and deluge valves and etc.
 Perform pipe routing study and modeling of all lines ≥ 2” for modification scope
 Maintain conformity to P&ID and Line List, Designer shall ensure that specific process requirements such as slope, free flow, and no
pockets, etc. are incorporated.
 Maintain conformity with JSD for Piping Design, Workplace Design Specification, and Working Instruction.
 Perform incorporation of Stress Calculation Notes into DCS Piping Design.
 Prepare adequate operation and maintenance space such as ladders, stairs and service platforms and etc for valves, flanges, joints,
and instruments.
 Perform study, identify and propose pipe support locations, span. Then, prepare pipe support attachments for issuance to the Stress
team.
 Transfer all changes and mark-up from personal copy onto the Piping Master Copy (P&ID, Equipment layouts and etc.)
 Relief device selection, sizing, installation, inspection, and servicing requirements and emergency flare system selection in
accordance with API codes and DEP

Mechanical Supervisor | 01/2008 to 06/ 2012


Elshcon Nigeria, Peace Vessel, Jacket, DAE House Bolt, RJ Manifold, Flow Station, Turnaround
Steel Structure Stage
 Reviewed Steel Erection drawings and Checked civil foundations elevation before steel columns/frames Erection
 Supervised ground assembly for main columns with beams to compose frames can be lifted and erected one time
 Organized erection of main steel girders and bracings between frames (with consideration of erection sequence)
 Controlled alignment and bolt tightening for main members of the structure on the main Aligns and Axis before offering for inspection
 Supervised erection of Dressing (erection of small beams, bracings, angles, C-Channels and other medium & light steel items).
 Coordinated Erection steel handrails and gratings and Inspected balance bolt tightening
 Sketched and documented as-built drawing to capture changes due to fabrication and installation constraints

Piping stage
 Reviewed Method of statement, specifications, and standards of materials (pipes, fittings, flanges, gaskets… etc.)
 Coordinated with the QC department to cover any required NDT or Heat treatment (preferably before installation lifting to avoid
difficult accessibility).
 Coordinated with scaffolding groups to make access for assembly of the whole lines at any elevation (fit-up and welding by taking
level and alignment into consideration).
 Supervised welding of vents/drains, pipe supports which to be erected in position at structure.
 Coordinated with the engineering department to divide piping scope into test packages.
 Closed punch items and release test packages for hydro, service, and visual test.)

Rotating Equipment stage


 Installation of new Turbine Package and new DLE burner to existing Turbine package
 Implementation of Turbine maintenance plan based on the recommended EOH
 Utilization of the standard replacement intervals for Turbine hot gas path components e.g. blades, vanes, and combustor.
 Carried out shaft alignment for pumps, compressors and turbine and gear systems

Accomplishments
 Saved company over $150,000 by implementing preventive maintenance for abandoned equipment package that was later reused

|
 Safely Supervised team of 120 technician and craftsmen during Turnaround outing with zero LTI
Developed a detail Plant valve state list of current status of CCP/CPF Plant which saved the company over $500,000
Vocational Course and Training

 Microsoft Project 2016: Beginners to Expert -2018


 Oracle Primavera P6 Training-Advanced (Industry based)-2018
 3D Modelling of piping system in AutoCAD-2018
 Quality Management System -(ISO 9001:2015)-2015
 Offshore/Onshore Professional HSE Certificate-2015
 Hazard Identification Certification (HAZID)-2015
 Piping Engineering and Drafting Refresh Course-2012
 Mechanical Equipment and Plant System Course-2017
 LHSP (Lifting and Hoisting Safety Practice)-2014
 Breathing Apparatus (BA) Training-2017

Computer Skill and Knowledge


 Microsoft Projects
 Primavera P6
 AutoCAD 2D and 3D
 STAAD PRO
 E-permit, PACER
 Microsoft Office
 PDMS
 Primavera Risk Analysis
Highlights and Skills
 Cost Estimation and Control, BOQ, Procurement  GRE, PVC, Carbon Steel, and Stainless Steel Piping
Management  Rotating Equipment’s such as Pumps, Compressors,
 Budget Estimation, Reliability Maintenance, and Turbine and Expanders Systems
Construction Management  Precomissiong, Commissioning and Operation of
 HVAC, MEP, Building Construction and Design CCP/CPF, Flow station, Power Plant and LNG Facility
 Civil Works, Mechanical Design and Field Instrumentation  Developing Bill of Material (BEME) for Mechanical and
 Risk Analysis, Evaluation, and Assessment Piping Building and Structural works
 FEED, DED, PFD, P&ID, PEFS, Isometrics Drawing works  Heat Exchanger and Vessel Maintenance and Repairs
for Project Execution  Project Planning, Execution, Monitoring and Closeout
 Static Equipment’s e.g. JT-LTS, Glycol Contactor &  Routine Maintenance, Turnaround Planning, Scheduling
Regeneration, Heat Exchangers, Separators, Tanks, and Execution
Columns, Slug Catchers, Slug catchers, Oil-Pit Sump  Budget Estimation, Reliability Maintenance, and
 Project Scheduling, Planning, Risk Analysis, and Evaluation Construction Management
 ASME/API Codes e.g. B31.3, B31.1, API 610, 570, etc.  HVAC, MEP, Building Construction Design
LNG, CCP/CPF, Flow Station and Power plant  Fabrication and Erection works of piping & structural
 Fabrication and Erection works of piping & structural  Shaft, Gears and Belt Alignment and Equipment Servicing