STA Elevasi Design

Centerline STA 0+100.00 10

Template Design Kiri Kanan CUT FILL


Jarak-1 (offset dari CL) -4.00 4.00 STA 0+100.00
Grade(%)-1 0.0% 0.0% STA 0+100.00 3.69 4.00
Elevasi-1 10.00 10.00 VOL (M3) 0.00 0.00
cut/fill slope (V:H) -1: 1.0 1: 1.0 TOTAL VOL (M3) 0.00 0.00
Catch Point Offset -5.13 5.13
Catch Point Elevasi 11.13 11.13

+15.0

+14.0

+13.0
+11.13

+11.13
+12.0
+10.00

+10.00

+10.00
+11.0

+10.0

+9.00

+8.00

+7.00
1
2

4
5

+6.00
-15 -13 -11 -9 -7 -5 -3 -1 1 3 5 7 9 11 13 15
ExistingElevasi
ExistingOffset

DesignElevasi
DesignOffset
nExisting: [51] #
m2 nDesign: [5] 1 -47.06 10.95 -5.13 11.13 7.00
m2 CUT:3.69m2 FILL:4.00m2 2 -43.55 10.92 -4.00 10.00 7.00
m3 offsetMin: -47.06 -48 3 -40.09 10.92 0.00 10.00 7.00
m3 offsetMan: 54.62 55 4 -35.72 10.81 4.00 10.00 7.00
ElevasiMin: 8.71 7 5 -31.51 11.01 5.13 11.13 7.00
ElevasiMax: 13.46 14 6 -27.47 10.78
Datum: 6 7 -22.72 10.87
8 -18.33 10.93
+15.00
9 -13.47 11.04
10 -8.16 10.91
+14.00
11 -5.088 11.14
12 -3.582 11.07
+13.00
13 -3.214 11
+12.00 14 -2.997 10.87
15 -2.697 10.58
+11.00 16 -2.186 9.979
17 -2.089 9.34
+10.00 18 -1.172 8.727
19 -0.449 8.706
+9.00 20 0 8.867
21 0.333 8.996
+8.00 22 0.883 9.181
23 1.804 9.346
+7.00 24 1.999 9.951
25 2.897 10.52
+6.00 3.495 10.88
26
11 13 15 27 4.007 11.08
28 4.267 11
29 5.09 11.13
30 6.177 11.27
31 7.136 11.49
32 8.138 11.77
33 9.531 12.07
34 11.314 12.1
35 12.891 12.25
36 14.385 12.47
37 15.679 12.61
38 17.315 12.78
39 18.309 12.91
40 18.773 13.05
41 19.337 13
42 19.535 12.92
43 20.776 12.92
44 23.41 12.94
45 25.907 13
46 31.736 13.16
47 36.157 13.23
48 40.613 13.32
49 45.258 13.34
50 49.875 13.46
51 54.616 13.27
Station CL Design Area Cut Area Fill Vol Cut Vol Fill Acc Vol Cut Acc Vol Fill
100 +10.00 3.69 4.00 - - - -
+8.00 - - - - - -
+8.00 - - - - - -