You are on page 1of 4

Name of Personnel: Saravanan Rangasamy

Date of Birth : 15​th​ Jun 1982

Education : B.Tech. in Electrical & Electronics Engineering from Vinayaka Mission University,
Tamilnadu -2009,

: Diploma in Electrical & Electronics Engineering from Sree Narayana Guru Institute of
Technology, Tamilnadu -2002,

: PDC in Thermal Power Plant Engineering from NPTI National Power Training
institute ,Nagpur, Maharashtra -2003,

: Certified Boiler operation Engineer, Govt. of Karanataka, India-2007

Years of Experience : 17 Years

Nationality : Indian

● BTG Commissioning​, Operation & Maintenance experience​: Power Plant – Hands on experience
in commissioning, ​Operation ​2X 660MW​, Boiler, Turbine, Generator Make: DEC-Don fang Electric
Machinery Co. Ltd.,​2 Nos of Oil fired boiler (HFO 380 CST, LFO), Front and Rear fired, SH, RH
(reheat) Type. Capacity 2220t/hr, Pr: 16.7 Mpa, Temp:535​0​c, Steam Turbine Three cylinder, Combined
HP & IP turbine and 2 no’s LP turbine, Condensing type with LP bypass & HP bypass system.
Including ATC and EHTC governing system, Turbine driven feed pump, FGD, Generator with Static
excitation system, Hydrogen Cooling system.
● ​ peration,Maintanence of Coal fired High Pressure
Have hands on experience in commissioning, O
Boilers Make BHEL (India), CVL(India) ,IGSEC(India),Type of Boilers FBC,HRSG,PF.

● ​ peration, of COAL Fired


Have hands on experience in Desk Control room operation commissioning, O
Boilers,Oil Fired Boilers, Steam turbine, Gas Turbine, BOP,CHP,AHP.
● Have hands on experience in commissioning ,Operational Experience of Gas Turbines of Frame 6,
with Mark VI control systems on Open cycle​.
● Have experience/knowledge in performance monitoring/calculation of Boilers, Steam Turbines, Gas
turbines, BOP, Auxiliary equipment’s and whole of power plant.
● Have operational experience of utilities in Oil/Gas Industry – Steam Systems, Waste water, Gas
turbines, Steam turbines, Compressors, Feed water pumps, DM plants, Sea water/Fresh cooling water
systems, HV/MV/LV Elect Distribution.
● Have hands on operational experience of various DCS systems, supplied by ABB,TATA Honeywell,
EMERSON, YOKOGOWA,SEMIENS.
● Can handle emergencies, trouble shooting, normal operations of Power Plants/Utilities.
● Assist, Conduct Training & Lectures, Conduct on job training & guide personnel.
● Isolate HV/MV/LV Electrical systems and equipment’s, SAP modules. Issue / withdraw work permit,
LOTO System.
● Knowledge Study of P&I diagram, Electrical single line diagram, Interlock and Logic signal diagram
Gate logics.

● Familiar DCS related activities (Yokogawa (centum CS 3000 & VP) ABB (AC 800M) and Invensys
Foxboro ,Emerson.
● Supervising the complex Loop checking, Function test, DCS operation, BMS ,Commissioning & Start
up activities.
● During the logic, sequence and function check of ESD & F&G system, checking the ESD valves on
line test, graphic display, graphic alarm manager, sequence of events, service description, trend
historian, DCS assigned key board, bad input/output, transmitter fail safe burnout and related
configured data.
● Coordinating all the activities to the DCS Vendor Which Sub-System need priority action.
● Assist the Vendor for Pre-comm. & Commissioning Activities.
● Supervising Pre-commissioning Activities like Air Blowing, Reinstatement, Leak Test, Preservation, ,
Mechanical Run test for all Pumps, compressors Turbines.
● Good knowledge of commissioning sub-system, BOP system, FGD system.
● Also providing Safety Procedure like work permit for the safe of manpower during operation.
● Involve in Ready for commissioning (RFC) walk through with Clint identifying Punch items and closing.
● Coordinate with the Site Manager for request of Material for Construction work at site.
● Preparation of work activities and scheduling of manpower assignment.
● Organize Daily toolbox meeting with Subordinates and labors before starting the day’s work.
● Also provide safety procedure like work permit for the safe of manpower during operation.
● Attended pre-commissioning meeting, installation, inspection, maintenance, test repair and selection of
the materials equipment and facilities, using the standards which can comply with latest addition.
● Handling of manpower and equipment in proper and execute on the spot solution by using common
sense when trouble shooting and decision making.
● Review Construction Planning, Scheduling & Execution exactly on time as required by the Company.
● Make sure that sub-contractor should rectify the punches as soon as possible to hand over the sub
system vise to the owner as per mile stone completion date

Period Project

Oct 19 – Till date ● Employer: ​RABEC Electricity, Rabigh, Saudi Arabia.


● Project:​ 4X660MW Hassyan Thermal Power Plant at Dubai, UAE.
● Key Roles / Activities Performed:
Responsibility of Operation activities commissioning and shift operation
Cold /Hot/ Warm start up, Normal Operation of 2* 660MW,
Preparation of SOP for all the equipment,
Monitoring the operation of BOP plant
Issue & cancellation PTW (Permit to Work) system,
Ensuring safety norms & safe work practices,
Maintaining statutory norms related with stack emission,
Improving the Heat Rate /Aux. Power/ Availability/ PLF.
Conducting Monthly ,Weekly test of Turbine , Boilers, Firefighting
Monitor plant operations and handling emergencies,
Coordinated the commissioning activities
Pre-boiler flushing, Boiler alkali and acid cleaning,
Commissioning of auxiliary equipment’s,
Commissioning of fire pumps before first light up,
Steam blowing with LDO / HFO firing,
All equipment’s lube oil flushing(to achieve the NAS value)
Stator water flushing, Hot well & Condenser tube leak test
Generator air leak test, CO2​ ​ purging and H​2​ filling,
Boiler MFT and TG ETS protection checking,
Rolling and synchronizing with LDO/HFO firing,
Successful completion of ​COD
● Achievements:
Root cause analyzed for continual light up failure of HFO,LFO Oil
Fired,AFBC,HRSG Boilers .
Various Emergencies handled in Gas ,Steam Turbine like excess vibration in Turbine &
Generator, Unit Black out, Station Black out, Control valve hunting.
Various Emergencies handled in Boiler like leakage in main steam line, bed coil
puncture, Economizer tube leakage.
All test of turbine like Over speed,CV movement test,Spray oil test.

Mar 2010 – Jul 2011 ● Employer: Fujairah Cement Industries​, Dibba, UAE

● Project: ​Preparation of bankable detailed project report (DPR) for


1X660MW Margherita Power Plant at Margherita, Assam.

● Key Roles / Activities Performed:


Operation and Maintenance activities of ​Total capacity of 180TPH AFBC Boiler,
Turbine of total capacity 40 MW (SNM).
● Boiler preparation for start up, cold & hot light up and smooth operations
with ​DCS (ABB)​.
● Preparation & rolling of Turbine and operational knowledge about
Condenser, Cooling Towers etc.
● Operation of Boiler, Turbine and its associated auxiliaries , BAGFILTER,
PRDS, Coal Handling Plant, Ash Handling Plant, Air Compressors, Fans &
Pumps through DCS.
● Planning & Preparation for the annual inspection and shut down of the
boiler.
● Exploring the possibilities of development activities with the view of energy
saving, breakdowns reduction, operational flexibility improvement and
implementing those which are technically, financially and economically
viable.
● Attending all routine works and periodical breakdowns independently.
● Also attending maintenance related activities like preventive maintenance,
inventory management & modification of equipment for better process
control.
● Responsible for managing man power in order to effective operation.
Jul 2009 to Jan 2010 ● Employer: ​Godawari Power & Ispat Ltd, C.G, INDIA.

● Project: 2 x 250 MW coal fired Thermal Power Plant of Calcutta Electric


Supply Corporation, Budge Budge, West Bengal.

● Key Roles / Activities Performed:


Jul 2009 to Jun 2009 ● Employer​: RAK AL Ghali Power LLC, UAE

● Project: ​652 MW CCPP at Auraiya Combined Cycle Gas Based


Thermal Power Plant​ ​at Auraiya, Etawah, Uttar Pradesh.

● Key Roles / Activities Performed:

Jul 2002 to Jan 2009 ● Employer: ACC LTD​, India

● Project: RAPP- 3 & 4 and KAPP-1 &2 Atomic Power Plant of Nuclear
Power Corporation of India Limited at Rajasthan & Karnataka.
● Key Roles / Activities Performed: