B.QROUNDING
‘The materials needed for the grounding system are the following:
Tape conductor hot dip galvanized steel (St/tZn) 30x3.Smm* .
Rebar quick connector hot dip galvanized steel (St/tZn} ...........
Connector H.7. tape conductors 30/30 hot dip galvanized steel (St/t2n)Print
Earth rod cross hot dip galvanized steel (St/tZn) Print
Earth rod clamp brass (Ms-Cu/2n)
=. 600m
++ 300 pes
35 pes
4 pes
ApesANODE JUNCTION BOX
(EXd TYPE)
[ease TRAY
Ssl-t ‘CABLE GLANDS
—) Ss 2" @ GALVANISED
/ ie PIPE
TOP PLATFORM WITH
HANDRAILS
+1700
NAMEPLATE
SPIRAL LADDER
WITH LANDING
12000
H=
3
af?
GL GL
se , sh
ig a .
8
19000 (INACTIVE COLUMN
11000 (GROUNDBED ACTIVE COLUMN
LENGTH)
LENGTH)
\L DIA. VC CONDUIT \
\— CONCRETE FOUNDATION
g (SEE DETAIL-1)
S 5 NOS. ANODE CABLES
j++} PP ROPE
CABLE TE
|— pvc casine
|
JN
Ny
5|
8
=“t—| I
2
8
8
8
as
Ae
1
~]
— Mo ANODE (SEE DETAIL-2)
aS
STEEL CASING
a
2
8 1Cx16 Sq.mm KYNAR/HMWPE ANODE
CABLE TO AJB
S
3 at
8
2
8
8 U eno welch
DEEP WELL ANODE GROUNDBED DETAILS (5 ANODES)
\
\
\
WELDED PAD CONNECTION
SEE DETAL-3
— SLOPE 1: —
Poe SLOPE 1: 100 soo
ae
oo
aI GROUND LEVEL
MEAN DIAMETER 34000
POSITIVE HEADER CABLE
(1x50 Sq.mm XLPE/AWAVLSF)
FROM TRANSFORMER!
RECTIFIER
GENERAL ARRANGEMENT
NTS
DC
DETAIL-1 ——
TYPICAL TEST POST
ANODE GROUNDBED
CANOPY
CABLE TRAY
\4 500 /
3" DIA. PVC CONDUIT
DETAIL-1
CONCRETE FOUNDATION DETAILS
NOZZLES AND LADDERS ORIENTATION
NTS
NOTES
1, ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPECIFIED.
2. AFTER SETTING OF COKE BREEZE, TOP OF THE ACTIVE COLUMN SHALL BE FILLED
WITH CLEAN SHINGLE (CRUSHED ROCK) OF APPROX. 10mm DIA. UPTO APPROX. 3m
HEIGHT
1 [22-12-2016 [SMART TECHNICAL SOLUTIONS| IATROPOULOS VASILEIOS [ISSUED FOR DETAILED ENGINEERING
REV.:| DATE: DRAWN BY: APPROVED BY: DESCRIPTION:
on NOE CONSTRUCTIONS
eer Pefka
‘hesi bro
19300 Aspropirgos. Greece
Tel. (+30) 210-5595190
Fox. (4130) 210-5596751
eimai infoonoe.or
PROJECT: ISOMERIZATION UNIT - BASHRA REFINERY — |PROJECT No
LOCATION:
BASRA, IRAQ
OWNER:
ICONTRACTOR: CAD-FILE: (DWG No)
DRAWING TITLE: CATHODIC PROTECTION SYSTEM
ISCALE: SIZE: DWG.No: 100-ELE-191 SHEET: — toff REV: 1TEST POST —m
SEE DETAIL-A
°
°
°
°
8 °
= GE]
Cu/CuS04 REFERENCE
ELECTRODE ° °
(00mm AWAY FROM THE TANK)
GL T 77 GL
‘ :
* 7 \
3 : :
8] |.
8 3
8 3
2 . ]
oat F 4X10 Sc, mm XLPE/AWA/LSF
“| |e “4 | RE CABLE
300
CABLE FROM TANK
DETAIL -A
TERMINATION DETAILS
TYPICAL TEST POST
4X10 Sc. mm XLPE/AWAVLSF
TANK
“|
NEGATIVE DRAIN CABLE
COATING REPAIR MATERIAL,
CONTINUOUS WELD
TANK COATING REMOVED PRIOR TO
WELDING BEING MADE, COATING
FULLY REISTATED OVER WELDED
PLATE AND CABLE CONNECTION
WELDED PAD CONNECTION
DETAIL -3
NOTES
2. ORIENTATION OF GROUNDING LUG IS TYPICAL.
3. FOR THE DETAILS OF CATHODIC SEE THE STUDY
6. CATHODIC CABLE ROUTES INDICATED ARE DIAGRAMMATIC ONLY. THE FINAL ROUTES
SHALL BE COORDINATED ON SITE.
22—12—2016|SMART TECHNICAL SOLUTIONS] IATROPOULOS VASILEIOS
ISSUED FOR DETAILED ENGINEERING:
REV.[ DATE: DRAWN BY: APPROVED BY: DESCRIPTION:
Deu NOE CONSTRUCTIONS
S05 Thesi Bio Pete
Tel. (+30) 210-5595190
Fax. (+30) 210-5596751
e=mel. info@noe.gr
PROJECT: ISOMERIZATION UNIT - BASHRA REFINERY | PROVECT No:
LOCATION: BASRA, IRAQ
OWNER:
CONTRACTOR: CAD—FILE: (DWG No)
DRAWING TITLE:
CATHODIC PROTECTION SYSTEM
ISCALE:
SIZE: DWG.No: = 100-ELE-191.1
SHEET:
tof REV.: 1je 10 STUD
|—_____— STEEL NuT
WELDED M10 STEEL THREADED
STUD ON THE CENTER
SS SERRATED WASHER
FLAT WASHER, STEEL PLATE 50X50X5mm
(TANK PIECE)
CURVATURE TO MATCH
THE SURFACE DIA, OF TANK
ISOMETRIC VIEW ELEVATION
STEEL PLATE DETAILS
10x16 Sq.mm KYNAR/HMWPE,
NOTES
EPOXY FILLING ANODE TAIL CABLE
MIXED METAL CONNECTOR
OXIDE ANODE \ SEAL EPOXY FILLING
||
a é
ee
fF
"FOLLOWER " HALF ADJUSTMENT SCREW
"SOLDERING " HALF OF CONNECTOR | SLOT MIXED METAL OXIDE ANODE
OF CONNECTOR ( [ /
\ we t] )
S
/ LEAD WIRE
ADJUSTMENT
SCREW SLOT FOR WIRE
ATTACHEMENT
CONNECTOR ASSEMBLY CONNECTOR INSTALLATION
FOR THN GROUNDING CONNECTION SE DETAILS 1-08.
2. ORIENTATION OF GROUNDING LUG IS TYPICAL.
3. FOR THE DETAILS OF CATHODIC SEE THE STUDY
6. CATHODIC CABLE ROUTES INDICATED ARE DIAGRAMMATIC ONLY. THE FINAL ROUTES
SHALL BE COORDINATED ON SITE.
22—12—2016 [SMART TECHNICAL SOLUTIONS IATROPOULOS VASILEIOS [ISSUED FOR DETALED ENGINEERING
REV.: DATE: DRAWN BY: APPROVED BY: DESCRIPTION:
on NOE CONSTRUCTIONS
Oh: Thesi Dio Pefxa
cron: 19300 Aspropirgos, Greece
Tel. (+30) 210-5595190
Fox. (+30) 210-5596751
ecmail, info@noe.gr
PROJECT: ISOMERIZATION UNIT - BASHRA REFINERY | PROJECT No:
LOCATION: BASRA, IRAQ
OWNER:
CONTRACTOR: CAD-FILE: (DWG No)
DRAWING TITLE: CATHODIC PROTECTION SYSTEM
ISCALE: SIZE: DWG.No: 100—ELE—191.2 SHEET: ofl REV.: 1