INSPECTION REPORT

 
To : Mr. BLN

Equipment No : MR-14448 Date of Inspection : 11/12/2018

Description : CPP Boiler-II Inspected By : Mr. KYK, SCK, VAR

We have carried out following inspection activities for MR-14448 (Boiler-II).

 Thickness survey of Bed super heater coils.

Observations & Recommendations

 Bed super heater coil: Leakage observed on RHS bed super heater coils#24, 25 & due to
leakage erosion noticed on adjacent bed super heater coils#22, 23 & 26. Same coils are
recommended for replacement.
Also reduction in thickness observed on coils#02 & 09. These two coils to be planned for
replacement during next suitable opportunity after rechecking for further reduction in
thickness.
Thickness of LHS bed super heater coil was checked & found satisfactory in general.

 Bed Coil: Due to leakages on RHS bed super heater coils, RHS bed coils#66, 67, 68, 69
found eroded. Same coils are recommended for replacement.
LHS bed coils condition found satisfactory in general.

Thanks,

[B. N. Jadhav] Prepared By: K. Y. Kedar

Encl.: Bed Super Heater tubes report (02 Sheets)


Finolex
CENTRAL ENGINEERING SERVICES
THICKNESS SURVEY REPORT Finolex Ind. Ltd

To : Mr. BLN
Equipment Name : Boiler-II (MR-14448) Date of Inspection : 11/12/2018
Specified Thk : OD 44.5 mm & 5.0 mm Thk MOC : SA 213 T91
Corrosion Allowance : Nil (As per IBR) Inspected By : Mr. SCK, VAR

We have carried out thickness survey of bed super heater coils as per requirement.
Details of the survey are given below.

Actual Thickness Actual Thickness


RHS Coil RHS Coil Remarks
Coil No. Point Point2 Point3 Point4 Coil No. Point 1 Point2 Point3 Point4
1 4.7 4.6 4.7 4.9 21 4.7 4.5 4.3 5.2
2 4.4 4.5 3.5 5.1 22 Erosion
3 4.0 4.1 4.4 5.3 23 Erosion
4 4.7 4.8 4.7 4.9 24 Leakage
5 4.5 4.6 4.3 5.4 25 Leakage
6 5.4 5.2 4.9 5.9 26 Erosion Point1
7 4.4 4.3 4.0 5.5 27 4.6 4.7 4.8 5.1
8 5.0 4.7 4.2 5.9 28 5.0 5.2 5.2 6.0
9 4.8 4.1 3.6 5.2 29 4.4 5.0 4.5 5.0 Point2
10 4.6 4.7 4.6 5.3 30 4.1 5.3 5.2 5.8
11 4.1 4.2 4.2 5.0 31 5.0 4.8 4.9 5.8 Point3 Point4
12 5.0 5.1 5.0 6.0 32 5.4 5.4 5.3 6.0
13 4.6 4.7 4.6 5.3 33 5.6 5.7 5.7 6.2
14 4.6 4.6 4.7 5.3 34 4.3 4.6 4.5 4.9
15 4.5 4.7 5.0 5.7 35 5.0 5.1 5.1 5.6
16 4.5 4.6 5.0 5.5 36 --- --- --- ---
17 4.6 4.2 4.2 5.3 37 4.2 4.2 4.1 5.5
18 4.1 4.2 4.4 5.1 38 5.3 5.3 5.4 5.8
19 4.7 4.6 4.7 5.6 39 4.7 4.6 4.8 5.0
20 5.5 5.4 5.3 6.4 40 4.8 4.6 4.6 5.4 VIEW FROM BOILER FRONT
Finolex
CENTRAL ENGINEERING SERVICES
THICKNESS SURVEY REPORT Finolex Ind. Ltd

To : Mr. BLN
Equipment Name : Boiler-II (MR-14448) Date of Inspection : 11/12/2018
Specified Thk : OD 44.5 mm & 5.0 mm Thk MOC : SA 213 T91
Corrosion Allowance : Nil (As per IBR) Inspected By : Mr. SCK, VAR

We have carried out thickness survey of bed super heater coils as per requirement.
Details of the survey are given below.

Actual Thickness Actual Thickness


LHS Coil LHS Coil Remarks
Coil No. Point1 Point2 Point3 Point4 Coil No. Point1 Point2 Point3 Point4
1 5.2 5.3 5.2 6.2 21 4.3 4.1 4.1 5.2
2 4.2 4.2 4.1 5.4 22 4.4 4.2 4.4 5.1
3 4.3 4.7 4.4 5.6 23 4.3 4.2 4.1 5.8
4 4.8 4.3 4.3 5.5 24 5.4 5.3 6.0 5.3
5 5.6 4.9 4.5 6.1 25 4.5 4.6 4.9 5.3
6 5.1 4.3 4.0 5.4 26 5.3 5.3 5.2 5.9
Point1
7 5.0 4.5 4.4 5.3 27 4.8 4.4 4.6 5.0
8 4.4 4.6 4.5 5.2 28 5.2 5.2 5.3 5.9 Point2
9 4.6 4.6 4.3 5.1 29 4.8 4.6 4.6 5.1
10 5.3 5.3 5.4 6.1 30 4.8 5.1 5.6 5.0
11 4.6 4.5 4.3 5.4 31 4.5 4.6 4.7 5.2 Point4 Point3
12 4.7 4.7 4.6 5.1 32 4.8 4.7 4.6 5.3
13 5.7 5.6 5.3 6.1 33 4.5 4.7 4.8 5.0
14 5.5 5.6 5.4 6.0 34 5.0 5.2 5.3 5.8
15 4.7 4.9 4.8 5.4 35 4.9 5.0 5.1 5.8
16 4.6 5.2 4.9 6.2 36 5.2 5.6 5.2 6.1
17 4.6 4.0 4.0 5.6 37 4.2 4.3 4.6 5.3
18 5.3 5.6 5.1 6.7 38 4.6 4.7 4.7 5.8
19 4.5 4.4 4.5 5.6 39 4.2 4.4 4.4 5.3
20 4.3 4.0 4.9 5.2 40 5.1 5.2 5.2 6.0 VIEW FROM BOILER FRONT