You are on page 1of 4
B.QROUNDING ‘The materials needed for the grounding system are the following: Tape conductor hot dip galvanized steel (St/tZn) 30x3.Smm* . Rebar quick connector hot dip galvanized steel (St/tZn} ........... Connector H.7. tape conductors 30/30 hot dip galvanized steel (St/t2n)Print Earth rod cross hot dip galvanized steel (St/tZn) Print Earth rod clamp brass (Ms-Cu/2n) =. 600m ++ 300 pes 35 pes 4 pes Apes ANODE JUNCTION BOX (EXd TYPE) [ease TRAY Ssl-t ‘CABLE GLANDS —) Ss 2" @ GALVANISED / ie PIPE TOP PLATFORM WITH HANDRAILS +1700 NAMEPLATE SPIRAL LADDER WITH LANDING 12000 H= 3 af? GL GL se , sh ig a . 8 19000 (INACTIVE COLUMN 11000 (GROUNDBED ACTIVE COLUMN LENGTH) LENGTH) \L DIA. VC CONDUIT \ \— CONCRETE FOUNDATION g (SEE DETAIL-1) S 5 NOS. ANODE CABLES j++} PP ROPE CABLE TE |— pvc casine | JN Ny 5| 8 =“t—| I 2 8 8 8 as Ae 1 ~] — Mo ANODE (SEE DETAIL-2) aS STEEL CASING a 2 8 1Cx16 Sq.mm KYNAR/HMWPE ANODE CABLE TO AJB S 3 at 8 2 8 8 U eno welch DEEP WELL ANODE GROUNDBED DETAILS (5 ANODES) \ \ \ WELDED PAD CONNECTION SEE DETAL-3 — SLOPE 1: — Poe SLOPE 1: 100 soo ae oo aI GROUND LEVEL MEAN DIAMETER 34000 POSITIVE HEADER CABLE (1x50 Sq.mm XLPE/AWAVLSF) FROM TRANSFORMER! RECTIFIER GENERAL ARRANGEMENT NTS DC DETAIL-1 —— TYPICAL TEST POST ANODE GROUNDBED CANOPY CABLE TRAY \4 500 / 3" DIA. PVC CONDUIT DETAIL-1 CONCRETE FOUNDATION DETAILS NOZZLES AND LADDERS ORIENTATION NTS NOTES 1, ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED. 2. AFTER SETTING OF COKE BREEZE, TOP OF THE ACTIVE COLUMN SHALL BE FILLED WITH CLEAN SHINGLE (CRUSHED ROCK) OF APPROX. 10mm DIA. UPTO APPROX. 3m HEIGHT 1 [22-12-2016 [SMART TECHNICAL SOLUTIONS| IATROPOULOS VASILEIOS [ISSUED FOR DETAILED ENGINEERING REV.:| DATE: DRAWN BY: APPROVED BY: DESCRIPTION: on NOE CONSTRUCTIONS eer Pefka ‘hesi bro 19300 Aspropirgos. Greece Tel. (+30) 210-5595190 Fox. (4130) 210-5596751 eimai infoonoe.or PROJECT: ISOMERIZATION UNIT - BASHRA REFINERY — |PROJECT No LOCATION: BASRA, IRAQ OWNER: ICONTRACTOR: CAD-FILE: (DWG No) DRAWING TITLE: CATHODIC PROTECTION SYSTEM ISCALE: SIZE: DWG.No: 100-ELE-191 SHEET: — toff REV: 1 TEST POST —m SEE DETAIL-A ° ° ° ° 8 ° = GE] Cu/CuS04 REFERENCE ELECTRODE ° ° (00mm AWAY FROM THE TANK) GL T 77 GL ‘ : * 7 \ 3 : : 8] |. 8 3 8 3 2 . ] oat F 4X10 Sc, mm XLPE/AWA/LSF “| |e “4 | RE CABLE 300 CABLE FROM TANK DETAIL -A TERMINATION DETAILS TYPICAL TEST POST 4X10 Sc. mm XLPE/AWAVLSF TANK “| NEGATIVE DRAIN CABLE COATING REPAIR MATERIAL, CONTINUOUS WELD TANK COATING REMOVED PRIOR TO WELDING BEING MADE, COATING FULLY REISTATED OVER WELDED PLATE AND CABLE CONNECTION WELDED PAD CONNECTION DETAIL -3 NOTES 2. ORIENTATION OF GROUNDING LUG IS TYPICAL. 3. FOR THE DETAILS OF CATHODIC SEE THE STUDY 6. CATHODIC CABLE ROUTES INDICATED ARE DIAGRAMMATIC ONLY. THE FINAL ROUTES SHALL BE COORDINATED ON SITE. 22—12—2016|SMART TECHNICAL SOLUTIONS] IATROPOULOS VASILEIOS ISSUED FOR DETAILED ENGINEERING: REV.[ DATE: DRAWN BY: APPROVED BY: DESCRIPTION: Deu NOE CONSTRUCTIONS S05 Thesi Bio Pete Tel. (+30) 210-5595190 Fax. (+30) 210-5596751 e=mel. info@noe.gr PROJECT: ISOMERIZATION UNIT - BASHRA REFINERY | PROVECT No: LOCATION: BASRA, IRAQ OWNER: CONTRACTOR: CAD—FILE: (DWG No) DRAWING TITLE: CATHODIC PROTECTION SYSTEM ISCALE: SIZE: DWG.No: = 100-ELE-191.1 SHEET: tof REV.: 1 je 10 STUD |—_____— STEEL NuT WELDED M10 STEEL THREADED STUD ON THE CENTER SS SERRATED WASHER FLAT WASHER, STEEL PLATE 50X50X5mm (TANK PIECE) CURVATURE TO MATCH THE SURFACE DIA, OF TANK ISOMETRIC VIEW ELEVATION STEEL PLATE DETAILS 10x16 Sq.mm KYNAR/HMWPE, NOTES EPOXY FILLING ANODE TAIL CABLE MIXED METAL CONNECTOR OXIDE ANODE \ SEAL EPOXY FILLING || a é ee fF "FOLLOWER " HALF ADJUSTMENT SCREW "SOLDERING " HALF OF CONNECTOR | SLOT MIXED METAL OXIDE ANODE OF CONNECTOR ( [ / \ we t] ) S / LEAD WIRE ADJUSTMENT SCREW SLOT FOR WIRE ATTACHEMENT CONNECTOR ASSEMBLY CONNECTOR INSTALLATION FOR THN GROUNDING CONNECTION SE DETAILS 1-08. 2. ORIENTATION OF GROUNDING LUG IS TYPICAL. 3. FOR THE DETAILS OF CATHODIC SEE THE STUDY 6. CATHODIC CABLE ROUTES INDICATED ARE DIAGRAMMATIC ONLY. THE FINAL ROUTES SHALL BE COORDINATED ON SITE. 22—12—2016 [SMART TECHNICAL SOLUTIONS IATROPOULOS VASILEIOS [ISSUED FOR DETALED ENGINEERING REV.: DATE: DRAWN BY: APPROVED BY: DESCRIPTION: on NOE CONSTRUCTIONS Oh: Thesi Dio Pefxa cron: 19300 Aspropirgos, Greece Tel. (+30) 210-5595190 Fox. (+30) 210-5596751 ecmail, info@noe.gr PROJECT: ISOMERIZATION UNIT - BASHRA REFINERY | PROJECT No: LOCATION: BASRA, IRAQ OWNER: CONTRACTOR: CAD-FILE: (DWG No) DRAWING TITLE: CATHODIC PROTECTION SYSTEM ISCALE: SIZE: DWG.No: 100—ELE—191.2 SHEET: ofl REV.: 1

You might also like